MassDOT Statewide TE FFY 2013 -2016 Year Region Location Pioneer Valley AGAWAM- CONSTRUCTION OF BIKEWAY LOOP CONNECTING CONNECTICUT RIVERWALK WITH MAIN STREET BEVERLY- CONSTRUCTION OF A WALKWAY ON BEVERLY HARBORFRONT 603731 2 100% Design 602514 4 75% Design $570,665.00 FRAMINGHAM- BIKE PATH CONSTRUCTION & IMPROVEMENTS ON COCHITUATE RAIL TRAIL, FROM SCHOOL STREET TO ROUTE 30 SALEM- CAUSEWAY PARK CONSTRUCTION 606137 3 25% Design $792,731.25 605121 4 25% Design $1,441,650.00 METHUEN- INTERCHANGE RECONSTRUCTION ON I-93 AT ROUTE 110/113 ROTARY, INCLUDING REMOVAL OF M-17-017 & M-17-018, REHAB OF M-17-007 & NEW BRIDGE CONSTRUCTION OF M-17-040 MassDOT Enhancements Incentive Program ($2 gets you $1) 605181 4 75% Design $188,500.00 NA N/A Boston Boston 2013 4/30/2012 Boston Merrimack Valley Statewide Proj Num. District Design Status N/A FFY2013 TOTAL 2016 $2,000,000.00 $7,499,567.33 - - HAVERHILL- RIVERWALK CONSTRUCTION (BRADFORD SECTION) FROM ROUTE 125 TO COUNTY ROAD WEST SPRINGFIELD- CONNECTICUT RIVERWALK & BIKEWAY EXTENSION, FROM ELM STREET TO DOTY CIRCLE, INCLUDES PEDESTRIAN BRIDGE W-21-020 605720 4 Approved $2,208,000.00 603730 2 100% Design $1,519,199.55 $1,579,967.53 Boston ACTON- CARLISLE- WESTFORD- BRUCE FREEMAN RAIL TRAIL (PHASE II-A) 604532 3 25% Design $8,450,000.00 $8,788,000.00 Merrimack Valley METHUEN- INTERCHANGE RECONSTRUCTION ON I-93 AT ROUTE 110/113 ROTARY, INCLUDING REMOVAL OF M-17-017 & M-17-018, REHAB OF M-17-007 & NEW BRIDGE CONSTRUCTION OF M-17-040 605181 4 75% Design $366,667.00 $366,667.00 Merrimack Valley NEWBURYPORT- CLIPPER CITY RAIL TRAIL ALONG THE CITY BRANCH (PHASE II) 606503 4 Approved $3,000,000.00 $3,240,000.00 NPEDC 606433 5 Approved $1,000,000.00 $1,080,000.00 Berkshire NANTUCKET- CONSTRUCTION OF IN TOWN SHARED USE PATH (WASHINGTON STREET TO ORANGE STREET) PITTSFIELD - ASHUWILLTICOOK RAIL TRAIL EXTENTION 606891 1 Initial $1,800,000.00 $1,944,000.00 Central MA UXBRIDGE- SOUTHERN NEW ENGLAND TRUNK TRAIL CONSTRUCTION 605215 3 Approved $1,159,273.75 $1,252,015.65 Berkshire NORTH ADAMS / WILLIAMSTOWN - MOHAWK BIKE TRAIL PROJECT N/A 1 Initial $4,200,000.00 $4,536,000.00 Merrimack Valley METHUEN- INTERCHANGE RECONSTRUCTION ON I-93 AT ROUTE 110/113 ROTARY, INCLUDING REMOVAL OF M-17-017 & M-17-018, REHAB OF M-17-007 & NEW BRIDGE CONSTRUCTION OF M-17-040 605181 4 75% Design $366,667.00 $366,667.00 Merrimack Valley BOXFORD- GEORGETOWN- NEWBURY- SALISBURY- MULTI-USE TRAIL EXTENSION (BORDERS TO BOSTON TRAIL) *Salisbury section WESTFIELD- COLUMBIA GREENWAY RAIL TRAIL CONSTRUCTION (CENTER DOWNTOWN SECTION), FROM COLUMBIA MFG SPUR TO COWLES COURT N/A 4 Approved 603783 2 602911 2 Pioneer Valley 2015 $2,506,021.08 $1,748,199.00 Merrimack Valley 2014 TFPCC Inflation Adj. Pioneer Valley Pioneer Valley CHICOPEE- CONNECTICUT RIVERWALK & BIKEWAY CONSTRUCTION, FROM THE SPRINGFIELD C.L. TO NASH FIELD FFY2014 TOTAL FFY2015 TOTAL $11,525,940.75 $12,482,833.53 $12,418,682.65 $26,270,248.00 $3,850,000.00 75% Design $6,281,630.65 $7,035,426.33 25% Design $1,398,100.00 $1,565,872.00 FFY2016 TOTAL MassDOT - OTP $12,543,866.55 $33,949,978.65 $12,451,298.33 April 30, 2012