FFY 2016 State Transportation Improvement Program - Commonwealth of Massachusetts MassDOT Project ID ▼ Municipality Name ▼ MPO ▼ MassDOT Project Description▼ District ▼ Funding Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Federal Aid Target Projects STP - Surface Transportation Program 606461 Cape Cod Central Mass Central Mass 606562 602740 Orleans Orleans- Intersection Improvements @ Route 6A & Main Street & Route 28 & Main Street 5 STP $ 1,449,149 $ 1,159,319 $ 289,830 CONSTRUCTION Total cost $2,294,723. See STP-Barnstable for difference. Oakham Oakham - Resurfacing And Related Work On Route 122 From Route 148 To The Barre Town Line 3 STP $ 1,255,000 $ 1,004,000 $ 251,000 Construction / Design Status = Pre 25% / TEC Score = 3.4 / Total Project Cost = $1,255,000 Shrewsbury - Resurfacing And Related Work On Main Street, From I-290 Ramps Easterly To Maple Avenue Montague- Reconstruction On Greenfield Road, From Turners Falls Road To Sta. 378+00 (3.49 Miles) Tisbury - Beach Road Shared-Use Path Leominster- Reconstruction Of Mechanic Street, From Laurel Street To The Leominster Connector 3 STP $ 201,216 $ 160,973 $ 2 STP $ 1,940,573 $ 1,552,458 $ 5 3 STP-AC STP $ $ 455,887 3,474,045 $ $ 364,710 $ 2,779,236 $ Chicopee- Resurfacing & Related Work On Montgomery Street, From Granby Road To Dale Street Springfield- North End & Brightwood Infrastructure Improvements, From Osgood Street To The Chicopee City Line (Northerly Segment) Wareham- Reconstruction Of Route 6 & 28, From 500 Ft. East Of Tyler Avenue To The Bourne T.L. (2.66 Miles) 2 STP $ 732,200 $ 585,760 $ 146,440 2.03 TEC 100% 2 STP $ 5,364,103 $ 4,291,283 $ 1,072,821 10.3 TEC 25% 5 STP-AC $8,305,996 $ 6,644,797 4 STP $ $23,178,169 3,600,000 $ $18,542,535 2,880,000 $ $1,661,199 Adv. Const. Yr 2 of 2 (FY15-16) Total Cost = $14,158,247; Yr 2Cost ($8,305,996) EC Score 51 Of 73; Status 25% Awaiting Additional Info to Qualify for CMAQ $4,635,634 720,000 AC 3 of 4. TFPC $17.16M with 4% YOE. 6 STP $ 1,350,000 $ 1,080,000 $ 4 STP $ 1,050,000 $ 840,000 $ Shrewsbury 601657 Franklin Montague N/A Martha's Tisbury 604928 Montachus Leominster ett 606034 Pioneer Valley Chicopee 605222 Pioneer Valley Springfield 117106 Southeast Wareham Mass 603917 Boston Stoneham etc 605733 Boston Boston 605703 Statewide Statewide 607035 607036 607038 607039 607041 607042 Statewide Statewide Statewide Statewide Statewide Statewide O f f i c e o f T r a n s p o District 1 District 2 District 3 District 4 District 5 District 6 r t a t i o n P l a n n i n STP-Flex Regional Subtotal Stoneham- Woburn- Lighting Upgrades On I-93 Boston- Highway Lighting System Replacement On I-93, From Southampton Street To Neponset Avenue Lowell- Methuen- Traffic Sign Replacement & Related Work On I-495 Statewide Infrastructure Program District 1- Ada Retrofits At Various Locations District 2- Ada Retrofits At Various Locations District 3- Ada Retrofits At Various Locations District 4- Ada Retrofits At Various Locations District 5- Ada Retrofits At Various Locations District 6- Ada Retrofits At Various Locations Statewide ADA Retrofit Program g state 1 2 3 4 5 6 STP STP STP STP STP STP FFY 2015 40,243 Construction / Design Status = 25% / TEC Score = 4.6 / Total Project Cost = $5,849,000 388,115 project will be funded AC over three years (expected cost $6,111,160). AC year 3/3. 91,177 STP + HSIP + CMAQ. AC 1 of 2 694,809 STP+HSIP Total Cost = $3,920,000 Adjusted for YOE by 12%; Non Adjusted Total Cost = $3,500,000 as of 4/12/12; 25% Design on 12/7/11; Construction; Resurfacing, No Added Capacity; TEC 6.25 of 18; 270,000 AC 2 of 3. TFPC $2,106,000 with 8% YOE. 270,000 AC 1 of 2. TFPC $4.256M with 12% TFPC. $6,000,000 $4,800,000 $1,260,000 $168,000 $358,400 $616,000 $1,052,800 $1,030,400 $795,200 $4,020,800 $134,400 $286,720 $492,800 $842,240 $824,320 $636,160 $3,216,640 $33,600 $71,680 $123,200 $210,560 $206,080 $159,040 $804,160 Page 1 of 11 MassDOT Project ID ▼ Municipality Name ▼ MPO ▼ MassDOT Project Description▼ Statewide Braintree- Quincy- Milton- Boston- HOV Lane Tow Truck Services Braintree- Quincy- Milton- Boston- HOV Lane Barrier Braintree etc Transfer Vehicle (BTV) Operator Contract Braintree- Quincy- Milton- Boston- HOV Lane Operating Braintree etc Expenses I-95, Rte 2, I- Highway Assistance Patrols, Area 1, 6 Routes, 3 Year Contract* (Year 2) 495, Rte 3 Highway Assistance Patrols, Area 2, 5 Routes, 3 Year I-93, I-95, Contract* (Year 1) Rte 1 I-93, Rte 3, I- Highway Assistance Patrols, Area 3, 5 Routes, 3 Year Contract* (Year 2) 95, Rte 24 Highway Assistance Patrols, Area 4, 4 Routes, 3 Year I-495, I-95, Contract* (Year 2) Rte 24 I-395, I-290, I- Highway Assistance Patrols, Area 5, 4 Routes, 3 Year 190, I-495, Contract* (Year 2) Rte 2 I-91, I-291, I- Highway Assistance Patrols, Area 6, 1 Route, 3 Year Contract* (Year 2) 391 Statewide ITS Program Statewide DBEs, FAPO, Misc Programs Regional Major Infrastructure Projects Sub-Total Statewide Statewide Award Adjustments, Change Orders, Etc 606596 Cape Cod Chatham 606461 Cape Cod Orleans 606272 Cape Cod Barnstable 606930 Boston Braintree etc 606931 Boston 606932 Boston 606939 Statewide 606940 Statewide 606941 Statewide 606942 Statewide 606943 Statewide 606944 Statewide Statewide Chatham- Improvements On West Main Street (Route 28), From George Ryder Road To Barn Hill Road Orleans- Intersection Improvements @ Route 6A & Main Street & Route 28 & Main Street Barnstable- Intersection Improvements At Iyannough Road (Route 28) And Yarmouth Road STP-Barnstable Sub-Total Bedford- Billerica- Burlington- Middlesex Turnpike Improvements, From Crosby Drive North To Manning Road, Includes Reconstruction Of B-04-006 (Phase III) Boston Marlborough Marlborough- Reconstruction Of Route 85 (Maple Street) Medway- Reconstruction On Route 109, From Holliston Boston Medway Street To 100 Ft. West Of Highland Street, Includes Rehab Of M-13-012 Groveland- Rehabilitation Of Route 97 (School Street & Merrimack Salem Street) Groveland Valley 29492 Boston 604810 605657 605114 O f f i c e o f T r a n Total Programmed Funds ▼ District ▼ Funding Source ▼ Federal Funds ▼ 6 STP $ 350,000 $ 280,000 $ 6 STP $ 800,000 $ 640,000 $ 6 STP $ 200,000 $ 160,000 $ 4 STP $ 450,000 $ 360,000 $ 90,000 AC 1 of 3. Total Cost = $2.7 M. 4 STP $ 450,000 $ 360,000 $ 90,000 AC 1 of 3. Total Cost = $2.4M. 6 STP $ 450,000 $ 360,000 $ 90,000 AC 1 of 3. Total Cost = $2.4M. 5 STP $ 400,000 $ 320,000 $ 80,000 AC 1 of 3. Total Cost = $2.1 M. 3 STP $ 400,000 $ 320,000 $ 80,000 AC 1 of 3. Total Cost = $1.9 M. 2 STP $ 100,000 $ 80,000 $ 20,000 AC 1 of 3. Total Cost = $500k. $3,600,000 $1,000,000 $11,250,000 $41,750,000 $90,798,969 state state state STP FLEX TOTAL Non-Federal Funds ▼ $2,880,000 $800,000 $9,000,000 $33,400,000 $72,639,175 5 STP $ 3,442,084 $ 2,753,667 $ 5 STP $ 845,574 $ 676,459 $ 5 STP $ 2,382,332 $ 1,905,866 $ s p o r t a t i o n P l a n n i n g 160,000 AC Yr 2 of 2. **District 6 to provide these services with MassDOT employees. 2015 YOE = $1M. 40,000 AC Yr 2 of 2. $720,000 $200,000 $2,250,000 $8,350,000 $18,219,794 688,417 169,115 CONSTRUCTION Total cost $2,294,723 476,466 $5,335,992 $ 16,117,954 $4,029,489 STP+ Northern Middlesex Council of Governments contribution ($1,000,000) Total Cost = $21,147,443 $679,545 STP+ CMAQ Total Cost = $5,397,727 $1,246,968 STP+ CMAQ Total Cost = $11,234,839 4 STP $20,147,443 3 3 STP STP $3,397,727 $6,234,839 $ $ 2,718,182 4,987,871 4 STP 2,870,838 $ 2,296,670 $ FFY 2015 70,000 AC Yr 2 of 2. 2015 YOE = $550,000. $6,669,990 Bedford etc $ Additional Information ▼ $1,333,998 574,168 AC YR 2 of 2. Total Project Cost = $5,747,849 in 2012 dollars = $6,437,591 in 2015 dollars to be converted to FA FY 2015 +.FY 2016 (Construction) TEC = 6.27 out of 18. (M) Page 2 of 11 MassDOT Project ID ▼ Municipality Name ▼ MPO ▼ 606161 Merrimack Haverhill Valley 606159 Merrimack North Valley Andover 29492 Northern Billerica Middlesex 600380 Old Colony Pembroke 604957 Old Colony Pembroke 606729 Southeast Taunton Mass Total Programmed Funds ▼ District ▼ Funding Source ▼ Haverhill- Improvements On Main Street (Route 125) 4 STP $ 2,474,089 $ 1,979,271 $ North Andover- Intersection & Signal Improvements At Route 125 & Massachusetts Avenue 4 STP $ 1,169,844 $ 935,875 $ 4 5 STP STP $ $ 1,000,000 3,422,264 $ $ 800,000 $ 2,737,811 $ Pembroke- Reconstruction On Route 14, From The Hanson T.L. To Washington Street (Route 53) 5 STP $ 3,283,685 $ 2,626,948 $ Taunton - County St (Rte 140) Reconstruction From Rte 24 To Mozzone Blvd To Widen RR Tracks Area (Massdot Project) STP-Boston Sub-Total 5 STP $1,754,788 $ 1,403,830 MassDOT Project Description▼ Bedford- Billerica- Burlington- Middlesex Turnpike Improvements, From Crosby Drive North To Manning Road, Includes Reconstruction Of B-04-006 (Phase III) Pembroke - Rehabilitation On Route 36 (Center Street) Federal Funds ▼ $45,755,517 Non-Federal Funds ▼ $36,604,414 STP $ 2,318,924 $ 1,855,139 $ Berkshire Tyringham Lee- Reconstruction Of Tyringham Road, From The Tyringham T.L. To Route 102 (2.0 Miles) 1 601320 STP $ 2,916,423 $ 2,333,138 $ Berkshire Pittsfield Pittsfield- Intersection & Signal Improvements At First Street & North Street (Near Berkshire Medical Center) 1 606233 Central Mass STP $ 2,587,000 $ 2,069,600 $ Brookfield 604739 Central Mass West Brookfield 2 STP $ 1,310,000 $ 1,048,000 $ 2 STP $ 2,853,473 $ 2,282,778 $ 606408 Montachus Athol ett Brookfield - Reconstruction Of Route 148 (Fiskdale Road) From Molasses Hill Road To Sturbridge T.L. Incl. Webber Road West Brookfield - Reconstruction On Route 9, Route 67 & Intersections At School Street Athol- Reconstruction Of West Royalston Road, From Silver Lake Street To The Royalston T.L. 3 603486 STP-Other Sub-Total North Attleborough - East Washington St / Chestnut St Southeast North Mass Attleboro 605372 $11,985,820 5 STP STP-Providence Sub-Total $858,778 Statewide Railroad Grade Crossings STP-Safety Sub-Total O f f i c e o f T r a n s p o r t a t i o n P l a n n i n g $858,778 $2,500,000 $2,500,000 FFY 2015 $9,588,656 $ 687,022 $687,022 $2,000,000 $ $2,000,000 Additional Information ▼ 494,818 Total Project Cost = $3,000,000 in 2013 dollars=$3,360,00 in 2016 dollars. FY 2016 HSIP + FY 2016 STP(Construction) TEC = 8.92 out of 18. (C) 233,969 Total Project Cost = $1,440,000 in 2013 dollars= $1,612,800 in 2016 dollars. FY 2016 STP + FY 2016 HSIP (Construction) TEC = 7.55 out of 18. (C) The balance of this project will be programmed in the Boston MPO TIP Total project cost estimate is 200,000 $21,147,443 684,453 25% Design; Total Cost YOE is $3,422,264 ; Funded by STP 656,737 75% Design; Total Cost YOE is $8,573,921 ; Funded by STP; Advance Construction Phase 1; Advance Construction Phase 2 to be included in FFY 2017 in the amount of $4,428,327. $350,958 Total Cost = $1,754,788; EC Score 33 Of 73; Status Pre 25% $9,151,104 463,785 AC - Year 2 of 2; Total Cost = 6,165,120; MPO evaluation score 3 of 7; Design Status: 100%; YOE 8% 583,285 AC - Year 2 of 2; STP + HSIP + CMAQ; Total Cost = 5,408,000; MPO evaluation score 5 of 7; Design Status: <25%; YOE 8% 517,400 Construction / Design Status = Pre 25% / TEC Score = 2.8 / Total Project Cost = $2,587,000 262,000 Construction / Design Status = Earlier 25% / TEC Score = 6.5 / Total Project Cost = $1,310,000 570,695 Total Cost = $2,853,473 Adjusted for YOE by 12%: Non Adjusted Total Cost = $2,547,744; Reclamation; TEC 5.48 of 18; 25% Design received on 2/16/12; Book job as of 4/12/12. $2,397,164 $171,756 STP ($858,778) / HSIP ($896,010)Total Cost = $1,687,296; EC Score 35 Of 73; Status Pre 25% Eligible for HSIP Funding $171,756 500,000 $500,000 Page 3 of 11 MassDOT Project ID ▼ Municipality Name ▼ MPO ▼ Pioneer Valley Pioneer Valley 605213 605815 606433 Springfield- Wilbraham- Reconstruction Of Boston Road (Route 20) Westhampto Westhampton- Resurfacing & Related Work On Route 66 n STP-Springfield Sub-Total Springfield Nantucket Nantucket Northern Billerica Middlesex 602945 MassDOT Project Description▼ 606717 SE Mass Fall River 605667 Southeast Mattapoisett Mass Nantucket- Construction Of In Town Shared Use Path Billerica- Middlesex Canal Enhancement Fall River- Construct Multi-Use Path From Brayton Avenue To Plymouth Avenue. Mattapoisett- Multi-Use Path Total Programmed Funds ▼ District ▼ Funding Source ▼ 2 STP $ 7,649,707 $ 6,119,766 $ 1,529,941 10.15 TEC 25% $8,683,580. See STP-FLEX. 2 STP $ 1,506,831 $ 1,205,465 $ 301,366 Moved from 2015 in order to achieve fiscal constraint $1,831,308 $9,156,538 5 STP-TE - AC 4 5 STP-TE STP-TE 5 STP-TE $ $ 323,532 3,400,656 $ 1,403,830 $547,696 STP-TE Regional Sub-Total Merrimack Boxford Valley Boxford - Salsibury Multi-Use Trail Chicopee- Chicopee River Riverwalk Multi-Use Path Construction, From Grape Street To Front Street (Near Ellerton Street) Westfield- Columbia Greenway Rail Trail Construction West Springfield- Connecticut Riverwalk & Bikeway STP-TE Statewide Sub-Total Pioneer Valley Chicopee 603783 603730 Pioneer Pioneer Westfield West 607004 Statewide Statewide 607005 607007 607009 607010 Statewide Statewide Statewide Statewide District 1 District 2 District 3 District 4 602740 Central Mass Shrewsbury O f f i c e o f T r a n s p o r t a t i o n P l a n n i n g Non-Federal Funds ▼ $7,325,230 $ $ 258,826 $ 2,720,525 $ 1,123,064.0 $ 438,157 Additional Information ▼ 64,706 TFPPC = $1,050,292 - yr 3 of 3 yr AC. 680,131 At (25% design FY 2016 YOE $3,400,656 ($3,036,300) 280,766.0 $109,539 STP ($547,696) / CMAQ ($1,792,021)Total Cost = $2,339,717; EC Score 37 Of 73; Status Pre 25%. Eligible for CMAQ Funding $1,135,143 $5,675,714 $4,540,571 3,850,000 3,080,000 1,614,574 7,035,426 1,579,678 $14,079,678 1,291,659 5,628,341 1,263,742 $11,263,742 322,915 1,407,085 315,936 Statewide TE $2,815,936 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $10,000,000 $29,755,392 $1,600,000 $1,600,000 $1,600,000 $1,600,000 $1,600,000 $8,000,000 $23,804,314 $400,000 $400,000 $400,000 $400,000 $400,000 $2,000,000 $5,951,078 STP-TE 4 602912 Federal Funds ▼ TFPC = $26,270,248. This item is for the Salisbury 770,000 Section Only STP-TE 2 2 2 STP-TE STP-TE Statewide- Stormwater Retrofits At Various Locations (IM/NHS) District 1- Stormwater Retrofits At Various Locations District 2- Stormwater Retrofits At Various Locations District 3- Stormwater Retrofits At Various Locations District 4- Stormwater Retrofits At Various Locations Statewide Stormwater Program Sub-Total STP-Transportation Enhancements Sub-Total Statewi de 1 1 3 4 STP-TE Shrewsbury - Resurfacing And Related Work On Main Street, From I-290 Ramps Easterly To Maple Avenue STP-Worcester Sub-Total 3 STP STP-TE STP-TE STP-TE STP-TE $ 5,647,784 $ 4,518,227 $ $5,647,784 $4,518,227 STP NON-FLEX TOTAL $112,329,819 $89,863,855 STP Total $203,128,788 $162,503,031 FFY 2015 1,129,557 Construction / Design Status = 25% / TEC Score = 4.6 / Total Project Cost = $5,849,000 $1,129,557 $22,465,965 $40,685,758 ◄ 80% Federal + 20% Non-Federal Page 4 of 11 MassDOT Project ID ▼ Municipality Name ▼ MPO ▼ MassDOT Project Description▼ District ▼ Funding Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ HSIP - Highway Safety Improvement Program HSIP $ 355,964 $ 320,368 $ Berkshire Pittsfield Pittsfield- Intersection & Signal Improvements At First Street & North Street (Near Berkshire Medical Center) 1 606233 Central Mass HSIP $ 2,250,000 $ 2,025,000 $ Spencer Spencer - Rehabilitation On Route 9 (Main Street), From High Street To Grove Street 3 606207 607246 Franklin Erving Erving Intersection Improvements at Route 2/2A 2 HSIP Tisbury - Beach Road Shared-Use Path 5 HSIP-AC $ 30,997 $ 27,897 $ North Andover- Intersection & Signal Improvements At Leominster- Reconstruction Of Mechanic Street, From Laurel Street To The Leominster Connector 3 HSIP HSIP $ $ 442,956 445,955 $ $ 398,660 $ 401,360 $ Andover- Tewksbury- Intersection & Signal Improvements At Dascomb Road, East Street & Shawsheen Street 4 HSIP $ 1,260,000 $ 1,134,000 $ Springfield- Wilbraham- Reconstruction Of Boston Road (Route 20) North Attleborough - East Washington St / Chestnut St 2 HSIP $ 1,080,992 $ 972,893 $ 5 HSIP $896,010 $ 806,409 $ $7,016,849 5,000,000 $ $6,315,164 4,500,000 $ Martha's Tisbury Vineyard Merrimack North Valley Andover N/A 606159 604928 Montachus Leominster ett 606298 Northern Middlesex 605213 Pioneer Valley 605372 Southeast North Mass Attleboro 607069 Statewide Springfield Statewide HSIP Regional Targets Sub-Total Statewide- Various Safety Strategies To Be Determined Based On 2012 SHSP And Updates Statewide HSIP Progam HSIPStatewide HSIP Total O f f i c e o f T r a n s p o r t a t i o n P l a n n i n g FFY 2015 $ $ 253,975 $5,000,000 $12,016,849 $ 228,578 $4,500,000 $10,815,164 $ 35,596 AC - Year 2 of 2; STP + HSIP + CMAQ; Total Cost = 5,408,000; MPO evaluation score 5 of 7; Design Status: <25%; YOE 8% 225,000 Construction / Design Status = Pre 25% / TEC Score = 5.1 / HSIP + CMAQ Total Project Cost = $4,387,000 25,398 District will work with MPO to identify appropriate project 3,100 STP + HSIP + CMAQ 44,296 Total Project Cost = $1,440,000 in 2013 dollars= 44,596 STP+HSIP Total Cost = $3,920,000 Adjusted for YOE by 12%; Non Adjusted Total Cost = $3,500,000 as of 4/12/12; 25% Design on 12/7/11; Construction; Resurfacing, No Added Capacity; TEC 6.25 of 18; 126,000 Total project cost estimate I $1,125,000. RSA conducted in 2011. ($1,260,000 FY2016 YOE) 108,099 10.15 TEC 25% $8,683,580 89,601 STP ($858,778) / HSIP ($896,010)Total Cost = $1,687,296; EC Score 35 Of 73; Status Pre 25% Eligible for HSIP Funding $701,685 500,000 All projects yet to be determined - SHSP update draft should be available by summer 2012 $500,000 $1,201,685 ◄ Funding Split Varies by Project Specifications Page 5 of 11 MassDOT Project ID ▼ Municipality Name ▼ MPO ▼ District ▼ Funding Source ▼ Pittsfield- Intersection & Signal Improvements At First Street & North Street (Near Berkshire Medical Center) 1 CMAQ Brookline- Intersection & Signal Improvements @ Route 9 & Village Square (Gateway East) Clean Air And Mobility Green Line Extension Project (Phase II), Medford Hillside (College Avenue) To Mystic Valley Parkway/Route 16 6 MassDOT Project Description▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ CMAQ - Congestion Mitigation and Air Quality Program 711,929 $ 569,543 $ CMAQ $4,591,009 $ 3,672,807 $ CMAQ CMAQ $3,000,000 $8,100,000 $ $ 2,400,000 $ 6,480,000 $ 3 3 CMAQ CMAQ $2,000,000 $5,000,000 $ $ 1,600,000 $ 4,000,000 $ 3 CMAQ 2,137,000 $ 1,709,600 $ Tisbury - Beach Road Shared-Use Path 5 CMAQ-AC $61,994 $ 49,595 $ Haverhill- Improvements On Main Street (Route 125) 4 CMAQ $ 885,911 $ 708,729 $ Old Colony Regional Bicycle Parking Program (Bicycle Pembroke- Reconstruction On Route 14, From The Hanson T.L. To Washington Street (Route 53) 5 5 CMAQ CMAQ $ $ 50,000 861,909 $ $ 40,000 $ 689,527 $ 2 CMAQ $ 2,161,984 $ 1,729,587 $ 5 CMAQ $ 3 CMAQ $1,792,021 $31,353,757 $1,120,000 4 CMAQ $3,519,779 2,815,823.2 703,955.8 3 CMAQ $2,053,972 1,643,177.6 410,794.4 3 CMAQ $ 485,100 2 CMAQ $ 1,685,241 1,348,192.8 2 CMAQ $ 910,000 728,000.0 182,000.0 CMAQ 2 CMAQ $ 2,419,200 1,935,360.0 483,840.0 CMAQ 606233 Berkshire Pittsfield 605110 Boston Brookline N/A Boston Regionwide Boston Somerville 604810 Boston 605657 Boston 606207 Central Mass Marlborough Marlborough- Reconstruction Of Route 85 (Maple Street) Medway- Reconstruction On Route 109, From Holliston Medway Street To 100 Ft. West Of Highland Street, Includes Rehab Of M-13-012 Spencer - Rehabilitation On Route 9 (Main Street), From Spencer High Street To Grove Street N/A Martha's Vineyard 606161 Merrimack Haverhill Valley Tisbury Old Colony Regionwide 604957 Old Colony Pembroke Pioneer Springfield- Wilbraham- Reconstruction Of Boston Road Springfield Valaley (Route 20) Southeast Mattaposiett Mattapoisett- Multi-Use Path Regional CMAQ Subtotal Holliston- Signal Installation At Route 16/126 And Oak Boston Holliston Street Stoneham- Signal & Intersection Improvements At Route Boston Stoneham 28/North Street Wayland- Signal & Intersection Improvements At Route 27 Boston Wayland (Main Street) And Route 30 (Commonwealth Road) Central Worcester - Signal & Intersection Improvements @ Holden Worcester Mass Street, Drummond Avenue & Shore Drive Pioneer Holyoke- Traffic Signal Upgrades At 15 Intersections Along Holyoke Valley High & Maple Streets Pioneer Northampton- Intersection Improvements At Route 5 Northampton Valley (Pleasant Street) And Conz Street Pioneer Southwick Southwick- Intersection Improvements At Four Locations 605213 605667 602462 602165 601579 603251 606450 605066 603477 O f f i c e o f T r a n s p o r t a t i o n P l a n n i n g FFY 2015 $ $ 1,433,617 $ $25,083,006 $ 896,000 $ $ 388,080 $ 142,386 AC - Year 2 of 2; STP + HSIP + CMAQ; Total Cost = 5,408,000; MPO evaluation score 5 of 7; Design Status: <25%; YOE 8% 918,202 CMAQ+ Private Sector Contribution ($1,000,000) Total Cost = $5,591,009 600,000 1,620,000 Total Cost = $190,100,000 ($8,100,000 programmed with FFYs 2013-16 TIP) 400,000 STP+ CMAQ Total Cost = $5,397,727 1,000,000 STP+ CMAQ Total Cost = $11,234,839 427,400 Construction / Design Status = Pre 25% / TEC Score = 5.1 / HSIP + CMAQ Total Project Cost = $4,387,000 12,399 Estimated Cost $951,000; Funded by STP, HSIP, and CMAQ; Accelerated Construction Year 2 of 2 177,182 Total Project Cost = $3,000,000 in 2013 dollars=$3,360,00 in 2016 dollars. FY 2016 HSIP + FY 2016 STP(Construction) TEC = 8.92 out of 18. (C) 10,000 172,382 75% Design; Total Cost YOE is $8,573,921 ; Funded by STP; Advance Construction Phase 1; Advance Construction Phase 2 to be included in FFY 2017 in the amount of $4,428,327. 432,397 10.15 TEC 25% $8,683,580 358,404 STP ($547,696) / CMAQ ($1,792,021)Total Cost = $6,270,751 224,000 97,020 Construction / Design Stage = Approved / Total Project Cost = $485,100 337,048.2 CMAQ Page 6 of 11 MassDOT Project ID ▼ Municipality Name ▼ MPO ▼ Southeast Taunton Mass Southeast Taunton Mass Statewide Statewide 605679 605367 606026 Statewide District 4 606107 Statewide District 6 606933 Statewide Statewide 606934 Statewide Statewide 606935 Statewide Statewide 606936 606938 606937 Statewide Statewide Statewide Statewide Statewide Statewide Regionwide MassDOT Project Description▼ Taunton- Intersection Improvements @ Route 140 (County Street) & Hart Street Taunton- Intersection Improvements At The Hon. Gordon M. Owen Riverway & Williams Street Travel Options; Vanpools; Alternative Vehicles; Aco District 4- Traffic Signal Replacement & Fiber-Optic Led Conversion At Various Locations District 6- Scheduled & Emergency Traffic Signal Repairs At Various Locations Statewide CMAQ Program Consultant Services Contract For Its Design And Support Services Consultant Services Contract For Its Design And Support Services Consultant Services Contract For Its Design And Support Services Expansion Of CCTV, VMS & The Traffic Sensor Network Deploy Critical Infrastructure Surveillance Its Portion Of Interstate Maintenance (IM) Projects Statewide ITS Program Funding Source ▼ 5 CMAQ $1,882,362 1,505,889.6 376,472.4 5 CMAQ $1,680,000 1,344,000.0 336,000.0 4 CMAQ CMAQ $ $ 2,762,128 1,680,000 2,209,702.4 1,344,000.0 552,425.6 336,000.0 6 CMAQ $ 560,280 448,224.0 112,056.0 CMAQ $ $20,758,062 550,000 $16,606,450 440,000.0 CMAQ $ 550,000 440,000.0 110,000.0 CMAQ $ 550,000 440,000.0 110,000.0 CMAQ CMAQ CMAQ $ $ $ 4,500,000 2,200,000 1,150,000 $9,500,000 $61,611,819 3,600,000.0 1,760,000.0 920,000.0 $7,600,000 $49,289,455 $276,757,456 $222,607,650 CMAQ Total TOTAL FEDERAL AID TARGET PROJECTS (non-Bridge) O f f i c e o f T r a n s p o r t a t i o n P l a n n i n g Total Programmed Funds ▼ District ▼ FFY 2015 Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ $4,151,612 110,000.0 900,000.0 440,000.0 230,000.0 $1,900,000 $12,322,364 ◄ 80% Federal + 20% Non-Federal $54,209,807 Page 7 of 11 MassDOT Project ID ▼ Municipality Name ▼ MPO ▼ Total Programmed Funds ▼ District ▼ Funding Source ▼ 6 BR-Off $3,454,080 $ 2,763,264 $690,816 6 BR-Off $3,081,792 $ 2,465,434 $616,358 3 BR-off $ 2,260,608 $ 1,808,486 $ 3 BR-off $ 4,480,896 $ 3,584,717 $ 452,122 Construction / Design Status = Pre 25% / Total Project Cost = $2,260,608 896,179 Construction / Total Project Cost = $4,480,896 2 2 BR-Off BR-Off $5,071,472 $2,688,000 $ $ 4,057,178 $ 2,150,400 $ 3 BR-Off $ 1,234,100 $ 987,280 $ Petersham - Bridge Replacement, P-08-002, Glen Valley Road Over East Branch Swift River 2 BR-Off $ 2,889,600 $ 2,311,680 $ Nantucket- Bridge Replacement, N-02-003, Ames Avenue Over Hither Creek Chelmsford- Bridge Presevation M C-08-048, Hunt Rd, Over I-495 Wareham- Bridge Replacement, W-06-002, Paper Mill Road Over Weweantic River Br-Off Subtotal Statewide Bridge Rehabilitation And Replacement Program 5 BR-Off $ 2,800,896 $ 2,240,717 $ 4 BR-off $ 5,765,760 $ 4,612,608 $ 5 BR-off $ 1,543,476 $ 1,234,781 $ 1 BR $ 3,920,031 $ 3,136,025 $ 784,006 YOE 12% 6 BR-AC $ 2,600,000 $ 2,080,000 $ 520,000 AC Yr 1 of 5; Total Cost = $52,999,912 ($2,600,000 programmed within FFYs 2013-16 TIP) MassDOT Project Description▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Federal Aid Bridge Projects Quincy- Bridge Replacement, Robertson Street Over I93/Us 1/Sr 3 Quincy- Bridge Replacement, Stedman Street Over I-93/Us Boston Quincy 1/Sr 3 Central West West Brookfield - Bridge Replacement, W-19-008, Mass Brookfield Wickaboag Valley Road Over Sucker Brook Worcester - Deck Replacement And Painting, W-44-083, Central Worcester Harrison Street Over I-290 Mass Franklin Deerfield Deerfield- Bridge Preservation, D-06-023, Mcclellan Farm Greenfield- Bridge Rehabilitation, G-12-010, Eunice Franklin Greenfield Williams Road Over The Green River Hubbardston - Bridge Replacement, H-24-009, Evergreen Montachus Hubbardston Road Over Mason Brook ett 607133 Boston 607132 604468 607135 602320 601894 607127 Quincy 605324 Montachus Petersham ett 607130 Nantucket Nantucket Northern Chelmsford Middlesex Southeast Wareham Mass 607123 606372 $35,270,680 $28,216,544 603560 Berkshire Pittsfield 604173 Boston Boston Pittsfield- Bridge Replacement, P-10-026, Elm Street Over The East Branch Of Housatonic River Boston- Bridge Rehabilitation, B-16-016, North Washington Street Over The Charles River BR-AC $ 9,000,000 $ 7,200,000 $ Boston Boston Boston- Bridge Replacement, B-16-237, Massachusetts Avenue (Route 2A) Over Commonwealth Avenue 6 600867 BR-AC $ 10,000,000 $ 8,000,000 $ Boston Lexington Lexington- Bridge Replacement, L-10-010, Route 2A (Marrett Road) Over I-95/Route 128 4 603722 Rutland - Bridge Superstructure Replacement, R-14-004, Intervale Road Over East Branch Of Ware River Worcester - Bridge Replacement, W-44-063, Route 122 (Grafton Street) Over Route 20 Haverhill- Bridge Replacement, H-12-007 & H-12-025, Bridge Street (Sr 125) Over The Merrimack River And The Abandoned B&M RR (Proposed Bikeway) Holyoke- Bridge Replacement, H-21-018, Lyman Street Over First Level Canal 3 BR $ 1,344,000 $ 1,075,200 $ 3 BR-on $ 5,046,720 $ 4,037,376 $ 4 BR-on $ 2,718,000 $ 2,174,400 $ 2 BR $ 6,889,400 $ 5,511,520 $ Central Mass Central Mass 606303 603516 Rutland Worcester 605304 Merrimack Haverhill Valley 600936 Pioneer Valley O f f i c e o f T r a n s Holyoke p o r t a t i o n P l a n n i n g FFY 2015 1,014,294 Cost inflated 12% 537,600 Cost inflated 12% 246,820 Cost Est as of 4/10/12; Total Cost = $1,234,100 Adjusted for YOE by 12%; Non Adjusted Total Cost = $1,101,875; Bridge Off System 577,920 Cost Est as of 4/10/12; Total Cost = $2,889,600 Adjusted for YOE by 12%; Non Adjusted Total Cost = $2,580,000; Bridge Off System 560,179 1,153,152 Total project cost FFY 2016 YOE $5,765,760 ($5,148,000) 308,695 $7,054,135 1,800,000 AC Yr 2 of 4; Total Cost = $23,117,239 ($11,916,000 programmed within FFYs 2013-16 TIP) 2,000,000 AC Yr 2 of 3; Total Cost = $22,117,239 ($11,572,762 programmed within FFYs 2013-16 TIP) 268,800 Construction / Total Project Cost = $1,344,000 1,009,344 Construction / Design Status = 75% / Total Project Cost = $5,046,720 543,600 AC YR 1 of 5. Total Cost = $56,672,000 to be converted to FA from FY 2016 to FY 2020 (Construction) (C) 1,377,880 Page 8 of 11 MassDOT Project ID ▼ Municipality Name ▼ MPO ▼ 603024 Pioneer Valley 605749 Southeast Rehoboth Mass Southampton Statewide Statewide Statewide Statewide MassDOT Project Description▼ Southampton- Bridge Replacement, S-19-024, Valley Road Over Moose Brook Rehoboth- Bridge Replacement, R-04-001, Route 44 (Winthrop Street) Over The Palmer River & Rehab Of R-04014, Route 44 Over Palmer River Bypass Br-On Statewide Bridge Rehabilitation And Replacement Program Bridge Maintenance Program Statewide Bridge Inspection Accelerated Bridge Program GANS BR-ON Sub-Total Total Programmed Funds ▼ District ▼ Funding Source ▼ Federal Funds ▼ Non-Federal Funds ▼ 2 BR $ 1,514,688 $ 1,211,750 $ 302,938 5 BR $ 2,848,610 $ 2,278,888 $ 569,722 BR-ON $45,881,449 $36,705,159 $9,176,290 BR BR-ON $10,001,600 $6,250,000 $139,785,714 $201,918,764 $237,189,444 $8,001,280 $5,000,000 $139,785,714 $189,492,154 $217,708,698 $2,000,320 $1,250,000 $1,532,500 $1,000,000 $2,532,500 $1,532,500 $800,000 $2,332,500 BR-ON Federal Aid Bridges Additional Information ▼ $12,426,610 $19,480,745 ◄ 80% Federal + 20% Non-Federal Federal Aid Non-Target Projects Statewide Safe Routes To Schools Recreational Trails Total Non-Target Projects O f f i c e o f T r a n s p o r t a t i o n P l a n n i n g FFY 2015 $0 $200,000 $200,000 ◄ Funding Split Varies by Earmark Page 9 of 11 MassDOT Project ID ▼ Municipality Name ▼ MPO ▼ Funding Source ▼ 5 IM $ 12,475,904 $ 11,228,314 $ 1,247,590 3 IM $ 10,149,888 $ 1,014,989 Sterling - Leominster - Lancaster I-190 3 IM $ 16,493,568 $ 14,844,211 $ Hatfield- Whately- Interstate Maintenance & Related Work On I-91 Statewide Interstate Maintenance Program Accelerated Bridge Program GANS 2 IM $ 11,894,400 $ 10,704,960 $ MassDOT Project Description▼ Federal Aid Major & State Category Projects IM - Interstate Maintenance Foxborough Foxborough- Plainville- Wrentham- Interstate Maintenance 606176 Boston etc & Related Work On I-495 (Nb & Sb) Franklin- Interstate Maintenance & Related Work On I-495 606546 Boston Franklin 606575 Montachus Sterling etc ett 606577 Pioneer Valley Hatfield Total Programmed Funds ▼ District ▼ IM total Federal Funds ▼ Non-Federal Funds ▼ 9,134,899 $ $51,013,760 $0 $51,013,760 $45,912,384 $0 $45,912,384 $23,500,000 18,800,000 $23,500,000 $18,800,000 Additional Information ▼ 1,649,357 Interstate Maintenance 90% Federal - 10% State; Total Cost = $16,493,568 Adjusted for YOE by 12%; Non Adjusted Cost = $14,726,400. 1,189,440 $5,101,376 $5,101,376 ◄ 90% Federal + 10% Non-Federal NHS - National Highway System 603711 Boston Needham etc Needham- Wellesley- Rehab/Replacement Of 6 Bridges On I-95/Route 128: N-04-020, N-04-021, N-04-022, N-04-026, N-04-027 & W-13-023 (Add-A-Lane - Contract V) 6 NHS-AC NHS Regional Targets Subtotal 606179 Cape Cod Dennis etc 607176 Central Mass Shrewsbury Dennis - Harwich - Brewster - Orleans - Resurfacing And Related Work On Rte. 6 Shrewsbury - Westborough Resurfacing And Related Work On Route 9 Kingston-Plymouth- Resurfacing And Related Work On Old Colony Kingston,etc Route 3 Statewide NHS Preservation Program Regional Major Infrastructure Projects Sub-Total Accelerated Bridge Program GANS 607175 4,700,000 AC Yr 4 of 5; NHS+BR Total Cost = $127,500,000 ($120,000,000 programmed within FFYs 2013-16 TIP, AC Yr 5 of 5 will be programmed in FFY 2017) $4,700,000 5 NHS $ 6,145,440 4,916,352.0 3 NHS $ 13,888,090 11,110,472.0 5 NHS $5,530,896 4,424,716.8 $1,247,590 $25,564,426 $28,750,000 $10,214,286 $88,028,712 $20,451,541 $23,000,000 $10,214,286 $72,465,827 $5,254,296 $5,750,000 $23,000,000 $18,400,000 $678,521,872 $579,427,058 state NHS total 1,229,088.0 CONSTRUCTION $6,145,440 DRAINAGE? (31 total lane miles, 2.5 lanes/shoulder from milemarker 78.5 to 90.9) 2,777,618.0 Construction / Total Project Cost = $13,888,090 $15,704,296 ◄ 80% Federal + 20% Non-Federal Planning Statewide Statewide Statewide Planning Activities PL, SPR TOTAL ALL FEDERAL PROJECTS PROGRAMMED O f f i c e o f T r a n s p o r t a t i o n P l a n n i n g FFY 2015 $4,600,000 OTP and MPO planning activities $99,296,224 Page 10 of 11 MassDOT Project ID ▼ Municipality Name ▼ MPO ▼ MassDOT Project Description▼ District ▼ Funding Source ▼ N/A Other Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Non-Federal Aid Target Projects Other N/A Boston Somerville Green Line Extension Project- Extension To College Avenue With The Union Square Spur Other Total Total Non-Federally Funded Projects Programmed ► $302,000,000 $202,000,000 $302,000,000 $0 $202,000,000 ◄100% Non-Federal $302,000,000 $0 $202,000,000 Project estimated total costs are BY YEAR OF EXPENDITURE (YOE), for years 2013-2016 an annual inflation rate of 4% is assumed. 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx O f f i c e o f T r a n s p o r t a t i o n P l a n n i n g FFY 2015 Page 11 of 11