Massachusetts Department of Transportation <MassDOT Project Info Number> <Short Project Description ‐ City Names BL PDS Schedule Grouped by Area of Work WBS CNT CNT.MS CNT.MS.010 CNT.MS.020 CNT.MS.030 CNT.MS.040 CNT.MS.050 CNT.MS.060 CNT.MS.070 CNT.100 CNT.100.010 CNT.100.020 HWY HWY.200 HWY.200.010 HWY.200.020 HWY.200.030 HWY.200.040 HWY.220 HWY.220.010 HWY.220.020 HWY.220.030 HWY.220.040 HWY.303 HWY.303.010 HWY.303.020 HWY.300 HWY.300.010 HWY.300.020 HWY.300.030 HWY.300.040 HWY.300.011 HWY.300.031 HWY.300.041 HWY.300.050 HWY.300.060 HWY.300.070 HWY.300.080 HWY.300.090 HWY.350 HWY.350.010 HWY.350.020 HWY.350.030 HWY.400 HWY.400.010 HWY.400.020 HWY.400.030 HWY.400.040 HWY.400.050 HWY.400.011 HWY.400.041 HWY.400.051 HWY.400.060 HWY.400.070 HWY.400.080 HWY.400.090 HWY.450 HWY.450.010 Task ID Task Name Start 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Contract/Project Management Project Milestones Issue Design Contract NTP PM Submits Documents for Advertising Prepare for Advertise Advertise Construction Contract Bid Opening Issue Construction Contract NTP Scope of Service Complete Project Development Finalize Project Plan and Design Schedule Project Design Schedule Updates Highway Design Functional Design Report Prepare Functional Design Report Submit Functional Design Report Review Functional Design Report Approval of Functional Design Report Design Exception Report Prepare Design Exception Report Submit Design Exception Report Review Design Exception Report Approval of Design Exception Report Conduct Survey Conduct Survey (MassDOT) Conduct Survey 25% Highway Design Submission Prepare 25% Highway Design Submission Prepare 25% Contract Time Determination Submit 25% Design Submission Review 25% Highway Design Submission Prepare 25% Highway Design Submission Rev1 Submit 25% Highway Design Submission Rev1 Review 25% Highway Design Submission Rev1 All Sections 25% Highway Design Comments sent to DE Utility Early Coordination Field Meeting Prepare 25% Design Responses Comment Resolution Meeting @25% (Full Team) Design Schedule Update Meeting @25% (Full Team) Design Public Hearing Schedule Design Public Hearing Conduct Public Hearing Respond to Comments (Public Hearing) 75% Highway Design Submission Prepare 75% Highway Design Submission Prepare 75% Construction Contract Time Determination Prepare 75% Bottom Up Estimate & Estimate Reconciliation Submit 75% Design Submission Review 75% Highway Design Submission Prepare 75% Highway Design Submission Rev1 Submit 75% Highway Design Submission Rev1 Review 75% Highway Design Submission Rev1 All Sections 75% Highway Design Comments sent to DE Prepare 75% Design Responses Comment Resolution Meeting @75% (Full Team) Design Schedule Update Meeting @75% (Full Team) 100% Highway Design Submission Prepare 100% Highway Design Submission Milestone MassDOT PM: <MassDOT Project Manager Name> Typical Bridge, Municipal ROW Status Date: Tue 1/14/14 / Report Run Date: Mon 9/29/14 Summary Finish Tue 1/14/14 Tue 1/14/14 Tue 1/14/14 Tue 8/11/15 Wed 8/12/15 Sat 8/15/15 Wed 10/14/15 Sun 12/13/15 Mon 12/12/16 Tue 1/14/14 Tue 1/14/14 Thu 2/13/14 Tue 1/14/14 Thu 3/27/14 Thu 3/27/14 Mon 8/11/14 Tue 8/12/14 Wed 9/10/14 Thu 3/27/14 Thu 3/27/14 Mon 8/11/14 Tue 8/12/14 Wed 9/10/14 Tue 1/14/14 Tue 1/14/14 Tue 1/14/14 Thu 3/27/14 Thu 3/27/14 Sun 7/13/14 Mon 8/11/14 Tue 8/12/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Thu 9/11/14 Sat 9/20/14 Thu 9/11/14 Thu 9/11/14 Thu 9/11/14 Wed 10/22/14 Thu 10/23/14 Thu 10/23/14 Thu 10/23/14 Sat 11/22/14 Sat 11/22/14 Sun 12/21/14 Mon 12/22/14 Tue 1/20/15 Tue 1/20/15 Tue 1/20/15 Tue 1/20/15 Wed 1/21/15 Fri 1/30/15 Wed 1/21/15 Wed 1/21/15 Wed 1/21/15 Mon 12/12/16 Mon 12/12/16 Tue 1/14/14 Tue 8/11/15 Thu 8/13/15 Sat 8/15/15 Wed 10/14/15 Sun 12/13/15 Mon 12/12/16 Sat 2/7/15 Wed 2/12/14 Sat 2/7/15 Sat 6/20/15 Wed 9/10/14 Sun 5/25/14 Mon 8/11/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Sun 5/25/14 Mon 8/11/14 Wed 9/10/14 Wed 9/10/14 Wed 3/26/14 Wed 3/26/14 Wed 3/26/14 Sat 9/20/14 Sun 5/25/14 Wed 9/10/14 Mon 8/11/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Sat 9/20/14 Sat 9/20/14 Thu 9/11/14 Fri 11/21/14 Wed 10/22/14 Wed 10/22/14 Fri 11/21/14 Fri 1/30/15 Sun 12/21/14 Tue 1/20/15 Tue 1/20/15 Sun 12/21/14 Tue 1/20/15 Tue 1/20/15 Tue 1/20/15 Tue 1/20/15 Tue 1/20/15 Fri 1/30/15 Fri 1/30/15 Wed 1/21/15 Thu 4/30/15 Sat 3/21/15 Duration 1064d 1064d 0d 1d 2d 1d 0d 0d 0d 390d 30d 360d 523d 168d 60d 0d 30d 0d 168d 60d 0d 30d 0d 72d 72d 72d 178d 60d 60d 0d 30d 0d 0d 0d 0d 0d 10d 0d 1d 72d 42d 0d 30d 100d 60d 60d 60d 0d 30d 0d 0d 0d 0d 10d 0d 1d 100d 60d Responsibility MassDOT.PM MassDOT.PM MassDOT.PM MassDOT.PM MassDOT.PM MassDOT.PM MassDOT.PM Consultants.DES Consultants.DES Consultants.DES Consultants.DES MassDOT.HW MassDOT.HW Consultants.DES Consultants.DES MassDOT.HW MassDOT.HW MassDOT.HW Consultants.DES Consultants.DES Consultants.DES Consultants.DES MassDOT.HW Consultants.DES Consultants.DES MassDOT.HW MassDOT.PM MassDOT.PM Consultants.DES MassDOT.PM MassDOT.PM MassDOT.PM MassDOT.PM MassDOT.PM Consultants.DES Consultants.DES Consultants.DES Consultants.DES MassDOT.HW Consultants.DES Consultants.DES MassDOT.HW MassDOT.HW Consultants.DES MassDOT.PM MassDOT.PM Consultants.DES Total Slack uarter Oct 0d 0d 0d 0d 1d 0d 0d 0d 0d 674d 674d 674d 3d 0d 78d 0d 0d 0d 0d 78d 0d 0d 0d 3d 3d 3d 78d 78d 0d 0d 0d 0d 0d 0d 0d 72d 122d 122d 131d 0d 0d 0d 266d 30d 30d 30d 30d 30d 30d 30d 30d 30d 30d 80d 80d 89d 30d 30d 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter 3rd Qu Jan Apr Jul Contract/Project Management Project Milestones Issue Design Contract NTP PM Submits Documents for Advertising Advertise Construction Contract Bid Opening Issue Construction Contract NTP Scope of Service Complete Project Development Highway Design Functional Design Report Submit Functional Design Report Approval of Functional Design Report Design Exception Report Submit Design Exception Report Approval of Design Exception Report Conduct Survey 25% Highway Design Submission Submit 25% Design Submission Submit 25% Highway Design Submission Rev1 All Sections 25% Highway Design Comments sent to DE Utility Early Coordination Field Meeting Comment Resolution Meeting @25% (Full Team) Design Public Hearing Conduct Public Hearing 75% Highway Design Submission Submit 75% Design Submission Submit 75% Highway Design Submission Rev1 All Sections 75% Highway Design Comments sent to DE Comment Resolution Meeting @75% (Full Team) 100% Highway Design Submission Critical Path Page 1 of 4 Design Engineer: <Design Consultant's Name> Contract #: <Contract #> / Assignement #: <Assign Massachusetts Department of Transportation <MassDOT Project Info Number> <Short Project Description ‐ City Names BL PDS Schedule Grouped by Area of Work WBS HWY.450.020 HWY.450.030 HWY.450.040 HWY.450.050 HWY.450.011 HWY.450.041 HWY.450.051 HWY.450.060 HWY.450.070 HWY.450.080 HWY.450.090 HWY.800 HWY.800.010 HWY.800.020 HWY.800.030 HWY.800.040 HWY.800.050 HWY.800.060 HWY.800.070 BRD BRD.705 BRD.705.010 BRD.705.020 BRD.705.030 BRD.705.040 BRD.706 BRD.706.010 BRD.706.020 BRD.706.030 BRD.706.040 BRD.708 BRD.708.010 BRD.708.020 BRD.708.030 BRD.708.040 BRD.708.050 BRD.600 BRD.600.010 BRD.600.020 BRD.600.030 BRD.600.040 BRD.600.050 BRD.600.060 BRD.710 BRD.710.010 BRD.710.020 BRD.710.030 BRD.710.011 BRD.710.021 BRD.710.031 BRD.710.040 BRD.710.050 BRD.755 BRD.755.010 BRD.755.020 BRD.755.030 BRD.755.011 BRD.755.021 Task ID Task Name Start 59 Finalize Construction Contract Time Determination 60 Bottom Up Estimate & Estimate Reconciliation (if required) 61 Submit 100% Design Submission 62 Review 100% Highway Design Submission 63 Prepare 100% Highway Design Submission Rev1 64 Submit 100% Design Submission Rev1 65 Review 100% Highway Design Submission Rev1 66 Prepare 100% Design Responses 67 Comment Resolution Meeting @100% (Full Team) 68 Design Schedule Update Meeting @100% (Full Team) 69 Approval of 100% Highway Design Submission 70 PS&E Submittal 71 Prepare PS&E Submission 72 Submit PS&E Submission 73 Review PS&E Submission 74 Peer Review of PS&E Submission 75 Approval of PS&E Submission 76 Submit Mylars 77 Highway Design Scope Complete 78 Bridge Design 79 Preliminary Structures Report 80 Prepare Preliminary Structures Report 81 Submit Preliminary Structures Report 82 Review Preliminary Structures Report 83 Approval of Preliminary Structures Report 84 Bridge Type Selection Worksheet 85 Prepare Type Selection Worksheet 86 Submit Type Selection Study 87 Review Type Selection Study 88 Approval of Type Selection Worksheet 89 Hydraulics Study and Report 90 Prepare Hydraulic Report (MassDOT) 91 Prepare Hydraulic Report 92 Submit Hydraulic Report 93 Review Hydraulic Report 94 Approval of Hydraulic Report 95 Geotechnical Design 96 Prepare Boring Layout Plan 97 Perform Borings 98 Prepare Geotechnical Report 99 Submit Geotechnical Report 100 Review Geotechnical Report 101 Approval of Geotech Report 102 Bridge Sketch Plan Submittal 103 Prepare Bridge Sketch Plans 104 Submit Bridge Sketch Plans 105 Review Bridge Sketch Plans 106 Prepare Bridge Sketch Plans Rev1 107 Submit Bridge Sketch Plans Rev1 108 Review Bridge Sketch Plans Rev1 109 Submit Sketch Plan Mylars 110 Approval of Bridge Sketch Plans 111 Bridge Submission-1st Structural 112 Prepare Bridge Submission-1st Structural Plans 113 Submit Bridge Submission-1st Structural Plans 114 Review Bridge Submission-1st Structural Plans 115 Prepare Bridge Submission-1st Structural Plans Rev1 116 Submit Bridge Submission-1st Structural Plans Rev1 Milestone MassDOT PM: <MassDOT Project Manager Name> Typical Bridge, Municipal ROW Status Date: Tue 1/14/14 / Report Run Date: Mon 9/29/14 Summary Finish Fri 2/20/15 Fri 2/20/15 Sat 3/21/15 Sun 3/22/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Tue 4/21/15 Thu 4/30/15 Tue 4/21/15 Thu 4/30/15 Fri 5/1/15 Fri 5/1/15 Sat 5/30/15 Sun 5/31/15 Sun 6/7/15 Sat 6/20/15 Sat 6/20/15 Sat 6/20/15 Tue 1/14/14 Tue 1/14/14 Tue 1/14/14 Thu 2/27/14 Fri 2/28/14 Sat 3/29/14 Sun 3/30/14 Sun 3/30/14 Tue 5/13/14 Wed 5/14/14 Thu 6/12/14 Thu 3/27/14 Thu 3/27/14 Thu 3/27/14 Sat 5/10/14 Sun 5/11/14 Mon 6/9/14 Thu 3/27/14 Thu 3/27/14 Sat 4/26/14 Mon 5/26/14 Wed 6/4/14 Thu 6/5/14 Fri 7/4/14 Fri 6/13/14 Fri 6/13/14 Mon 8/11/14 Tue 8/12/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Thu 10/23/14 Thu 10/23/14 Sun 12/21/14 Mon 12/22/14 Tue 1/20/15 Tue 1/20/15 Mon 4/20/15 Mon 4/20/15 Sat 3/21/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Thu 4/30/15 Thu 4/30/15 Tue 4/21/15 Thu 4/30/15 Sat 6/20/15 Sat 5/30/15 Sat 5/30/15 Sat 6/6/15 Sat 6/20/15 Sat 6/20/15 Sat 6/20/15 Sat 6/20/15 Mon 4/20/15 Sat 3/29/14 Thu 2/27/14 Thu 2/27/14 Sat 3/29/14 Sat 3/29/14 Thu 6/12/14 Tue 5/13/14 Tue 5/13/14 Thu 6/12/14 Thu 6/12/14 Mon 6/9/14 Sun 5/25/14 Sat 5/10/14 Sat 5/10/14 Mon 6/9/14 Mon 6/9/14 Fri 7/4/14 Fri 4/25/14 Sun 5/25/14 Wed 6/4/14 Wed 6/4/14 Fri 7/4/14 Fri 7/4/14 Wed 9/10/14 Mon 8/11/14 Mon 8/11/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Tue 1/20/15 Sun 12/21/14 Sun 12/21/14 Tue 1/20/15 Tue 1/20/15 Tue 1/20/15 Duration 60d 60d 0d 30d 0d 0d 0d 10d 0d 1d 0d 51d 30d 0d 7d 14d 0d 0d 0d 462d 75d 45d 0d 30d 0d 75d 45d 0d 30d 0d 75d 60d 45d 0d 30d 0d 100d 30d 30d 10d 0d 30d 0d 90d 60d 0d 30d 0d 0d 0d 0d 0d 90d 60d 0d 30d 0d 0d Responsibility Consultants.DES Consultants.DES Consultants.DES MassDOT.HW Consultants.DES Consultants.DES MassDOT.HW Consultants.DES MassDOT.PM MassDOT.PM MassDOT.HW Consultants.DES Consultants.DES MassDOT.PM Consultants.Other MassDOT.HW Consultants.DES MassDOT.PM Consultants.DES Consultants.DES MassDOT.BRD MassDOT.BRD Consultants.DES Consultants.DES MassDOT.BRD MassDOT.BRD MassDOT.BRD Consultants.DES Consultants.DES MassDOT.BRD MassDOT.BRD Consultants.DES Consultants.DES Consultants.DES Consultants.DES MassDOT.GEO MassDOT.BRD Consultants.DES Consultants.DES MassDOT.BRD Consultants.DES Consultants.DES MassDOT.BRD Consultants.DES MassDOT.BRD Consultants.DES Consultants.DES MassDOT.BRD Consultants.DES Consultants.DES Total Slack uarter Oct 61d 61d 51d 51d 51d 51d 51d 51d 51d 60d 51d 51d 51d 51d 51d 51d 51d 116d 541d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 3d 18d 3d 3d 3d 3d 8d 8d 8d 8d 8d 68d 68d 0d 0d 0d 0d 0d 0d 0d 0d 0d 30d 30d 51d 51d 51d 51d 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Qu Jul Submit 100% Design Submission Submit 100% Design Submission Rev1 Comment Resolution Meeting @100% (Full Team) Approval of 100% Highway Design Submission PS&E Submittal Submit PS&E Submission Approval of PS&E Submission Submit Mylars Highway Design Scope Complete Bridge Design Preliminary Structures Report Submit Preliminary Structures Report Approval of Preliminary Structures Report Bridge Type Selection Worksheet Submit Type Selection Study Approval of Type Selection Worksheet Hydraulics Study and Report Submit Hydraulic Report Approval of Hydraulic Report Geotechnical Design Submit Geotechnical Report Approval of Geotech Report Bridge Sketch Plan Submittal Submit Bridge Sketch Plans Submit Bridge Sketch Plans Rev1 Submit Sketch Plan Mylars Approval of Bridge Sketch Plans Bridge Submission-1st Structural Submit Bridge Submission-1st Structural Plans Submit Bridge Submission-1st Structural Plans Rev1 Critical Path Page 2 of 4 Design Engineer: <Design Consultant's Name> Contract #: <Contract #> / Assignement #: <Assign Massachusetts Department of Transportation <MassDOT Project Info Number> <Short Project Description ‐ City Names BL PDS Schedule Grouped by Area of Work WBS ID Task Name Start Finish Duration BRD.755.031 BRD.755.040 BRD.758 BRD.758.010 BRD.758.020 BRD.758.030 BRD.758.011 BRD.758.021 BRD.758.031 BRD.758.040 BRD.758.050 ENV ENV.MS ENV.MS.010 ENV.MS.020 ENV.151 ENV.151.010 ENV.151.020 ENV.151.030 ENV.151.040 ENV.152 ENV.152.010 ENV.152.020 ENV.152.030 ENV.152.040 ENV.152.050 ENV.157 ENV.157.010 ENV.157.020 ENV.157.030 ENV.157.040 ENV.157.050 117 Review Bridge Submission-1st Structural Plans Rev1 118 Approval of Bridge Submission-1st Structural 119 Bridge Submission-2nd Structural 120 Prepare Bridge Submission-2nd Structural Plans 121 Submit Bridge Submission-2nd Structural Plans 122 Review Bridge Submission-2nd Structural Plans 123 Prepare Bridge Submission-2nd Structural Plans Rev1 124 Submit Bridge Submission-2nd Structural Plans Rev1 125 Review Bridge Submission-2nd Structural Plans Rev1 126 Approval of Bridge Submission-2nd Structural 127 Bridge Design Scope Complete 128 Environmental 129 Environmental Milestones 130 Wetland Permits Filed 131 Issue Environmental Clearance 132 25% Early Environmental Coordination 133 Perform 25% Early Environmental Coordination 134 Submit 25% Early Environmental Coordination 135 Review 25% Early Environmental Coordination 136 Approve 25% Early Environmental Coordination for DPH 137 State or Federal Historic Review 138 Conduct Historic Impact Analysis 139 Effect Finding Determined 140 Submit Effect Finding to Agency 141 Agency Review of Effect Finding 142 Approve Effect Finding 143 NEPA-Categorical Exclusion (CE) 144 Prepare Categorical Exclusion 145 Submit Categorical Exclusion 146 Review Categorical Exclusion 147 Review Categorical Exclusion by FHWA 148 Approve Categorical Exclusion Tue 1/20/15 Tue 1/20/15 Wed 1/21/15 Wed 1/21/15 Sat 3/21/15 Sun 3/22/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Thu 3/27/14 Sun 12/21/14 Sun 12/21/14 Mon 4/20/15 Thu 3/27/14 Thu 3/27/14 Mon 8/11/14 Tue 8/12/14 Wed 9/10/14 Tue 8/12/14 Tue 8/12/14 Thu 9/11/14 Fri 10/10/14 Sat 10/11/14 Sun 11/9/14 Sun 5/11/14 Sun 5/11/14 Mon 8/11/14 Tue 8/12/14 Mon 11/10/14 Tue 12/9/14 Tue 1/20/15 Tue 1/20/15 Mon 4/20/15 Sat 3/21/15 Sat 3/21/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Sun 12/21/14 Mon 4/20/15 Wed 9/10/14 Sun 5/25/14 Mon 8/11/14 Wed 9/10/14 Wed 9/10/14 Sun 11/9/14 Wed 9/10/14 Fri 10/10/14 Fri 10/10/14 Sun 11/9/14 Sun 11/9/14 Tue 12/9/14 Sun 5/25/14 Mon 8/11/14 Tue 8/26/14 Tue 12/9/14 Tue 12/9/14 0d 0d 90d 60d 0d 30d 0d 0d 0d 0d 0d 390d 120d 0d 0d 168d 60d 0d 30d 0d 90d 30d 30d 0d 30d 0d 213d 15d 0d 15d 30d 0d ENV.171 ENV.171.010 ENV.171.020 ENV.171.030 ENV.171.040 ENV.173 ENV.173.010 ENV.173.020 ENV.173.030 ENV.173.040 ENV.173.050 ENV.173.060 ENV.173.070 ENV.182 ENV.182.010 ENV.182.020 ENV.182.030 ENV.182.040 ENV.182.050 ENV.182.060 ROW ROW.501 ROW.501.010 ROW.501.020 ROW.501.030 149 404 Permit - ACOE PGP 150 Prepare ACOE PGP 151 File ACOE PGP Permit Application 152 Agency Review ACOE PGP Application 153 Approve ACOE PGP 154 De minimis 4(f) 155 Evaluate Section 4(f) Applicability 156 Submit De minimis Evaluation to Officials 157 Review De minimis Evaluation by Officials 158 Approve De minimis Evaluation by Officials 159 Submit De minimis Evaluation to FHWA 160 Review De minimis Evaluation by FHWA 161 Approve De minimis Evaluation by FHWA 162 Water Quality Certification 163 Prepare Draft WQC 164 Submit Draft WQC 165 Review Draft WQC 166 File WQC 167 Agency Review WQC 168 Issue Water Quality Certification 169 Right of Way 170 Preliminary ROW Plans 171 Prepare Preliminary ROW Plans 172 Submit Preliminary ROW Plans 173 Review Preliminary ROW Plans Sat 11/22/14 Sat 11/22/14 Sun 12/21/14 Mon 12/22/14 Mon 4/20/15 Thu 9/11/14 Thu 9/11/14 Sat 9/20/14 Sun 9/21/14 Tue 11/4/14 Tue 11/4/14 Wed 11/5/14 Thu 12/4/14 Thu 10/23/14 Thu 10/23/14 Fri 11/21/14 Sat 11/22/14 Sun 12/21/14 Mon 12/22/14 Mon 4/20/15 Thu 3/27/14 Thu 3/27/14 Thu 3/27/14 Mon 8/11/14 Tue 8/12/14 Mon 4/20/15 Sun 12/21/14 Sun 12/21/14 Mon 4/20/15 Mon 4/20/15 Thu 12/4/14 Sat 9/20/14 Sat 9/20/14 Tue 11/4/14 Tue 11/4/14 Tue 11/4/14 Thu 12/4/14 Thu 12/4/14 Mon 4/20/15 Fri 11/21/14 Fri 11/21/14 Sun 12/21/14 Sun 12/21/14 Mon 4/20/15 Mon 4/20/15 Mon 8/10/15 Mon 4/20/15 Sun 5/25/14 Mon 8/11/14 Wed 9/10/14 150d 30d 0d 120d 0d 85d 10d 0d 45d 0d 0d 30d 0d 180d 30d 0d 30d 0d 120d 0d 502d 390d 60d 0d 30d Task Milestone MassDOT PM: <MassDOT Project Manager Name> Typical Bridge, Municipal ROW Status Date: Tue 1/14/14 / Report Run Date: Mon 9/29/14 Summary Responsibility MassDOT.BRD MassDOT.BRD Consultants.DES Consultants.DES MassDOT.BRD Consultants.DES Consultants.DES MassDOT.BRD MassDOT.BRD MassDOT.PM MassDOT.ENV MassDOT.ENV Consultants.DES Consultants.DES MassDOT.ENV MassDOT.ENV MassDOT.ENV MassDOT.ENV MassDOT.ENV Agencies.MHC Agencies.MHC Consultants.DES Consultants.DES MassDOT.ENV Agencies.FHWA MassDOT.ENV or Agencies.FHWA MassDOT.ENV MassDOT.ENV Agencies.ACOE Agencies.ACOE MassDOT.ENV MassDOT.ENV Other.Municipality Other.Municipality MassDOT.ENV Agencies.FHWA Agencies.FHWA Consultants.DES Consultants.DES MassDOT.ENV MassDOT.ENV Agencies.DEP Agencies.DEP Consultants.DES Consultants.DES MassDOT.ROW Total Slack uarter Oct 51d 51d 51d 51d 51d 51d 51d 51d 51d 61d 602d 78d 112d 232d 112d 0d 78d 0d 0d 0d 72d 72d 72d 72d 72d 72d 72d 78d 147d 147d 72d 72d 112d 112d 112d 112d 112d 77d 77d 77d 77d 77d 77d 77d 77d 112d 112d 112d 112d 112d 112d 112d 0d 30d 78d 0d 0d 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Qu Jul Approval of Bridge Submission-1st Structural Bridge Submission-2nd Structural Submit Bridge Submission-2nd Structural Plans Submit Bridge Submission-2nd Structural Plans Rev1 Approval of Bridge Submission-2nd Structural Bridge Design Scope Complete Environmental Environmental Milestones Wetland Permits Filed Issue Environmental Clearance 25% Early Environmental Coordination Submit 25% Early Environmental Coordination Approve 25% Early Environmental Coordination for DPH State or Federal Historic Review Submit Effect Finding to Agency Approve Effect Finding NEPA-Categorical Exclusion (CE) Submit Categorical Exclusion Approve Categorical Exclusion 404 Permit - ACOE PGP File ACOE PGP Permit Application Approve ACOE PGP De minimis 4(f) Submit De minimis Evaluation to Officials Approve De minimis Evaluation by Officials Submit De minimis Evaluation to FHWA Approve De minimis Evaluation by FHWA Water Quality Certification Submit Draft WQC File WQC Issue Water Quality Certification Right of Way Preliminary ROW Plans Submit Preliminary ROW Plans Critical Path Page 3 of 4 Design Engineer: <Design Consultant's Name> Contract #: <Contract #> / Assignement #: <Assign Massachusetts Department of Transportation <MassDOT Project Info Number> <Short Project Description ‐ City Names BL PDS Schedule Grouped by Area of Work WBS ID Task Name Start ROW.501.011 ROW.501.021 ROW.501.031 ROW.501.040 ROW.501.750 ROW.501.751 ROW.501.752 ROW.501.753 ROW.501.754 ROW.501.755 ROW.501.756 ROW.501.990 ROW.501.991 ROW.501.992 ROW.501.993 ROW.501.994 ROW.501.995 ROW.501.996 ROW.502 ROW.502.010 ROW.502.020 ROW.502.030 ROW.502.040 ROW.502.050 ROW.502.060 ROW.502.070 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 ROW.502.051 ROW.502.061 ROW.502.071 200 201 202 ROW.502.080 ROW.502.090 ROW.502.100 ROW.502.110 ROW.502.120 ROW.502.130 ROW.502.140 ROW.502.150 CSS CSS.900 CSS.900.010 203 Approve Layout Taking Plans 204 Offer & Negotiations 205 Municipal Approval, Record & File 206 Acquisitions Recorded & Filed 207 Submit Community Compliance Package 208 Review Community Compliance Package 209 Pay Award of Damages 210 Issue ROW Certificate 211 Construction Engineering 212 Construction Support Services 213 Construction Support Services Task Prepare Preliminary ROW Plans Rev1 Submit Preliminary ROW Plans Rev1 Review Preliminary ROW Plans Rev1 Approve Preliminary ROW Plans for DPH Prepare 75% ROW Plans Submit 75% ROW Plans Review 75% ROW Plans Prepare 75% ROW Plans Rev1 Submit 75% ROW Plans Rev1 Review 75% ROW Plans Rev1 Approve 75% ROW Plans Prepare 100% ROW Plans Submit 100% ROW Plans Review 100% ROW Plans Prepare 100% ROW Plans Rev1 Submit 100% ROW Plans Rev1 Review 100% ROW Plans Rev1 Approve 100% ROW Plans Layout Plans and Order of Taking Peform Title Exams (All TPI) Hold Town Meeting Contact Property Owners Perform Appraisals (All TPI) Prepare Layout Taking Plans & Instrument Submit Layout TPIs Review Layout TPIs Prepare Layout Taking Plans & Instrument Rev1 Submit Layout TPIs Rev 1 Review Layout TPIs Rev 1 Milestone MassDOT PM: <MassDOT Project Manager Name> Typical Bridge, Municipal ROW Status Date: Tue 1/14/14 / Report Run Date: Mon 9/29/14 Summary Finish Duration Responsibility Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Thu 10/23/14 Sun 12/21/14 Mon 12/22/14 Tue 1/20/15 Tue 1/20/15 Tue 1/20/15 Tue 1/20/15 Wed 1/21/15 Sat 3/21/15 Sun 3/22/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Thu 9/11/14 Thu 9/11/14 Thu 10/23/14 Fri 2/20/15 Fri 2/20/15 Wed 1/21/15 Sat 3/21/15 Sun 3/22/15 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Wed 9/10/14 Sun 12/21/14 Sun 12/21/14 Tue 1/20/15 Tue 1/20/15 Tue 1/20/15 Tue 1/20/15 Tue 1/20/15 Sat 3/21/15 Sat 3/21/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Mon 4/20/15 Mon 8/10/15 Tue 12/9/14 Thu 2/19/15 Wed 5/20/15 Wed 5/20/15 Sat 3/21/15 Sat 3/21/15 Sat 3/28/15 0d 0d 0d 0d 60d 0d 30d 0d 0d 0d 0d 60d 0d 30d 0d 0d 0d 0d 334d 90d 120d 90d 90d 60d 0d 7d Sat 3/28/15 Sat 3/28/15 Sat 3/28/15 Sat 3/28/15 Sat 3/28/15 Sat 3/28/15 0d 0d 0d Mon 4/20/15 Thu 5/21/15 Sat 6/20/15 Sun 7/19/15 Mon 7/20/15 Tue 8/4/15 Mon 7/20/15 Mon 8/10/15 Mon 12/14/15 Mon 12/14/15 Mon 12/14/15 Mon 4/20/15 Fri 6/19/15 Sun 7/19/15 Sun 7/19/15 Mon 8/3/15 Mon 8/10/15 Sat 8/8/15 Mon 8/10/15 Mon 12/12/16 Mon 12/12/16 Mon 12/12/16 0d 30d 30d 0d 15d 7d 20d 0d 365d 365d 365d Consultants.DES Consultants.DES MassDOT.ROW MassDOT.ROW Consultants.DES Consultants.DES MassDOT.ROW Consultants.DES Consultants.DES MassDOT.ROW MassDOT.ROW Consultants.DES Consultants.DES MassDOT.ROW Consultants.DES Consultants.DES MassDOT.ROW MassDOT.ROW Other.Municipality Other.Municipality Other.Municipality Other.Municipality Consultants.DES Consultants.DES MassDOT.ROW and Other.Municipality Consultants.DES Consultants.DES MassDOT.ROW and Other.Municipality MassDOT.ROW Other.Municipality Other.Municipality Other.Municipality Other.Municipality MassDOT.ROW Other.Municipality MassDOT.PM Consultants.DES Total Slack uarter Oct 0d 0d 0d 0d 30d 30d 30d 30d 30d 30d 30d 30d 30d 30d 30d 30d 30d 30d 0d 162d 0d 0d 0d 53d 53d 53d 53d 53d 53d 30d 0d 0d 0d 0d 0d 2d 0d 0d 0d 0d 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Quarter Jul Oct 1st Quarter Jan Apr 3rd Qu Jul Submit Preliminary ROW Plans Rev1 Approve Preliminary ROW Plans for DPH Submit 75% ROW Plans Submit 75% ROW Plans Rev1 Approve 75% ROW Plans Submit 100% ROW Plans Submit 100% ROW Plans Rev1 Approve 100% ROW Plans Layout Plans and Order of Taking Submit Layout TPIs Submit Layout TPIs Rev 1 Approve Layout Taking Plans Acquisitions Recorded & Filed Issue ROW Certificate Construction Engineering Construction Support Services Critical Path Page 4 of 4 Design Engineer: <Design Consultant's Name> Contract #: <Contract #> / Assignement #: <Assign