FFY 2013 - 2016 Statewide HSIP (Safety) Program FF Year Project Number Location/Description TFPCC YOE $1,000,000.00 $1,000,000.00 $ 1,000,000.00 HSIP Comments 2013 606466 Statewide Systematic Low Cost Intersection Improvements - Phase Ii Statewide 2013 607069 Statewide- Various Safety Strategies To Be Determined Based On 2012 Shsp And Updates $2,000,000.00 $2,000,000.00 $ 2,000,000.00 All projects yet to be determined - SHSP update draft should be available by summer 2012 2013 607070 Statewide- Implementation (Phase I) Of The Flashing Yellow Arrow At Signalized Intersections--One Of The "Fhwa Nine Proven Countermeasures $1,300,000.00 $1,300,000.00 $ 1,300,000.00 Development of project scope and PNF underway 2013 605442 Longmeadow - Northampton: Traffic Sign Replacement On I-91 - District 2 $4,300,000.00 $4,300,000.00 $ 700,000.00 $ 5,000,000.00 FF Year Project Number Location/Description 2014 607069 Various Safety Strategies To Be Determined Based On 2012 Shsp And Updates 2014 605668 Raynham-Signal And Intersection Improvement At Route 44, Orchard Street And Route 24 Nb Off Ramp- District 5 2014 604964 2014 607071 2014 606733 FF Year 2015 2015 Project Number 607072 607069 FF Year Project Number 2016 607069 MassDOT Highway Division Lowell- Signal & Intersection Improvements At Vfw Highway, Bridge Street & Lakeview Avenue - District 4 Statewide- Implementation (Phase Ii) Of The Flashing Yellow Arrow At Signalized Intersections--One Of The "Fhwa Nine Proven Countermeasures" Attleboro - Improvements To I-95 Sb / I-295 Sb Ramps Which Is One Of The Highest Truck Rollover Locations In The State District 5 Location/Description Implementation (Phase Iii) Of The Flashing Yellow Arrow At Signalized Intersections--One Of The "Fhwa Nine Proven Countermeasures" Statewide Various Safety Strategies To Be Determined Based On 2012 Shsp And Updates Location/Description Various Safety Strategies to be determined based on 2012 SHSP and updates TFPCC YOE 4% HSIP AC 2 of 2. TFPC $4.4M. Comments Unknown #VALUE! $ 2,000,000.00 All projects yet to be determined - SHSP update draft should be available by summer 2012 $2,302,759.43 $2,394,869.81 $ 1,000,000.00 funded through a variety of sources, fully funded $2,105,658.00 $2,189,884.32 $ 1,000,000.00 funded through a variety of sources, fully funded $960,500.00 $998,920.00 $ 1,000,000.00 $2,496,000.00 $2,595,840.00 $ 1,000,000.00 $ 6,000,000.00 TFPCC YOE 8% $925,000.00 $999,000.00 $ 1,000,000.00 $3,700,000.00 $3,996,000.00 $ 4,000,000.00 $ 5,000,000.00 TFPCC YOE 12% $4,625,000.00 $4,995,000.00 HSIP Comments HSIP All projects yet to be determined - SHSP update draft should be available by summer 2012 Comments $ 5,000,000.00 $ 5,000,000.00 All projects yet to be determined - SHSP update draft should be available by summer 2012 May 8, 2012