FACILITY ENVIRONMENTAL AUDIT PROGRAM HAZARDOUS WASTE | UNIVERSAL WASTE | HAZARDOUS MATERIALS | ASBESTOS CONTAINING MATERIALS | SOLID WASTE ROADSIDE ISSUES | TANKS | WATER QUALITY | WETLANDS | RECORD KEEPING | INSPECTIONS MassDOT Environmental Compliance Audit Program Fieldbook Page 1 Table of Contents 1.0 2.0 Introduction ..................................................................................... 2 1.1 Facility List ......................................................................... 2 1.2 Audit Schedule .................................................................... 2 1.3 Audit Team ......................................................................... 3 Self-Audit Procedure ...................................................................... 3 2.1 Pre-audit .............................................................................. 3 2.2 Audit Site Visit ................................................................... 4 2.3 Post-audit ............................................................................ 5 3.0 Environmental Requirement List .................................................... 6 4.0 Environmental Compliance Audit Checklist .................................. 7 List of Attachments A. Audit Facility List B. Audit Schedule C. Information Resources and Records Review List D. Audit Checklist E. Audit Finding Report Form F. Corrective Action Plan Report Form G. Environmental Requirement List H. Standard Operating Procedures January 2011 MassDOT Environmental Compliance Audit Program Fieldbook Page 2 1.0 Introduction Environmental compliance auditing is a component of The Massachusetts Department of Transportation (MassDOT)’s Environmental Management System (EMS). MassDOT’s EMS is summarized in the MassDOT EMS Manual which can be accessed on the MassDOT intranet. Procedures for periodic review and revision of the Environmental Compliance Audit Program are provided in the EMS manual. This Environmental Compliance Audit Program Fieldbook is intended to assist MassDOT in self-identifying and correcting environmental compliance issues at MassDOT maintenance facilities. The Environmental Compliance Audit Program Fieldbook details the audit procedures and provides audit forms, the Environmental Requirements List, the Information Resources and Records Review List, and the Audit Checklist as attachments. 1.1 Audit Facility List Environmental compliance audits will be conducted at the MassDOT facilities that appear on the Audit Facility List. Included on the list are highway maintenance depots, snow & ice depots, special operation facilities, and drawbridges. The Audit Facility List may be updated as needed based upon changes in facilities’ operational status. The Audit Facility List is presented in Attachment A. 1.2 Audit Schedule All facilities on the Audit Facility List will be audited over a five-year cycle, with approximately 20% of the total number of facilities audited annually. The First Cycle audits will be conducted from 2008 to 2012, the Second Cycle will take place between 2013 and 2017, and so on. A general Master Schedule accounting for all the facilities on the Audit Facility List will be produced at the beginning of each Cycle. The Master Schedule is a template to be used for generating specific yearly audit schedules that will be issued at the beginning of each calendar year throughout a cycle. The yearly audit schedules will give the date, time, facility name and address, and the Auditor assigned to perform each audit. If a scheduled audit is canceled, than a rescheduled audit must be conducted within 30 days of the original scheduled date. The Audit Schedule is presented in Attachment B. January 2011 MassDOT Environmental Compliance Audit Program Fieldbook Page 3 1.3 Audit Team The Audit Team will be comprised of four individuals, including the Audit Coordinator, the Auditor, a Facility Representative, and an EMS Compliance Coordinator (ECC). The Audit Coordinator is a person from the Environmental Services Division assigned to oversee the Environmental Compliance Audit Program. The Audit Coordinator is responsible for updating the Audit Facility List, producing the Audit Schedule, tracking completion of audit documentation, maintaining audit records, and making entries to the Clean State Database. The Auditor is an ECC from a district other than that district where the audited facility is located. The Auditor is responsible for making observations and inquiries about activities conducted at the audited facility in order to determine compliance with applicable Environmental Requirements at the audited facility. A Facility Representative is a person from the district where the audited facility is located who is familiar with the operation of the audited facility. The Facility Representative is responsible for providing access to all areas of the audited facility and for answering questions regarding activities conducted at the audited facility. The ECC is a person from the Environmental Services Division who has been assigned to coordinate a district’s efforts to comply with MassDOT’s EMS. The ECC is responsible for providing information and documentation regarding compliance with applicable environmental requirements at the audited facility. 2.0 Audit Procedure The Environmental Compliance Audit Procedure consists of three phases: pre-audit, audit, and post-audit. The process for conducting each audit phase is described below. 2.1 Pre-audit Prior to the beginning of the calendar year, the Audit Coordinator develops a proposed yearly audit schedule, using the Master Schedule as a template. The proposed yearly audit schedule is forwarded to the ECCs, who consult the District Maintenance Engineers (DMEs) for acceptance of the proposed audit schedule. The Audit Coordinator makes changes requested by the ECCs and DMEs and issues the yearly audit schedule. January 2011 MassDOT Environmental Compliance Audit Program Fieldbook Page 4 At least two weeks prior to the audit site visit, the ECC contacts the DME to verify that a Facility Representative will be present, and the ECC ensures that all applicable facility records (e.g. waste manifests, permit conditions, fuel inventory records and as built plans) will be made available for review. Also in advance of the audit site visit, the Auditor obtains information regarding the facility to be audited, including a copy of the Facility Plan, preexisting Clean State Matters, underground storage tank registration and MCP site status. 2.2 Audit Site Visit Initial Briefing. For the benefit of the Facility Representative the Auditor conducts an introductory meeting to (1) inform personnel of the purpose of the audit; (2) inform facility personnel of their responsibilities and required participation in the audit and (3) to answer any questions that facility personnel may have regarding the audit. Walkthrough. Accompanied by the Facility Representative and the ECC, the Auditor conducts a facility walkthrough to inspect all areas of the facility and to make observations regarding the activities conducted at the facility. The Auditor uses an Environmental Compliance Audit Checklist to prompt examination of specific regulatory compliance programs and to record field notes of observations. Interviews of facility personnel may be conducted to ensure that the scope of facility operation has been understood and verified by the Auditor. Records Review. Following the walkthrough, the Auditor reviews applicable facility records provided by the ECC. The Auditor may request additional documentation that may be needed to evaluate compliance. The Records Review List is presented as Attachment C. Audit Checklist. Following the walkthrough and records review, the Auditor completes the established Environmental Compliance Audit Checklist, which serves to document environmental findings identified during the audit, confirm regulated activities and act as a quality control and assurance tool for ensuring that applicable regulatory compliance program programs are reviewed during the audit. The Audit Checklist is presented as Attachment D. Exit Briefing. Based on the site walkthrough, records review, and completed Audit Checklist, the Auditor discusses the audit findings and responsibilities for correcting a violation with the Facility Representative and the ECC. January 2011 MassDOT Environmental Compliance Audit Program Fieldbook Page 5 2.3 Post-audit Audit Findings Report. If the Auditor has findings to report, then within 3 days of conducting the audit site visit, the Auditor completes a typed Audit Findings Report (AFR) in Word document format and e-mails a signed electronic version to the ECC and the Audit Coordinator. The AFR shall include a summary of each finding, a regulatory citation and/or SOP reference, and a recommended corrective action. The AFR may also include the Auditor’s recommendation for implementation of Good Management Practices at the facility. The Audit Coordinator enters all reported regulatory violations, as a new matter, into the Clean State Database within twenty-one days of discovery. A copy of the Audit Finding Report form is presented as Attachment E. Facility Audit Reports. Within 14 days of the audit site visit, the Auditor provides an Audit Report, via e-mail or inter-office mail, to the Audit Coordinator. The Audit Report should include the following: • Cover memorandum summarizing the audit findings • Signed Audit Checklist (original or scanned) • Signed Audit Finding Report (if applicable; original or scanned) • Audit finding notes and photographs Corrective Action Plan Report. Within 14 days of the audit site visit the ECC prepares a separate Corrective Action Plan (CAP) Report for each regulatory violation identified on the AFR. The District ECC works with the DME to establish a CAP and records it on the CAP Report. The DME signs the CAP Report to certify agreement with and commitment to executing the CAP. At the end of the 14-day period, an electronic copy of the CAP Report is e-mailed to the Audit Coordinator for entry into the Clean State Database. A copy of the Corrective Action Plan Report is presented in Attachment F. A CAP must be implemented and completed within 60 days of discovery of the regulatory violation (i.e. the audit site visit). When the corrective action has been completed, the ECC signs the CAP Report to certify that the violation has been corrected. The completed CAP Report with both the DME’s and the ECC’s signatures is submitted to the Audit Coordinator, along with supporting documentation, by the end of the sixty-day correction period. If the CAP is implemented and completed within 60 days of discovery, the Audit Coordinator updates the Clean State Database and submits to DEP a January 2011 MassDOT Environmental Compliance Audit Program Fieldbook Page 6 request for de-listing of a regulatory finding from the Clean State Database. If the CAP cannot be completed within the 60-day period, the EMS Coordinator provides written justification on the CAP Report and the Audit Coordinator updates the Clean State Database to include the written justification. Upon its completion, the original CAP Report(s) with signatures will be added to the Facility Audit Report by the Audit Coordinator to finalize the documentation. A summary of the timelines described in the preceding sections for conducting audits and follow-up activities is provided below. Table 1 Environmental Compliance Audit Process Timelines Responsible Person Activity Timeline Develop Schedules, Assign Auditors and Notify EMS Coordinators Audit Coordinator Notify DME to ensure availability of Facility Representative and documentation at audit Complete and forward Audit Findings Report (AFR) to EMS Coordinator and Audit Coordinator Complete and forward Facility Audit Report to Audit Coordinator Work with DME to develop a CAP. Record CAP on the CAP Report and forward an electronic version (with DME’s signature) to Audit Coordinator for entry into Clean State Database. Assist with and monitor performance of CAP, and finalize CAP Report with signature when the CAP is completed. ECC Master Schedule at beginning of each new Cycle; Yearly Schedules at beginning of each year in a Cycle. At least two weeks before audit site visit date. Auditor Within 3 days of audit site visit date. Auditor Within 14 days of audit site visit date. ECC Within 14 days of audit site visit date. ECC Within 60 days of audit site visit 3.0 Environmental Requirements List The Environmental Requirements List identifies federal and state environmental regulations and policies, as well as Standard Operating Procedures (SOPs), which are applicable to MassDOT facilities. The list covers a wide variety of environmental compliance areas including Air Quality, Hazardous Materials and Hazardous Waste, Tanks, Waste Site Clean-up (21E) and Solid Waste Landfill Closure, Water Quality, Wetlands, and Asbestos. The Environmental Requirements List is a component of MassDOT’s EMS. Procedures for review and revision of the Environmental Requirements List are described in MassDOT’s EMS January 2011 MassDOT Environmental Compliance Audit Program Fieldbook Page 7 Manual. The Environmental Requirements List is presented as Attachment G, and SOPs are presented as Attachment H. 4.0 Environmental Compliance Audit Checklist The Requirements List was used as a basis for the development of the Environmental Compliance Audit Checklist. The Checklist consists of a structured series of questions organized by environmental media to aid the auditors in evaluating compliance status at MassDOT maintenance facilities. Regulatory and SOP references are provided to assist auditors in post-audit regulatory research. Sections of the Checklist include: Hazardous Waste Water Quality Hazardous Materials Natural Resource Areas Solid Waste Pollution Prevention Roadside Issues Air Quality Storage Tanks Environmental Management January 2011 Audit Facilities List (Updated: December 2012) District 1 Facility # 1 2 3 4 5 6 7 City/Town Lenox Becket Buckland Address 270 Pittsfield Road (Route 7A) 98 Washington Road (Route 8) 1 Creamery Avenue (Route 2) Dalton Goshen Huntington Lee 229 Orchard Road USMC League Highway (Route 9) Worthington Road (Route 112) 435 Pleasant Street (Route 102) Facility # 8 9 10 City/Town North Adams Otis Pittsfield M1 - Lee M2 - Blandford Sheffield Williamstown Lee Blandford Address 590 Ashland Street(Route 8A) 298 North Main Road (Route 8) 77 Central Berkshire Boulevard (Route 41) 1269 North Main Street (Route 7) 900 New Ashfield Road (Route 7) 239 Marble Street 3 Old Chester Road 11 12 172 173 District 2 Facility # 13 14 15 16 17 18 20 22 23 24 City/Town Northampton Athol Belchertown Bernardston Deerfield Erving Northampton Orange Palmer Springfield Address North King Street Route 32 (Petersham Road) Route 9 (Ware Road) Route 10 (Northfield Road) Route116 Route 2 (Mohawk Trail) Route 5 (Mt. Tom Road) Route 122 Route 20 Magaziner Street Facility # 25 26 27 28 120 121 174 175 176 177 City/Town South Hadley Westfield West Springfield Winchenden Granby Ware Chicopee Westfield Warren Palmer Address Route 33 Route 20 (East Main Street) 2 Ashley Avenue Route 202 (Baldwinville Road) Route 116 Route 32 240 Fuller Road Sgt. T.M. Dione Way Brimfield Rd. (Rt. 9) 146 Thorndike Road M3 - Chicopee SPB - Westfield M4 - Warren Toll Plaza 08 - Palmer Address 403 Belmont Street Swanson Road at Route 495 Route 20 Route 140 at Route 495 West Elm Street Mechanic Street Route 2 at Underpass Route 2 at Railroad Bridge Route 146 West Main Street Route 9 Depot Road Route 122A Route 12 Chocksett Road Routes 20 & 131 Boston Post Road Facility # 46 47 48 49 50 122 123 124 125 165 166 167 178 179 180 181 192 City/Town Townsend Upton Uxbridge Westford Westminister Boylston Framingham Hudson West Brookfield Worcester Marlborough Spencer Charlton Auburn Westboro/Hopkinton Southborough Sturbridge Address New Fitchburg Road Route 140 Route 146 Route 225 Routes 140 & 2 Route 140 Route 9 Routes 62 & 495 Route 9 Cambridge Street Route 290 at Route 495 Route 9 Route 90/Sturbridge Road 85-89 Bancroft St Route 90/Wood Street 115 Woodland Road Routes 90 & 84 SPB - Charlton M5 - Auburn SA 6AW - Hopkinton SPB - Southborough Sturbridge salt shed Address 519 Appleton Street Route 125 & Prospect Street Crosby Road Topsfield Road Grant Avenue Route 4 north of Route 3 Facility # 70 73 74 75 76 77 City/Town Manchester Newbury Peabody Reading Reading Revere Address Pine Street off Route 128 Scotland Road Route 1 Route 28 at Route 128 Route 129 at Route 93 745 Washington Avenue District 3 Facility # 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 City/Town Worcester Boxboro Charlton Franklin Hopkinton Lancaster Littleton Littleton Millbury Millbury Northboro Oxford Rutland Sterling Sterling Sturbridge Sudbury District 4 Facility # 51 52 53 58 60 61 City/Town Arlington Andover Bedford Boxford Burlington Chelmsford Page 1 of 3 62 63 65 66 67 Concord Concord Haverhill Ipswich Lawrence 68 Lawrence 69 Lexington 196 Andover Route 2 at Crosby Corner 215 Elm Street Route 97 Route 1A Marston Street Route 114 at Route 495 Marrett Road River Road 78 79 81 130 131 153 160 163 Rowley Salisbury Tewskbury Lexington Lowell Somerville Andover Medford 279 Newbyr Turnpike Rabbit Road Clark Street Route 2 at Watertown Street Route 495 at Lowell Connector Mystic Avenue beneath Route 93 Route 93 at Route 495 Area 4C HQ, Mystic Avenue City/Town Orleans Plymouth Sandwich Seekonk Sharon-Walpole Stoughton Swansea Truro Wareham Whitman Wrentham Yarmouth Barnstable Bourne Dennis Edgartown Fall River New Bedford Edgartown Tisbury Address Route 6A at Bay Ridge Obery Street Route 130 Route 114A Route 27 Park Street 1001 G.A.R. Highway Route 6 Plymouth Road Ext. Route 18 & Bedford Street Route 1 Willow Street Phinney's Lane MacArthur Boulevard Theo F. Smith Road Meshakett Road Under Braga Bridge King's Highway 14 A Street 115 High Point Lane District 5 Facility # 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 112 City/Town Taunton Avon Bridgewater Bourne Cohassett Dartmouth Dartmouth Duxbury East Freetown Fall River Falmouth Freetown Foxboro Hanover Lakeville Mattapoisett Middleboro Middleboro Norton North Attleboro Taunton Address 1000 County Street Pond Street Routes 24 & 104 Sagamore Circle Route 3A Route 6 Faunce Corner Road East & Summer Streets Braley Road North Main Street Route 151 Route 79 off Route 140 Route 140 Route 53 at Mill Street Routes 105 at 118 North Street at Route 195 Vine Street Route 28 Route 123 Draper Avenue 1050 County Street Facility # 105 106 107 108 109 110 111 113 114 116 117 118 133 134 136 137 138 139 170 171 Address 90 Wood Road Granite Avenue at Route 93 Route 1A Beech & Sixth Street West Street Facility # 184 185 186 187 188 District 6 Facility # 59 72 84 128 129 City/Town Braintree Milton Westwood Chelsea Dedham 183 CMF 370 D Street, Boston 152 162 158 159 182 197 199 201 203 205 207 Neptune Road beneath Route 1A Columbia Rd (under I-93) Route 128N at Route 95 Recreation Road 668 South Ave 55 Dorchester Ave 500 Atlantic Ave 2 FID Kennedy Ave 100 Massport Haul Road 50 Bunker Hill Industrial Park, SMF 257 Congress Street East Boston Boston Canton Weston Weston Vent Bldg #1 Vent Bldg #3 Vent Bldg #6 Em. Resp. 2 Em. Resp. 10 Air Intake Struc City/Town SMF Vent Bldg #5 Vent Bldg #7 Vent Bldg #15 Em. Resp. 1, ESS #3, ET Toll Support Bldg 191 Tobin Bridge 193 194 195 198 200 202 204 206 208 Allston/Brighton S&I Weston Boston Vent Bldg #2 Vent Bldg #4 Vent Bldg #8 Em. Resp. 4 OCC Elec Substation #3 Address Rear of 410 Rutherford St, Boston 300 Massport Haul Road, Boston 7 Harborside Dr, Boston Chelsea and Warren, Boston 2B & 4 Harborside Dr, Boston M6 - Weston M8 CMF - South Boston SMF - Charlestown OCC - South Boston VB #5 - Boston VB #7 - Boston Charlestown (191a); 62 Broadway St., Chelsea (191) Exit 18 toll booth Park Road 185 Kneeland Street 257 Congress Street 136 Blackstone Street 42 Acclon Way 480 Albany Street 50 Massport Haul Road 497 W Austin Street Weston Park Road 5 Page 2 of 3 VB #15 - Boston ERS 1 - Boston ESS 3 - Boston TBF #1 - Boston Tobin Bridge - Chelsea, Charlestown Allston/Brighton 2 Boston - Special Operations Facility # City/Town 57 Boston R&M 112 Taunton 156 Braintree Address 400 D Street 1050 County Street HOV Lane Route 93 (audit w/157, same facility) Facility # City/Town 157 Boston 163 Medford Address HOV Lane Route 93 (audit w/156, same facility) Medford Sign Shop Statewide - Drawbridges Facility # Drawbridge Location 140 Blynman Bridge Blynman Canal and Anisquam River, #G-05-002 Gloucester 141 142 143 144 145 Facility # Drawbridge Location 147 Derek Hines Merrimack River, Amesbury Memorial Bridge #A07-010 Kenwood Danvers River, Beverly to Salem 148 Oak Bluffs Lagoon Vineyard Haven Barbor, Oak Bluffs to Bridge #B-11Bridge #O-01-001=T- Tisbury 005=S-01-013 04-001 Gillis Bridge #N- Merrimack River, Salisbury to Newburyport 149 Fairhaven/New Taunton River, Fall River 11-011=S-02Bedford Bridge #F-01003 002 Plum Island Plum Island River, Newburyport 150 Route 88 Bridge #W- westport River, Westport Bridge #N-1003-016 011 Belden Bly Saugus River, Lynn to Saugus 151 Brightman Street Taunton River, Fall River (Foxhill) Bridge Bridge #F-02-001=S#L-18-016 16-004 Granite Avenue Neponset River, Boston to Milton Bridge #B-16002=M-25-001 Page 3 of 3 Master Schedule - 2008 to 2012 First Cycle District 1 District 2 District 3 District 4 District 5 District 6 S.O & Drawbridges 2013 January February Worcester HQ 29 Duxbury 92 March Bedford 53 Granby 120 April Littleton 36 Weston 182 Foxboro 97 Burlington 60 Em Resp. etc. 188 Truro 113 May Ware 121 Boylston 122 Air Intake Struct 207 Boxford 58 June Avon 86 Goshen 5 Stoughton 110 July Sturbridge 44 Orange 22 August CMF 183 Manchester 70 Dartmouth 91 Vent Bldg. #4 200 September Becket 2 Framingham 123 Lawrence 67 New bedford 139 Revere 77 Taunton 112 Lancaster 34 Andover 52 Seekonk 108 Townsend 46 Haverhill 65 Vent Bldg #3 199 October Allston/Brighton S&I 193 Palmer 23 November December 2014 January February N. Adams 8 March Sandwich 107 Tobin Bridge 191 West Brookfield 125 April Concord 62 Williamstown 12 May Falmouth 95 Dennis 136 Milton 72 Millbury Route-146 37 South Hadley 25 June Middleboro 101. Taunton 112 Braintree 59 Upton 47 July Lakeville 99 Vent Bldg #15 187 Northampton -20 August Ipswich 66 Sterling 42 September Buckland 3 Wrentham 117 Concord 63 Athol 14 Sturbridge 192 Vent Bldg #6 201 Middleboro 102 Vent Bldg #7 186 October Sudbury 45 Palmer 177 November Belden Bly Bridge 144 Tewksbury 81 Vent Bldg #8 202 East Freetown 93 December 2015 January Arlington HQ 51 February Somerville 153 March Plymouth 106 Boxborough 30 Em. Resp. 2 203 Deerfield 17 April Edgartown 170 Lawrence 68 Huntington 6 May Fall River 138 Franklin 32 West Springfield 27 June Oak Bluffs Lagoon 148 Weston 194 Brightman St. Bridge 151 Vent Bldg #1 197 Andover 160 Hanover 98 Westminister 50 Barnstable 133 July Southborough 181 Sheffield 11 August Newbury 73 Belchertown 15 Plum Island Bridge 143 Orleans 105 Uxbridge 48 Whitman 116 Em. Resp. 4 204 Otis 9 October SMF 184 Reading 75 September Worcester Camb. St. 165 Canton 158 Winchendon 28 November North Attleboro 104 Route 88 Bridge 150 Spencer 167 Lexington 69 December 2016 January February Hudson 124 March Fall River 94 Reading 76 Pittsfield 10 April Fairhaven Bridge 149 Boston 195 Bourne 134 Chicopee 174 Littleton 35 May Lee 7 June Erving 18 Rutland 41 July Cohasset 89 Bernardston 16 Andover River Rd 196 Westboro/Hopkinton 180 Chelsea 128 Tisbury 171 - done w/170 2010 Dedham 129 Norton 103 Boston 162 Kenwood Bridge 141 HOV Lane Garage 156/7 Lee 172 August Sterling 43. Chelmsford 61 Warren 176 September October Taunton HQ 85 Oxford 40 Wareham 114 Marlboro 290 @ 495 166Lexington 130 Mattapoisett 100 East Boston 152 D Street Lab 57 OCC 206 November December 2017 January Medford 4C HQ 163 Medford Sign Shop 163 February Charlton 31 March June Springfield 24 November December Westwood 84 Hopkington 33 Sharon/Walpole 109 Weston 159 Dalton 4 Westfield 26 Granite Ave Bridge 145 Edgartown 137 Northboro 39 Bourne 88 Blandford 173 Charlton 178 Peabody 74 Bl;yman Bridge 140 Northampton HQ 13 Em. Resp 10 205 Millbury 38 September October Derek Hines Bridge 147 Auburn 179 Swansea 111 Lenox 1 July August Freetown 96 Elec Substation #3 208 April May Lowell 131 Yarmouth 118 Salisbury 79 Vent Bldg. #2 198 Dartmouth 90 Westfield 175 Westford 49 Vent Bldg #5 185 Bridgwaters E/W 87 Rowley 78 Gillis Bridge 142 Audit Schedule - 2013 Second Cycle Date 2/20/2013 3/21/2013 3/26/2013 4/10/2013 4/16/2013 4/18/2013 4/23/2013 5/1/2013 5/15/2013 5/15/2013 5/20/2013 5/29/2013 6/4/2013 6/4/2013 6/11/2013 6/18/2013 7/9/2013 7/11/2013 7/16/2013 7/23/2013 8/1/2013 8/6/2013 9/4/2013 9/5/2013 9/12/2013 9/17/2013 9/19/2013 9/20/2013 10/1/2013 10/9/2013 10/15/2013 10/17/2013 11/5/2013 11/7/2013 11/12/2013 Time 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM 10:00 AM Facility (District) Worcester HQ #29 (D3) Bedford #53 (D4) Weston #182 (D6) Littleton #36 (D3) Burlington #60 (D4) Foxboro #97 (D5) I-90 Toll Bldg #209 (D6) Truro #113 (D5) Ware #121 (D2) Granby #120 (D2) Duxbury Boylston #122 (D3) Air Intake Struct #207 (D6) Boxford #58 (D4) Avon #86 (D5) Goshen #5 (D1) Stoughton #110 (D5) CMF #183 (D6) Sturbridge #44 (D3) Manchester #70 (D4) Orange #22 (D2) Dartmouth #91 (D5) Becket #2 (D1) Framingham #123 (D3) Vent Bldg 4 #200 (D6) Lawrence #67 (D4) New Bedford #139 (D5) Vent Bldg #3 #199 (D6) Revere #44 (D4) Taunton #112 (D5) Palmer #23 (D2) Allston/Brighton S&I #193 (D6) Lancaster #34 (D3) Seekonk #108 (D5) Andover #52 (D4) Auditor LaParl LaParl Leach Spink Giando LaParl Leach LaParl Abbott Abbott Spink Abbott Fulgione Giando Leach Spink Spink Giando Abbott LaParl Leach Giando Spink Abbott Fulgione LaParl Leach Giando Fulgione Spink Abbott Giando Abbott Leach Fulgione Coordinator Giando Leach LaParl Giando Leach Fulgione LaParl Fulgione Spink Spink Fulgione Giando LaParl Leach Fulgione Abbott Fulgione LaParl Giando Leach Spink Fulgione Abbott Giando LaParl Leach Fulgione LaParl Leach Fulgione Spink LaParl Giando Fulgione Leach Status complete, no violations complete, no violations complete, 19 regulatory violations, three SOP violations complete, no violations complete, one SOP violation complete, no violations complete, one regulatory violation, one SOP violation complete, no violations complete, no violations complete, no violations complete, no violations complete, no violations complete, no violations complete, one SOP violation complete, no violations complete, three regulatory violations, one SOP violation complete, no violations complete, two regulatory violations, two SOP violations complete, no violations complete, no violations complete, no violations complete, two SOP violations complete, no violations complete, no violations complete, no violations complete, no violations complete, no violations complete, one regulatory violation, one SOP violation, one BMP complete, no violations complete, no violations complete, 2 BMPs MassDOT Environmental Compliance Audit Program Information Resource and Records Review List This is a list of information resources and facility records that should be available for review during the audit where applicable: Pre-Audit Information Resources Facility Maps on the EOT Intraway Previous Environmental Compliance Audit Reports on Environmental Share Drive at S:\HQ\Environment\EMS-Sustainability\Environmental Compliance Audit Program Existing Clean State Matter on the Clean State Database UST Registry on the Massachusetts Department of Environmental Protection Website at http://db.state.ma.us/dep/ust/ustQueryPage.asp 21E/MCP Sites at http://db.state.ma.us/dep/cleanup/sites/search.asp USEPA Enforcement & Compliance History Online at www.epa-echo.gov/echo/compliance_report.html Record Review Building Floor Plans indicating functions of each area Building Plumbing Plans Chemical Usage Records for Past 2 years Waste Characterization/Profile Records Weekly Hazardous Waste Inspection Forms Hazardous Waste Generator Registration Certificate Hazardous Waste Manifests for past 36 months Notices of Noncompliance, Consent Orders, or other Notices Issued by DEP or EPA Personnel Training Records relative to environmental regulations Aboveground and Underground Storage Tank Permits Spill Prevention Control and Countermeasure Plan & Spill Reports Facility Asbestos Survey Reports UST and UIC Closure Reports Septic System Permits and related documents Fuel reconciliation records DEP Class A Recycling Permit or DEP On-Site Class A Recycling Notification Form Local Fire Department permit for waste oil space heater Waste oil accumulation records Documentation that the waste oil space heater is approved for use ENVIRONMENTAL COMPLIANCE AUDIT CHECKLIST Facility Information Facility Name: Facility Representative: Address: Title: City, State, Zip: Telephone: Fax: Auditing Information Regulated Activities Date of Audit: Vehicle Fueling Auditor: Vehicle Washing Signature:_______________________________________________________ Wastewater Recycling System EMS Compliance Coordinator: Industrial Wastewater Discharge Persons Interviewed: Oil Water Separator Industrial Wastewater Holding Tank Waste Oil Generation RCRA Hazardous Waste Generation Inaccessible Areas: Universal Waste Generation Hazardous Materials Use/Storage General Comments: Solid Waste Accumulation On-Site Sewage Disposal On-Site Drinking Water Well Natural Resources: wetlands Riverfront Area USTs ASTs MCP Site Existing Clean State Matters AULs Other: Facility Operations Vehicle/Equipment Maintenance Snow/Ice Operations Stockroom District Offices Other: = ENVIRONMENTAL COMPLIANCE AUDIT CHECKLIST Page 2 of 9 SECTION 1: HAZARDOUS WASTE (310 CMR 30.000 and SOP ENV-03) YES NO N/A Citation Verification of Generator Status (310 CMR30.060 and 30.303) Has the facility registered as a Generator of Hazardous Waste and/or Waste Oil? Generator ID No: _________________ 30.303(1) Facility Hazardous Waste Generator Status: Facility Waste Oil Generator Status: SQG 30.351(1) VSQG 30.353(1) VSQG VSQG SQG SQG Is the registered generator status appropriate? VSQG <25 gallons/month (100 kg/month) or SQG <250 gallons/month (1,000 kg/month). Review manifests for confirmation. SQG 30.351(1) VSQG 30.353(1) Have appropriate hazardous waste determinations been made for wastes generated at the facility? 30.302 Verification of the Accumulation Limits If the facility is a VSQG, are there less than four 55-gallon drums (<1,000 kg or approximately 250 gallons) of hazardous waste/waste oil at the facility? 30.353(1)(b) If the facility is an SQG, are there less than twenty-seven 55-gallon drums (6,000 kg or approximately 1,500 gallons) of hazardous waste/waste oil at the facility (30.351(1)(b))? 30.351(1)(b) IF the facility has DUAL STATUS (e.g. VSQG of hazardous waste and SQG of waste oil), are the quantities of hazardous waste and waste oil stored at the facility below the maximum allowed for each status? (e.g. < 4 drums of hazardous waste and < 27 drums of waste oil) 30.253(5) Waste Container Management (310 CMR 30.253; 30.351; 30.353) Are all hazardous waste containers in good condition? (Note any dents, rust, or damage) SQG: 30.351(8)(b) VSQG: 30.353(6)(g) Are all hazardous waste containers tightly closed (bungs sealed and bolt ring secured, except when adding/removing waste)? SQG: 30.351(8)(b) VSQG: 30.353(6)(g) Are all hazardous waste containers labeled? SQG: 30.351(8)(a) VSQG: 30.353(6)(g) Do the labels include the name of the waste (waste oil, waste paint, etc.)? SQG: 351(8)(a) VSQG: 30.353(6)(g) Is the waste Hazard Type (toxic, ignitable, corrosive, and/or reactive) included on each label? SQG: 30.351(8)(a) VSQG: 30.353(6)(g) If the facility is a Small Quantity Generator (SQG), is the date when accumulation began clearly marked on the container label? 30.351(5) Is the accumulation time within regulatory limits? (180-days for SQGs) 30.351(5) and (6) Are containers compatible with the waste being accumulated? SQG: 30.351(8)(b) VSQG: 30.353(6)(g) Are containers of hazardous waste stored in the designated accumulation area? SQG: 30.351(8)(a) VSQG: 30.353(6)(h) Hazardous Waste Accumulation Areas (310 CMR 30.253; 30.351; 30.353) If the facility maintains a Hazardous Waste Accumulation Area: Is the accumulation area secured to prevent unauthorized entry? SQG: 30.351(8)(a) VSQG: 30.353(6)(h) Is the accumulation area adequately demarcated? ( e.g., visible line on floor and only hazardous waste stored therein)? SQG: 30.351(8)(a) VSQG: 30.353(6)(h) Is the accumulation area located on a surface free of cracks/gaps and is impervious to the hazardous wastes being stored, or is secondary containment in use? SQG: 30.351(8)(b) VSQG: 30.353(6)(h) Is the accumulation area labeled as “HAZARDOUS WASTE” with lettering at least 1-inch high? SQG: 30.351(8)(a) VSQG: 30.353(6)(h) Is Emergency Information/Contact List posted at the facility phone? SQG: 30.351(9)(c)(6) Is emergency equipment (spill, fire, etc.) located nearby? SQG: 30.351(9)(c)(3) Is secondary containment in use where required (e.g., if located outside)? SQG: 30.351(8)(b) VSQG; 30.353(6)(h) Is the accumulation area in good order? SQG: 30.351(8)(b) VSQG; 30.353(6)(h) Does the accumulation area have adequate aisle space between drums to allow for inspections of the containers? SQG: 30.351(8)(b) ENVIRONMENTAL COMPLIANCE AUDIT CHECKLIST Page 3 of 9 SECTION 1: HAZARDOUS WASTE (CONT’D) YES NO N/A Citation If the facility does NOT maintain a Hazardous Waste Accumulation Area: Is the waste transported to a designated facility on the day of generation or within 3 days of filling a container? VSQG: 30.353(6)(i) Hazardous Waste Satellite Accumulation Areas (310 CMR 30.253; 30.351; 30.353): If the facility maintains a Satellite Hazardous Waste Accumulation Area: SQG: 30.351(4) VSQG: 30.353(6)(i) Is there only one drum/container for each waste type? (limit one container up to 55-gallons) See above Is the satellite accumulation area at or near the waste’s point of generation? See above Is the satellite accumulation area managed by the person responsible for the area/operations generating the waste? See above Are container labels complete? (e.g. “Hazardous Waste,” type of waste, & hazard associated with waste) See above Are wastes moved to the accumulation area or shipped within 3 days of the satellite container becoming filled? See above Are containers compatible with the waste? See above Are containers closed when not adding/removing waste? See above Is secondary containment in use where required/warranted? (e.g., if located outside) See above Hazardous Waste Recordkeeping (310 CMR 30.253; 30.351; 30.353; 30.310; 30.330; 30.750) All Hazardous Waste Generators: If SQG, are weekly inspection records of the hazardous waste and satellite accumulation areas maintained? (One Year) 39.351(8)(b) If the facility is a VSQG and self-transports hazardous waste: Is a receipt received from the destination facility and on file? 30.353(7) If the facility does NOT self-transport hazardous waste (VSQG, SQG): Are hazardous waste manifests used when shipping hazardous wastes? 30.311(1) Are manifest records maintained for three years? 30.331(1) Has the facility received all return copies of manifests from receiving facilities and maintained for 3 years? 30.331(1) Is the hazardous waste generator ID number properly written on each manifest? 30.311(1) If the facility has not received a return copy of a manifest from the disposal facility in 45 days, has the facility filed an Exception Report and are these Exception Reports maintained for 3 years? 30.333(1) and (2) 30.331(3)(b) Are copies of Land Ban Certifications completed and maintained for 3 years? 40 CFR 268.7 Did the manifests reviewed demonstrate that the facility is appropriately disposing of all waste to only licensed facilities via licensed transporters? 30.311(2) and (3) If SQG of Hazardous Waste or Waste Oil: Has the facility made an attempt to notify the police department, fire department, local board of health, and emergency response teams as to the facility layout, the hazards associated with the wastes, location of the hazards, and possible emergency evacuation routes? (e.g., with a signed and dated letter) 30.351(9)(j) and (k) Are applicable employees trained as to their duties related to hazardous waste handling? SQG: 30.351(9)(g) Universal & Special Waste (310 CMR 30.1000 and ENV-07) Universal Waste Batteries (skip subsection if not generated) Are universal waste batteries stored in a container or other manner suitable for preventing/containing possible leakage? (This is only required if there is evidence of leakage, spillage, or damage that could cause leakage) 30.1034(1) Is battery container labeled with “Universal Waste – Batteries”? 30.1034(1)(d) Is battery container labeled with accumulation start date? 30.1034(6)(c) Is the accumulation date no more than one year old? 30.1034(6)(a) Universal Waste Mercury Containing Lamps and/or Devices (skip subsection if not generated) Are devices stored in a container or other manner suitable for preventing/containing possible breakage? (This is only required if the device or lamp is leaking or broken) 30.1034(4) and (5) Is storage container labeled with “Universal Waste-Mercury Containing Devices” or “Universal Waste-Mercury Containing Lamps” for fluorescent bulbs? 30.1034(4)(d) 30.1034(5)(e) Are containers labeled with the start date of accumulation? 30.1034(6)(c) Is the accumulation date no more than one year old? 30.1034(6)(a) ENVIRONMENTAL COMPLIANCE AUDIT CHECKLIST Page 4 of 9 SECTION 1: HAZARDOUS WASTE (CONT’D) YES NO N/A Citation Lead Acid Batteries (40 CFR 266 Subpart G, SOP ENV-05) Are used lead acid batteries appropriately stored, or, if leaking, containerized for eventual return to the Stockroom, supplier, or recycler? 40 CFR 266.80 In addition to the specific compliance areas above, is the facility in compliance with the following SOPs: Hazardous Waste Management at MassDOT Highway Facilities? ENV-01-03 Used Vehicle Battery Disposal at MassDOT Highway Division Facilities? ENV-01-05 Universal Waste Management at MassDOT Highway Division Facilities? ENV-01-07 Roadside Unknown Waste Handling? ENV-01-25 Used Oil Fired Space Heaters (310 CMR 30.200, 527 CMR 4.03, 310 CMR 7.04) Does the facility have a DEP Class A Recycling Permit that was issued by February 27, 2004? 30.225 If not, was a one-time Class A Recycling Notification Form submitted to the DEP? 30.225 Does the facility have approval to operate a waste oil burner from the local fire department? 527 CMR 4.03(1) Are records of burner operation hours properly maintained? 30.205(14) Are all Used Oil FUEL containers properly labeled? (Burner Tank: Regulated Recyclable Material, “USED OIL,” Toxic; Drums: Regulated Recyclable Material, “USED OIL,” Toxic, and labeled with the accumulation date) Is the space heater operated only between September 15th and June 15th? (7.04(9)(d)4.) 30.205(19) 7.04(9)(d)4. SECTION 2: HAZARDOUS MATERIALS YES NO N/A Hazardous Materials Management (454 CMR 21.00, 40 CFR 355, and SOPs ENV-02, -06, -08, 09, -11) Are hazardous material containers labeled with the name of their contents? MGL 111F Chapter 7(a) Are storage tanks/dispensers and containers having capacities greater than 5 gallons labeled with an NFPA label? MGL 111F Chapter 7(a) Does the Facility have any Extremely Hazardous Substances equal to or greater than the Threshold Planning Quantity? 40 CFR 355 If Yes, has there been a release above and RQ? 40 CFR 355 If Yes was the SERC or LEPC notified? 40 CFR 355 Are MSDS maintained at the Facility or available upon request? MGL 111F Chapter 11 Has a list of hazardous materials been filed with DEP? (e.g., with a signed and dated letter) MGL Ch 111F(16) In addition to the specific compliance areas above, is the facility in compliance with the following SOPs: Material Safety Data Sheet Management at MassDOT Highway Division Facilities? ENV-01-02 Handling, Storage, and Disposal of Compressed Gas Cylinders at MassDOT Highway Division Facilities? ENV-01-06 Management of Sand and Deicing Chemicals at MassDOT Highway Division Facilities? ENV-01-08 Hazardous Materials Management at MassDOT Highway Division Facilities? ENV-01-11 SECTION 3: SOLID WASTE YES NO N/A Solid Waste Management (310 CMR 16.00 & 19.000 and SOPs ENV-10, -12, -13, and -24) Are the solid wastes present at the facility separated by type and/or stored in designated accumulation areas and trash stored in a covered dumpster? 310 CMR 16.05(5)(a) ENV-01-12 Are street sweepings stored in accordance with requirements of DEP Policy? DEP Policy #BWP-94092 Is there evidence of improper disposal in the trash dumpster (batteries, lamps, waste oil, etc.)? 310 CMR 19.017 Are cathode ray tubes (CRTs) collected, stored, handle and transported in a manner that prevents and minimizes breakage and stored/segregated from other solid waste? 310 CMR 16.05(3)(f) Is there an active or inactive landfill or dumping ground at the Facility? If yes, has the landfill/dumping ground been approved or closed or is it being closed in accordance with a DEP approved plan? If Yes, describe status: In addition to the specific compliance areas above, is the facility in compliance with the following SOPs: ENVIRONMENTAL COMPLIANCE AUDIT CHECKLIST Page 5 of 9 Disposal of Animal Carcasses? ENV-01-10 Temporary Storage of Solid Waste at MassDOT Highway Division Facilities? ENV-01-12 SECTION 4: STORAGE TANKS YES NO N/A Storage Tank Management (527 CMR 9.00 and SOPs ENV-14 and -28) Underground Storage Tanks (527 CMR 9.00) Are the USTs equipped with secondary containment, spill and overflow protection, and leak detection? 9.05 Are steel USTs/underground piping equipped with cathodic protection? 9.05(A)(3) Are cathodic protection systems tested and calibrated every 60 days, annually, or triennially as applicable? 9.05(H)(4)-(6) Are electronic daily inventory checks conducted on Facility USTs? 9.05(D)(2) Are daily inventory/monthly reconciliation records completed and kept at the Facility and/or at the District HQ? 9.05(E)(1) Are the electronic inventory checks/reconciliations reviewed by District personnel for abnormal loss of product and/or gain of water? 9.05(E)(1) Are leak detection systems tested and calibrated in accordance with manufacturer recommendations? 9.05(D)(3) Is leak detection equipment maintained in operating condition? 9.05(D)(3) Has the tank been inspected by a third party within the past three years? 9.07(P) If the UST electronic system is inoperable: Has the facility taken steps to initiate repair of the leak detection equipment? 9.05(D) If the Facility Dispenses Gasoline (310 CMR 7.24): Is the gasoline dispensing operation equipped with a Stage II vapor recovery system? 7.24(6)(a) 1-3 Is the Stage II system registered with DEP and tested annually (Annual In-Use Compliance Certification submittal)? 7.24(6)(c)3 Are records of Stage II system weekly inspections and periodic maintenance documentation kept at the Facility or immediately available for inspection (able to be faxed by District Headquarters)? 7.24(6)(b)3 All Tanks (527 CMR 9.07) Have tanks been appropriately registered/permitted with the local fire department and the State Fire Marshal? 9.07(M); M.G.L. c. 148, Section 37 Are tank registration/permit certificates conspicuously posted or kept at the Facility? 9.07(M)(1) Are there any abandoned tanks at the facility? 9.07(J) 2-3 If yes, describe out of service date(s) and status of any DEP notification and/or closure/removal: Spill Prevention (40 CFR 112) Does the facility store oil in aboveground tanks or drums in quantities equal to or greater than 1,320 gallons? 40 CFR 112.1(d)(2)(ii) If Yes, does the facility have and up-to-date and P.E.-certified SPCC Plan? 40 CFR 112.3(d) If Yes, is the facility implementing the SPCC Plan? 40 CFR 112.3 In addition to the specific compliance areas above, is the facility in compliance with the following SOP: Inspection And Repair Of Stage I And Stage II Recovery Systems Associated With Underground Storage Tanks? ENV-01-28 SECTION 5: WATER QUALITY YES NO N/A Drinking Water Supply (310 CMR 22.22) What is the Facility’s water supply source? Private Well Municipal Public Water Supply If the facility is supplied with municipal water answer backflow devices questions below. Other: Does the facility have backflow prevention devices for boiler supply water? 22.22(9)(a) Does the facility have backflow prevention devices on its fire protection/sprinkler system? 22.22(9)(a) Does the facility have backflow prevention devices on threaded hose connections? 22.22(2)(b) Have applicable devices been registered with the Public Water Supplier? 22.22(7)(b) ENVIRONMENTAL COMPLIANCE AUDIT CHECKLIST Page 6 of 9 SECTION 5: WATER QUALITY (CONT’D) YES NO N/A Septic Systems (310 CMR 15.000, SOP ENV-17) Does the facility discharge to a subsurface sewage disposal system (septic system)? If present and installed on or after 3/31/95, has the facility received a certificate of compliance (COC) for the septic system? 310 CMR 15.021 If present, is only sanitary wastewater discharged to the septic system (i.e., no process water/chemicals)? 310 CMR 15.004 Drainage Systems (314 CMR 1-15) Does the facility have a floor drain(s)? If yes, where do they discharge to: Describe: Yes POTW No Surface Water Ground Holding Tank Other If floor drains are located in an area of hazardous material storage or maintenance areas, do the drains discharge to a sanitary sewer or to an industrial wastewater holding tank? If the facility discharges process wastewater to a municipal sewer system, has the facility notified the POTW of the discharge to determine whether a permit is required? 314 CMR 7.00 If floor drains, have been sealed, did the facility file a WS-1 form with the DEP? (NA for drains connected to sanitary sewer) 310 CMR 27.10 If floor drains discharged to the ground, did facility close underground structure(s) and file UIC Notification Form with DEP? 310 CMR 27.10 Are there any oil/water separators on-site? If present, are oil/water separators inspected and serviced periodically (as required in some areas, such as MWRA)? If a permit has been issued, are the facility oil/water separators in compliance with permit requirements? MWRA: 360 CMR 10.016(4) or permit Stormwater Discharges (310 CMR 27.00; 314 CMR 3.00; 314 CMR 5.00, SOP ENV-19) Are there stormwater catchbasins on the property? If Yes, where do the catch basins discharge? describe: POTW Surface Water Ground Other, If present, have leaching catch basins located within process areas been registered with the DEP (Class V Injection Well Registration)? 310 CMR 27.08 If a leaching catch basin was registered with DEP, does the Facility maintain a map/plan showing the catch basin location? 310 CMR 27.08 Vehicle Washing (310 CMR 1-15; 40 CFR 122, SOP ENV-22) If facility is a Designated Vehicle Washing Facility: Are vehicles washed only indoors? Is the facility equipped with floor drains connected to either the municipal sewer or wash water recycling system, or Is the facility equipped with an approved holding tank? If facility is NOT a Designated Vehicle Washing Facility: Are vehicles only rinsed onsite (no detergents or heated water/steam)? If the facility has an Industrial Wastewater Holding Tank: (Existing Permits; 314 CMR 18.00) Does the facility have a DEP Industrial Wastewater Holding Tank Permit? If Yes, is the Facility in compliance with permit conditions? 314 CMR 18.00 Review permit For applicable holding tanks, has the Facility submitted a one-time compliance certification to DEP (due by February 15, 2003, or within 60 days for new tanks)? (Not required if the Facility has a DEP-issued plan approval for the holding tank.) 18.10(1) Does the Facility maintain copies of installation plans (until tank is decommissioned) and records on pumping and wastewater shipments/disposal (three years)? 18.09(1) If an existing holding tank was not installed in accordance with PE Certified Plans, has the holding tank undergone an integrity assessment (due by November 15, 2003)? 18.08(2) Is the Holding Tank labeled as “Non-Hazardous Industrial Wastewater?” (required for underground and aboveground tanks) 18.07(6) Is the Holding Tank equipped with a high level alarm? If yes, is the alarm functioning properly? 18.07 or 18.08 Is the holding tank gauged/inspected for leakage regularly? (required for new underground tanks, otherwise SOP) ENV-01-18 Is the alarm system tested by an electrician on a semi-annual basis? (SOP, unless permit condition says otherwise) ENV-01-18 Is the holding tank pumped cleaned and inspected for structural integrity every five years? (SOP, unless permit condition says otherwise) ENV-01-18 ENVIRONMENTAL COMPLIANCE AUDIT CHECKLIST Page 7 of 9 SECTION 5: WATER QUALITY (CONT’D) YES NO N/A In addition to the specific compliance areas above, is the facility in compliance with the following SOPs: Groundwater Monitoring Well Maintenance at MassDOT Highway Division Facilities? ENV-01-16 Maintenance of Subsurface Sewage Disposal Systems at MassDOT Highway Division Facilities? ENV-01-17 Maintenance of Wastewater Holding Tanks and Proper Disposal of Accumulated Wastewater at MassDOT Highway Division Facilities? ENV-01-18 Inspection and Maintenance of Stormwater Catch Basins at MassDOT Highway Facilities? ENV-01-19 Vehicle Washing at MassDOT Highway Facilities? ENV-01-22 Inspection And Maintenance of Oil/Water Separators (OWS) at MassDOT Highway Division Facilities? ENV-01-27 SECTION 6: NATURAL RESOURCE AREAS YES NO N/A Wetlands, Buffer Zones, and Riverfront Zones (310 CMR 9.00 & 10.00, SOP ENV-15) Are there any Natural Resource Areas (wetland, buffer zone, or riverfront zone) at the property? (If NO, go to next section) 9.02 and 10.03 Is the facility conducting work in a Natural Resource Area (e.g. removing, filling, dredging, or altering)? 9.03 - .04 10.02-10.05(6) If the facility is conducting work in a Resource Area, was a Request for Determination of applicability, or NOI submitted to and approved by the local Conservation Commission, and was Certificate of Compliance received upon work completion? 10.05(4) If issued, is the facility is compliance with wetlands Order of Conditions or enforcement order? 310 CMR 10.02-05 In addition to the specific compliance areas above, is the facility in compliance with the following SOPs: Protection of Wetland Resource Areas at MassDOT Highway Facilities? ENV-01-15 SECTION 7: POLLUTION PREVENTION YES NO N/A Spills/Releases (310 CMR 40.0000; 40 CFR 300; 40 CFR 355, SOPs ENV-03, -07, -11, -20, and -21) Is there an indication of a release or threat of release of oil and/or hazardous material at the facility? 310 CMR 40.0000 If yes, describe event(s) and actions taken, including notifications made. Is there an MCP site at the facility in which a permanent solution has not been achieved? 310 CMR 40.0000 If yes, have MCP/Clean State timelines been met? Describe status and conditions: Is there an AUL at the facility? 310 CMR 40.0000 Is the facility in compliance with the terms of the AUL? Asbestos (310 CMR 7.09 & 7.15; 453 CMR 6.00) Has the facility conducted building renovations/demolitions or asbestos abatement projects? 453 CMR 6.01 - .02 If yes, was an asbestos survey conducted prior to renovation/demolition? Prior to renovation/demolition, was DEP properly notified using ANF 001 Form? 310 CMR 7.09 and 7.15 453 CMR 6.12 If an asbestos abatement project was conducted, were licensed contractors used? 453 CMR 6.030 If an asbestos abatement project was conducted, was asbestos containerized for offsite disposal at a licensed facility? 453 CMR 6.13(2)(b) 453 CMR 6.14(4)(h) ENVIRONMENTAL COMPLIANCE AUDIT CHECKLIST Page 8 of 9 SECTION 7: POLLUTION PREVENTION (CONT’D) YES NO N/A In addition to the specific compliance areas above, is the facility in compliance with the following SOPs: Outdoor Operation/Maintenance Equipment Storage at MassDOT Highway Facilities? ENV-01-20 Management of Asbestos Containing Materials at MassDOT Highway Division Facilities? ENV-01-29 SECTION 8: AIR QUALITY YES NO N/A Air Emissions, Permits & Recordkeeping (310 CMR 7.00) Parts Cleaners Is a solvent parts cleaner used? 310 CMR 7.18 If yes, is the unit equipped with a drain to a remote reservoir? 310 CMR 7.18 If present, is the unit equipped with a functioning cover? 310 CMR 7.18 If present, is the unit cover kept closed when not in use and are instructions on the proper operation posted on the unit? BMP Refrigerant Management Does the facility conduct vehicle refrigeration maintenance? 40 CFR 82 If yes, are personnel who perform refrigerant work certified by EPA? 40 CFR 82.34(a)(2) Is refrigerant recovery equipment EPA-certified? 40 CFR 82.34(a)(1) Has the facility submitted a Notification Form with EPA for use of the refrigeration equipment? 40 CFR 82.42(a) Are waste appliances containing refrigerants (e.g., refrigerators, air conditioners) properly stored to prevent damage and accidental release of refrigerant? 40 CFR 82 SECTION 9: TRAINING YES NO N/A Training Records Does the facility have the following training records on file, where applicable: Hazardous Waste Management training? SQG: 30.351(9)(g) Universal Waste Management Training? 30.1035 Stage II Vapor Recovery System training? 7.24(6)(b)2. Spill Prevention, Control, and Countermeasure Plan training? 40 CFR 112.7(f) Other (list)? SECTION 10: CLEAN STATE PROGRAM YES NO N/A Clean State Program Management Are there any existing Clean State Matters for the facility? If Yes, list and describe status: Policy ENF-05-001 ENVIRONMENTAL COMPLIANCE AUDIT CHECKLIST Page 9 of 9 Additional notes/Comments: MassDOT Environmental Compliance Audit AUDIT FINDINGS REPORT Facility: PAGE ___ of ___ Audit Date: Note: Provide a description of each finding (i.e. regulatory violation or SOP noncompliance) identified during the audit and the appropriate recommendation (corrective action or best management practice) for implementation. FINDING SUMMARY Finding Description Regulatory Citation or SOP Reference Recommended Corrective Action (Violation) or Best Management Practice (SOP) The signature below certifies that the Auditor has identified the finding listed above and that the above are accurate and true to the best of the Auditor’s knowledge. Auditor Date MassDOT Environmental Compliance Audit CORRECTIVE ACTION PLAN REPORT Facility: PAGE __ of __ Audit Date: Description of Violation and Regulatory Citation: Possible Cause of Violation: Corrective Action Plan: The following signature certifies agreement with the Corrective Action Plan, as described above, and commitment to providing the necessary personnel, equipment and/or contractual resources for its successful completion within sixty days of the audit date: District Maintenance Engineer Date Note: The CAP Report with the DME Signature must be submitted to the Audit Coordinator via e-mail within 14 days of audit site visit date for updating the Clean State Database. The following signature certifies that the completed corrective action, as described above, has successfully corrected the violation within sixty days of its discovery: EMS Compliance Coordinator Date MassDOT Environmental Compliance Audit Program Fieldbook ENVIRONMENTAL REQUIREMENTS LIST This Environmental Requirements List provides a summary of State and Federal regulations, State Department of Environmental Protection policies, and Executive Orders that may be applicable to MassDOT Facilities. In addition, a list of current MassDOT Environmental Standard Operating Procedures is provided herein. Under MassDOT’s GreenDOT Policy, Policy P-10-002, MassDOT will pursue the GreenDOT Vision and achieve the three GreenDOT goals by making sustainability an integral part of every MassDOT employee’s job, and by integrating these objectives into our organizational vision and mission. • We will address short- and long-term greenhouse gas emissions at every stage of design, construction, and operation of our transportation system in order to minimize climate disruption and its effects on the environment and on our customers. • We will consider the needs of all our customers, regardless of mode choice or ability, in the design and operation of MassDOT transportation facilities. We will be guided by the MassDOT Complete Streets design philosophy articulated in the Highway Division Project Development and Design Guide and the principles of safe and full access to and within transit, rail, and other transportation facilities. • We will distribute staff resources and define department objectives in a manner that ensures adequate attention to all customers and modes. • We will design, build and operate our transportation system so that it supports smart growth development; this in turn will facilitate travel by the healthy transportation modes of walking, bicycling, and public transit; improve air quality; preserve the environment; and enhance quality of life for all of our customers. • We will measure our performance toward the GreenDOT goals with a robust set of performance measures that evaluate sustainability and service to our customers – the users of our transportation facilities. Page 1 of 7 July 2011 MassDOT Environmental Compliance Audit Program Fieldbook State Environmental Regulations State Law/Regulation Subject MGL c. 111 § 2B-2C; § 31C; § 142A142M; 150A-B 310 CMR 7.00 Air Quality 310 CMR 7.01 310 CMR 7.02 310 CMR 7.03 310 CMR 7.04 310 CMR 7.05 310 CMR 7.06 310 CMR 7.07 310 CMR 7.09 Air pollution control regulations Causing or contributing to a condition of air pollution Air Plan Approval permits, Restricted Emission Status Plan Approval exemption construction requirements Maintenance and testing of fuel burners Fuel restrictions – sulfur, ash, and additives – fuel supply records Opacity/smoke density limits for fuel burner emissions Open burning of combustible material 310 CMR 7.11 Construction and demolition causing or contributing to air pollution Causing or contributing to a condition of noise pollution Motor vehicle emission standards (idling vehicles) 310 CMR 7.12 Source Registration 310 CMR 7.15 Asbestos 310 CMR 7.18 Volatile organic compound emission limits and controls Vapor control for organic material storage – Stage I and Stage II 310 CMR 7.10 310 CMR 7.24 MGL c. 21C Hazardous Waste Management 310 CMR 30.0000 310 CMR 30.060 - 064 Massachusetts hazardous waste management regulations Notification procedures 310 CMR 30.253 Waste oil storage and disposal 310 CMR 30.302 Determination of whether a waste is hazardous 310 CMR 30.303 Generator registration 310 CMR 30.351 310 CMR 30.353 310 CMR 30.310 Hazardous waste management for VSQG and SQG Manifests Page 2 of 7 July 2011 MassDOT Environmental Compliance Audit Program Fieldbook State Law/Regulation Subject 310 CMR 30.330 Record Keeping 310 CMR 30.750 Land Disposal Restrictions 310 CMR 30.320 Pre-transport requirements 310 CMR 30.1000 Disposal of universal waste MGL c. 22, §§ 2 & 14 MGL c. 30, § 30 MGL c. 146, § 22 MGL c. 148, § 9 – 38E MGL c. 21E Storage Tanks and Equipment 527 CMR 4.00 Oil burning equipment 527 CMR 5.00 527 CMR 6.00 O&M of buildings/structures/garages/service stations for gasoline or other motor fuel storage/use LPG containers and systems 527 CMR 8.00 Transportation of combustible liquids 527 CMR 9.00 Tanks and containers 527 CMR 9.05 Leak detection, Inventory monitoring, Tightness testing, Upgrading, and Corrosion protection for USTs General provisions: Abandoned USTs, Tank removal, Registration and permitting of tanks 527 CMR 9.07 MGL c. 21E MGL c. 21H 310 CMR 40.0000 Waste Site Cleanup 310 CMR 40.0000 Subpart C Reporting of hazardous material releases 310 CMR 40.0000 Subpart E 310 CMR 40.0300 Assessment and cleanup of hazardous material releases Maintenance of Response Action Outcomes & Activity and Use Limitations Management of remediation wastes 310 CMR 40.0400 IRA, RAM, URAM procedures MGL c. 21A, §§ 2 and 8 MGL c. 111 § 150A-150A1/2 Solid Waste Management 310 CMR 40.0000 Subpart J 310 CMR 16.00 Massachusetts Contingency Plan 310 CMR 16.05 Site assignment regulations for solid waste facilities Applicability and conditionally exempt operations 310 CMR 16.06 Prohibitions 310 CMR 19.000 Solid waste management regulations Page 3 of 7 July 2011 MassDOT Environmental Compliance Audit Program Fieldbook State Law/Regulation Subject 310 CMR 19.003 & 19.013 Applicability and exemptions 310 CMR 19.014 - 19.016 Prohibitions on open dumps, dumping grounds and un-permitted facilities - post closure use restrictions Closure of Un-permitted Waste dumps 310 CMR 19.021 MGL c. 21 § 26-53 MGL c. 111, § 17 – 160 MGL c. 83 § 11 MGL c. 131, § 40 St. 1984, c. 372§ 40 6(e) & 8(m) St. 1987, c. 307 St. 1991, c.41 MGL c.142, § 13 310 CMR 15.00 310 CMR 27.00 Water Pollution Control; Underground Injection Control Septic systems: Title 5 314 CMR 2.00 Underground water source protection: Class V injection Wells General Permitting 314 CMR 3.00 Surface water discharge permit program 314 CMR 5.00 Ground water discharge permit program 314 CMR 7.00 Sewer system extension and connection permit program Industrial wastewater holding tanks 314 CMR 18.00 360 CMR 10.00 248 CMR 2.00 Massachusetts Water Resources Authority (MWRA) Uniform state plumbing code MGL c. 131 § 40 MGL c. 30 §§ 61-62H MGL c. 91 MGL c.6A § 2-7 MGL c. 21A, § 4A Wetlands Protection Act Massachusetts Environmental Protection Act (MEPA) Wetlands and Waterways; Water withdrawals 310 CMR 9.00 Waterways 310 CMR 10.00 Wetlands 301 CMR 12.00 Areas of Critical Environmental Concern 301 CMR 20.00-21.00 Coastal Zone Management Program 321 CMR 10.00 Endangered Species Act Regulations 321 CMR 8.00 Endangered Wildlife and Wild Plants 950 CMR 71.00 Historic Commission Page 4 of 7 July 2011 MassDOT Environmental Compliance Audit Program Fieldbook State Law/Regulation Subject 301 CMR 11.00 Massachusetts Environmental Policy Act (MEPA) 321 CMR 2.14 Problem Animal Control (Beavers) MGL c. 40, 111, 114, 140, 165 Drinking Water Supply 310 CMR 22.00 Drinking water protection: Public water supply wells – cross connection program MGL c. 149 §§ 2, 5, & 6 MGL c. 111 §§ 2 – 5P 105 CMR 410.000 Asbestos & Radiation 453 CMR 6.00 Licensing and protection of asbestos workers 310 CMR 7.09; 310 CMR 7.15 310 CMR 19.061 Demolition/renovation of asbestos containing materials Disposal of asbestos waste 105 CMR 122.000 453 CMR 4.00 Fixed facilities which generate electromagnetic fields Ionizing radiation 453 CMR 5.00 Non-Ionizing radiation Maintenance of asbestos-containing materials Vegetation Management 333 CMR Pesticide Board 330 CMR 9.00 Plant Pest Control MGL c. 111F MGL c. 21I, §§ 3, 10, 11, and 12 105 CMR 670.000 Right to Know 310 CMR 33.00 454 CMR 21.00 Massachusetts right-to-know law Community right-to-know: Filing of Material Safety Data Sheets with DEP Employee right-to-know Page 5 of 7 July 2011 MassDOT Environmental Compliance Audit Program Fieldbook Federal Environmental Regulations Federal Regulation Subject Air Quality 40 CFR 61 40 CFR 82 National Emission Standards for Hazardous Air Pollutants (NESHAPs) (Asbestos) Ozone depleting substances (ODS) Federal hazardous Waste Regulations 40 CFR 266 Subpart G 40 CFR 311- (29 CFR 1910.120) 40 CFR 355 40 CFR 370* Spent Lead-Acid Batteries Being Reclaimed Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) – Emergency Planning and Right-toKnow Regulations Worker Protection – hazardous waste operations and emergency response Emergency planning and notification – CERLCA extremely hazardous substances reportable quantities (RQs) Hazardous chemical reporting: Community right-to-know – MSDS and Tier reports Water Quality 40 CFR 110 Discharge of Oil 40 CFR 112 Spill prevention control and countermeasure plans (SPCC) 40 CFR 122 National Pollutant Discharge Elimination System (NPDES) 40 CFR 300 National oil and hazardous substances pollution contingency plan – Notification of Releases to NRC General pretreatment standards for existing and new sources of pollution US Army Corps of Engineer Regulations (Massachusetts Programmatic General Permit) Wildlife 40 CFR 403 33 CFR 320-330 50 CFR 17.00 Federal Endangered Species Act Toxic Substances Control Act (TSCA) 40 CFR 761 Manufacturing, processing, distribution in commerce, and use of PCBs and PCB items Department of transportation (DOT) 49 CFR 106, 107, 110, 130, 171-180 Regulations for Shipping and Receiving Hazardous Materials Coast Guard 33 CFR 114-115 * Voluntary participation Page 6 of 7 July 2011 US Coast Guard Protection of Navigable Waters MassDOT Environmental Compliance Audit Program Fieldbook MassDEP Policies & Guidance Documents DEP Policy Number Subject BWP-94-015 Policy for Industrial Wipers Contaminated with Solvents BWP-89-02 Policy for Contractors with Hazardous Waste HW-93-02 Policy for the Management of Used Oil Filters BWP/DHW-92-01 Policy for the Disposal of Lighting Ballasts from Fluorescent Lights Containing PCB Impregnated Capacitors Waste Management Guidance for Industrial Wipers and Sorptive Minerals Contaminated with Waste Oil Reuse and Disposal of Street Sweepings BWP/DHW-92-02 BWP-94.092 ABC Guide (rev 2/2000) DWSG97-1 Guide to Regulations for Using or Processing Asphalt, Brick and Concrete Rubble Management Requirements for Hazardous Waste Batteries intended for Recycling Guideline on Deicing Chemical (Road Salt) Storage BRPG01-01 Snow Disposal Guidelines ENF-05-001 Policy on Incentives for Self-Policing: Environmental Self Audit Policy Addendum for State Agencies ENF-97-004 Policy on Incentives for Self-Policing: Environmental Audit Policy MassDEP Fact Sheet (4/2004) Management of Catch Basin Cleanings BMP (4/2004) On-Site Class A Recycling Guidance (http://www.mass.gov/dep/recycle/approvals/oscarpkg.pdf) MassDEP Fact Sheet (3/2005) Safe Handling of Waste Oil for Burning in Space Heaters (http://www.mass.gov/dep/recycle/laws/spacehtr.pdf) MassDEP Municipal Compliance Fact Sheet (6/2007) Municipal Compliance Fact Sheet: Stormwater (http://www.mass.gov/dep/water/laws/mc_stormw.htm) MassDEP Guidance (09/2010) Guidance for Emergency repairs in Wetland Resource Areas or Buffer Zones, & Waterways (http://www.mass.gov/dep/water/laws/2010eg.htm) BWP-95-005 Page 7 of 7 July 2011 MassDOT Environmental Compliance Audit Program Fieldbook Executive Orders Executive Order No. Subject 484 Leading By Example – Clean Energy and Efficient Buildings 515 Establishing an Environmental Purchasing Policy Page 8 of 7 July 2011 MassDOT Environmental Compliance Audit Program Fieldbook MassDOT Standard Operating Procedures SOP 01 Environmental Compliance SOPS ENV-01-01-1-000 SOP 02 Materials Safety Data Sheet Management ENV-01-02-1-000 SOP 03 Hazardous Waste Management ENV-01-03-1-000 SOP 05 Used Vehicle Battery Disposal ENV-01-05-1-000 SOP 06 Handling, Storage and Disposal of Compressed Gas Cylinders ENV-01-06-1-000 SOP 07 Universal Waste Management ENV-01-07-1-000 SOP 08 Management of Sand and Deicing Chemicals ENV-01-08-1-000 SOP 10 Disposal of Animal Carcasses ENV-01-10-1-000 SOP 11 Hazardous Materials Management ENV-01-11-1-000 SOP 12 Temporary Storage of Solid Waste ENV-01-12-1-000 SOP 15 Wetland Resource Protection ENV-01-15-1-000 SOP 16 Groundwater Monitoring Well Maintenance ENV-01-16-1-000 SOP 17 Maintenance of Subsurface Sewage Disposal Systems ENV-01-17-1-000 SOP 18 Maintenance of Wastewater Holding Tanks ENV-01-18-1-000 SOP 19 Inspection and Maintenance of Stormwater Catch Basins ENV-01-19-1-000 SOP 20 Outdoor Operation/Maintenance Equipment Storage ENV-01-20-1-000 SOP 22 Vehicle Washing ENV-01-22-1-000 SOP 25 Roadside Unknown Waste Handling ENV-01-25-1-000 SOP 27 Inspection and Maintenance of Oil/Water Separators ENV-01-27-1-000 SOP 28 Inspection and Repair of Stage I and Stage II Recovery Systems ENV-01-28-1-000 SOP 29 Management of Asbestos Containing Materials ENV-01-29-1-000 SOP 31 Performing Facility Environmental Compliance Inspections ENV-01-31-1-000 SOP 32 Contractors’ Use of Facilities ENV-01-32-1-000 SOP 33 Beaver Dam Control ENV-01-33-1-000 SOP 34 Environmental Scope Review of Maintenance Projects ENV-01-34-1-000 SOP 35 Routine Maintenance of Drainage Structures ENV-01-35-1-000 SOP 36 Emergency Response to Roadway Flooding ENV-01-36-1-000 SOP 37 Operation of Waste or Used Oil Space Heaters ENV-01-37-1-000 SOP 38 Inventory Control for Underground Storage Tanks ENV-01-38-1-000 Page 9 of 7 July 2011