FF Year
Project Number
Location/Description
TFPCC
YOE
$1,000,000.00
$1,000,000.00
$
1,000,000.00
HSIP
Comments
2013
606466
Statewide Systematic Low Cost Intersection Improvements - Phase Ii Statewide
2013
607069
Statewide- Various Safety Strategies To Be Determined Based On 2012
Shsp And Updates
$2,000,000.00
$2,000,000.00
$
2,000,000.00
All projects yet to be determined - SHSP update draft should be
available by summer 2012
2013
607070
Statewide- Implementation (Phase I) Of The Flashing Yellow Arrow At
Signalized Intersections--One Of The "Fhwa Nine Proven Countermeasures
$1,300,000.00
$1,300,000.00
$
1,300,000.00
Development of project scope and PNF underway
2013
605442
Longmeadow - Northampton: Traffic Sign Replacement On I-91 - District 2
$4,300,000.00
$4,300,000.00
$
700,000.00
$
5,000,000.00
FF Year
Project Number
Location/Description
2014
607069
Various Safety Strategies To Be Determined Based On 2012 Shsp And
Updates
2014
605668
Raynham-Signal And Intersection Improvement At Route 44, Orchard
Street And Route 24 Nb Off Ramp- District 5
2014
604964
2014
607071
2014
606733
FF Year
2015
2015
Project Number
607072
607069
FF Year
Project Number
2016
607069
MassDOT Highway Division
Lowell- Signal & Intersection Improvements At Vfw Highway, Bridge Street
& Lakeview Avenue - District 4
Statewide- Implementation (Phase Ii) Of The Flashing Yellow Arrow At
Signalized Intersections--One Of The "Fhwa Nine Proven
Countermeasures"
Attleboro - Improvements To I-95 Sb / I-295 Sb Ramps Which Is One Of
The Highest Truck Rollover Locations In The State District 5
Location/Description
Implementation (Phase Iii) Of The Flashing Yellow Arrow At Signalized
Intersections--One Of The "Fhwa Nine Proven Countermeasures" Statewide
Various Safety Strategies To Be Determined Based On 2012 Shsp And
Updates
Location/Description
Various Safety Strategies to be determined based on 2012 SHSP and
updates
TFPCC
YOE 4%
HSIP
AC 2 of 2. TFPC $4.4M.
Comments
Unknown
#VALUE!
$
2,000,000.00
All projects yet to be determined - SHSP update draft should be
available by summer 2012
$2,302,759.43
$2,394,869.81
$
1,000,000.00
funded through a variety of sources, fully funded
$2,105,658.00
$2,189,884.32
$
1,000,000.00
funded through a variety of sources, fully funded
$960,500.00
$998,920.00
$
1,000,000.00
$2,496,000.00
$2,595,840.00
$
1,000,000.00
$
6,000,000.00
TFPCC
YOE 8%
$925,000.00
$999,000.00
$
1,000,000.00
$3,700,000.00
$3,996,000.00
$
4,000,000.00
$
5,000,000.00
TFPCC
YOE 12%
$4,625,000.00
$4,995,000.00
HSIP
Comments
HSIP
All projects yet to be determined - SHSP update draft should be
available by summer 2012