Bowker Alternative 3: Future Year LOS – AM Peak Hour 1 1 Bowker Alternative 3: Future Year LOS – AM Peak Hour 2 December 4, 2013 2 Bowker Alternative 3: Future Year LOS – PM Peak Hour 3 3 Bowker Alternative 3: Future Year LOS – PM Peak Hour 4 4 Bowker Alternative 4 – New Regional & Local Access 5 December 9, 2013 Bowker Overpass Alternative 4 – New Regional & Local Access 5 Bowker Alternative 4: Future Year LOS – AM Peak Hour 6 6 Bowker Alternative 4: Future Year LOS – AM Peak Hour 7 7 Bowker Alternative 4: Future Year LOS – PM Peak Hour 8 8 Bowker Alternative 4: Future Year LOS – PM Peak Hour 9 9 I-90 Back Bay Ramp Alternatives • Back Bay Alternative 1: New I-90 WB off-ramp to Berkeley Street with closure of the existing I-90 WB on-ramp from Arlington Street • Back Bay Alternative 2: New I-90 WB off-ramp to Trinity Place with closure of the existing I-90 WB on-ramps from Clarendon Street and Arlington Street • Back Bay Alternative 3: New I-90 WB off-ramp to Brookline Avenue • Back Bay Alternative 4: New I-90 EB on-ramp from the Bowker Overpass NB December 4, 2013 10 Back Bay Alternative 1: New Westbound Off-Ramp to Berkeley Street 11 December 9, 2013 Back Bay Alternative 1: New Berkeley Street Off-Ramp 11 Back Bay Alternative 1: Future Year LOS – AM Peak Hour 12 12 Back Bay Alternative 1: Future Year LOS – PM Peak Hour 13 13 Back Bay Alternative 2: New Westbound Off-Ramp to Trinity Place/Stuart Street Back Bay Alternative 2: New Westbound Off-Ramp to Trinity Place/Stuart Street 14 December 9, 2013 14 Back Bay Alternative 2: Future Year LOS – AM Peak Hour 15 December 4, 2013 15 Back Bay Alternative 2: Future Year LOS – PM Peak Hour 16 December 4, 2013 16 Back Bay Alternative 3: New Westbound Off-Ramp to Brookline Avenue Back Bay Alternative 3: New Westbound Off-Ramp to Brookline Avenue 17 December 9, 2013 Back Bay Alternative 3: Future Year LOS – AM Peak Hour 18 December 4, 2013 18 Back Bay Alternative 3: Future Year LOS – PM Peak Hour 19 December 4, 2013 19 Back Bay Alternative 4: New Eastbound On-Ramp from the Bowker Overpass Back Bay Alternative 4: New Eastbound On-Ramp from the Bowker Overpass 20 December 9, 2013 Back Bay Alternative 4: Future Year LOS – AM Peak Hour 21 December 4, 2013 21 Back Bay Alternative 4: Future Year LOS – PM Peak Hour 22 December 4, 2013 22 Project Next Steps – Alternatives Analysis Evaluation Traffic Congestion Motorized Circulation and Access Transit and Non-Motorized Circulation and Access Measure level of service, delays, queues travel times, vehicle route continuity, directness, connectivity bicycle and pedestrian access, changes in access for transit passengers, physical impacts to proposed transit Safety vehicle crashes, changes in pedestrian and bicycle route separation, changes in emergency vehicle access, highway weaves, ramp geometrics Neighborhood Impacts noise, cut-through traffic, aesthetics, neighborhood cohesion air quality, wetlands, hazardous material sites, archaeological/historic sites, parks/open spaces Environmental Impacts Business Considerations access to existing and future development sites, physical impacts to development, parking for customers, truck circulation and access Cost and Schedule total construction cost and timeframe December 4, 2013 23 Project Next Steps – Timeline February 2014 – Alternatives Analysis March 2014 – Draft Report Findings and Recommendations April 2014 - Draft Final Report December 4, 2013 24 Thank You! Questions??? 12/9/2013 25 Contact Information: Paul Nelson Phone: (857) 368-8867 E-mail: paul.nelson@state.ma.us Website: http://www.mass.gov/massdot/bostonramps 12/9/2013 26