FFY 2014 State Transportation Improvement Program - Commonwealth of Massachusetts MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ District ▼ Funding Source ▼ Total Programmed Funds ▼ 1 STP-Flex $ 333,838 $ 267,070 $ 2 STP-Flex $ 875,000 $ 700,000 $ Montague- Reconstruction On Greenfield Road, From Turners Falls Road To Sta. 378+00 (3.49 Miles) 2 STP-AC $ 2,045,011 $ 1,636,009 $ Oak Bluffs - Intersection Improvements At Edgartown, Vineyard Road & Barnes Road Amesbury- Reconstruction Of Route 150 5 STP-AC $ 477,585 $ 382,068 $ 4 STP-Flex $ 4,816,711 $ 3,853,369 $ Merrimac- Resurfacing & Related Work On Route 110 4 STP-Flex $ 540,000 $ 432,000 $ Methuen- Interchange Reconstruction On I-93 At Route 110/113 Rotary, Including Removal Of M-17-017 & M-17018, Rehab Of M-17-007 & New Bridge Construction Of M17-040 4 STP-Flex $ 410,040 $ 328,032 $ Fitchburg- Resurfacing Of Route 31 (Ashby State Road), From John Fitch Highway Northerly To Scripture Road, Includes F-04-023 3 STP-Flex $ 2,912,000 $ 2,329,600 $ 582,400 Total Cost = $2,912,000 Adjusted for YOE by 4%: Non Adjusted Total Cost = $2,800,000 as of 4/12/12: Construction; TEC 7.05 of 18; New Design needed; MassDOT to assign to consultant. 3 STP-Flex $ 1,131,000 $ 904,800 $ 226,200 Total Cost = $1,131,000 Adjusted for YOE by 4%: Non Adjusted Total Cost = $1,087,500; 25% design returned on 3/10/11. Bridge Project carried under Target STP Funds. TFPPC = $1,050,292 - yr 1 of 3 yr Ac. CMAQ and $67,786 STP-AC 203,060 Total project cost estimate at design at 75% $5,825,516 MassDOT Project Description▼ Federal Aid Target Projects STP - Surface Transportation Program Adams, North Adams - Ashuwillticook Rail Trail Extension 606890 Berkshire Adams (Lime St To Hodges Cross Rd) Warren - Resurfacing & Intersection Improvements At Central 605559 Warren Route 67 & Route 19 (Warren Town Center) Mass 601657 Franklin 604813 M Vineyard Oak Bluffs 602033 Merrimack Amesbury Valley 605689 Merrimack Merrimac Valley 605181 Merrimack Methuen Valley 602621 Montachus Fitchburg ett Hubbardston- Bridge Rehabiltation, H-24-004, Burnshirt Montachus Road Over Water Burnshirt River Hubbardston ett 605696 606433 Nantucket 604907 Northern Dracut Middlesex 606238 Northern Tewksbury Middlesex 603660 Old Colony Bridgwater 606071 604433 f f ic e o f T r a n s p o r t a t io n P la n Nantucket n in g Non-Federal Funds ▼ Nantucket- Construction Of In Town Shared Use Path (Washington Street To Orange Street) Dracut- Reconstruction Of Arlington Street, From Broadway Road (Route 113) To Methuen Street (Approx. 7500 Ft) 5 4 STP-Flex $ $338,931 1,015,300 $ $271,145 812,240 $ Tewksbury- Resurfacing & Related Work On Route 38 4 STP-Flex $ 300,000 $ 240,000 $ 5 STP-Flex $ 1,434,827 $ 1,147,862 $ 5 STP-Flex $ 4,004,767 $ 3,203,814 $ 5 STP-Flex $ 1,329,301 $ 1,063,441 $ 2 STP-Flex $ 9,908,200 $ 7,926,560 $ Bridgewater- Signal & Intersection Improvements At State Route 18 & High Street Brockton- Resurfacing & Related Work On West Elm Old Colony Brockton Street, From Warren Avenue To West Street (6,800 Ft.) Easton- Signal & Intersection Improvements @ Route 138 Old Colony Easton (Turnpike Street) And Route 106 (Foundry Street) Pioneer Belchertown- Pavement Rehabilitation & Related Work On Belchertown Valley Route 181 601644 O Montague Federal Funds ▼ STP-Flex FFY 2014 Additional Information ▼ 66,768 Construction; Total project cost = 3,500,000 175,000 Construction / Design Status = 25% / TEC Score = 4.07 / Total Project Cost = $1,768,000 (SP-WOR + STP-Flex 409,002 project will be funded AC over three years (expected cost $6,875,000). Design status - 100%. AC year 1/3. 95,517 100% DESIGN Funded by STP and HSIP; Accelerated Construction Year 3 of 3 963,342 Total Project Cost = $4,453,320 in 2012 dollars, = $4,816,711 in 2014 dollars. (Construction) TEC = 4.82 out of 18. (M) 108,000 Part of project was completed, remaining section to cost $500,000 in FY 2012 Dollars, = $540,000 in 2014 dollars. (Construction) TEC = 4.23 out of 18 (M) 82,008 Total Project Cost = $59,892,000 FY 2013, 2014 & 2015 Statewide CMAQ & TE + 2013 HPP #2434 (2005) + 2013 IM (2010 Discretionary) + FY 2013 and FY 2015 STP, CMAQ & HSIP + FY 2014 STP + HSIP (Construction). TEC = 9.63 out of 18. ( C ) 60,000 STP-Flex + STP-Boston 286,965 25% Design; Total Cost YOE is $2,296,736; Funded by STP, HSIP and CMAQ 800,953 25% Design; Total Cost YOE is $4,460,721; Funded by STP, STP-E, and HSIP 265,860 25% Design; Total Cost YOE is 1,329,301. Funded by STP 1,981,640 7.73 TEC 100% Page 1 of 14, July 2012 MassDOT Project ID ▼ MPO ▼ Pioneer Valley Pioneer Valley 604435 604446 Municipality Name ▼ Chicopee Westfield District ▼ Funding Source ▼ Total Programmed Funds ▼ Chicopee- Signal & Intersection Improvements At Memorial Drive (Route 33) & Broadway Westfield- Reconstruction Of Route 187 (Little River Road) And Shaker Road Attleboro - Rte I-95 Sb To Route I-295 Sb Ramp Reconstruction (Massdot Project) 2 STP-Flex $ 562,503 $ 450,002 $ 2 STP-Flex $ 424,239 $ 339,391 $ 84,848 7.87% TEC 75%. STP-Flex + STP-Springfield 5 STP-Flex $ 165,000 $ 132,000 $ 33,000 STP-PROV+STP-Flex ($1,595,840) / Statewide HSIP ($1,000,000) Total Cost = $2,595,840; Construction; EC Score 27 Of 73; Status Pre 25% Dartmouth - Padanaram Bridge Causeway 5 STP-Flex $ 5,948,800 $ 4,759,040 $ MassDOT Project Description▼ e o f T r a n s p o Additional Information ▼ 112,501 10 TEC 25% Southeast Mass Attleboro 603893 Southeast Mass Dartmouth STP-Flex $ 2,271,360 $ 1,817,088 $ Southeast Mass North Attleboro North Attleborough- Traffic Signal And Intersection Improvements At East Washington Street (Route 1), South Washington Street And Hoppin Hill Road (Route 120) 5 605368 STP-Flex $ 498,860 $ 399,088 $ Southeast Mass Raynham Raynham- Signal And Intersection Improvement @ Route 44 (New State Highway), Orchard Street And Route 24 Nb Off Ramp 5 605668 99,772 STP ($498,860) / HSIP ($896,010) / Statewide HSIP ($1,000,000) Total Cost = $2,394,870; Construction; EC Score 45 Of 73; Status Pre 25% Eligible for HSIP & CMAQ Funding Southeast Mass STP-Flex $ 1,020,139 $ 816,111 $ Seekonk Seekonk- Intersection Improvements At Route 114A, Arcade Avenue And Mill Road 5 602615 204,028 STP ($1,020,139) / CMAQ ($1,792,021)Total Cost = $2,812,160; EC Score 41 Of 73; Status 25%. Eligible for HSIP & CMAQ Funding $8,552,682 603917 Boston Stoneham etc 607021 607022 607023 607024 607025 607026 Statewide Statewide Statewide Statewide Statewide Statewide District 1 District 2 District 3 District 4 District 5 District 6 606427 Statewide 606428 Statewide 604255 Boston Statewide Statewide f f ic Non-Federal Funds ▼ 606733 STP-Flex Regional Subtotal O Federal Funds ▼ r t a t io n P la n n in g Stoneham- Woburn- Lighting Upgrades On I-93 Statewide Infrastructure Program District 1- ADA Retrofits At Various Locations District 2- ADA Retrofits At Various Locations District 3- ADA Retrofits At Various Locations District 4- ADA Retrofits At Various Locations District 5- ADA Retrofits At Various Locations District 6- ADA Retrofits At Various Locations Statewide ADA Retrofit Program I-93, I-95, Highway Assistance Patrols, Area 2, 5 routes, 3 year Rte 1 contract* (year 3) I-93, Rte 3, I- Highway Assistance Patrols, Area 3, 5 routes, 3 year 95, Rte 24 contract* (year 3) Statewide ITS Program Boston Boston - Central Artery / Third Harbor Tunnel Statewide DBEs, FAPO, Misc Programs Regional Major Infrastructure Projects Sub-Total Statewide Statewide Award Adjustments, Change Orders, Etc $42,763,412 $34,210,730 $1,100,000 $6,000,000 $166,400 $353,600 $613,600 $1,050,400 $1,029,600 $790,400 $4,004,000 $880,000 $4,800,000 $133,120 $282,880 $490,880 $840,320 $823,680 $632,320 $3,203,200 $1,328,535 $1,062,828 $1,328,535 $2,657,070 $58,390,000 $1,000,000 $8,125,000 $41,750,000 $164,689,482 $1,062,828 $2,125,656 $58,390,000 $800,000 $6,500,000 $33,400,000 $143,429,586 1,189,760 Total Cost = $5,948,800; EC Score 10 Of 73; Status 25% 454,272 Total Cost = $2,271,360; EC Score 41 Of 73; Status Pre 25% Eligible for HSIP & CMAQ Funding STP-Flex 4 state 1 2 3 4 5 6 STP-Flex STP-Flex STP-Flex STP-Flex STP-Flex STP-Flex AC 1 of 4. TFPC $17.16M with 4% YOE. STP-Flex 4 STP-Flex 6 6 state state state STP FLEX TOTAL FFY 2014 $220,000 $1,200,000 $33,280 $70,720 $122,720 $210,080 $205,920 $158,080 $800,800 AC Yr 3 of 3. TFPCC= $2.4M over three years in $265,707 2012 dollars, Contract 71975 AC Yr 3 of 3. YOE= $2.4M over three years in 2012 $265,707 dollars, Contract 71976 $531,414 $0 100% match $200,000 $1,625,000 $8,350,000 $21,259,896 Page 2 of 14, July 2012 MassDOT Project ID ▼ 600220 MPO ▼ Boston 602984 Boston 602602 Boston 605146 Boston Municipality Name ▼ MassDOT Project Description▼ District ▼ STP-Barnstable Sub-Total Beverly- Reconstruction & Signal Improvements On Beverly Rantoul Street (Route 1A) From Cabot Street (South) To Cabot Street (North) Concord- Lincoln- Limited Access Highway Improvements Concord etc At Route 2 & 2A, Between Crosby'S Corner & Bedford Road, Includes C-19-024 Hanover- Reconstruction Of Washington Street (Route 53) Hanover And Related Work From The Route 3 Northbound Ramp To Webster Street (Route 123) Salem- Reconstruction On Canal Street, From Washington Salem Street & Mill Street To Loring Avenue & Jefferson Avenue Funding Source ▼ $0 Boston Weymouth 604255 Northern Tewksbury Middlesex Boston Boston 602280 Berkshire Dalton 604227 Central Mass Barre 606238 Weymouth- Abington- Reconstruction & Widening On Route 18 (Main Street) From Highland Place To Route 139 (4.0 Miles) Includes Rehab Of W-32-013, Route 18 Over The Old Colony Railroad (MBTA) Tewksbury- Resurfacing & Related Work On Route 38 Boston - Central Artery / Third Harbor Tunnel STP-Boston Sub-Total 4 Central Mass Warren 4 Franklin 5 Franklin 6 O f f ic e o f T r a n s p o Southeast Mass Attleboro 606580 Southeast Mass Somerset r t a t io n P la n n in g $2,999,054 $749,764 $1,103,037 $882,430 $220,607 $1,144,000 $915,200 $228,800 $4,301,569 $3,441,255 $860,314 STP+CMAQ Total Cost = $6,301,569 AC Yr 2 of 3; STP+ TEA-21 Earmark Total Cost = $38,340,000 $8,821,534 $7,057,227 4 6 $1,700,000 $20,000,000 $40,818,958 $1,360,000 $20,000,000 $36,655,166 Dalton- Reconstruction Of Housatonic Street, From Route 8 & 9 To Route 8, Includes New Pedestrian D-01-002 Barre - Town Common Improvements Warren - Resurfacing & Intersection Improvements At Route 67 & Route 19 (Warren Town Center) $5,150,684 $4,120,547 $2,339,000 $1,871,200 $893,000 $714,400 $1,461,059 $1,168,847 $407,043 $10,250,786 $325,634 $8,200,629 $1,430,840 $1,144,672 $1,149,200 $2,580,040 $919,360 $2,064,032 Construction / TEC Score = 6.0 / Design Status = $467,800 Pre 25% / Total Project Cost = $2,339,000 Construction / Design Status = 25% / TEC Score = 4.07 / Total Project Cost = $1,768,000 (SP-WOR + $178,600 STP-Fllex Replaces 602316. Includes safety repairs to the Rice Brook Culvert in the village center; cost reflects 4% inflation. Design status = Pre-25% although numerous stakeholder meetings have been held and $292,212 project has been scoped. Remainder programmed under section 1C below (2 earmarks). Total project cost estimate is $3.3 million. Project using STP, Sec 115, and Sec 125 $81,409 funding sources. AC year 2 of 2. $2,050,157 STP ($1,595,840) / Statewide HSIP ($1,000,000) Total Cost = $2,595,840; Construction; EC Score $286,168 27 Of 73; Status Pre 25% Total Cost = $1,149,200; EC Score 23 Of 73; Status $229,840 Pre 25% $516,008 $8,000,000 $ $8,000,000 2,000,000 $2,000,000 $4,483,649 $1,120,912 STP STP Conway- Retaining Wall Replacement On Route 116 Along The South River STP STP-Other Sub-Total Attleboro - Rte I-95 Sb To Route I-295 Sb Ramp Reconstruction (Massdot Project) STP 5 Westfield Statewide Railroad Grade Crossings STP-Safety Sub-Total Westfield- Reconstruction Of Route 187 (Little River Road) And Shaker Road STP-Flex + STP-Boston $340,000 $0 100% match $4,163,792 AC Year 2 of 2; Total Cost = 5,550,000; MPO evaluation score 3 of 7; Design Status: <75% STP 2 Somerset- Park & Ride Expansion On Route 103 (Massdot Project) STP-Providence Sub-Total $1,764,307 STP Charlemont 606733 Pioneer Valley $3,748,818 STP 1 604446 STP+CMAQ Total Cost = $15,748,818 STP-AC 2 Conway $0 STP 1 80822 $0 Additional Information ▼ STP Charlemont- Resurfacing,Infrasturcture Improvement, And Traffic Calming On Route 2 From Mm 29.6 To Mm 31.1 606507 Non-Federal Funds ▼ STP-AC 1 605559 Federal Funds ▼ STP 4 601630 Total Programmed Funds ▼ STP 5 $10,000,000 $10,000,000 $1,030,137 STP 2 7.87% TEC 75%. STP-Flex + STP-Springfield $5,604,561 FFY 2014 Page 3 of 14, July 2012 MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ District ▼ Funding Source ▼ Total Programmed Funds ▼ STP-Springfield Sub-Total Merrimack Amesbury Valley 606669 $5,604,561 Amesbury- Powwow Riverwalk Construction, From Main Street To Water Street, Includes Ped Bridge A-07-034 (Phase I) 4 2 604532 Boston 605720 Merrimack Haverhill Valley Merrimack Methuen Valley 605144 Pioneer Valley Amherst etc 606990 Statewide Statewide 606991 606993 606994 606995 606996 606997 Statewide Statewide Statewide Statewide Statewide Statewide District 1 District 2 District 3 District 4 District 5 District 6 Central Mass Central Mass 606485 f T r a n s p o Acton etc 605181 605390 o r t a t io n P la n $1,058,089 $846,471 $72,800 $1,130,889 $58,240 $904,711 STP-TE STP-TE Regional Sub-Total e $4,483,649 Montachus Athol ett 606636 f f ic Non-Federal Funds ▼ STP-TE Athol- Scenic Byway Access & Overlook Construction. O Federal Funds ▼ n in g Dudley Millbury Acton- Carlisle- Westford- Bruce Freeman Rail Trail (Phase II-A) Haverhill- Riverwalk Construction (Bradford Section) From Route 125 To County Road Methuen- Interchange Reconstruction On I-93 At Route 110/113 Rotary, Including Removal Of M-17-017 & M-17018, Rehab Of M-17-007 & New Bridge Construction Of M17-040 Amherst-Northampton-Southampton-West Brookfield, Sidewalk & Wheelchair Ramp Construction on Routes 5, 9 and 10 STP-TE Statewide Sub-Total Statewide- Stormwater Retrofits At Various Locations (IM/NHS) District 1- Stormwater Retrofits At Various Locations District 2- Stormwater Retrofits At Various Locations District 3- Stormwater Retrofits At Various Locations District 4- Stormwater Retrofits At Various Locations District 5- Stormwater Retrofits At Various Locations District 6- Stormwater Retrofits At Various Locations Statewide Stormwater Program Sub-Total STP-Transportation Enhancements Sub-Total Dudley - Resurfacing & Related Work On Center Road, From Dudley Hill Road To 1200' West Of Healy Road Millbury - Sutton - Median Barrier Replacement On Route 146, From Route 122A To Boston Road STP-Worcester Sub-Total Additional Information ▼ $1,120,912 Total Project Cost = $1,800,000 in 2012 dollars, = 1,944,000 in 2014 dollars. FY 2014 CMAQ + FY 2014 TE (STP) (Construction) $211,618 TEC = 5.42 out of 18. (C) Total Cost = $72,800 Adjusted for YOE by 4%; Non Adjusted Total Cost = $70,000; TEC 4.48 of 18; Landscape & Roadside Development; Prelim $14,560 Design; $226,178 STP-TE 3 STP-TE $ $8,788,000 2,296,320 $ $7,030,400 1,837,056 $ $1,757,600 459,264 4 (Construction) TEC = 5.32 out of 18. (C) Total Project Cost = $59,892,000 FY 2013, 2014 & 2015 Statewide CMAQ & TE + 2013 HPP #2434 (2005) + 2013 IM (2010 Discretionary) + FY 2013 and FY 2015 STP, CMAQ & HSIP + FY 2014 STP + HSIP (Construction). TEC = 9.63 out of 18. ( C ) STP-TE -AC 4 2 Statewi de 1 1 3 4 5 6 STP-TE $366,667 $1,600,000 $293,334 $1,280,000 $73,333 $320,000 $13,050,987 $10,440,790 $2,610,197 $2,000,000 $1,500,000 $1,500,000 $1,500,000 $1,500,000 $1,000,000 $1,000,000 $10,000,000 $24,181,876 $1,600,000 $1,200,000 $1,200,000 $1,200,000 $1,200,000 $800,000 $800,000 $8,000,000 $19,345,501 $400,000 $300,000 $300,000 $300,000 $300,000 $200,000 $200,000 $2,000,000 $4,836,375 $2,912,000 $2,329,600 $3,224,000 $6,136,000 $2,579,200 $4,908,800 STP-TE STP-TE STP-TE STP-TE STP-TE STP-TE STP-TE STP 3 STP 3 STP NON-FLEX TOTAL $99,572,221 $83,657,777 STP Total $264,261,703 $227,087,362 FFY 2014 Construction / TEC Score = 6.23 / Design Status = $582,400 25% / Total Project Cost = $2,912,000 Construction / Design Status = Pre 25% / TEC $644,800 Score = 2.28 / Total Project Cost = $3,224,000 $1,227,200 $15,914,444 $37,174,341 ◄ 80% Federal + 20% Non-Federal Page 4 of 14, July 2012 MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ Total Programmed Funds ▼ District ▼ Funding Source ▼ 4 HSIP-AC $ 4,296,710 $ 3,867,039 $ 3 HSIP $ 2,652,000 $ 2,386,800 $ Worcester - East/West Improvements At Park Avenue & Highland Street Intersection Greenfield, Route 2A And Shelburne Rd/River St Intersection Improvements Oak Bluffs - Intersection Improvements At Edgartown, Vineyard Road & Barnes Road Methuen- Interchange Reconstruction On I-93 At Route 110/113 Rotary, Including Removal Of M-17-017 & M-17018, Rehab Of M-17-007 & New Bridge Construction Of M17-040 3 HSIP $ 884,000 $ 795,600 $ 2 HSIP $ 253,975 $ 228,578 $ 5 HSIP-AC $ 30,997 $ 27,897 $ 4 HSIP $ 442,956 $ 398,660 $ Leominster- Reconstruction On Route 13, From Hawes Street To Prospect Street 3 HSIP $ 445,955 $ 401,360 $ Lowell- Improvements On Route 38 At Four Intersections 4 HSIP $ 2,767,440 $ 2,490,696 $ 4 HSIP $ 407,962 $ 367,166 $ 5 HSIP $ 455,954 $ 410,359 $ 276,744 Total project cost FFY 2014 YOE $2,767,440 ($2,661,000) 40,796 Total project cost FFY 2014 YOE $2,189,884 ($2,105,658) 45,595 2 HSIP $ 1,080,992 $ 972,893 $ 108,099 8.8 TEC 0% $1,087,600 Springfield Lowell- Signal & Intersection Improvements At Vfw Highway, Bridge Street & Lakeview Avenue Brockton- Resurfacing & Related Work On West Elm Street, From Warren Avenue To West Street (6,800 Ft.) Springfield- Signal & Intersection Improvements At Sumner Avenue, Allen Street, Abbot Street & Harkness Avenue 5 HSIP $ 896,010 $ 806,409 $ Raynham Raynham- Signal And Intersection Improvement @ Route 44 (New State Highway), Orchard Street And Route 24 Nb Off Ramp HSIP Statewide HSIP Statewide $ 2,000,000 $ 1,800,000 $ $ 1,000,000 $ 900,000 $ HSIP Statewide HSIP Statewide $ 1,000,000 $ 900,000 $ $ 1,000,000 $ 900,000 $ 100,000 Total project cost FFY 2014 YOE $2,189,884 ($2,105,658) 100,000 HSIP Statewide $ 1,000,000 $ 900,000 $ 100,000 HSIP - Highway Safety Improvement Program Concord- Lincoln- Limited Access Highway Improvements 602984 Boston Concord etc At Route 2 & 2A, Between Crosby'S Corner & Bedford Road, Includes C-19-024 Westborough - Intersection & Signal Improvements At Central Westboroug 604864 Route 9 & Lyman Street Mass h 607220 Central Mass Worcester 607223 Franklin Greenfield 604813 M Vineyard Oak Bluffs 605181 Merrimack Methuen Valley Northern Lowell Middlesex Northern Lowell Middlesex 606189 604964 601644 Old Colony Brockton 605685 Pioneer Valley 605668 Southeast Mass $14,614,951 HSIP Regional Targets Sub-Total 607069 Statewide Statewide 605668 Statewide Statewide 604964 Statewide Statewide 607071 Statewide Statewide 606733 Statewide Statewide Statewide- Various Safety Strategies To Be Determined Based On 2012 SHSP And Updates Raynham- Signal And Intersection Improvement @ Route 44 (New State Highway), Orchard Street And Route 24 Nb Off Ramp Lowell- Signal & Intersection Improvements At Vfw Highway, Bridge Street & Lakeview Avenue Statewide- Implementation (Phase II) Of The Flashing Yellow Arrow At Signalized Intersections--One Of The "FHWA Nine Proven Countermeasures" Attleboro- Ramp Reconstruction And Realignment From Route I-95 Sb To Route I-295 Sb Statewide HSIP Progam 5 4 5 HSIP Total f f ic e o f T r a n s p o r t a t io n P la n Non-Federal Funds ▼ Montachus Leominster ett 605651 O Federal Funds ▼ n in g FFY 2014 $13,153,456 Additional Information ▼ 429,671 AC Yr 4 of 4; STP+HSIP+CMAQ Total Cost = $61,723,980 ($21,757,641 programmed within FFYs 2013-16 TIP) 265,200 Construction / TEC Score = 7.9 / Design Status = 25% / HSIP+CMAQ Total Project Cost = $4,732,000 88,400 TOTAL Project COST = $884,000 / Construction / TEC Score = 8.1 / Design Status = 100% 25,398 Road Safety Audit complete, design underway in 2012. 3,100 100% DESIGN Funded by STP and HSIP; Accelerated Construction Year 3 of 3 44,296 Total Project Cost = $59,892,000 FY 2013, 2014 & 2015 Statewide CMAQ & TE + 2013 HPP #2434 (2005) + 2013 IM (2010 Discretionary) + FY 2013 and FY 2015 STP, CMAQ & HSIP + FY 2014 STP + HSIP (Construction). TEC = 9.63 out of 18. ( C ) 44,596 HSIP+CMAQ Total Cost = $4,056,000 Adjusted for YOE by 4%; Non Adjusted Total Cost = $3,900,00 (as of 4/12/12); Cost est. reduced from $6,331,111 as of 4/12/12; Construction; TEC 6.72 of 18; 25% Design Expected Fall 2011; Cost includes utilites; AQ analysis shows positive impact. 89,601 STP ($498,860) / HSIP ($896,010) / Statewide HSIP ($1,000,000) Total Cost = $2,394,870; Construction; EC Score 45 Of 73; Status Pre 25% Eligible for HSIP & CMAQ Fun+J85ding $1,461,495 200,000 All projects yet to be determined - SHSP update draft should be available by summer 2012 100,000 funded through a variety of sources, fully funded $6,000,000 $5,400,000 $600,000 $20,614,951 $18,553,456 $2,061,495 ◄ Funding Split Varies by Project Specifications Page 5 of 14, July 2012 MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ Total Programmed Funds ▼ District ▼ Funding Source ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ 1 CMAQ $ 711,929 $ 569,543 $ 4 CMAQ $ 12,000,000 $ 9,600,000 $ 6 CMAQ $ 4,146,746 $ 3,317,397 $ 829,349 Construction N/A 4 CMAQ CMAQ $ $ 350,000 3,799,858 $ $ 280,000 $ 3,039,886 $ 6 CMAQ $ 3,371,722 $ 2,697,378 $ 70,000 759,972 CMAQ+SAFETEA-LU Earmark Total Cost = $4,429,788 674,344 4 CMAQ $ 2,000,000 $ 1,600,000 $ 400,000 STP+CMAQ Total Cost = $6,301,569 CMAQ - Congestion Mitigation and Air Quality Program Boston Salem Adams, North Adams - Ashuwillticook Rail Trail Extension (Lime St To Hodges Cross Rd) Beverly- Reconstruction & Signal Improvements On Rantoul Street (Route 1A) From Cabot Street (South) To Cabot Street (North) Boston- Multi-Use Trail Construction (South Bay Harbor) From Ruggles Station To Fan Pier Intersection Improvement Program Melrose- Intersection & Signal Improvement To Lebanon Street, From Lynde Street To Main Street Quincy- Intersection & Signal Improvements At Hancock Street & East/West Squantum Streets Salem- Reconstruction On Canal Street, From Washington Street & Mill Street To Loring Avenue & Jefferson Avenue CMAQ $ 148,764 $ 148,764 $ CCRTA CCRTA - New Transit Service Demonstration Bourne To Falmouth ($297,528 Total) 5 Cape Cod CMAQ $ 149,888 $ 149,888 $ CCRTA CCRTA - New Transit Service Demonstration Bourne To Sandwich ($299,776 Total) 5 Cape Cod CCRTA For Ccns- New Transit Service Demonstration Outer Cape Shuttle 5 CMAQ $ 62,386 $ 62,386 $ Dennis-Yarmouth- Cape Cod Rail Trail Extension, From Route 134 To Yarmouth, Includes 3 Bridges 5 CMAQ $ 7,598,693 $ 6,078,954 $ 3 CMAQ $ 2,080,000 $ 1,664,000 $ Greenfield, Route 2A And Shelburne Rd/River St Intersection Improvements Amesbury- Powwow Riverwalk Construction, From Main Street To Water Street, Includes Ped Bridge A-07-034 (Phase I) 2 CMAQ $ 507,949 $ 406,359 $ 4 CMAQ $ 885,911 $ 708,729 $ Leominster- Reconstruction On Route 13, From Hawes Street To Prospect Street 3 CMAQ $ 3,610,045 $ 2,888,036 $ Nantucket- Construction Of In Town Shared Use Path (Washington Street To Orange Street) Lowell- Signal & Intersection Improvements At Vfw Highway, Bridge Street & Lakeview Avenue Bridgewater- Signal & Intersection Improvements At State Route 18 & High Street Old Colony Regional Bicycle Parking Program (Bicycle Rack Grant Progam) Chicopee- Signal & Intersection Improvements At Memorial Drive (Route 33) & Broadway 5 CMAQ-AC $ 43,996 $ 35,197 $ 4 CMAQ $ 781,922 $ 625,538 $ 5 CMAQ $ 861,909 $ 689,527 $ 5 CMAQ $ 50,000 $ 40,000 $ 2 CMAQ $ 1,017,976 $ 814,381 $ 606890 Berkshire Adams 600220 Boston Beverly 604761 Boston Boston N/A Boston Regionwide 601553 Boston Melrose 605729 Boston Quincy 605146 Cape Cod CCRTA 604488 Cape Cod Dennis etc 604864 Central Mass Westborough - Intersection & Signal Improvements At Westboroug Route 9 & Lyman Street h Franklin Greenfield Merrimack Amesbury Valley 606669 605651 Montachus Leominster ett 606433 Nantucket 604964 Northern Lowell Middlesex 603660 Old Colony Bridgewater Nantucket Old Colony Regionwide Pioneer Valley 604435 O f f ic e o f T r a n s p o r t a t io n P la n n in g Chicopee FFY 2014 142,386 Construction; Total project cost = 3,500,000 2,400,000 STP+CMAQ Total Cost = $15,748,818 - $149,888 TRANSFER TO FTA, CMAQ Year 3 out of 3 ($149,888 CMAQ with $37,472 CCRTA match for $187,360 Total cost) 100% design - $148,764 TRANSFER TO FTA, CMAQ Year 3 out of 3 ($148,764 CMAQ with $37,191 CCRTA match for $185,955 Total cost) 100% design - Transfer to FTA for CCNS, $62,396 CMAQ operating funds, with $15,597 NPS match for operating funds, and $7,073 capital for a total project cost of $85,056. (100% federal funds) Year 2of 3, 100% design 1,519,739 CONSTRUCTION Total $9,321,897 + 4% annual inflation= $9,694,773: TI 173 MA 209: $2,096,080 in 2014; CMAQ $7,598,693 in 2014; 25% design 416,000 Construction / TEC Score = 7.9 / Design Status = 25% / HSIP+CMAQ Total Project Cost = $4,732,000 101,590 Road Safety Audit complete, design underway in 2012. 177,182 Total Project Cost = $1,800,000 in 2012 dollars, = 1,944,000 in 2014 dollars. FY 2014 CMAQ + FY 2014 TE (STP) (Construction) TEC = 5.42 out of 18. (C) 722,009 HSIP+CMAQ Total Cost = $4,056,000 Adjusted for YOE by 4%; Non Adjusted Total Cost = $3,900,00 (as of 4/12/12); Cost est. reduced from $6,331,111 as of 4/12/12; Construction; TEC 6.72 of 18; 25% Design Expected Fall 2011; Cost includes utilites; AQ analysis shows positive impact. 8,799 TFPPC = $1,050,292 - yr 1 of 3 yr Ac. CMAQ and STP-AC 156,384 Total project cost FFY 2014 YOE $2,189,884 ($2,105,658) 172,382 25% Design; Total Cost YOE is $2,296,736 and CMAQ 10,000 316,096 10 TEC 25% Page 6 of 14, July 2012 MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ District ▼ Funding Source ▼ Total Programmed Funds ▼ Springfield- Signal & Intersection Improvements At Sumner Avenue, Allen Street, Abbot Street & Harkness Avenue 2 CMAQ $ 1,144,008 $ 915,207 $ Springfield Southeast Mass CMAQ $ 1,792,021 $ 1,433,617 $ Seekonk Seekonk- Intersection Improvements At Route 114A, Arcade Avenue And Mill Road 5 602615 Duxbury- Intersection Improvements At Kingstown Way (Route 53) & Winter Street Winchester- Signal & Intersection Improvements At 4 Locations On Church Street & Route 3 (Cambridge St) Methuen- Interchange Reconstruction On I-93 At Route 110/113 Rotary, Including Removal Of M-17-017 & M-17018, Rehab Of M-17-007 & New Bridge Construction Of M17-040 5 Statewide CMAQ Statewide CMAQ Statewide CMAQ $ 1,141,606 $ 913,285 $ 228,321 $ 4,145,339 $ 3,316,271 $ 829,068 $ 17,700,000 $ 14,160,000 $ North Andover- Traffic Signal Betterment @ 8 Locations Along Route 125 Salisbury- Traffic Signal Betterments At 4 Locations 4 Statewide CMAQ Statewide CMAQ Statewide CMAQ Statewide CMAQ $ 1,046,182 $ 836,945 $ 209,236 (Maintenance) TEC = 6.48 (M) $ 1,205,867 $ 964,694 $ 241,173 (Maintenance) TEC = 5.65 (M) $ 231,853 $ 185,482 $ $ 6,822,000 $ 5,457,600 $ 603462 Boston Regionwide 601019 Boston Winchester Merrimack Methuen Valley Merrimack Valley Merrimack Valley Pioneer Valley 605730 605735 North Andover Salisbury Statewide Northampton- Transit Signal Priority System Installation On Northampton Route 9 Travel Options; Vanpools; Alternative Vehicles; ACO Statewide 606916 Statewide I-95 606917 Statewide Statewide 606918 Statewide Statewide 606919 Statewide Statewide 606920 Statewide Statewide 606921 606922 Statewide Statewide Statewide Statewide 606513 $47,115,723 Statewide CMAQ Program HOC Operations And Maintenance Support ITS Contract Consultant Services Contract For ITS Design And Support Services Consultant Services Contract For ITS Design And Support Services Consultant Services Contract For ITS Design And Support Services Expansion Of CCTV, VMS & The Traffic Sensor Network Deploy Critical Infrastructure Surveillance ITS Portion Of Interstate Maintenance (IM) Projects Statewide ITS Program 4 4 4 2 f T r a n s p o r t a t io n P la n n in g $25,834,277 $416,000 228,802 8.8 TEC 0% $1,087,600 358,404 STP ($1,020,139) / CMAQ ($1,792,021)Total Cost = $2,812,160; EC Score 41 Of 73; Status 25% Eligible for HSIP & CMAQ Funding $9,463,438 3,540,000 Total Project Cost = $59,892,000 FY 2013, 2014 & 2015 Statewide CMAQ & TE + 2013 HPP #2434 (2005) + 2013 IM (2010 Discretionary) + FY 2013 and FY 2015 STP, CMAQ & HSIP + FY 2014 STP + HSIP (Construction). TEC = 9.63 out of 18. ( C ) 46,371 Statewide CMAQ 1,364,400 $6,458,569 $104,000 CMAQ $ $520,000 520,000 $ $416,000 416,000 $ $104,000 104,000 CMAQ $ 520,000 $ 416,000 $ 104,000 CMAQ $ 5,000,000 $ 4,000,000 $ 1,000,000 CMAQ CMAQ $ $ 3,420,000 2,000,000 $12,500,000 $91,908,570 $ $ TOTAL FEDERAL AID TARGET PROJECTS (non-Bridge) o $37,764,786 $32,292,847 $520,000 CMAQ CMAQ CMAQ Total e Additional Information ▼ Pioneer Valley 605181 f f ic Non-Federal Funds ▼ 605685 Regional CMAQ Subtotal O Federal Funds ▼ $376,785,224 FFY 2014 2,736,000 $ 684,000 1,600,000 $ 400,000 $10,000,000 $2,500,000 $73,599,063 $18,422,007 ◄ 80% Federal + 20% Non-Federal $319,239,882 $57,657,843 Page 7 of 14, July 2012 MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ Total Programmed Funds ▼ District ▼ Funding Source ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ 1 BR-off $ 3,481,920 $ 2,785,536 $ 3 BR-off $ 417,300 $ 333,840 $ 2 BR-off $ 1,216,800 $ 973,440 $ 4 BR-off $ 1,404,000 $ 1,123,200 $ 280,800 3 BR-Off $ 3,837,600 $ 3,070,080 $ 1 BR-off $ 2,184,000 $ 1,747,200 $ 767,520 Cost Est as of 4/10/12; Total Cost = $3,837,600 Adjusted for YOE by 4%; Non Adjusted Total Cost = $3,690,000; Bridge Off System 436,800 5 BR-off $ 1,275,631 $ 1,020,505 $ 255,126 Federal Aid Bridge Projects Williamstown- Bridge Replacement, W-37-009, Hooper Road Over Green River Central Dudley - Bridge Replacement, D-12-009, Carpenter Road Dudley Mass Over Abandoned Rr Northfield- Bridge Replacement, N-22-010, Birnam Road Franklin Northfield Over Mill Brook Merrimack Newburyport- Bridge Repairs, N-11-015, Washington Street Newburyport Valley Over Us 1 Lancaster - Superstructure Replacement, L-02-018, Montachus Lancaster Jackson Road Over Route 2. ett 605935 Berkshire 607113 602319 607115 607114 604429 Pioneer Valley Pelham 603796 Southeast Mass Mansfield 1,248,000 $ 998,400 $ 6 BR-AC $ 3,000,000 $ 2,400,000 $ 600,000 AC Yr 4 of 4 6 BR-On $ 1,316,640 $ 1,053,312 $ 263,328 6 BR-On $ 3,744,000 $ 2,995,200 $ 4 BR-AC $ 15,000,000 $ 12,000,000 $ 3,000,000 AC Yr 2 of 3; Total Cost = $31,800,000 6 BR-AC $ 8,500,000 $ 6,800,000 $ 1,700,000 AC Yr 2 of 5; NHS+BR Total Cost = $127,500,000 ($120,000,000 programmed within FFYs 2013-16 TIP, AC Yr 5 of 5 will be programmed in FFY 2017) Wilmington- Bridge Replacement, W-38-002, Route 38 (Main Street) Over The B&M Railroad Sandwich- Bridge Replacement, S-04-001, Cranberry Cape Cod Sandwich Highway (Rte. 6A) Over Scorton River Bernardston- Bridge Replacement, B-10-004, Brattleboro Franklin Bernardston Road (Shattuck Brook) Deerfield- Bridge Rehabilitation, D-06-044 & D-06-045, Franklin Deerfield Route I-91 (Nb & Sb) Over The Deerfield River (Stillwater Road And Lower Road) Oak Bluffs - Tisbury - Bridge Replacement, O-01-001=T-04M Vineyard Oak Bluffs 001, Beach Road Over Lagoon Pond Drawbridge Gardner - Bridge Replacement, G-01-008, Pleasant Street Montachus Gardner Over The B&M Railroad ett 4 BR-On $ 4,492,800 $ 3,594,240 $ 898,560 5 BR-On $ 2,995,200 $ 2,396,160 $ 599,040 CONSTRUCTION TOTAL $2,995,200 2 BR-On $ 2,272,608 $ 1,818,086 $ 454,522 Cost inflated 4%. Design satus = Pre-25%. 2 BR-AC $ 5,000,000 $ 4,000,000 $ 5 BR-AC $ 12,000,000 $ 9,600,000 $ 3 BR-On $ 1,497,600 $ 1,198,080 $ Westminster- Bridge Replacement, W-28-017, Route 12 Montachus Westminster (Ashburnham Road) Over Phillips Brook ett 3 BR-On $ 1,497,600 $ 1,198,080 $ 602587 Northern Lowell Middlesex 4 BR-AC $ 4,800,000 $ 3,840,000 $ 601845 603370 Boston 604462 Boston 606449 Boston 600703 Boston 603711 Boston 42603 Boston 603513 f T r a n s p o $2,763,450 $ 604029 o $11,053,801 BR-On 603478 e $13,817,251 83,460 Construction / Design Status = Pre 25% / Total Project Cost = $417,300 243,360 Cost inflated 4%. Design satus = Pre-25%. 3 Boston 604189 f f ic Pelham- Bridge Replacements, P-04-006, Meetinghouse Road Over Amethyst Brook & P-04-007, Meetinghouse Road Over Harris Brook Mansfield- Bridge Replacement, M-03-003 & M-03-045, Balcom Street Over The Wading River Br-Off Subtotal Statewide Bridge Rehabilitation And Replacement Program 696,384 YOE 4% Bellingham- Bridge Demolition, B-06-011, Route 126 Over Csx Railroad (Abandoned) & Installation Of Bike Path Culvert Boston- Bridge Rehabilitation, B-16-029, Route 99 (Alford Boston Street) Over Mystic River Boston- Bridge Replacement, B-16-209, West Second Boston Street Over Haul Road & Csx Rr Cambridge- Bridge Preservation, C-01-008, First Street Cambridge Bridge & C-01-040, Land Boulevard/Broad Canal Bridge Lexington- Bridge Replacement, L-10-009, Route 2 (Eb & Lexington Wb) Over Route I-95 (Route 128) Needham- Wellesley- Rehab/Replacement Of 6 Bridges On I-95/Route 128: N-04-020, N-04-021, N-04-022, N-04-026, Needham etc N-04-027 & W-13-023 (Add-A-Lane - Contract V) 605895 606390 O Williamstown r t a t io n P la n n in g 249,600 Bellingham Wilmington Lowell- Bridge Demolition, L-15-021 & New Bridge Construction, L-15-095, University (Textile) Avenue Over The Merrimack River And Northern Canal FFY 2014 748,800 1,000,000 Additional funding for this project is provided in FY 2015. AC year is 4/5. Total project cost = $48,840,444. 2,400,000 75% DESIGN Accelerated Construction Year 3 of 4 299,520 Cost Est as of 4/10/12; Total Cost = $1,497,600 Adjusted for YOE by 4%; Non Adjusted Total Cost = $1,440,000; Bridge On System 299,520 Cost Est as of 4/10/12; Total Cost = $1,497,600 Adjusted for YOE by 4%; Non Adjusted Total Cost = $1,440,000; Bridge On System 960,000 Page 8 of 14, July 2012 MassDOT Project ID ▼ MPO ▼ 82611 Pioneer Valley 606354 Southeaste Fall River rn Mass 604589 Southeast Mass Statewide Statewide O f f ic e o f T r a n s p o Municipality Name ▼ r t a t io n P la n n in g Chicopee Norton Statewide Statewide MassDOT Project Description▼ Chicopee- Holyoke- Bridge Rehabilitation, C-13-012=H-21030, Route 116 (Chicopee/Cabot St) Over Connecticut River & Pv Rr (Aka Willimansett Bridge) Fall River- Somerset- Structural Steel Repairs & Painting, F-02-058=S-16-008, I-195 Over Rte 79 & Taunton River (Braga Bridge - Phase II) Norton- Bridge Replacement, N-23-017, Plain Street Over The Canoe River Br-On Statewide Bridge Rehabilitation And Replacement Program Bridge Maintenance Program Statewide Bridge Inspection BR-ON Sub-Total District ▼ Funding Source ▼ 2 BR-AC 5 BR 5 BR-on BR-ON BR BR-ON BR-ON Federal Aid Bridges FFY 2014 Total Programmed Funds ▼ $ 1,000,000 Federal Funds ▼ $ Non-Federal Funds ▼ 800,000 $ $ 14,375,000 $ 11,500,000 $ $ $ 1,027,000 821,600 $ Additional Information ▼ 200,000 AC 2,875,000 13.01 Cost changed and combined with 606355. Add to 2014. AC 3 of 3. 205,400 $83,766,448 $67,013,158 $16,753,290 $9,994,400 $6,250,000 $100,010,848 $113,828,099 $7,995,520 $5,000,000 $80,008,678 $91,062,479 $1,998,880 $1,250,000 $20,002,170 $22,765,620 ◄ 80% Federal + 20% Non-Federal Page 9 of 14, July 2012 MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ Total Programmed Funds ▼ District ▼ Funding Source ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Malden- Safe Routes To School (Beebe School) Manchester- Safe Routes To School (Memorial Elementary) 4 5 SRTS SRTS $ 480,480 $505,440 $ 480,480 $ $505,440 - Milton- Safe Routes To School (Grover Elementary School) 4 SRTS $ 624,520 $ 624,520 $ - Westwood- Safe Routes To School (Downey Elementary) 6 SRTS $ 569,920 $ 569,920 $ - Worcester - Safe Routes To School (Elm Park School) 3 SRTS $ 583,000 $ 583,000 Southampton - Southampton Safe Routes To School Norris Elementary School Springfield - Safe Routes To School - Alice Beal School 2 SRTS $572,940 $572,940 $0 SRTS 2 SRTS $404,560 $404,560 $0 SRTS Federal Aid Non-Target Projects N/A N/A Boston Malden Boston Manchester Boston Milton N/A Boston Westwood TBD Central Mass Worcester Pioneer Valley Pioneer Valley Southeast Mass Statewide Southampton Springfield Mansfield Statewide Mansfield - Jordon/Jackson Elementary 5 SRTS - Education And Planning & Design Statewide Safe Routes To Schools SRTS $ 609,440 $ SRTS $ 1,425,500 $5,775,800 $ Recreational Trails Total $1,000,000 609,440 $ Construction / Design Status = Pre 25% / Total Project Cost = $583,000 / 100% Federally Funded - 1,425,500 $5,775,800 $0 $800,000 $200,000 Earmarks 606889 Boston Boston Adams, North Adams - Ashuwillticook Rail Trail Extension (Lime St To Hodges Cross Rd) Pittsfield- Intersection & Signal Improvements At First Street & North Street (Near Berkshire Medical Center); Engineering Design Acton- Maynard- Assabet River Rail Trail Construction, Includes 4 Bridges Boston- Improvements Along Gainsborough And St. Botolph Streets Boston- Improvements Along Gainsborough And St. Botolph Streets HPP (2005) $ 2,429,730 $ 1,938,598 $ Boston Boston Boston- Reconstruction Of Melnea Cass Boulevard (Hpp 756 & 4284) 6 605789 HPP (2005) $ 5,007,375 $ 4,005,900 $ Boston Boston Boston- Reconstruction Of Melnea Cass Boulevard (Hpp 756 & 4284) 6 605789 606134 Boston Boston 6 HPP (2005) $ 2,377,900 $ 1,902,320 $ 601553 Boston Melrose Boston- Traffic Signal Improvements On Blue Hill Avenue And Warren Street Melrose- Intersection & Signal Improvement To Lebanon Street, From Lynde Street To Main Street Weymouth- Abington- Reconstruction & Widening On Route 18 (Main Street) From Highland Place To Route 139 (4.0 Miles) Includes Rehab Of W-32-013, Route 18 Over The Old Colony Railroad (MBTA) Quinebaug Rail Trail 4 HPP (2005) $ 629,930 $ 503,944 $ 6 HPP (1998) $ 4,178,466 $ 3,342,773 $ 3 HPP (2005) $ 800,000 $ 640,000 $ 606890 Berkshire 606233 Berkshire Pittsfield 604531 Boston Acton etc 606889 Boston Boston 601630 O f f ic e o f T r a n s p o Adams r t a t io n P la n n in g Boston Weymouth etc Central Mass Regionwide 1 HPP (2005) $ 1,987,670 $ 1,590,136 $ 1 HPP (1998) $ 884,370 $ 707,496 $ 397,534 Design & Construction; Total project cost = 3,500,000 176,874 Design 3 HPP 1761 $ 769,314 $ 615,451 $ 153,863 Design; HPP 1761; Local Match 6 HPP (2005) $ 512,389 $ 377,834 $ 6 HPP (2005) $ 2,505,854 $ 1,732,520 $ 134,555 Construction; HPP 2012; SAFETEA-LU Earmark + HPP TI 180 Earmark Total Cost = $3,018,243 773,334 Construction; HPP TI 180; SAFETEA-LU Earmark + HPP TI 180 Earmark Total Cost = $3,018,243 FFY 2014 491,132 Construction; HPP 756; SAFETEA-LU Earmark (HPP 756)+ SAFETEA-LU Earmark (HPP 4284) =Total Cost $7,430,623 1,001,475 Construction; HPP 4284; SAFETEA-LU Earmark (HPP 756)+ SAFETEA-LU Earmark (HPP 4284) =Total Cost $7,430,623 475,580 Construction; HPP 2129 125,986 Construction; HPP 1604; CMAQ+SAFETEA-LU Earmark Total Cost = $4,429,788 835,693 Construction; HPP 1236; AC Yr 2 of 3; STP+TEA-21 Earmark Total Cost = $38,340,000 160,000 Construction / HPP#2173 - MA156 / Design Status Pre 25% / Total Project Cost = $800,000 Page 10 of 14, July 2012 MassDOT Project ID ▼ O f f ic e o f T r a n s p o MPO ▼ Municipality Name ▼ MassDOT Project Description▼ Total Programmed Funds ▼ District ▼ Funding Source ▼ Federal Funds ▼ Non-Federal Funds ▼ Sturbridge - Grand Trunk Trail 3 HPP (2005) $ 507,500 $ 406,000 $ 101,500 Construction / HPP#2439 - MA162 / Design Status = Pre 25% / Total Project Cost = $507,500 Worcester - Bike Path Construction, From Tainter Street To Kilby Street 3 HPP (2005) $ 1,862,544 $ 1,490,035 $ Worcester - Blackstone River Bikeway (Segment 7) 3 HPP (2005) $ 2,400,000 $ 1,920,000 $ Worcester - Blackstone River Bikeway (Segment 7) 3 HPP (2005) $ 96,500 $ 77,200 $ Worcester - Blackstone Visitor Center 3 HPP (2005) $ 360,000 $ 288,000 $ 372,509 Construction / HPP#918 - MA136 & HPP#4288 MA207 / Design Status = 25% / Total Project Cost = $1,862,544 480,000 Construction / HPP#4283 - MA202 & HPP#2218 MA157 / Design Status = Pre 25% / Total Project Cost = $2,400,000 19,300 Design & Construction / HPP#2509 - MA165 / Design Status = Pre 25% / Total Project Cost = $2,400,000 72,000 Design / HPP#2351 - MA158 / Design Status - For Final Design / Total Project Cost = $7,890,000 Worcester - Blackstone Visitor Center 3 HPP (2005) $ 5,300,000 $ 4,240,000 $ 1,060,000 Construction / HPP#2351 - MA158 / Design Status Pre 25% / Total Project Cost = $7,890,000 Worcester - Blackstone Visitor Center 3 HPP (2005) $ 360,000 $ 288,000 $ Worcester - Blackstone Visitor Center, Bikeway & Bridge 3 HPP (2005) $ 85,000 $ 68,000 $ Worcester - Blackstone Visitor Center, Bikeway & Bridge 3 HPP (2005) $ 1,700,000 $ 1,360,000 $ Worcester - Blackstone Visitor Center, Bikeway & Bridge 3 HPP (2005) $ 85,000 $ 68,000 $ 72,000 Design / HPP#2351 - MA158 / Funding to be used for Env & 25% Design / Total Project Cost = $7,890,000 / Moved from 2012 17,000 Design / HPP#4283 - MA202 & HPP#2218 - MA157 & MA006 / Design Status - For Final Design / Total Project Cost = $7,890,000 340,000 Construction / HPP#4283 - MA202 & HPP#2218 MA157 & MA006 / Design Status - Pre 25% / Total Project Cost = $7,890,000 17,000 Design / HPP#4283 - MA202 & HPP#2218 - MA157 & MA006 / Funding to be used for Env & 25% Design / Total Project Cost = $7,890,000 / Moved from 2012 1,125,000 Design & Construction / HPP#4266 - MA185 / Design Status = Pre 25% / Total Project Cost = $5,625,000 200,000 Construction / HPP#4283 - MA202 & HPP#2218 MA157 / Design Status = 75% / Total Project Cost = $1,200,000 605674 Central Mass Sturbruidge 604892 Central Mass Worcester 605820 Central Mass Worcester 605820 Central Mass Worcester 606629 Central Mass Worcester 606629 Central Mass Worcester 606629 Central Mass Worcester 606629 Central Mass Worcester 606629 Central Mass Worcester 606629 Central Mass Worcester Central Mass HPP (2005) $ 5,625,000 $ 4,500,000 $ Worcester Worcester - Central Business District Streetscape Improvements 3 606434 Central Mass HPP (2005) $ 1,000,000 $ 800,000 $ Worcester Worcester - City Common Pavilion & Multi-Use Path Construction (Franklin Street) 3 604998 r t a t io n P la n n in g FFY 2014 Additional Information ▼ Page 11 of 14, July 2012 MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ Funding Source ▼ Worcester - City Common Pavilion & Multi-Use Path Construction (Franklin Street) 3 HPP (2005) $ 200,000 $ 160,000 $ Worcester - Quinsigamond Village Bikeway Construction, From Blackstone River Bikeway To Mckeon Road, Includes Work On W-44-155 Montague- Greenfield Road Pedestrian Bridge 3 HPP (1998) $ 1,462,580 $ 1,170,064 $ 2 HPP (2005) $ 1,249,448 $ 899,901 $ Winchendon - Multi-Use Trail Construction (North Central Montachus Pathway - Phase V) Includes W-39-023, W-39-024 & W-39Winchendon ett 028 2 HPP (2005) $ 1,849,594 $ 1,479,675 $ Westfield- Columbia Greenway Rail Trail Construction, North Section - From Cowles Court Access Ramps To The Westfield River Bridge Includes Rehab Of W-25-036 (Westfield River Crossing) HPP Total 2 HPP (2005) $ 2,275,104 $ 1,785,506 $ Adams- Signalization Of Route 8 @ Friend Street Conway- Retaining Wall Replacement On Route 116 Along The South River 1 1 Central Mass Worcester 605780 Central Mass Worcester 604696 Franklin Montague Pioneer Valley 604968 Total Programmed Funds ▼ District ▼ 604998 604439 MassDOT Project Description▼ Westfield 604553 Berkshire Adams 606705 Franklin Conway $48,501,268 § 115 (2004) § 115 (2004) $ $ Section 115 Total Central Mass Central Mass 605649 605649 606705 Franklin Worcester Worcester Conway Berkshire Adams SB11MA1 Berkshire 0 Lee 606719 Cape Cod Barnstable 604488 Cape Cod Dennis etc Central Mass Central Mass 604893 Pending Worcester Worcester f f ic e o f T r a n s p o r t a t io n P la n n in g $ $ 650,000 $ 826,551 $1,476,551 Worcester - Sidewalk Construction On Mckeon Road 3 § 125 (2009) $ Worcester - Sidewalk Construction On Mckeon Road 3 § 125 (2009) Conway- Retaining Wall Replacement On Route 116 Along The South River 1 § 125 (2009) Adams - Mount Greylock Scenic Byways Improvements 1 SBYWY $ 1,095,000 $ $ 25,000 $ 1,615,000 850,000 $ 680,000 $ Lee - Bikeway (Sb-2011-Ma-10) 1 SBYWY $ 366,500 $ 293,200 $ Barnstable- Hyannis Memorial Walkway -Sidewalk Reconstruction & Streetscaping On Pearl St, From Main St To South St Hyannis Dennis-Yarmouth- Cape Cod Rail Trail Extension, From Route 134 To Willow Street, Includes 3 Bridges 5 112 (2006) MA217 $ 99,000 $ 99,000 $ 5 TI (2005) TI173 $ 2,096,080 $ 1,676,864 $ Worcester - Streetscape Improvements At Main Street & Maywood Street Worcester -Blackstone Canal Streetscape Improvements On Harding Street Miscellaneous / Other Total 3 TI (2005) $ 2,000,000 $ 1,600,000 $ 3 § 129 (2008) $ 735,000 $ FFY 2014 349,547 Earmark 2820-MA-172; cost adjusted for inflation; could use TE funds. Design status = Pre-25%. 369,919 HPP #1798 MA 148 Earmark: Total Cost = $1,849,594 Adjusted for YOE by 4%; Non Adjusted Total Cost = $1,778,456; Cost as of 4/12/12 adjusted to $1,778,456. 489,598 $10,143,915 - $ 25,000 $ - $ 1,615,000 $ - 735,000 $ $6,146,580 $5,084,064 $65,635,199 $54,228,768 Construction $2.5 m earmark. $1,673,449 used with Ashfield Walls in 2012. Remainder used here for Conway. Total project cost estimated at $3.3 million. Design status = Pre-25%. Project using STP, Sec 115 and Sec 125 funding sources. $0 - $2,735,000 Additional Information ▼ 40,000 Design & Construction / HPP#2509 - MA165 / Design Status = 75% / Total Project Cost = $2,000,000 292,516 Construction / MA006 / Design Status = 100% / Total Project Cost = $1,462,580 1,095,000 $ $2,735,000 Non-Target Projects O 650,000 826,551 Non-Federal Funds ▼ $38,357,353 $1,476,551 Section 125 Total 605930 Federal Funds ▼ Construction / MA241 & MA251 / Design Status = 25% / Total Project Cost = $1,095,000 Design / MA241 & MA251 / Design Status = 25% / Total Project Cost = $1,095,000 2009 earmark of $1,615,000. Total project cost estimated at $3.3 million. Design status = Pre-25%. Project using STP, Sec 115 and Sec 125 funding sources. $0 170,000 Construction; Move construction from 2011 to 2014 73,300 Planning and Design; Move from 2013 to 2014 - CONSTRUCTION - $99,000 100% Federal Funds 419,216 CONSTRUCTION Total $9,321,897 + 4% annual inflation= $9,694,773: TI 173 MA 209: $2,096,080 in 2014; CMAQ $7,598,693 in 2014; 25% design 400,000 Construction / TI#177 - MA213 / Design Status = Pre 25% / Total Project Cost = $2,000,000 - Construction / MA238 / Design Status = Pre 25% / Total Project Cost = $735,000 $1,062,516 $11,406,431 ◄ Funding Split Varies by Earmark Page 12 of 14, July 2012 MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ Federal Aid Major & State Category Projects IM - Interstate Maintenance Sharon- Walpole - Interstate Maintenance & Related Work 606171 Boston Sharon etc On I-95 Central Worcester - Interstate Maintenance & Related Work On I605588 Massachue Worcester 190 (Nb) tts Bernardston- Interstate Maintenance & Related Work On I606173 Franklin Bernardston 91 Northern Chelmsford Lowell-Tewksbury -Interstate Maintenance 606174 Chelmsford Middlesex ,Resurfacing And Related Work -I-495 Pioneer Easthampton Easthampton/Northampton - Interstate Maintenance And 606582 Valley etc Related Work Ik-91 Southeast New Bedford- Fairhaven- Interstate Maintenance & Related 606172 New Bedford Mass Work On I-195 Seekonk- Dartmouth- Guide & Traffic Sign Replacement 605444 Statewide Statewide On I-195 & Sr 24 Total Programmed Funds ▼ District ▼ Funding Source ▼ 5 IM $ 10,308,480 $ 3 IM $ 11,486,592 $ 10,337,933 $ 2 IM $ $ 4 IM $ 12,988,685 $ 11,689,817 $ 1,298,869 2 IM $ 11,228,880 $ 10,105,992 $ 1,122,888 5 IM $ 10,799,360 $ 1,079,936 8,283,600 Federal Funds ▼ Non-Federal Funds ▼ 9,277,632 $ 7,455,240 $ 9,719,424 $ STP-Flex 5 $4,900,000 $69,995,597 IM total $3,920,000 $62,506,037 Additional Information ▼ 1,030,848 1,148,659 Construction / Design Status = Pre 25% / Total Project Cost = $11,486,592 828,360 inflated 4% AC 2 of 2, TFPC $5.3M with 0% YOE $980,000 $7,489,560 ◄ 90% Federal + 10% Non-Federal NHS - National Highway System 603711 Boston Needham etc Needham- Wellesley- Rehab/Replacement Of 6 Bridges On I-95/Route 128: N-04-020, N-04-021, N-04-022, N-04-026, N-04-027 & W-13-023 (Add-A-Lane - Contract V) 6 NHS-AC $ 30,000,000 NHS Regional Targets Subtotal Weymouth etc Weymouth- Braintree- Quincy - Resurfacing & Related Work On Route 3 Westborough- Southborough- Resurfacing And Related Westboroug Work On Route 9 h 606639 Boston 607172 Boston, Central Mass 606178 Cape Cod 605610 Central Northboroug Massachue h tts 604255 Boston Bourne Boston Bourne-Resurfacing & Safety Upgrading On Route 28 (General Macarthur Boulevard) Northborough - Resurfacing & Related Work On Route 20 Statewide NHS Preservation Program Regional Major Infrastructure Projects Sub-Total Boston - Central Artery / Third Harbor Tunnel $ 24,000,000 $ $30,000,000 $24,000,000 6,000,000 AC Yr 2 of 5; NHS+BR Total Cost = $127,500,000 ($120,000,000 programmed within FFYs 2013-16 TIP, AC Yr 5 of 5 will be programmed in FFY 2017) $6,000,000 6 NHS $ 9,817,600 $ 7,854,080 $ 1,963,520 3 NHS $ 8,099,520 $ 6,479,616 $ 1,619,904 5 NHS $ 7,795,507 $ 6,236,406 $ 1,559,101 CONSTRUCTION Total cost $7,795507 3 NHS $ 3,534,336 $ 2,827,469 $ state 6 NHS total $29,246,963 $13,750,000 $44,450,000 $117,446,963 $23,397,570 $11,000,000 $44,450,000 $102,847,570 $23,000,000 $18,400,000 $761,791,082 $644,364,737 706,867 Construction / Design Status = Pre 25% / Total Project Cost = $3,534,336 $5,849,393 $2,750,000 $0 100% match $14,599,393 ◄ 80% Federal + 20% Non-Federal Planning Statewide Statewide Statewide Planning Activities PL, SPR TOTAL ALL FEDERAL PROJECTS PROGRAMMED O f f ic e o f T r a n s p o r t a t io n P la n n in g FFY 2014 $4,600,000 OTP and MPO planning activities $117,538,846 Page 13 of 14, July 2012 MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ Total Programmed Funds ▼ District ▼ Funding Source ▼ Federal Funds ▼ Green Line Extension Project- Extension To College Avenue With The Union Square Spur N/A Other $ 94,900,000 Fairmount Improvements N/A Other $ 11,155,536 Red Line-Blue Line Connector Design N/A Other Non-Federal Funds ▼ Additional Information ▼ Non-Federal Aid Target Projects Other N/A Boston Somerville N/A Boston Boston N/A Boston $ $ 94,900,000 The Green Line Extension project is currently in the New Starts pipeline and the Commonwealth anticipates a decision in a Full Funding Grant Agreement in FFY 2015. The cash flows for the project, therefore, provide 100% bond funding for FFY 2013-14 and begin programming New Starts funding in FFY 2015. The Commonwealth is committed to fully funding this project with bond funds if New Starts is not awarded. $ 11,155,536 Lists cash flows (based on state fiscal year) for Fairmount Improvements $ - MassDOT made a formal request on Aug. 1, 2011, to remove this project from the State Implementation Plan regulation. The MPO is continuing to reference this project in the document until the process is complete. - Boston Other Total Total Non-Federally Funded Projects Programmed ► $106,055,536 $0 $106,055,536 ◄100% Non-Federal $106,055,536 $0 $106,055,536 Project estimated total costs are BY YEAR OF EXPENDITURE (YOE), for years 2013-2016 an annual inflation rate of 4% is assumed. 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx O f f ic e o f T r a n s p o r t a t io n P la n n in g FFY 2014 Page 14 of 14, July 2012