Route 79/Davol Street Corridor Study Fall River, MA Working Group Meeting #3 March 5, 2013 Boys and Girls Club of Fall River 803 Bedford Street Agenda Welcome and Introductions Overview of Working Group Meeting #2 Review and Discussion of Remaining Task 2 Materials Future No-Build Conditions Land Use / Economic Development Traffic Multi-modal Summary of Issues and Constraints Initial Discussion of Potential Alternatives Next Steps Study Process Task 1 – Study Area, Goals & Objectives, Evaluation Criteria, & Public Involvement Task 2 – Existing and Future No-Build Conditions and Issues Identification Task 3 – Alternatives Development Task 4 – Alternatives Analysis Task 5 – Recommendations Future No-Build Conditions No-Build Conditions Future No-Build Conditions Travel Demand Model Developed by Central Transportation Planning Staff (CTPS) Horizon Year: 2035 Forecasts Based on Projected Socio-Economic Data: Population Housing Employment Roadway Network Generally Unchanged Includes I-195 / Route 79 Interchange Modifications South Coast Rail is Active Travel Demand Model Based on Socio-Economic Data within Transportation Analysis Zones (TAZ) Population Households Employment Uses Four-Step Process Trip Generation Trip Distribution Mode Choice Trip Assignment Travel Demand Model Transportation Analysis Zones (TAZ) in the Fall River/Somerset Area Source: Central Transportation Planning Staff Travel Demand Model Split TAZ s within the Route 79/Davol Street Corridor Task 2 – Existing and Future No-Build Conditions and Issues Identification Land Use and Economic Development Focus Area Corridor Transportation Analysis Zones (TAZ) within the Project Corridor No Build Scenario 2035 Developments Restaurant on Remington Ave. 125 New Jobs Marina at City Pier 6 New Jobs Regata Club 70 New Jobs South Coast Rail Commonwealth Landing Mill Population – 112 525 New Jobs Focus Area Total Population – 112 726 New Jobs No Build Scenario Change in Population & Jobs – Focus Area Population Households Jobs 2010 2035 Corridor Area Change 3274 1391 697 3747 1652 1423 473 261 726 Corridor Area % Change State Average % Change 14% 19% 104% 8% 13% 8% No Build Scenario Change in Population & Jobs – City of Fall River Population Households Jobs 2010 2035 City of Fall River Change 85857 38457 34006 103495 46361 38809 17638 7904 4803 City of Fall River % Change State Average % Change 21% 21% 14% 8% 13% 8% Task 2 – Existing and Future No-Build Conditions and Issues Identification Traffic Braga Bridge Wilbur Ave 2012 Existing Regional Average Daily Traffic Veterans Memorial Bridge Taunton River Highland Avenue President Avenue Eastern Avenue Watuppa Pond Braga Bridge Wilbur Ave 2035 No-Build Regional Average Daily Traffic Veterans Memorial Bridge Taunton River Highland Avenue President Avenue Eastern Avenue Watuppa Pond Braga Bridge Wilbur Ave 2035 No-Build Regional Change in Average Daily Traffic Veterans Memorial Bridge Taunton River Highland Avenue President Avenue Eastern Avenue Watuppa Pond 2012 Existing Regional Peak Hour Traffic Volumes 214 (177) XX – AM Peak Hour (XX) – PM Peak Hour 192 (444) 730 (1,048) Braga Bridge Wilbur Ave Legend Veterans Memorial Bridge Taunton River Highland Avenue President Avenue Eastern Avenue Watuppa Pond 2035 No-Build Regional Peak Hour Traffic Volumes 374 (272) XX – AM Peak Hour (XX) – PM Peak Hour 286 (371) 764 (1,084) Braga Bridge Wilbur Ave Legend Veterans Memorial Bridge Taunton River Highland Avenue President Avenue Eastern Avenue Watuppa Pond 2035 No-Build Regional Peak Hour Annual Traffic Growth Legend 2.5% (1.9%) 1.7% (-0.8%) 0.2% (0.1%) Braga Bridge Wilbur Ave XX – AM Peak Hour Change (XX) – PM Peak Hour Change Veterans Memorial Bridge Taunton River Highland Avenue President Avenue Eastern Avenue Watuppa Pond 2012 Existing Corridor Level Peak Hour Traffic Volumes Taunton River Legend XX – AM Peak Hour (XX) – PM Peak Hour Veterans Memorial Bridge Davol St West 83 (65) 175 (124) 1,209 (1,174) 500 (813) 2035 No-Build Corridor Level Peak Hour Traffic Volumes Legend Taunton River XX – AM Peak Hour (XX) – PM Peak Hour Veterans Memorial Bridge Davol St West 92 (100) 288 (110) 1,288 (1,259) 980 (1,018) 2035 No-Build Corridor Level AM Peak Hour Travel Pattern Changes Taunton River Veterans Memorial Bridge Davol St West +113 2035 No-Build Corridor Level PM Peak Hour Travel Pattern Changes Taunton River Veterans Memorial Bridge Davol St West +35 Level of Service Criteria Level of Service Signalized Intersections Ramp Merge/Diverge Delay (sec/veh) Density (pc/mi/ln) A ≤ 10 ≤ 10 B >10-20 >10-20 C >20-35 >20-28 D >35-55 >28-35 E >55-80 >35 F >80 Demand exceeds capacity 2012 Existing Traffic Operation – Regional Level Legend Braga Bridge Wilbur Ave AM PM Veterans Memorial Bridge Taunton River President Avenue Eastern Avenue Watuppa Pond 2035 No-Build Traffic Operation – Regional Level Legend Braga Bridge Wilbur Ave AM PM Veterans Memorial Bridge Taunton River President Avenue Eastern Avenue Watuppa Pond 2012 Existing Traffic Operation – Corridor Level Legend AM PM 2035 No-Build Traffic Operation – Corridor Level Legend AM PM Task 2 – Existing and Future No-Build Conditions and Issues Identification Multi-Modal Existing Bus Transit Routes Future Transit – South Coast Rail SouthCoast Rail – Fall River Depot Local Bus Connections Proposed South Coast Bikeway Study Area Includes Proposed Regional Bikeway Link Quequechan River Bike Trail and Regional Connections Wilbur Avenue Braga Bridge Existing Path Planned Path Future Connector Future connector Veterans Memorial Bridge N. Main Street Planned Path President Avenue Existing Bike Path Watuppa Pond Taunton River Task 2 – Existing and Future No-Build Conditions and Issues Identification Summary of Issues and Constraints Issues & Constraints -Transportation High crash rates on President Avenue and Davol Street A number of crashes involving pedestrians Issues & Constraints -Transportation Lack of continuity in pedestrian paths of travel Lack of designated provisions for bicycles Limited connectivity between areas east and west of Rte. 79 Issues & Constraints -Transportation Operational deficiency along Route 6 Issues & Constraints - Economic Development & Land Use Economic: Low income/high unemployment/poverty 2.5 2 1.5 Fall River Mass Avg. 1 0.5 0 High School College Household Income Income Poverty Unemployment Issues & Constraints - Economic Development & Land Use Economic: Low Real Estate prices indicate weak demand Issues & Constraints - Economic Development & Land Use Land Use: Underutilized sites on the west side of Davol Street Shallow sites on east side of Davol St. Rail barrier on east side of study area from Central to Pearce Street Issues & Constraints – Cultural Resources Natural Resources: Taunton River Wild & Scenic River designation Coastal Zone, Tidelands Wetlands, Floodplain Social and Economic: Water Quality, Hazardous Materials Recreation – Parks, Open Space Businesses & Homes Noise Cultural Resources: Historic Properties Opportunities Excess capacity on Route 79 allows some flexibility in development of alternatives Reconfiguration of Route 79/Davol Street Corridor will facilitate safety and circulation improvements for all modes South Coast Rail – Transit Oriented Development potential Good supply of redevelopment sites along the river Riverfront becoming a regional draw Introducing Task 3 – Alternatives Development Initial Discussion of Potential Alternatives Introducing Task 3 – Alternatives Development Alternative B (2008 Route 79 Corridor Study) Introducing Task 3 – Alternatives Development Alternative E (2008 Route 79 Corridor Study) Next Steps and Study Schedule Public Information Meeting: March 21 Initiate Task 3: Alternatives Development Aug Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Define Study Area Goals and Objectives Data Collection, Future Year Conditions, Issues Definition, Constraints Identification Alternatives Development Alternatives Analysis Draft and Final Recommendations Final Report Sep W 2012 Oct Nov Dec Jan Feb W Mar Apr May Aug Sep W P Oct Nov W (W) W P W W = Working Group Me P = Public Informational Meeting (W) = Working Group Meeting if Necessary 2013 Jun Jul W Dec Questions Questions or Comments?