Massachusetts Department of Transportation <MassDOT Project Info Number> <Short Project Description ‐ City Names BL PDS Schedule Grouped by Area of Work WBS CNT CNT.MS CNT.MS.010 CNT.MS.020 CNT.MS.030 CNT.MS.040 CNT.MS.050 CNT.MS.060 CNT.MS.070 CNT.100 CNT.100.010 CNT.100.020 HWY HWY.200 HWY.200.010 HWY.200.020 HWY.200.030 HWY.200.040 HWY.220 HWY.220.010 HWY.220.020 HWY.220.030 HWY.220.040 HWY.303 HWY.303.010 HWY.303.020 HWY.300 HWY.300.010 HWY.300.030 HWY.300.040 HWY.300.011 HWY.300.031 HWY.300.041 HWY.300.020 HWY.300.050 HWY.300.060 HWY.300.070 HWY.300.080 HWY.300.090 HWY.350 HWY.350.010 HWY.350.020 HWY.350.030 HWY.400 HWY.400.010 HWY.400.020 HWY.400.030 HWY.400.040 HWY.400.050 HWY.400.011 HWY.400.041 HWY.400.051 HWY.400.060 HWY.400.070 HWY.400.080 HWY.400.090 HWY.450 HWY.450.010 Task ID Task Name Start 1 Contract/Project Management 2 Project Milestones 3 Issue Design Contract NTP 4 PM Submits Documents for Advertising 5 Prepare for Advertise 6 Advertise Construction Contract 7 Bid Opening 8 Issue Construction Contract NTP 9 Scope of Service Complete 10 Project Development 11 Finalize Project Plan and Design Schedule 12 Project Design Schedule Updates 13 Highway Design 14 Functional Design Report 15 Prepare Functional Design Report 16 Submit Functional Design Report 17 Review Functional Design Report 18 Approval of Functional Design Report 19 Design Exception Report 20 Prepare Design Exception Report 21 Submit Design Exception Report 22 Review Design Exception Report 23 Approval of Design Exception Report 24 Conduct Survey 25 Conduct Survey (MassDOT) 26 Conduct Survey 27 25% Highway Design Submission 28 Prepare 25% Highway Design Submission 29 Submit 25% Design Submission 30 Review 25% Highway Design Submission 31 Prepare 25% Highway Design Submission Rev1 32 Submit 25% Highway Design Submission Rev1 33 Review 25% Highway Design Submission Rev1 34 Prepare 25% Contract Time Determination 35 All Sections 25% Highway Design Comments sent to DE 36 Utility Early Coordination Field Meeting 37 Prepare 25% Design Responses 38 Comment Resolution Meeting @25% (Full Team) 39 Design Schedule Update Meeting @25% (Full Team) 40 Design Public Hearing 41 Schedule Design Public Hearing 42 Conduct Public Hearing 43 Respond to Comments (Public Hearing) 44 75% Highway Design Submission 45 Prepare 75% Highway Design Submission 46 Prepare 75% Construction Contract Time Determination 47 Prepare 75% Bottom Up Estimate & Estimate Reconciliation 48 Submit 75% Design Submission 49 Review 75% Highway Design Submission 50 Prepare 75% Highway Design Submission Rev1 51 Submit 75% Highway Design Submission Rev1 52 Review 75% Highway Design Submission Rev1 53 All Sections 75% Highway Design Comments sent to DE 54 Prepare 75% Design Responses 55 Comment Resolution Meeting @75% (Full Team) 56 Design Schedule Update Meeting @75% (Full Team) 57 100% Highway Design Submission 58 Prepare 100% Highway Design Submission Milestone MassDOT PM: <MassDOT Project Manager Name> Typical Bridge, State ROW Status Date: Tue 1/14/14 / Report Run Date: Mon 9/29/14 Summary Finish Tue 1/14/14 Tue 1/14/14 Tue 1/14/14 Tue 2/23/16 Wed 2/24/16 Sat 2/27/16 Wed 4/27/16 Sun 6/26/16 Mon 6/26/17 Tue 1/14/14 Tue 1/14/14 Thu 2/13/14 Tue 1/14/14 Thu 3/27/14 Thu 3/27/14 Mon 8/11/14 Tue 8/12/14 Wed 9/10/14 Thu 3/27/14 Thu 3/27/14 Mon 8/11/14 Tue 8/12/14 Wed 9/10/14 Tue 1/14/14 Tue 1/14/14 Tue 1/14/14 Thu 3/27/14 Thu 3/27/14 Mon 8/11/14 Tue 8/12/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Sun 7/13/14 Wed 9/10/14 Wed 9/10/14 Thu 9/11/14 Sat 9/20/14 Thu 9/11/14 Sun 10/26/14 Sun 10/26/14 Sat 12/6/14 Sun 12/7/14 Sun 12/7/14 Sun 12/7/14 Tue 1/6/15 Tue 1/6/15 Wed 2/4/15 Thu 2/5/15 Fri 3/6/15 Fri 3/6/15 Fri 3/6/15 Fri 3/6/15 Sat 3/7/15 Mon 3/16/15 Sat 3/7/15 Sat 3/7/15 Sat 3/7/15 Mon 6/26/17 Mon 6/26/17 Tue 1/14/14 Tue 2/23/16 Thu 2/25/16 Sat 2/27/16 Wed 4/27/16 Sun 6/26/16 Mon 6/26/17 Sat 2/7/15 Wed 2/12/14 Sat 2/7/15 Tue 8/4/15 Wed 9/10/14 Sun 5/25/14 Mon 8/11/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Sun 5/25/14 Mon 8/11/14 Wed 9/10/14 Wed 9/10/14 Wed 3/26/14 Wed 3/26/14 Wed 3/26/14 Sat 9/20/14 Sun 5/25/14 Mon 8/11/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Sat 9/20/14 Sat 9/20/14 Thu 9/11/14 Mon 1/5/15 Sat 12/6/14 Sat 12/6/14 Mon 1/5/15 Mon 3/16/15 Wed 2/4/15 Fri 3/6/15 Fri 3/6/15 Wed 2/4/15 Fri 3/6/15 Fri 3/6/15 Fri 3/6/15 Fri 3/6/15 Fri 3/6/15 Mon 3/16/15 Mon 3/16/15 Sat 3/7/15 Sun 6/14/15 Tue 5/5/15 Duration 1260d 1260d 0d 1d 2d 1d 0d 0d 0d 390d 30d 360d 568d 168d 60d 0d 30d 0d 168d 60d 0d 30d 0d 72d 72d 72d 178d 60d 0d 30d 0d 0d 0d 60d 0d 0d 10d 0d 1d 72d 42d 0d 30d 100d 60d 60d 60d 0d 30d 0d 0d 0d 0d 10d 0d 1d 100d 60d Responsibility MassDOT.PM MassDOT.PM MassDOT.PM MassDOT.PM MassDOT.PM MassDOT.PM MassDOT.PM Consultants.DES Consultants.DES Consultants.DES Consultants.DES MassDOT.HW MassDOT.HW Consultants.DES Consultants.DES MassDOT.HW MassDOT.HW MassDOT.HW Consultants.DES Consultants.DES Consultants.DES MassDOT.HW Consultants.DES Consultants.DES MassDOT.HW Consultants.DES MassDOT.PM MassDOT.PM Consultants.DES MassDOT.PM MassDOT.PM MassDOT.PM MassDOT.PM MassDOT.PM Consultants.DES Consultants.DES Consultants.DES Consultants.DES MassDOT.HW Consultants.DES Consultants.DES MassDOT.HW MassDOT.HW Consultants.DES MassDOT.PM MassDOT.PM Consultants.DES Total Slack uarter Oct 0d 0d 1d 0d 1d 0d 0d 0d 0d 870d 870d 870d 4d 46d 79d 46d 46d 46d 46d 79d 46d 46d 46d 4d 4d 4d 79d 79d 1d 46d 46d 46d 46d 46d 46d 289d 339d 339d 348d 1d 1d 1d 1d 202d 202d 202d 202d 202d 202d 202d 202d 202d 202d 252d 252d 261d 202d 202d 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Quarter 1st Qu Jul Oct Jan Contract/Project Managemen Project Milestones Issue Design Contract NTP PM Submits Documents for Advertising Advertise Construction Contract Bid Opening Issue Construction Contract NTP Scope of Service Complete Project Development Highway Design Functional Design Report Submit Functional Design Report Approval of Functional Design Report Design Exception Report Submit Design Exception Report Approval of Design Exception Report Conduct Survey 25% Highway Design Submission Submit 25% Design Submission Submit 25% Highway Design Submission Rev1 All Sections 25% Highway Design Comments sent to DE Utility Early Coordination Field Meeting Comment Resolution Meeting @25% (Full Team) Design Public Hearing Conduct Public Hearing 75% Highway Design Submission Submit 75% Design Submission Submit 75% Highway Design Submission Rev1 All Sections 75% Highway Design Comments sent to DE Comment Resolution Meeting @75% (Full Team) 100% Highway Design Submission Critical Path Page 1 of 4 Design Engineer: <Design Consultant's Name> Contract #: <Contract #> / Assignement #: <Assign Massachusetts Department of Transportation <MassDOT Project Info Number> <Short Project Description ‐ City Names BL PDS Schedule Grouped by Area of Work WBS HWY.450.040 HWY.450.050 HWY.450.011 HWY.450.041 HWY.450.051 HWY.450.060 HWY.450.020 HWY.450.030 HWY.450.070 HWY.450.080 HWY.450.090 HWY.800 HWY.800.010 HWY.800.020 HWY.800.030 HWY.800.040 HWY.800.050 HWY.800.060 HWY.800.070 BRD BRD.705 BRD.705.010 BRD.705.020 BRD.705.030 BRD.705.040 BRD.706 BRD.706.010 BRD.706.020 BRD.706.030 BRD.706.040 BRD.708 BRD.708.010 BRD.708.020 BRD.708.030 BRD.708.040 BRD.708.050 BRD.600 BRD.600.010 BRD.600.020 BRD.600.030 BRD.600.040 BRD.600.050 BRD.600.060 BRD.710 BRD.710.010 BRD.710.020 BRD.710.030 BRD.710.011 BRD.710.021 BRD.710.031 BRD.710.040 BRD.710.050 BRD.755 BRD.755.010 BRD.755.020 BRD.755.030 BRD.755.011 BRD.755.021 Task ID Task Name Start 59 Submit 100% Design Submission 60 Review 100% Highway Design Submission 61 Prepare 100% Highway Design Submission Rev1 62 Submit 100% Design Submission Rev1 63 Review 100% Highway Design Submission Rev1 64 Prepare 100% Design Responses 65 Finalize Construction Contract Time Determination 66 Bottom Up Estimate & Estimate Reconciliation (if required) 67 Comment Resolution Meeting @100% (Full Team) 68 Design Schedule Update Meeting @100% (Full Team) 69 Approval of 100% Highway Design Submission 70 PS&E Submittal 71 Prepare PS&E Submission 72 Submit PS&E Submission 73 Review PS&E Submission 74 Peer Review of PS&E Submission 75 Approval of PS&E Submission 76 Submit Mylars 77 Highway Design Scope Complete 78 Bridge Design 79 Preliminary Structures Report 80 Prepare Preliminary Structures Report 81 Submit Preliminary Structures Report 82 Review Preliminary Structures Report 83 Approval of Preliminary Structures Report 84 Bridge Type Selection Worksheet 85 Prepare Type Selection Worksheet 86 Submit Type Selection Study 87 Review Type Selection Study 88 Approval of Type Selection Worksheet 89 Hydraulics Study and Report 90 Prepare Hydraulic Report (MassDOT) 91 Prepare Hydraulic Report 92 Submit Hydraulic Report 93 Review Hydraulic Report 94 Approval of Hydraulic Report 95 Geotechnical Design 96 Prepare Boring Layout Plan 97 Perform Borings 98 Prepare Geotechnical Report 99 Submit Geotechnical Report 100 Review Geotechnical Report 101 Approval of Geotech Report 102 Bridge Sketch Plan Submittal 103 Prepare Bridge Sketch Plans 104 Submit Bridge Sketch Plans 105 Review Bridge Sketch Plans 106 Prepare Bridge Sketch Plans Rev1 107 Submit Bridge Sketch Plans Rev1 108 Review Bridge Sketch Plans Rev1 109 Submit Sketch Plan Mylars 110 Approval of Bridge Sketch Plans 111 Bridge Submission-1st Structural 112 Prepare Bridge Submission-1st Structural Plans 113 Submit Bridge Submission-1st Structural Plans 114 Review Bridge Submission-1st Structural Plans 115 Prepare Bridge Submission-1st Structural Plans Rev1 116 Submit Bridge Submission-1st Structural Plans Rev1 Milestone MassDOT PM: <MassDOT Project Manager Name> Typical Bridge, State ROW Status Date: Tue 1/14/14 / Report Run Date: Mon 9/29/14 Summary Finish Tue 5/5/15 Wed 5/6/15 Thu 6/4/15 Thu 6/4/15 Thu 6/4/15 Fri 6/5/15 Mon 4/6/15 Mon 4/6/15 Sun 6/14/15 Fri 6/5/15 Sun 6/14/15 Mon 6/15/15 Mon 6/15/15 Tue 7/14/15 Wed 7/15/15 Wed 7/22/15 Tue 8/4/15 Tue 8/4/15 Tue 8/4/15 Tue 1/14/14 Tue 1/14/14 Tue 1/14/14 Thu 2/27/14 Fri 2/28/14 Sat 3/29/14 Sun 3/30/14 Sun 3/30/14 Tue 5/13/14 Wed 5/14/14 Thu 6/12/14 Thu 3/27/14 Thu 3/27/14 Thu 3/27/14 Sat 5/10/14 Sun 5/11/14 Mon 6/9/14 Thu 3/27/14 Thu 3/27/14 Sat 4/26/14 Mon 5/26/14 Wed 6/4/14 Thu 6/5/14 Fri 7/4/14 Fri 6/13/14 Fri 6/13/14 Mon 8/11/14 Tue 8/12/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Sun 12/7/14 Sun 12/7/14 Wed 2/4/15 Thu 2/5/15 Fri 3/6/15 Fri 3/6/15 Tue 5/5/15 Thu 6/4/15 Thu 6/4/15 Thu 6/4/15 Thu 6/4/15 Sun 6/14/15 Thu 6/4/15 Thu 6/4/15 Sun 6/14/15 Fri 6/5/15 Sun 6/14/15 Tue 8/4/15 Tue 7/14/15 Tue 7/14/15 Tue 7/21/15 Tue 8/4/15 Tue 8/4/15 Tue 8/4/15 Tue 8/4/15 Thu 6/4/15 Sat 3/29/14 Thu 2/27/14 Thu 2/27/14 Sat 3/29/14 Sat 3/29/14 Thu 6/12/14 Tue 5/13/14 Tue 5/13/14 Thu 6/12/14 Thu 6/12/14 Mon 6/9/14 Sun 5/25/14 Sat 5/10/14 Sat 5/10/14 Mon 6/9/14 Mon 6/9/14 Fri 7/4/14 Fri 4/25/14 Sun 5/25/14 Wed 6/4/14 Wed 6/4/14 Fri 7/4/14 Fri 7/4/14 Wed 9/10/14 Mon 8/11/14 Mon 8/11/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Fri 3/6/15 Wed 2/4/15 Wed 2/4/15 Fri 3/6/15 Fri 3/6/15 Fri 3/6/15 Duration 0d 30d 0d 0d 0d 10d 60d 60d 0d 1d 0d 51d 30d 0d 7d 14d 0d 0d 0d 507d 75d 45d 0d 30d 0d 75d 45d 0d 30d 0d 75d 60d 45d 0d 30d 0d 100d 30d 30d 10d 0d 30d 0d 90d 60d 0d 30d 0d 0d 0d 0d 0d 90d 60d 0d 30d 0d 0d Responsibility Consultants.DES MassDOT.HW Consultants.DES Consultants.DES MassDOT.HW Consultants.DES Consultants.DES Consultants.DES MassDOT.PM MassDOT.PM MassDOT.HW Consultants.DES Consultants.DES MassDOT.PM Consultants.Other MassDOT.HW Consultants.DES MassDOT.PM Consultants.DES Consultants.DES MassDOT.BRD MassDOT.BRD Consultants.DES Consultants.DES MassDOT.BRD MassDOT.BRD MassDOT.BRD Consultants.DES Consultants.DES MassDOT.BRD MassDOT.BRD Consultants.DES Consultants.DES Consultants.DES Consultants.DES MassDOT.GEO MassDOT.BRD Consultants.DES Consultants.DES MassDOT.BRD Consultants.DES Consultants.DES MassDOT.BRD Consultants.DES MassDOT.BRD Consultants.DES Consultants.DES MassDOT.BRD Consultants.DES Consultants.DES Total Slack uarter Oct 202d 202d 202d 202d 202d 202d 212d 212d 202d 211d 202d 202d 202d 202d 202d 202d 202d 267d 692d 1d 1d 1d 1d 1d 1d 1d 1d 1d 1d 1d 4d 19d 4d 4d 4d 4d 9d 9d 9d 9d 9d 114d 114d 1d 1d 46d 46d 46d 46d 46d 46d 46d 202d 202d 202d 202d 202d 202d 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter 3rd Quarter 1st Quarter Jan Apr Jul Oct Jan Apr Submit 100% Design Submission 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Qu Jan Submit 100% Design Submission Rev1 Comment Resolution Meeting @100% (Full Team) Approval of 100% Highway Design Submission PS&E Submittal Submit PS&E Submission Approval of PS&E Submission Submit Mylars Highway Design Scope Complete Bridge Design Preliminary Structures Report Submit Preliminary Structures Report Approval of Preliminary Structures Report Bridge Type Selection Worksheet Submit Type Selection Study Approval of Type Selection Worksheet Hydraulics Study and Report Submit Hydraulic Report Approval of Hydraulic Report Geotechnical Design Submit Geotechnical Report Approval of Geotech Report Bridge Sketch Plan Submittal Submit Bridge Sketch Plans Submit Bridge Sketch Plans Rev1 Submit Sketch Plan Mylars Approval of Bridge Sketch Plans Bridge Submission-1st Structural Submit Bridge Submission-1st Structural Plans Submit Bridge Submission-1st Structural Plans Rev1 Critical Path Page 2 of 4 Design Engineer: <Design Consultant's Name> Contract #: <Contract #> / Assignement #: <Assign Massachusetts Department of Transportation <MassDOT Project Info Number> <Short Project Description ‐ City Names BL PDS Schedule Grouped by Area of Work WBS BRD.755.031 BRD.755.040 BRD.758 BRD.758.010 BRD.758.020 BRD.758.030 BRD.758.011 BRD.758.021 BRD.758.031 BRD.758.040 BRD.758.050 ENV ENV.MS ENV.MS.010 ENV.MS.020 ENV.151 ENV.151.010 ENV.151.020 ENV.151.030 ENV.151.040 ENV.152 ENV.152.010 ENV.152.020 ENV.152.030 ENV.152.040 ENV.152.050 ENV.157 ENV.157.010 ENV.157.020 ENV.157.030 ENV.157.040 ENV.157.050 ENV.171 ENV.171.010 ENV.171.020 ENV.171.030 ENV.171.040 ENV.173 ENV.173.010 ENV.173.020 ENV.173.030 ENV.173.040 ENV.173.050 ENV.173.060 ENV.173.070 ENV.182 ENV.182.010 ENV.182.020 ENV.182.030 ENV.182.040 ENV.182.050 ENV.182.060 ROW ROW.501 ROW.501.010 ROW.501.020 ROW.501.030 ROW.501.011 Task ID Task Name Start 117 Review Bridge Submission-1st Structural Plans Rev1 118 Approval of Bridge Submission-1st Structural 119 Bridge Submission-2nd Structural 120 Prepare Bridge Submission-2nd Structural Plans 121 Submit Bridge Submission-2nd Structural Plans 122 Review Bridge Submission-2nd Structural Plans 123 Prepare Bridge Submission-2nd Structural Plans Rev1 124 Submit Bridge Submission-2nd Structural Plans Rev1 125 Review Bridge Submission-2nd Structural Plans Rev1 126 Approval of Bridge Submission-2nd Structural 127 Bridge Design Scope Complete 128 Environmental 129 Environmental Milestones 130 Wetland Permits Filed 131 Issue Environmental Clearance 132 25% Early Environmental Coordination 133 Perform 25% Early Environmental Coordination 134 Submit 25% Early Environmental Coordination 135 Review 25% Early Environmental Coordination 136 Approve 25% Early Environmental Coordination for DPH 137 State or Federal Historic Review 138 Conduct Historic Impact Analysis 139 Effect Finding Determined 140 Submit Effect Finding to Agency 141 Agency Review of Effect Finding 142 Approve Effect Finding 143 NEPA-Categorical Exclusion (CE) 144 Prepare Categorical Exclusion 145 Submit Categorical Exclusion 146 Review Categorical Exclusion 147 Review Categorical Exclusion by FHWA 148 Approve Categorical Exclusion 149 404 Permit - ACOE PGP 150 Prepare ACOE PGP 151 File ACOE PGP Permit Application 152 Agency Review ACOE PGP Application 153 Approve ACOE PGP 154 De minimis 4(f) 155 Evaluate Section 4(f) Applicability 156 Submit De minimis Evaluation to Officials 157 Review De minimis Evaluation by Officials 158 Approve De minimis Evaluation by Officials 159 Submit De minimis Evaluation to FHWA 160 Review De minimis Evaluation by FHWA 161 Approve De minimis Evaluation by FHWA 162 Water Quality Certification 163 Prepare Draft WQC 164 Submit Draft WQC 165 Review Draft WQC 166 File WQC 167 Agency Review WQC 168 Issue Water Quality Certification 169 Right of Way 170 Preliminary ROW Plans 171 Prepare Preliminary ROW Plans 172 Submit Preliminary ROW Plans 173 Review Preliminary ROW Plans 174 Prepare Preliminary ROW Plans Rev1 Milestone MassDOT PM: <MassDOT Project Manager Name> Typical Bridge, State ROW Status Date: Tue 1/14/14 / Report Run Date: Mon 9/29/14 Summary Finish Fri 3/6/15 Fri 3/6/15 Sat 3/7/15 Sat 3/7/15 Tue 5/5/15 Wed 5/6/15 Thu 6/4/15 Thu 6/4/15 Thu 6/4/15 Thu 6/4/15 Thu 6/4/15 Thu 3/27/14 Wed 2/4/15 Wed 2/4/15 Tue 5/5/15 Thu 3/27/14 Thu 3/27/14 Mon 8/11/14 Tue 8/12/14 Wed 9/10/14 Tue 8/12/14 Tue 8/12/14 Sun 10/26/14 Mon 11/24/14 Tue 11/25/14 Wed 12/24/14 Sun 5/11/14 Sun 5/11/14 Mon 8/11/14 Tue 8/12/14 Thu 12/25/14 Fri 1/23/15 Tue 1/6/15 Tue 1/6/15 Wed 2/4/15 Thu 2/5/15 Tue 5/5/15 Sun 10/26/14 Sun 10/26/14 Tue 11/4/14 Wed 11/5/14 Fri 12/19/14 Fri 12/19/14 Sat 12/20/14 Sun 1/18/15 Sun 12/7/14 Sun 12/7/14 Mon 1/5/15 Tue 1/6/15 Wed 2/4/15 Thu 2/5/15 Tue 5/5/15 Thu 3/27/14 Thu 3/27/14 Thu 3/27/14 Mon 8/11/14 Tue 8/12/14 Thu 9/11/14 Fri 3/6/15 Fri 3/6/15 Thu 6/4/15 Tue 5/5/15 Tue 5/5/15 Thu 6/4/15 Thu 6/4/15 Thu 6/4/15 Thu 6/4/15 Thu 6/4/15 Thu 6/4/15 Tue 5/5/15 Tue 5/5/15 Wed 2/4/15 Tue 5/5/15 Wed 9/10/14 Sun 5/25/14 Mon 8/11/14 Wed 9/10/14 Wed 9/10/14 Wed 12/24/14 Wed 9/10/14 Mon 11/24/14 Mon 11/24/14 Wed 12/24/14 Wed 12/24/14 Fri 1/23/15 Sun 5/25/14 Mon 8/11/14 Tue 8/26/14 Fri 1/23/15 Fri 1/23/15 Tue 5/5/15 Wed 2/4/15 Wed 2/4/15 Tue 5/5/15 Tue 5/5/15 Sun 1/18/15 Tue 11/4/14 Tue 11/4/14 Fri 12/19/14 Fri 12/19/14 Fri 12/19/14 Sun 1/18/15 Sun 1/18/15 Tue 5/5/15 Mon 1/5/15 Mon 1/5/15 Wed 2/4/15 Wed 2/4/15 Tue 5/5/15 Tue 5/5/15 Sun 3/26/17 Wed 5/27/15 Sun 5/25/14 Mon 8/11/14 Wed 9/10/14 Fri 10/10/14 Duration Responsibility Total Slack uarter Oct 0d MassDOT.BRD 202d 0d MassDOT.BRD 202d 90d 202d 60d Consultants.DES 202d 0d Consultants.DES 202d 30d MassDOT.BRD 202d 0d Consultants.DES 202d 0d Consultants.DES 202d 0d MassDOT.BRD 202d 0d MassDOT.BRD 212d 0d MassDOT.PM 753d 405d 79d 90d 293d 0d MassDOT.ENV 383d 0d MassDOT.ENV 293d 168d 46d 60d Consultants.DES 79d 0d Consultants.DES 46d 30d MassDOT.ENV 46d 0d MassDOT.ENV 46d 135d 245d 30d MassDOT.ENV 290d 30d MassDOT.ENV 245d 0d MassDOT.ENV 245d 30d Agencies.MHC 245d 0d Agencies.MHC 245d 258d 79d 15d Consultants.DES 79d 0d Consultants.DES 365d 15d MassDOT.ENV 365d 30d Agencies.FHWA 245d 0dENV or Agencies.FHWA 245d 120d 293d 30d MassDOT.ENV 293d 0d MassDOT.ENV 293d 90d Agencies.ACOE 293d 0d Agencies.ACOE 293d 85d 250d 10d MassDOT.ENV 250d 0d MassDOT.ENV 250d 45d Other.Municipality 250d 0d Other.Municipality 250d 0d MassDOT.ENV 250d 30d Agencies.FHWA 250d 0d Agencies.FHWA 250d 150d 293d 30d Consultants.DES 293d 0d Consultants.DES 293d 30d MassDOT.ENV 293d 0d MassDOT.ENV 293d 90d Agencies.DEP 293d 0d Agencies.DEP 293d 1096d 79d 427d 1d 60d Consultants.DES 79d 0d Consultants.DES 1d 30d MassDOT.ROW 1d 30d Consultants.DES 1d 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Qu Jan Approval of Bridge Submission-1st Structural Bridge Submission-2nd Structural Submit Bridge Submission-2nd Structural Plans Submit Bridge Submission-2nd Structural Plans Rev1 Approval of Bridge Submission-2nd Structural Bridge Design Scope Complete Environmental Environmental Milestones Wetland Permits Filed Issue Environmental Clearance 25% Early Environmental Coordination Submit 25% Early Environmental Coordination Approve 25% Early Environmental Coordination for DPH State or Federal Historic Review Submit Effect Finding to Agency Approve Effect Finding NEPA-Categorical Exclusion (CE) Submit Categorical Exclusion Approve Categorical Exclusion 404 Permit - ACOE PGP File ACOE PGP Permit Application Approve ACOE PGP De minimis 4(f) Submit De minimis Evaluation to Officials Approve De minimis Evaluation by Officials Submit De minimis Evaluation to FHWA Approve De minimis Evaluation by FHWA Water Quality Certification Submit Draft WQC File WQC Issue Water Quality Certification Right of Way Preliminary ROW Plans Submit Preliminary ROW Plans Critical Path Page 3 of 4 Design Engineer: <Design Consultant's Name> Contract #: <Contract #> / Assignement #: <Assign Massachusetts Department of Transportation <MassDOT Project Info Number> <Short Project Description ‐ City Names BL PDS Schedule Grouped by Area of Work WBS ROW.501.021 ROW.501.031 ROW.501.040 ROW.501.050 ROW.501.060 ROW.501.070 ROW.501.051 ROW.501.061 ROW.501.071 ROW.501.052 ROW.501.062 ROW.501.072 ROW.501.080 ROW.502 ROW.502.010 ROW.502.011 ROW.502.012 ROW.502.013 ROW.502.020 ROW.502.030 ROW.502.040 ROW.502.021 ROW.502.031 ROW.502.041 ROW.502.022 ROW.502.032 ROW.502.042 ROW.502.050 ROW.502.060 ROW.502.070 ROW.502.080 ROW.502.090 ROW.502.100 ROW.502.110 ROW.504 ROW.504.010 ROW.504.020 ROW.504.030 ROW.504.040 CSS CSS.900 CSS.900.010 Task ID Task Name Start 175 Submit Preliminary ROW Plans Rev1 176 Review Preliminary ROW Plans Rev1 177 Preliminary ROW Plans OK for DPH 178 Prepare Revised ROW Plans after DPH 179 Submit Revised ROW Plans after DPH 180 Review Revised ROW Plans after DPH 181 Prepare Revised ROW Plans after DPH Rev1 182 Submit Revised ROW Plans after DPH Rev1 183 Review Revised ROW Plans after DPH Rev1 184 Prepare Revised ROW Plans after DPH Rev2 185 Submit Revised ROW Plans after DPH Rev2 186 Review Revised ROW Plans after DPH Rev2 187 Accept ROW Plans 188 Acquisition Process 189 Acquisition Case Work 190 Perform Title Exams 191 Property Interviews 192 Perform Appraisals 193 Prepare Layout Taking Plans & Instrument 194 Submit Layout TPIs 195 Review Layout TPIs 196 Prepare Layout Taking Plans & Instrument Rev1 197 Submit Layout TPIs Rev1 198 Review Layout TPIs Rev1 199 Prepare Layout Taking Plans & Instrument Rev2 200 Submit Layout TPIs Rev2 201 Review Layout TPIs Rev2 202 Approve Layout Taking Plans 203 Offer & Negotiations 204 Admin approved & signed 205 Record & File 206 Acquisitions Recorded & Filed 207 Payment 208 Issue ROW Certificate 209 Final ROW Plans 210 Prepare Final ROW Plans 211 Submit Final ROW Plans 212 Review Final ROW Plans 213 Approve/Accept Final ROW Plans 214 Construction Engineering 215 Construction Support Services 216 Construction Support Services Milestone MassDOT PM: <MassDOT Project Manager Name> Typical Bridge, State ROW Status Date: Tue 1/14/14 / Report Run Date: Mon 9/29/14 Summary Finish Fri 10/10/14 Sat 10/11/14 Sat 10/25/14 Tue 1/6/15 Wed 2/4/15 Thu 2/5/15 Sat 3/7/15 Sun 4/5/15 Mon 4/6/15 Tue 4/21/15 Wed 5/20/15 Thu 5/21/15 Wed 5/27/15 Thu 5/28/15 Thu 5/28/15 Thu 5/28/15 Fri 7/17/15 Sat 9/5/15 Thu 5/28/15 Sun 7/26/15 Mon 7/27/15 Tue 8/11/15 Wed 9/9/15 Thu 9/10/15 Thu 9/17/15 Fri 10/16/15 Sat 10/17/15 Fri 10/23/15 Sun 10/25/15 Mon 11/23/15 Tue 11/24/15 Wed 12/23/15 Thu 12/24/15 Sun 2/21/16 Mon 2/27/17 Mon 2/27/17 Sun 3/5/17 Mon 3/6/17 Sun 3/26/17 Mon 6/27/16 Mon 6/27/16 Mon 6/27/16 Fri 10/10/14 Sat 10/25/14 Sat 10/25/14 Wed 2/4/15 Wed 2/4/15 Fri 3/6/15 Sun 4/5/15 Sun 4/5/15 Mon 4/20/15 Wed 5/20/15 Wed 5/20/15 Wed 5/27/15 Wed 5/27/15 Sun 2/21/16 Sat 10/24/15 Thu 7/16/15 Fri 9/4/15 Sat 10/24/15 Sun 7/26/15 Sun 7/26/15 Mon 8/10/15 Wed 9/9/15 Wed 9/9/15 Wed 9/16/15 Fri 10/16/15 Fri 10/16/15 Fri 10/23/15 Fri 10/23/15 Mon 11/23/15 Mon 11/23/15 Wed 12/23/15 Wed 12/23/15 Sun 2/21/16 Sun 2/21/16 Sun 3/26/17 Sun 3/5/17 Sun 3/5/17 Sun 3/26/17 Sun 3/26/17 Mon 6/26/17 Mon 6/26/17 Mon 6/26/17 Duration 0d 15d 0d 30d 0d 30d 30d 0d 15d 30d 0d 7d 0d 270d 150d 50d 50d 50d 60d 0d 15d 30d 0d 7d 30d 0d 7d 0d 30d 0d 30d 0d 60d 0d 28d 7d 0d 21d 0d 365d 365d 365d Responsibility Consultants.DES MassDOT.ROW MassDOT.ROW Consultants.DES Consultants.DES MassDOT.ROW Consultants.DES Consultants.DES MassDOT.ROW Consultants.DES Consultants.DES MassDOT.ROW MassDOT.ROW MassDOT.ROW MassDOT.ROW MassDOT.ROW MassDOT.ROW Consultants.DES Consultants.DES MassDOT.ROW Consultants.DES Consultants.DES MassDOT.ROW Consultants.DES Consultants.DES MassDOT.ROW MassDOT.ROW MassDOT.ROW MassDOT.ROW MassDOT.ROW MassDOT.ROW MassDOT.ROW MassDOT.PM Consultants.DES Consultants.DES MassDOT.ROW MassDOT.ROW Consultants.DES Total Slack uarter Oct 1d 1d 1d 1d 1d 1d 1d 1d 1d 1d 1d 1d 1d 1d 121d 1d 1d 1d 2d 2d 2d 2d 2d 2d 2d 2d 2d 2d 1d 1d 1d 1d 1d 1d 92d 92d 92d 92d 92d 0d 0d 0d 1st Quarter Jan Apr 3rd Quarter 1st Quarter 3rd Quarter Jul Oct Jan Apr Jul Oct Submit Preliminary ROW Plans Rev1 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Qu Jan Preliminary ROW Plans OK for DPH Submit Revised ROW Plans after DPH Submit Revised ROW Plans after DPH Rev1 Submit Revised ROW Plans after DPH Rev2 Accept ROW Plans Acquisition Process Submit Layout TPIs Submit Layout TPIs Rev1 Submit Layout TPIs Rev2 Approve Layout Taking Plans Admin approved & signed Acquisitions Recorded & Filed Issue ROW Certificate Final ROW Plans Submit Final ROW Plans Approve/Accept Final ROW Plans Construction Engineering Construction Support Servic Critical Path Page 4 of 4 Design Engineer: <Design Consultant's Name> Contract #: <Contract #> / Assignement #: <Assign