WELLESLEY ‐CEDAR STREETOVER ROUTE 9 MASSDOT DESIGN BUILD CONTRACT NO. 65281 PROJECT TEAM OWNER ‐ MASSACHUSETTS DEPARTMENT OF TRANSPORTATION – HIGHWAY DIVISION J. F. WHITE CONTRACTING COMPANY ‐ established in 1924 as a heavy civil contractor concentrated in public works and has expanded to provide general contracting services, services construction management, Design‐Build, and specialty services. The firm has an annual volume of approximately $200 million/year and currently employs over 500 people on its 50 active projects. J.F. White’s current backlog is $425 million, $100 million for MassDOT. ROLE FIRM PRIME DESIGN‐BUILD CONTRACTOR J.F. WHITE CONTRACTING COMPANY DESIGN MANAGER /BRIDGE ENGINEERING (LEAD) GILL ENGINEERING ASSOCIATES, INC. BRIDGE CONSTRUCTION ENGINEERING FINLEY ENGINEERING GROUP, INC. HIGHWAY AND TRAFFIC ENGINEERING, TRAFFIC MANAGEMENT, ENVIRONMENTAL PERMITTING TETRA TECH RIZZO GEOTECHNICAL LAMSON ENGINEERING CORPORATION BRIDGE ENGINEERING GREEN INTERNATIONAL AFFILIATES, INC. MASSDOT DESIGN BUILD CONTRACT NO. 65281 EXISTING BRIDGE Elevation – Looking West Elevation – Looking East MASSDOT DESIGN BUILD CONTRACT NO. 65281 EXISTING BRIDGE BUILT IN 1932 – 78 YEARS OLD MASSDOT DESIGN BUILD CONTRACT NO. 65281 PROPOSED BRIDGE Project Goals • Maintain the Existing Highway Alignment • Maintain the Existing Roadway Width; 3 Lanes, One North Thru, One South Thru and One South Turn to go East on Route 9 • Maintain the Existing Sidewalks on Both Sides • ADA Compliance with Wheelchair Ramps at Intersection • Complete New Superstructure – Steel Beams and Concrete Deck • Weathering Steel – Low Maintenance • Steell Laminated Neoprene Bearings • High Performance Concrete Deck • New Type II Screen to Protect Traffic on Route 9 • Modifications to Existing Substructure to Accommodate New Superstructure • Improve the Vertical Clearance Under Bridge • Existing i i 13’‐9” 3’ 9” • Proposed 15’‐0” MASSDOT DESIGN BUILD CONTRACT NO. 65281 PROPOSED BRIDGE PROJECT GOALS ‐ ACCELERATED BRIDGE CONSTRUCTION • Contract between Desiggn‐Build Team and MassDOT req quires the comp plete replacement of the superstructure over the weekend of July 4, 2011 • To facilitate this the team is permitted to close Cedar Street and Route 9 for a period i d off 72 H Hours St Starting ti att 10 10:00pm 00 JJuly l 1 1, 2011 through th h 10:00pm 10 00 July J l 4, 4 2011 • Route 9 will be detoured through the site, Westbound on the on and off ramps and across Cedar Street and Eastbound using the Worcester Street Ramps Ramps • Cedar Street will be detoured on alternative routes • Other work to accommodate the construction will occur in the weeks immediatelyy preceding and after the move • The majority of the work before the move will occur off of the traveled roadway d i daylight during d li ht h hours iin the th area adjacent dj t to t the th bridge b id on the th northeast th t quadrant d t MASSDOT DESIGN BUILD CONTRACT NO. 65281 PROPOSED BRIDGE PROPOSED LOCATION OF SUPERSTRUCTURE CONSTRUCTION PRIOR TO 7/1/11 MASSDOT DESIGN BUILD CONTRACT NO. 65281 PROPOSED BRIDGE MASSDOT DESIGN BUILD CONTRACT NO. 65281 PROPOSED BRIDGE MASSDOT DESIGN BUILD CONTRACT NO. 65281 TRAFFIC & HIGHWAY OBJECTIVES • PROVIDE A SAFE WORK ZONE FOR THE WORKERS AND MOTORISTS • PROVIDE ADVANCED NOTIFICATION FOR MOTORISTS • EARLY JUNE‐ MESSAGE BOARDS • MINIMIZE ROADWAY WORK CONDUCTED DURING 72‐HOUR CEDAR STREET CLOSURE • CONSTRUCT ACCESSIBLE PEDESTRIAN ROUTE • PROVIDE CEDAR STREET SHUTTLE BUS • REDUCE ROUTE 9 TRAFFIC DELAYS WITH 2‐LANE DETOUR OPTION MASSDOT DESIGN BUILD CONTRACT NO. 65281 Temporary Pedestrian Route • ADA ACCESSIBLE ROUTE • WHEELCHAIR RAMPS • TRAFFIC CONTROLS MASSDOT DESIGN BUILD CONTRACT NO. 65281 Shuttle Route MASSDOT DESIGN BUILD CONTRACT NO. 65281 Route 9 Westbound Detour • ROUTE 9 LANE DROP • ADVANCED WARNING DEVICES • 1‐LANE BYPASS • POLICE OFFICER CONTROL • OPTION FOR 2‐LANE BYPASS MASSDOT DESIGN BUILD CONTRACT NO. 65281 Route 9 Eastbound Detour MASSDOT DESIGN BUILD CONTRACT NO. 65281 Traffic Control Signal • ALL NEW EQUIPMENT • FULLY ACTUATED SIGNAL • New Controller & Cabinet • Video Detection • EXCLUSIVE PEDESTRIAN PHASE MASSDOT DESIGN BUILD CONTRACT NO. 65281 Intersection Reconstruction • SIDEWALKS & RAMPS • DRIVEWAYS • PROFILE CHANGE • Match new bridge elevation MASSDOT DESIGN BUILD CONTRACT NO. 65281 BRIDGE DESIGN OBJECTIVES MASSDOT DESIGN BUILD CONTRACT NO. 65281 BRIDGE DESIGN OBJECTIVES MASSDOT DESIGN BUILD CONTRACT NO. 65281 BRIDGE DESIGN OBJECTIVES MASSDOT DESIGN BUILD CONTRACT NO. 65281 SELF PROPELLED MOBILE TRANSPORTER The Sarens Group – subcontractor to J.F. White to move the bridge into place over the July 4th, 2011 weekend. SPMT s since the early 1980 1980’ss • Moving bridges using SPMT’s • Average 70 bridge moves per year all over the world • Have 1,200 axle lines available – this project requires 24 lines • All are 100% computer controlled, ll d ffrom a single i l point i off operation i MASSDOT DESIGN BUILD CONTRACT NO. 65281 SELF PROPELLED MOBILE TRANSPORTER MASSDOT DESIGN BUILD CONTRACT NO. 65281 SELF PROPELLED MOBILE TRANSPORTER MASSDOT DESIGN BUILD CONTRACT NO. 65281 72‐Hour Schedule MASSDOT DESIGN BUILD CONTRACT NO. 65281 CRITICAL TASK IMPORTANT TO PREP EXISTING FOR NEW CAPS PRODUCTION TIME IS CRITICAL SAWCUTTING OUT EXISTING ABUTMENT AND PIER CAPS CRITICAL TASK DOWELING AND GROUTING OF CAPS ONTO EXISTING SUBSTRUCTURE GROUT APPLICATION AND CURE TIME IS CRITICAL IMPORTANT TO PREP EXISTING FOR NEW CAPS CRITICAL TASK SETTING SUPERSTRUCTURE IN PLACE TOLERANCES AND ADJUSTABILITY IS IMPORTANT SPMT’S ARE THE KEY CRITICAL TASK WATERPROOFING APPLICATION ENVIRONMENTAL CONDITIONS WILL AFFECT APPLICATION MUST PROVIDE ANTICIPATED LONG TERM PERFORMANCE CLOSING Questions • Federal Officials • State or Local Officials • Citizens MASSDOT DESIGN BUILD CONTRACT NO. 65281