75% Design – Public Information Meeting Memorial Avenue Rotary Bridge Superstructure Replacement Project Bridge No. W-21-025(15C) & W-21-025(15D) State Route 147 EB & WB (Memorial Ave) over US Route 5 (Riverdale Street) West Springfield, Massachusetts Project #605353 1 December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot MassDOT – Project Owner • TetraTech – 25% Design and Owner’s Representative SPS New England, Inc. – Design Builder • VHB, Inc. – Lead Designer • • • • 2 RVA - Public Outreach Prime AE, Inc. - Survey Copley Wolff - Landscape Architecture LGCI, Inc. - Geotechnical Engineer December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot Speakers • Alex Murray – MassDOT (Project Manager) • Erich Brown – SPS New England, Inc. (Project Manager) • Bob Penfield, PE – VHB, Inc. (Design Manager) 3 December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot What drove this project? • MassDOT’s Accelerated Bridge Program • Since 2008, ABP has rehabilitated or replaced over 100 bridges throughout the Commonwealth • Both rotary bridges are generally in “fair” condition, Westbound superstructure is in “Serious” condition = Structurally Deficient* *Still safe to drive on 4 December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot Bridge Terminology Superstructure Substructure 5 December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot Design Goals? • Replace bridge superstructures • Improve functionality and safety for all modes of transportation • Improve aesthetics Construction Goals? • Minimize disruption to abutters • Minimize traffic impacts during construction • Avoid impacts to critical utilities 6 December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot Preliminary Design (0-25%) 7 December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot Prefabricated Bridge Units (PBUs) Similar Projects: • Fast 14 Project – Medford, MA • I-195 over River Rd. – Fairhaven, MA • Revere Beach Parkway over MBTA – Revere, MA 8 December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot What is Design – Build? Note: Traditional construction would require multiple years of traffic impacts. 9 December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot Recent Project Timeline: • • • • • • • • October 17, 2013: February 6, 2014: March 12, 2014: May 18, 2014: May 2014 – Dec. 2014: December 2, 2014: Dec. 2014 – Feb. 2015: March 2015 – Sept. 2015: 10 25% Design Public Hearing Design/Build Team Proposals Submitted Public Bid Opening Notice to Proceed Issued to DB Team 25% - 75% Design 75% Design Public Meeting 75% to 100% Design Construction December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot Connecticut River Route 5 Formalized Travel Lanes and 5ft Outside Shoulders Crosswalks Proposed Striping ADA Accessibility Improvements • ADA compliant ramps at all crossing locations • Rapid Flash Pedestrian Beacons • Wider Sidewalks (w/ BR-2 railing on bridges) 8-9FT SIDEWALKS BR-2 RAILING Protected Sidewalks along Bridge (BR-2 Railing) 12 Rapid Flash Ped. Beacons December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot Aesthetic Improvements Ornamental Railings Rotary Landscaping 13 December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot Ornamental Lighting (LED) Construction Staging 14 December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot Stage 1 Stage 1: Pre-Shutdown Work March 2015 – May 2015 Stage 2: EB Bridge Shutdown 5/29/2015 – 6/2/2015 Stage 1 Stage 3: Between Demos 6/3/2015 – 6/18/2015 Stage 4: WB Bridge Shutdown 6/19/2015 – 6/23/2015 Stage 5: EB and WB Fascia Work June 2015 – August 2015 Animation 20 December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot Traffic Management During Shutdowns 21 December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot Signed Detours Police Details Upcoming Project Schedule: • December 2, 2014: • Dec. 2014 – Feb. 2015: • March – May 2015 : • Weekend Shutdowns: (Friday 10pm – Tues. 1am) • June 2015 – Aug. 2015: • Sept. 18, 2015: 24 75% Design Public Meeting Finalize Design, Fabricate PBUs Abutment and Wall Repairs, Partial Bridge Demo (EB Fascia), Temporary Utility Supports Installed Remove Existing Superstructure, Install PBUs, Install Temporary Barrier, Reopen Roadways Finish Bridge Decks, Sidewalks, Barriers, Final Pavement, and Pavement Striping Start of the Big E! December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot Additional Project Considerations: 25 Springfield Viaduct: - Bid Opening in February 2015 - April 2015 Award - No lane restrictions or significant construction until after the rotary weekend shutdowns MGM Casino: - Progressing as a result of this November’s vote - DEIR is out for public comment - Striped bike lanes on Memorial Bridge July 4th Fireworks: - Pedestrian and Cyclist access for this event! Big E (Sept. 18): - Construction to be completed prior to start of next year’s Big E! December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot Questions? 26 December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot More Information: • Project Website: www.mass.gov/massdot/MemorialAvenueRotaryReplacement • Project Blog: http://blog.mass.gov/transportation/massdot-highway Click on “West Springfield Memorial Ave Rotary” • Alex Murray (MassDOT PM) Phone: (857) 368-8811 Email: alex.murray@state.ma.us 27 December 2, 2014 | Leading the Nation in Transportation Excellence | www.mass.gov/massdot