FFY 2013 State Transportation Improvement Program - Commonwealth of Massachusetts MassDOT Project ID ▼ District ▼ Funding Source ▼ Total Programmed Funds ▼ 1 STP-Flex $ 3,278,672 $ 2,622,938 $ Danvers- Reconstruction Of Liberty Street, From Route 128 To Water/High Street Intersection, Includes D-03-004 & D03-014 Somerville- Reconstruction Of Beacon Street, From Oxford Street To Cambridge C.L. Conway- Retaining Wall Replacement On Route 116 Along The South River 4 STP-Flex $ 1,250,000 $ 1,000,000 $ 4 STP-Flex $ 1,571,252 $ 1,257,002 $ 1 STP-Flex $ 451,406 $ 361,125 $ Haverhill- Reconstruction Of Route 125 (South Main St), From Boston Road To Basiliere Bridge & Salem Street, From South Main Street To Peabody Street Merrimac- Reconstruction Of Route 110 (West Main Street/East Main Street), From 400 Feet West Of Orchard Street To Broad Street Methuen- Interchange Reconstruction On I-93 At Route 110/113 Rotary, Including Removal Of M-17-017 & M-17018, Rehab Of M-17-007 & New Bridge Construction Of M17-040 4 STP-Flex- AC $ 368,848 $ 295,078 $ 4 STP-Flex $ 4,820,296 $ 3,856,237 $ 4 STP-Flex $ 260,795 $ 208,636 $ Dracut- Reconstruction Of Arlington Street, From Broadway Road (Route 113) To Methuen Street (Approx. 7500 Ft) 4 STP-Flex- AC $ 4,810,216 $ 3,848,173 $ Old Colony Regional Bicycle Parking Program (Bicycle Rack Grant Progam) Plymouth- Reconstruction Of Route 44 (Samoset Street) From Route 3 (Nb Ramp) Easterly To Water Street West Bridgewater- Intersection Improvements At Route 106 & Route 28 (Central Square) 5 STP-Flex $ 50,000 $ 40,000 $ 5 STP-Flex $ 4,044,720 $ 3,235,776 $ 5 STP-Flex $ 138,247 $ 110,598 $ Easthampton Easthampton- Intersection Improvements @ Pomeroy Meadow Road, Loudville Road, Glendale Street, West Street Plainfield Plainfield- Rehabilitation Of Route 116 2 STP-Flex $ 2,760,969 $ 2,208,775 $ 808,944 25% Design; Total Cost YOE is $4,318,290; Funded by STP, STP-E, and CMAQ 27,649 25% Design; HPP-1931; Total Cost YOE is $2,805,960; Funded by SAFETEA-LU HPP Earmark, STP, HSIP, and CMAQ 552,194 6.47 TEC 75% 1 STP-Flex $ 1,683,000 $ 1,346,400 $ 336,600 4.68TEC PS&E Attleboro 5 STP-Flex $ 305,000 $ 244,000 $ MassDOT Project Description▼ Municipality Name ▼ MPO ▼ Federal Aid Target Projects STP - Surface Transportation Program Berkshire Great Great Barrington- Reconstruction Of Main Street (Route 7) 602182 Barrington Boston Danvers Boston Somerville Franklin Conway 601825 607209 Federal Funds ▼ Non-Federal Funds ▼ 80822 600214 Merrimack Haverhill Valley 602469 Merrimack Merrimac Valley Merrimack Methuen Valley 605181 Northern Middlesex 604907 Dracut Old Colony Regionwide TBD Old Colony Plymouth 600426 603457 Old Colony West Bridgewater 602486 Pioneer Valley Pioneer Valley Southeast Mass 604825 605141 O f f i c e o f T r a n s p o r t a t i o n P l a n Attleboro- Reconstruction & Geometric Improvements On Tiffany Street, From Route 123 To New Road (Phase Ii) n i n g FFY 2013 Additional Information ▼ 655,734 STP + CMAQ + HSIP+TE+Statewide TE; Total Cost = 5,155,000; MPO evaluation score 7 of 7; Design Status: 25% (75% expected in July) 250,000 STP-Flex + STP-Boston. Total project cost is $7,128,052 314,250 STP+SAFETEA-LU Earmark Total Cost = $4,056,000 90,281 Remainder programmed under section 1C below (2 earmarks), and under STP-AC in 2014. Total project cost estimate is $3.3 million. Project using STP, Sec 115, and Sec 125 funding sources. AC year 1 of 2 73,770 AC YR 4 of 4. Total Project Cost = $14,596,160 to be converted to FA FY 2010+. (Construction) TEC = 6.10 out of 18. (M) 964,059 Total Project Cost = $4,634,900 in 2012 dollars, $4,820,296 in 2013 dollars. (Construction) TEC = 6.38 out of 18. (C) 52,159 Total Project Cost = $59,892,000 FY 2013, 2014 & 2015 Statewide CMAQ & TE + 2013 HPP #2434 (2005) + 2013 IM (2010 Discretionary) + FY 2013 and FY 2015 STP, CMAQ & HSIP + FY 2014 STP + HSIP (Construction). TEC = 9.63 out of 18. ( C ) 962,043 Total project cost estimate at design at 25% $5,825,516 ($1,015,300 FY14) 10,000 61,000 Construction; EC Score 31 Of 73; Status 25%. STPFlex + STP-Providence Page 1 of 15, July 2012 MassDOT Project ID ▼ District ▼ Funding Source ▼ Total Programmed Funds ▼ 5 STP-Flex $ 5,146,601 $ 4,117,281 $ 1,029,320 Regionally Significant Project STP ($5,146,601) / CMAQ ($1,792,021) / Federal Aid Bridge ($9,360,000) Total Cost = $16,298,622; Construction ; EC Score 54 Of 73; Pre 75% Eligible for CMAQ Funding 5 STP-Flex $ 2,324,429 $ 1,859,543 $ 4 STP-Flex $ $33,264,451 2,800,000 $ $26,611,561 2,240,000 $ 464,886 STP ($2,324,429) / HSIP ($896,010) Total Cost = $3,220,439; Construction; EC Score 60 Of 73; Status 25% Eligible for HSIP & CMAQ Funding $6,652,890 560,000 AC 2 of 2. TFPC $4.1M. 4 STP-Flex $ 2,800,000 $ 2,240,000 $ state 1 2 3 4 5 6 STP-Flex STP-Flex STP-Flex STP-Flex STP-Flex STP-Flex 6 STP-Flex $ $5,600,000 $120,000 $270,000 $460,000 $790,000 $770,000 $590,000 $3,000,000 550,000 $ $4,480,000 $96,000 $216,000 $368,000 $632,000 $616,000 $472,000 $2,400,000 440,000 $ 6 STP-Flex $ 1,000,000 $ 800,000 $ 200,000 6 STP-Flex $ 500,000 $ 400,000 $ 100,000 4 STP-Flex $ 600,000 $ 480,000 $ 6 STP-Flex $ 600,000 MassDOT Project Description▼ Municipality Name ▼ MPO ▼ Southeast Mass Dartmouth Dartmouth- Ramp Construction At Route I-195/Faunce Corner Road (Phase 1) Includes Bridge Widening, D-04016, Faunce Corner Road Over I-195 Southeast Mass New Bedford New Bedford- Intersection Improvements At Route 140/Route 6 (Kempton Street) And Brownell Avenue. Statewide Statewide Boston Lexington Statewide Statewide Statewide Statewide Statewide Statewide District 1 District 2 District 3 District 4 District 5 District 6 Boston Braintree etc Boston Braintree etc Boston Braintree etc Boston I-93, I-95, Rte 1 I-93, Rte 3, I95, Rte 24 600496 605365 606092 604937 607014 607015 607016 607018 607019 607020 606497 606498 606422 606427 Boston 606428 604255 Boston Statewide Statewide O f f i c e o f T r a n Boston Statewide Statewide s p o r t a t i o n P l a n n i n g STP-Flex Regional Subtotal District 4- Highway Lighting Upgrades On The Lowell Connector, From The I-495 Ramps To Gorham Street Lexington- Newton- Waltham- Wellesley- Weston- Traffic Sign Replacement On I-95, From Wellesley (Route 9) To Lexington (Routes 4/225) Statewide Infrastructure Program District 1- ADA Retrofits At Various Locations District 2- ADA Retrofits At Various Locations District 3- ADA Retrofits At Various Locations District 4- ADA Retrofits At Various Locations District 5- ADA Retrofits At Various Locations District 6- ADA Retrofits At Various Locations Statewide ADA Retrofit Program Braintree- Quincy- Milton- Boston- HOV Lane Tow Truck Services Braintree- Quincy- Milton- Boston- HOV Lane Barrier Transfer Vehicle (BTV) Operator Contract Braintree- Quincy- Milton- Boston- HOV Lane Operating Expenses Highway Assistance Patrols, Area 2, 5 Routes, 3 Year Contract* (Year 2) Highway Assistance Patrols, Area 3, 5 Routes, 3 Year Contract* (Year 2) Statewide ITS Program Boston - Central Artery / Third Harbor Tunnel DBEs, FAPO, Misc Programs Statewide Award Adjustments, Change Orders, Etc 6 state state STP FLEX TOTAL FFY 2013 $3,250,000 $70,710,000 $1,000,000 $42,750,000 $159,574,451 Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ 560,000 AC 2 of 2. TFPC $3M. $1,120,000 $24,000 $54,000 $92,000 $158,000 $154,000 $118,000 $600,000 110,000 **District 6 to provide these services with MassDOT employees 120,000 AC Yr 2 of 3. TFPCC= $2.4M over three years in 2012 dollars, Contract 71975 $ 480,000 $ 120,000 AC Yr 2 of 3. YOE= $2.4M over three years in 2012 dollars, Contract 71976 $2,600,000 $650,000 $70,710,000 $0 100% match $800,000 $200,000 $34,200,000 $8,550,000 $141,801,561 $17,772,890 Page 2 of 15, July 2012 MassDOT Project ID ▼ MassDOT Project Description▼ Municipality Name ▼ MPO ▼ District ▼ Funding Source ▼ Total Programmed Funds ▼ STP-Barnstable Sub-Total 604255 Boston Boston Boston Concord etc Boston Danvers Boston Weymouth etc 602984 601825 601630 Boston - Central Artery / Third Harbor Tunnel Concord- Lincoln- Limited Access Highway Improvements At Route 2 & 2A, Between Crosby'S Corner & Bedford Road, Includes C-19-024 Danvers- Reconstruction Of Liberty Street, From Route 128 To Water/High Street Intersection, Includes D-03-004 & D03-014 Weymouth- Abington- Reconstruction & Widening On Route 18 (Main Street) From Highland Place To Route 139 (4.0 Miles) Includes Rehab Of W-32-013, Route 18 Over The Old Colony Railroad (MBTA) STP-Boston Sub-Total 6 4 STP STP-AC $ $ 20,000,000 11,775,130 $ $ 20,000,000 $ 9,420,104 $ 4 STP $ 5,878,052 $ 4,702,442 $ $ 3,340,620 $ 2,672,496 $ 6 STP-AC $40,993,802 $36,795,042 Dalton- Reconstruction Of Housatonic Street, From Route 8 & 9 To Route 8, Includes New Pedestrian D-01-002 1 STP $ 399,316 $ 319,453 $ Franklin Bernardston Bernardston- Resurfacing & Related Work On Route 10, From I-91 To Route 142 Greenfield Greenfield- Roundabout Construction At The Intersection Of Colrain Road, College Street & Colrain Street 2 STP $ 1,911,850 $ 1,529,480 $ 2 STP $ 761,539 $ 609,231 $ Franklin 606008 $0 Dalton 606048 604813 $0 Non-Federal Funds ▼ Berkshire 602280 606010 Federal Funds ▼ Martha's Oak Bluffs Vineyard Montachus Athol etc ett Oak Bluffs - Intersection Improvements At Edgartown, Vineyard Road & Barnes Road Athol- Petersham- Resurfacing & Related Work On Route 32, From 1 Mile North Of Route 101 To Route 2 5 STP-AC $ 381,373 $ 305,098 $ 2 STP $ 2,945,691 $ 2,356,553 $ Montachus Tempelton ett Templeton- Reconstruction Of Baldwinville Road, From Route 202/68 To Patriots Road (Approx. 3 Miles) 2 STP-AC $ 1,231,978 $ 985,582 $ Montachus Winchendon Winchendon - Resurfacing & Improvements On Route 140, ett From Gardner Town Line To Teel Road Nantucket Nantucket Polpis Road - Resurfacing & Related Work Pioneer Pelham Pelham- Reconstruction Of Amherst Road, From The Valley Amherst T.L. To 800 Feet East Of Enfield Road (1.7 Miles) Phase 1 STP-Other Sub-Total 2 STP $ 1,051,004 $ 840,803 $ 5 2 STP STP $ $ 270,651 3,077,338 $ $ 216,521 $ 2,461,870 $ Southeast Mass 5 604917 607219 607240 601154 605141 Attleboro Attleboro- Reconstruction & Geometric Improvements On Tiffany Street, From Route 123 To New Road (Phase Ii) $12,030,740 STP STP-Providence Sub-Total O f f i c e o f T r a n s p o r t a t i o n P l a n n i n g $ 2,907,550 $2,907,550 FFY 2013 $9,624,592 $ 2,326,040 $ $2,326,040 Additional Information ▼ $0 - 100% match 2,355,026 AC Yr 3 of 4; STP+HSIP+CMAQ Total Cost = $61,723,980 ($22,471,587 programmed within FFYs 2013-16 TIP) 1,175,610 STP-Flex + STP-Boston. Total project cost is $7,128,052 668,124 AC Yr 1 of 3; STP+ TEA-21 Earmark Total Cost = $38,340,000 $4,198,760 79,863 AC Year 1 of 2; Total Cost = 5,550,000; MPO evaluation score 3 of 7; Design Status: <75% 382,370 Design status = at final design (PS&E) 152,308 Project is using a combination of STP, HSIP, and CMAQ. Design status = Pre-25%. Total project cost $1,340,511. 76,275 100% DESIGN Funded by STP and HSIP; Accelerated Construction Year 2 of 3 589,138 Non Adjusted Total Cost = $2,945,691; Construction; TEC 4.82 of 18; 75% Design; In-house Design; Cost revised by MassDOT D2 to $2,945,691 via email 4/19/12. 246,396 AC Yr 2 of 2; Construction; TEC 7.13 of 18; Revised 100% Design due 4/13/12; Environ done; ROW expected; STP+STP/TE+Statewide TE Total Cost = $5,357,811 4/12/12; $4,050,707 programmed in FFY 2012. 210,201 STP+HSIP Total Cost = $1,496,959 54,130 District 5 project - book job 615,468 5.55 TEC 75% $2,406,148 581,510 Construction; EC Score 31 Of 73; Status 25%. STPFlex + STP-Providence $581,510 Page 3 of 15, July 2012 MassDOT Project ID ▼ MassDOT Project Description▼ Municipality Name ▼ MPO ▼ District ▼ Funding Source ▼ Total Programmed Funds ▼ Statewide Railroad Grade Crossings STP-Safety Sub-Total 606643 604442 Pioneer Valley Pioneer Valley West Springfield Westfield Berkshire Great Barrington Boston Boston 602182 $10,000,000 $10,000,000 Non-Federal Funds ▼ $8,000,000 $ $8,000,000 2,000,000 $2,000,000 2 STP $ 166,958 $ 133,566 $ 2 STP $ 5,138,400 $ 4,110,720 $ 1 STP-TE $ $5,305,358 213,576 $ $4,244,286 170,861 $ Arlington Arlington- Reconstruction Of Massachusetts Avenue, From Pond Lane To The Cambridge C.L. 4 STP-TE $ 474,668 $ 379,734 $ Cambridge Cambridge- Common Improvements At Waterhouse Street, Mass Ave & Garden Street Templeton- Reconstruction Of Baldwinville Road, From Route 202/68 To Patriots Road (Approx. 3 Miles) 6 STP-TE $ 1,093,334 $ 874,667 $ 2 STP-TE $ 50,084 $ 40,067 $ Plymouth- Reconstruction Of Route 44 (Samoset Street) From Route 3 (Nb Ramp) Easterly To Water Street Enhancement Elements 5 STP-TE $ 182,380 $ 145,904 $ 4 STP-TE $ $2,014,042 237,332 $ $1,611,234 189,866 $ 6 STP-TE $ 546,666 $ 437,333 $ MassDOT Enhancements Incentive Program Subtotal Great Barrington- Reconstruction Of Main Street (Route 7) 1 STP-TE $ $783,998 106,788 $ $627,198 85,430 $ Beverly- Construction Of A Walkway On Beverly Harborfront 4 STP-TE $ 570,665 $ 456,532 $ $156,800 21,358 STP + CMAQ + HSIP+TE+Statewide TE; Total Cost = 5,155,000; MPO evaluation score 7 of 7; Design Status: 25% (75% expected in July) 114,133 158,546 Montachus Templeton ett 604917 Old Colony Plymouth 600426 STP-TE Regional Sub-Total Arlington- Reconstruction Of Massachusetts Avenue, From Pond Lane To The Cambridge C.L. Boston Arlington Boston Cambridge Berkshire Great Barrington Boston Beverly Boston Framingham Framingham- Bike Path Construction & Improvements On Cochituate Rail Trail, From School Street To Route 30 3 STP-TE $ 792,731 $ 634,185 $ Boston Central Mass Salem Northbridge 4 3 STP-TE STP-TE $ $ 1,441,650 174,000 $ $ 1,153,320 $ 139,200 $ 604687 Cambridge- Common Improvements At Waterhouse Street, Mass Ave & Garden Street 605188 602182 Additional Information ▼ West Springfield- Improvements & Related Work On I91/Route 5/I-90 Connector Road Westfield- Reconstruction Of Route 187 (Feeding Hills Road) STP-Springfield Sub-Total Great Barrington- Reconstruction Of Main Street (Route 7) 604687 605188 Federal Funds ▼ 33,392 4.73 TEC 75% 1,027,680 7.78 TEC 100% $1,061,072 42,715 STP + CMAQ + HSIP+TE+Statewide TE; Total Cost = 5,155,000; MPO evaluation score 7 of 7; Design Status: 25% (75% expected in July) 94,934 CMAQ+TE+Statewide TE+SAFETEA-LU Earmark+Section 129 Earmark Total Cost = $5,887,336 218,667 Construction; TE+Statewide TE+SAFETEA-LU Earmark Total Cost = $2,764,874 10,017 AC Yr 2 of 2; Construction; TEC 7.13 of 18; Revised 100% Design due 4/13/12; Environ done; ROW expected; STP+STP/TE+Statewide TE Total Cost = $5,357,811 4/12/12; $4,050,707 programmed in FFY 2012. 36,476 25% Design; Total Cost YOE is $4,318,290; Funded by STP, STP-E, and CMAQ; Identified Transportation Enhancement Fund (STP-E) eligible project components (2-for-1 state match portion) $402,808 47,466 CMAQ+TE+Statewide TE+SAFETEA-LU Earmark+Section 129 Earmark Total Cost = $5,887,336 109,333 Construction; TE+Statewide TE+SAFETEA-LU Earmark Total Cost = $2,764,874 602514 606137 605121 606493 O f f i c e o f T r a n s p o r t a t i o n P l a n n i n g Salem- Causeway Park Construction Northbridge - Reconstruction Of Sutton Street, From Sutton T.L. To Route 122 (Approx. - 2.2 Miles) FFY 2013 288,330 34,800 The source of the Statewide Transportation Enhancements 2-for-1 funding / Total Project Cost = $7,758,000 of TE + STP Page 4 of 15, July 2012 MassDOT Project ID ▼ MassDOT Project Description▼ Municipality Name ▼ MPO ▼ District ▼ Funding Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Merrimack Methuen Valley Methuen- Interchange Reconstruction On I-93 At Route 110/113 Rotary, Including Removal Of M-17-017 & M-17018, Rehab Of M-17-007 & New Bridge Construction Of M17-040 4 STP-TE-AC $ 188,500 $ 150,800 $ Montachus Templeton ett Templeton- Reconstruction Of Baldwinville Road, From Route 202/68 To Patriots Road (Approx. 3 Miles) 2 STP-TE $ 25,042 $ 20,034 $ Old Colony Plymouth Plymouth- Reconstruction Of Route 44 (Samoset Street) From Route 3 (Nb Ramp) Easterly To Water Street Enhancement Elements 5 STP-TE $ 91,190 $ 72,952 $ Pioneer Valley Agawam- Construction Of Bikeway Loop Connecting Connecticut Riverwalk With Main Street STP-TE Statewide + Incentive Program Sub-Total 2 STP-TE $ 2,506,021 $ 2,004,817 $ Statewide- Stormwater Retrofits At Various Locations (IM/NHS)) District 1- Stormwater Retrofits At Various Locations District 1- District 2- Stormwater Retrofits At Various Locations District 3- Stormwater Retrofits At Various Locations District 4- Stormwater Retrofits At Various Locations District 5- Stormwater Retrofits At Various Locations District 6- Stormwater Retrofits At Various Locations Statewide Stormwater Program Sub-Total STP-Transportation Enhancements Sub-Total Statewi de 1 605181 604917 600426 603731 606980 Agawam Statewide Statewide Statewide District 1 606984 606985 606988 606989 Statewide Statewide Statewide Statewide Statewide District 1 District 3 District 4 District 5 District 6 Central Mass Northbridge 606493 606981 606983 Northbridge - Reconstruction Of Sutton Street, From Sutton T.L. To Route 122 (Approx. - 2.2 Miles) f f i c e o f T r a n s p o r t a t i o n P l a n n i n g 37,700 AC 1 OF 3. Total Project Cost = $59,892,000 FY 2013, 2014 & 2015 Statewide. CMAQ & TE + 2013 HPP #2434 (2005) + 2013 IM (2010 Discretionary). + FY 2013 and FY 2015 STP, CMAQ & HSIP + FY 2014 STP + HSIP (Construction) TEC = 9.63 out of 18. ( C ) 5,008 AC Yr 2 of 2; Construction; TEC 7.13 of 18; Revised 100% Design due 4/13/12; Environ done; ROW expected; STP+STP/TE+Statewide TE Total Cost = $5,357,811 4/12/12; $4,050,707 programmed in FFY 2012. 18,238 25% Design; Total Cost YOE is $4,318,290; Funded by STP, STP-E, and CMAQ; Identified Transportation Enhancement Fund (STP-E) eligible project components (2-for-1 state match portion) 501,204 $6,680,585 $5,344,468 $1,336,117 $2,000,000 $1,500,000 $1,600,000 $1,200,000 $400,000 $300,000 $1,500,000 $2,000,000 $2,000,000 $500,000 $500,000 $10,000,000 $18,694,627 $1,200,000 $1,600,000 $1,600,000 $400,000 $400,000 $8,000,000 $14,955,702 $300,000 $400,000 $400,000 $100,000 $100,000 $2,000,000 $3,738,925 STP-TE STP-TE STP-TE 1 3 4 5 6 STP-TE STP-TE STP-TE STP-TE 3 STP STP-Worcester Sub-Total O Additional Information ▼ $ 7,584,000 $ 6,067,200 $ STP NON-FLEX TOTAL $7,584,000 $97,516,077 $6,067,200 $82,012,862 STP Total $257,090,528 $223,814,422 FFY 2013 1,516,800 Construction / TEC Score = 2.8 / Design Status = 75100% / TE + STP Total Project Cost = $7,758,000 $1,516,800 $15,503,215 $33,276,106 ◄ 80% Federal + 20% Non-Federal Page 5 of 15, July 2012 MassDOT Project ID ▼ MassDOT Project Description▼ Municipality Name ▼ MPO ▼ District ▼ Funding Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ HSIP - Highway Safety Improvement Program Berkshire Great Barrington Great Barrington- Reconstruction Of Main Street (Route 7) 1 HSIP $ 355,964 $ 320,368 $ Boston Concord et 4 HSIP-AC $ 5,296,710 $ 4,767,039 $ Cape Cod Central Mass Orleans Worcester Concord- Lincoln- Limited Access Highway Improvements At Route 2 & 2A, Between Crosby'S Corner & Bedford Road, Includes C-19-024 Orleans- Roundabout Improvements At Routes 28 & 6A Worcester - Intersection & Signal Improvements At Lincoln Street, Highland Street, Pleasant Street Corridor 5 3 HSIP HSIP $ $ 458,514 2,000,000 $ $ 412,663 $ 1,800,000 $ Franklin Greenfield Greenfield- Roundabout Construction At The Intersection Of Colrain Road, College Street & Colrain Street 2 HSIP $ 253,975 $ 228,578 $ HSIP-AC $ 30,997 $ 27,897 $ 4 HSIP $ 442,956 $ 398,660 $ Montachus Winchendon Winchendon - Resurfacing & Improvements On Route 140, ett From Gardner Town Line To Teel Road Old Colony West West Bridgewater- Intersection Improvements At Route 106 Bridgwater & Route 28 (Central Square) 2 HSIP $ 445,955 $ 401,360 $ 5 HSIP $ 455,954 $ 410,359 $ Pioneer Valley Southeast Mass 2 HSIP $ 1,080,992 $ 972,893 $ 5 HSIP $ 896,010 $ 806,409 $ 602182 602984 602213 602037 606048 Martha's Oak Bluffs Vineyard Merrimack Methuen Valley 604813 Oak Bluffs - Intersection Improvements At Edgartown, 5 Vineyard Road & Barnes Road Methuen- Interchange Reconstruction On I-93 At Route 110/113 Rotary, Including Removal Of M-17-017 & M-17018, Rehab Of M-17-007 & New Bridge Construction Of M17-040 605181 607219 603457 606643 605365 West West Springfield- Improvements & Related Work On ISpringfield 91/Route 5/I-90 Connector Road New Bedford New Bedford- Intersection Improvements At Route 140/Route 6 (Kempton Street) And Brownell Avenue. $11,718,027 HSIP Regional Targets Sub-Total 606466 607069 Statewide Statewide Statewide Statewide Statewide Statewide Statewide Statewide Statewide- Signs & Marking Upgrades For Stop-Sign Controlled Intersections At Various Locations Statewide- Various Safety Strategies To Be Determined Based On 2012 SHSP And Updates Statewide- Implementation (Phase I) Of The Flashing Yellow Arrow At Signalized Intersections--One Of The "FHWA Nine Proven Countermeasures Longmeadow- West Springfield- Guide & Traffic Sign Replacement On I-91 Statewide HSIP Progam 607070 605442 HSIP $ 1,000,000 $ 900,000 $ HSIP $ 2,000,000 $ 1,800,000 $ HSIP $ 1,300,000 $ 1,170,000 $ HSIP $ 700,000 $ 630,000 $ HSIP Total O f f i c e o f T r a n s p o r t a t i o n P l a n n i n g $10,546,224 FFY 2013 35,596 STP + CMAQ + HSIP+TE+Statewide TE; Total Cost = 5,155,000; MPO evaluation score 7 of 7; Design Status: 25% (75% expected in July) 529,671 AC Yr 3 of 4; STP+HSIP+CMAQ Total Cost = $61,723,980 ($21,757,641 programmed within FFYs 2013-16 TIP) 45,851 CONSTRUCTION Total cost is $1,491,500 200,000 HSIP+CMAQ TOTAL COST = 3,700,000 / Construction / TEC Score = 8.1 / Design Status = 100% 25,398 Project is using a combination of STP, HSIP, and CMAQ. Design status = Pre-25%. Total project cost $1,340,511. 3,100 100% DESIGN Funded by STP and HSIP; Accelerated Construction Year 2 of 3 44,296 Total Project Cost = $59,892,000 FY 2013, 2014 & 2015 Statewide CMAQ & TE + 2013 HPP #2434 (2005) + 2013 IM (2010 Discretionary) + FY 2013 and FY 2015 STP, CMAQ & HSIP + FY 2014 STP + HSIP (Construction) TEC = 9.63 out of 18. ( C ) 44,596 STP+HSIP Total Cost = $1,496,959 45,595 25% Design; HPP-1931; Total Cost YOE is $2,805,960; Funded by SAFETEA-LU HPP Earmark, STP, HSIP, and CMAQ 108,099 4.73 TEC 75% 89,601 STP ($2,324,429) / HSIP ($896,010) Total Cost = $3,220,439; Construction; EC Score 60 Of 73; Status 25%. Eligible for HSIP & CMAQ Funding $1,171,803 100,000 200,000 All projects yet to be determined - SHSP update draft should be available by summer 2012 130,000 Development of project scope and PNF underway 70,000 AC 2 of 2. TFPC $4.4M. $5,000,000 $4,500,000 $500,000 $16,718,027 $15,046,224 $1,671,803 ◄ Funding Split Varies by Project Specifications Page 6 of 15, July 2012 MassDOT Project ID ▼ MassDOT Project Description▼ Municipality Name ▼ MPO ▼ CMAQ - Congestion Mitigation and Air Quality Program Berkshire Great Great Barrington- Reconstruction Of Main Street (Route 7) 602182 Barrington N/A 602037 $ 1,200,000 $ 960,000 $ 240,000 STP + CMAQ + HSIP+TE+Statewide TE; Total Cost = 5,155,000; MPO evaluation score 7 of 7; Design Status: 25% (75% expected in July) 595,668 CMAQ+TE+Statewide TE+SAFETEA-LU Earmark+Section 129 Earmark Total Cost = $5,887,336 1,054,783 $ 2,978,340 $ 2,382,672 $ Boston Lynn 4 CMAQ $ 5,273,913 $ 4,219,130 $ Boston Regionwide Lynn- Reconstruction Of Route 129 (Broadway), From Wyoma Square To Boston Street Clean Air And Mobility (See Projects Below) Arlington- Bikeway Connection At Intersection Route 3 And Route 60 Brookline- Bike Share, Year 3 Cambridge- Bike Share, Year 3 CCRTA - New Transit Service Demonstration Bourne To Falmouth ($275,080 Total) CCRTA - New Transit Service Demonstration Bourne To Sandwich ($277,160 Total) CCNS- New Transit Service Demonstration Outer Cape Bike Shuttle -- CMAQ And FLHP N/A 4 CMAQ CMAQ $ $ 823,010 570,000 $ $ 658,408 $ 456,000 $ 5 CMAQ CMAQ CMAQ $ $ $ 95,732 157,278 143,042 $ $ $ 76,586 $ 125,822 $ 143,042 $ 5 CMAQ $ 144,123 $ 144,123 $ 5 CMAQ $ 59,987 $ 59,987 Falmouth Intersection Improvements @ Teaticket Highway (Route 28)/Jones Road/Worcester Court Falmouth Intersection Improvements At East Falmouth Highway (Route 28) Davisville Road/Old Meetinghouse Road Orleans- Roundabout Improvements At Routes 28 & 6A Millbury - Bridge Replacement, M-22-020, Route 146 (Nb & Sb) Over West Main Street And Improvements On Route 146 @ Elm Street, Elmwood Street & West Main Street (Rotary) Worcester - Intersection & Signal Improvements At Lincoln Street, Highland Street, Pleasant Street Corridor 5 CMAQ $ 1,737,120 $ 1,389,696 $ transfer to CCNS with NPS match of $14,997 for operating funds + $6,801 operating funds;100% design; yr 1 of 3 347,424 CONSTRUCTION Total cost is $1,737,120 5 CMAQ $ 1,420,170 $ 1,136,136 $ 284,034 CONSTRUCTION Total cost is $1,420,170 5 3 CMAQ CMAQ $ $ 1,032,986 2,015,000 $ $ 826,389 $ 1,612,000 $ 206,597 CONSTRUCTION Total cost is $1,491,500 403,000 Construction / Design Status = w/ABP funds 25% / TEC Score = 6.90 / Total Project Cost = $2,015,000 / See also NFA Bridge Project under Section 2B 3 CMAQ $ 1,700,000 $ 1,360,000 $ 340,000 Greenfield- Roundabout Construction At The Intersection Of Colrain Road, College Street & Colrain Street 2 CMAQ $ 507,949 $ 406,359 $ Merrimack Methuen Valley Methuen- Interchange Reconstruction On I-93 At Route 110/113 Rotary, Including Removal Of M-17-017 & M-17018, Rehab Of M-17-007 & New Bridge Construction Of M17-040 4 CMAQ $ 885,911 $ 708,729 $ Montachus Lancaster ett Lancaster- Intersection Improvements @ Five Corners: Route 110 (Bolton Road, High Street Extension), Center Bridge Road, Old Common Road 3 CMAQ $ 1,100,000 $ 880,000 $ Cape Cod CCRTA Cape Cod CCRTA Cape Cod CCNS Cape Cod Falmouth Cape Cod Falmouth Cape Cod Central Mass Orleans Millbury Central Mass Worcester Franklin Greenfield 605181 O CMAQ CMAQ 606048 605392 1 Additional Information ▼ 4 605671 605964 Non-Federal Funds ▼ Arlington- Reconstruction Of Massachusetts Avenue, From Pond Lane To The Cambridge C.L. N/A N/A 602213 Federal Funds ▼ Arlington 606885 605661 Funding Source ▼ Boston 604687 602094 Total Programmed Funds ▼ District ▼ f f i c e o f T r a n s p o r t a t i o n P l a n n i n g FFY 2013 164,602 114,000 19,146 31,456 - $143,042 TRANSFER TO FTA ($286,083 Total cost) - $144,123 TRANSFER TO FTA ($288,246 Total cost) HSIP+CMAQ TOTAL COST = 3,700,000 / Construction / TEC Score = 8.1 / Design Status = 100% 101,590 Project is using a combination of STP, HSIP, and CMAQ. Design status = Pre-25%. Total project cost $1,340,511. 177,182 AC 1 OF 3. Total Project Cost = $59,892,000 FY 2013, 2014 & 2015 Statewide. CMAQ & TE + 2013 HPP #2434 (2005) + 2013 IM (2010 Discretionary). + FY 2013 and FY 2015 STP, CMAQ & HSIP + FY 2014 STP + HSIP (Construction) TEC = 9.63 out of 18. ( C ) 220,000 CMAQ Non Adjusted Total Cost = $1,100,000; Construction; TEC 5.83 of 18; 75% Design Submittal; Moving towards 100%; Cost Updated to $1,100,000 4/12/12 Page 7 of 15, July 2012 MassDOT Project ID ▼ MassDOT Project Description▼ Municipality Name ▼ MPO ▼ Funding Source ▼ Old Colony Regional Bicycle Parking Program (Bicycle Rack Grant Progam) West Bridgewater- Intersection Improvements At Route 106 & Route 28 (Central Square) 5 CMAQ $ 50,000 $ 40,000 $ 5 CMAQ $ 861,909 $ 689,527 $ Holyoke- Signal & Intersection Improvements At Homestead Avenue & Lower Westfield Road Northampton Northampton- Park & Ride Construction At The Va Medical Center Dartmouth Dartmouth- Ramp Construction At Route I-195/Faunce Corner Road (Phase 1) Includes Bridge Widening, D-04016, Faunce Corner Road Over I-195 Regionwide bike rack installation 2 CMAQ $ 1,352,827 $ 1,082,262 $ 2 CMAQ $ 800,000 $ 640,000 $ 5 CMAQ $ 1,792,021 $ 1,433,617 $ 358,404 5 CMAQ $ 100,000 $ 80,000 $ 20,000 4 CMAQ $ $25,978,308 17,700,000 $ $20,852,077 14,160,000 $ CMAQ $ Old Colony Regionwide Old Colony West Bridgwater 603457 Pioneer Valley Pioneer Valley Southeast Mass 606045 606375 600496 Holyoke Southeast Mass Regional CMAQ Subtotal Methuen- Interchange Reconstruction On I-93 At Route 110/113 Rotary, Including Removal Of M-17-017 & M-17018, Rehab Of M-17-007 & New Bridge Construction Of M17-040 Merrimack Methuen Valley 605181 Statewide Statewide Travel Options; Vanpools; Alternative Vehicles; ACO Statewide CMAQ Program Statewide HOC Operations And Maintenance Support ITS Contract Consultant Services Contract For ITS Design And Support Statewide Services Consultant Services Contract For ITS Design And Support Statewide Services Burlington- Woburn- Reading- Expansion Of Fiber, CCTV, I-95 VMS & Traffic Sensor Network On I-95 HOC and ITS Field Equipment Operational Expenses For 2 Statewide Years I-495 from Hopkinton To Andover- Installation Of Cameras, Message Hopkinton to Signs & Communication Infrastructure On I-495 Lawrence (Design/Build ITS) Statewide ITS Program 606414 606913 606914 606432 606915 606283 4 3&4 e o f T r a n s p o r t a t i o n P l a n n i n g Additional Information ▼ 10,000 172,382 25% Design; HPP-1931; Total Cost YOE is $2,805,960; Funded by SAFETEA-LU HPP Earmark, STP, HSIP, and CMAQ 270,565 10.02 TEC 25% 160,000 5.77 TEC 25% Resub $5,126,231 3,540,000 Total Project Cost = $59,892,000 FY 2013, 2014 & 2015 Statewide CMAQ & TE + 2013 HPP #2434 (2005) + 2013 IM (2010 Discretionary) + FY 2013 and FY 2015 STP, CMAQ & HSIP + FY 2014 STP + HSIP (Construction). TEC = 9.63 out of 18. ( C ) $ $ CMAQ $ 500,000 $ 400,000 $ 320,000 CMAQ $ 4,000,000 $ 3,200,000 $ 2,560,000 CMAQ $ 1,000,000 $ 800,000 $ 640,000 CMAQ $ 6,000,000 $ 4,800,000 $ 3,840,000 FFY 2013 $ Non-Federal Funds ▼ CMAQ CMAQ TOTAL FEDERAL AID TARGET PROJECTS (non-Bridge) f f i c Federal Funds ▼ 19,041,948 $36,741,948 $ 500,000 $ 500,000 CMAQ Total O Total Programmed Funds ▼ District ▼ 15,233,558 $ 33,201,948 $29,393,558 $36,741,948 400,000 $ 320,000 400,000 $ 320,000 $12,500,000 $10,000,000 $75,220,256 $60,245,635 $349,028,811 $299,106,282 $8,000,000 $49,868,179 ◄ 80% Federal + 20% Non-Federal $84,816,088 Page 8 of 15, July 2012 MassDOT Project ID ▼ MassDOT Project Description▼ Municipality Name ▼ Total Programmed Funds ▼ District ▼ Funding Source ▼ Sandisfield- Bridge Replacement, S-03-005, Clark Road Over The Farmington River (West Branch) Bedford- Bridge Preservation, Sr 4 (Great Road) Over The Boston Bedford Shawsheen River Concord- Bridge Preservation, Old Stow Road Over MBTA Boston Concord & Bm Railroad Central Sutton - Bridge Replacement, S-33-005, Blackstone Street Sutton Mass Over Blackstone River Montachus Royalston- Bridge Replacement, R-12-001, Stockwell Road Royalston ett Over Lawrence Brook Montachus Royalston- Bridge Replacement, R-12-006, North Royalston ett Fitzwilliam Road Over Lawrence Brook Pioneer Chester - Bridge Replacement, C-11-020, George Miller Chester Valley Road Over The Middle Branch Of The Westfield River Pioneer Huntington - Bridge Replacement Route 112 Over The Huntington Valley Westfield River & Csx Railroad Pioneer Westhampto Westhampton - Bridge Rehabilitation, W-27-015, North Valley n Road Over Roberts Meadow Brook Southeast Dighton- Bridge Replacement, D-08-006, Brook Street Over Dighton Mass Segreganset River Southeast Fall River- Bridge Preservation, F-02-052, Herman Street Fall River Mass Over Route 79 Br-Off Subtotal Statewide Bridge Rehabilitation And Replacement Program 1 BR-off $ 1,440,000 $ 1,152,000 $ 288,000 4 BR-Off $ 586,250 $ 469,000 $ 117,250 4 BR-Off $ 825,000 $ 660,000 $ 165,000 3 BR-off $ 2,400,000 $ 1,920,000 $ 2 BR-Off $ 920,301 $ 736,241 $ 480,000 Construction / Design Status = Pre 25% / Total Project Cost = $2,400,000 184,060 Cost Est as of 4/10/12; Bridge Off System 2 BR-Off $ 1,168,400 $ 934,720 $ 233,680 Cost Est as of 4/10/12; Bridge Off System 2 BR-off $ 1,055,423 $ 844,338 $ 211,085 1 BR-off $ 4,872,000 $ 3,897,600 $ 974,400 2 BR-off $ 1,093,834 $ 875,067 $ 218,767 5 BR-off $ 1,888,104 $ 1,510,483 $ 377,621 5 BR-off $ 1,920,000 $ 1,536,000 $ 384,000 Boston- Bridge Rehabilitation, B-16-029, Route 99 (Alford Street) Over Mystic River Boston- Deck Patching & Superstructure Repairs On B-16Boston 365 (Bowker Overpass) Hopkinton- Bridge Betterment, H-23-012, I-90 Ramp Over IHopkinton 495 Lexington- Bridge Replacement, L-10-009, Route 2 (Eb & Lexington Wb) Over Route I-95 (Route 128) Needham- Wellesley- Rehab/Replacement Of 6 Bridges On I-95/Route 128: N-04-020, N-04-021, N-04-022, N-04-026, Needham etc N-04-027 & W-13-023 (Add-A-Lane - Contract V) 6 BR-AC $ 7,700,000 $ 6,160,000 $ 1,540,000 AC Yr 3 of 4 6 BR-On $ 10,800,110 $ 8,640,088 $ 2,160,022 3 BR-On $ 5,341,960 $ 4,273,568 $ 1,068,392 4 BR-AC $ 1,800,000 $ 1,440,000 $ 360,000 AC Yr 1 of 3; Total Cost = $31,800,000 6 BR-AC $ 2,000,000 $ 1,600,000 $ 400,000 AC Yr 1 of 5; NHS+BR Total Cost = $127,500,000 ($120,000,000 programmed within FFYs 2013-16 TIP, AC Yr 5 of 5 will be programmed in FFY 2017) 3 BR-On $ 1,303,038 $ 1,042,430 $ 3 BR-on $ 7,572,261 $ 6,057,809 $ 2 BR-AC $ 5,850,000 $ 4,680,000 $ MPO ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Federal Aid Bridge Projects 607112 Berkshire 607110 607111 606638 604492 604515 604721 602994 604339 606374 606386 603370 Boston 606448 Boston 605774 Boston 600703 Boston 603711 Boston Sandisfield Boston Central Mass Central Mass 604507 604065 603478 Worcester Franklin O f f i c e o f T Oxford - Culvert Replacement, O-06-001, Comins Road Over French River Worcester - Bridge Reconstruction, W-44-094, (Sr9) Belmont Street Over I-290 Deerfield- Bridge Rehabilitation, D-06-044 & D-06-045, Route I-91 (Nb & Sb) Over The Deerfield River (Stillwater Road And Lower Road) Oxford r a Deerfield n s p o r t a t i o n P l a n n i n g $18,169,312 FFY 2013 $14,535,450 $3,633,862 260,608 Construction / Design Status = 25% / Total Project Cost = $1,303,038 1,514,452 Construction / Design Status = 25% / Total Project Cost = $7,272,261 1,170,000 Additional funding for this project is provided in FY 2014-15. AC year is 3/5. Total project cost $48,840,444. Page 9 of 15, July 2012 MassDOT Project ID ▼ MassDOT Project Description▼ Municipality Name ▼ MPO ▼ 601585 Franklin Gill etc 606911 Franklin Monroe 604029 Martha's Vineyard Oak Bluffs 600988 Merrimack Groveland Valley Montachus Leominster ett Northern Dunstable Middlesex 603514 606302 601845 Northern Middlesex Lowell 82611 Pioneer Valley Chicopee Pioneer Valley Pioneer Valley Southeast Mass Southeast Mass 605618 606345 606033 604642 Ludlow Springfield Attleboro Berkley Southeast Mass 600496 Dartmouth Southeast Mass Southeast Mass 605838 606136 Fall River Fall River 606354 Southeaste Fall River rn Mass 606383 Southeast Mass Raynham Statewide Statewide O f f i c e o f T r a n Statewide Statewide s p o r t a t i o n P l a n n i n g Total Programmed Funds ▼ District ▼ Funding Source ▼ Gill- Montague- Bridge Rehabilitation, G-04-010=M-28-031, Avenue A Over Connecticut River & Repair Of G-12-020=M28-001, Montague City Road Over The Connecticut River 2 BR-AC $ 1,313,000 $ 1,050,400 $ 262,600 Final year of funding. AC year is 6/6. Total project cost = $47,721,430 Monroe- Rowe- Bridge Preservation, M-26-002=R-10-002, Depot Street Over The Deerfield River Oak Bluffs - Tisbury - Bridge Replacement, O-01-001=T-04001, Beach Road Over Lagoon Pond Drawbridge Groveland- Haverhill- Bridge Replacement, G-15-001=H-12012, Route 97 & Route 113 Over The Merrimack River (Bates Bridge) Leominster- Bridge Replacement, L-08-014, Whitney Street Over The Monoosnoc Brook Dunstable- Bridge Replacement, D-13-001, Main Street Over Salmon Brook Lowell- Bridge Demolition, L-15-021 & New Bridge Construction, L-15-095, University (Textile) Avenue Over The Merrimack River And Northern Canal Chicopee- Holyoke- Bridge Rehabilitation, C-13-012=H-21030, Route 116 (Chicopee/Cabot St) Over Connecticut River & Pv RR (Aka Willimansett Bridge) Ludlow - Wilbraham - Bridge Rehabilitationeast Street Over The Chicopee River Springfield - Bridge Rehabilitation, S-24-077, Route I-291 Over Page Boulevard Attleboro- Bridge Preservation, A-16-053, I-95 (Nb) Over North Avenue Berkley- Bridge Replacement, B-08-003, Padelford Street Over State Route 24 Dartmouth- Ramp Construction At Route I-195/Faunce Corner Road (Phase 1) Includes Bridge Widening, D-04016, Faunce Corner Road Over I-195 Fall River- Bridge Betterment, F-02-042, Wilson Road Over Route 24 Fall River- Superstructure Replacement, F-02-044, Meridian Street Over Route 24 Fall River- Somerset- Structural Steel Repairs & Painting, F02-058=S-16-008, I-195 Over Rte 79 & Taunton River (Braga Bridge - Phase Ii) Raynham- Bridge Deck Replacement, R-02-025, Route 138 Over I-495 Br-On Statewide Bridge Rehabilitation And Replacement Program Bridge Maintenance Program Statewide Bridge Inspection Bridge On-System Sub-Total 1 BR-On $ 3,000,000 $ 2,400,000 $ 600,000 5 BR-AC $ 9,000,000 $ 7,200,000 $ 1,800,000 75% DESIGN Accelerated Construction Year 2 of 4 4 BR-AC- ON $ 8,585,000 $ 6,868,000 $ 3 BR-On $ 2,430,800 $ 1,944,640 $ 1,717,000 AC YR 5 of 5. Total Cost = $55,935,012 to be converted to FA from FY 2009 to FY 2013. (Construction) (C) 486,160 Cost Est as of 4/10/12; Bridge On System 3 BR-on $ 1,440,000 $ 1,152,000 $ 4 BR-AC-ON $ 5,502,597 $ 4,402,078 $ 2 BR-on $ 1,850,000 $ 1,480,000 $ 370,000 2 BR-on $ 950,000 $ 760,000 $ 190,000 2 BR-on $ 3,125,400 $ 2,500,320 $ 625,080 5 BR-on $ 1,000,000 $ 800,000 $ 200,000 5 BR-on $ 4,831,567 $ 3,865,254 $ 966,313 5 BR-on $ 9,360,000 $ 7,488,000 $ 1,872,000 5 BR-on $ 5,600,040 $ 4,480,032 $ 1,120,008 5 BR-on $ 4,600,080 $ 3,680,064 $ 920,016 5 BR $ 15,000,000 $ 12,000,000 $ 5 BR-on $ 1,920,000 $ 1,536,000 $ BR-ON BR BR-ON BR-ON Federal Aid Bridges FFY 2013 Federal Funds ▼ $121,875,853 $97,500,682 $9,990,000 $6,250,000 $138,115,853 $156,285,165 $7,992,000 $5,000,000 $110,492,682 $125,028,132 Non-Federal Funds ▼ Additional Information ▼ 288,000 1,100,519 Project advertised in FY 2010 3,000,000 AC 2 of 3. 384,000 $24,375,171 $1,998,000 $1,250,000 $27,623,171 $31,257,033 ◄ 80% Federal + 20% Non-Federal Page 10 of 15, July 2012 MassDOT Project ID ▼ MassDOT Project Description▼ Municipality Name ▼ MPO ▼ Total Programmed Funds ▼ District ▼ Funding Source ▼ Federal Funds ▼ Non-Federal Funds ▼ 1 6 SRTS SRTS $ $ 546,000 553,000 $ $ 546,000 $ 553,000 $ - 4 5 SRTS SRTS $ $ 513,000 618,125 $ $ 513,000 $ 618,125 $ - SRTS $ 1,382,000 $3,612,125 1,382,000.0 $3,612,125 $0 $783,000 $626,400 $156,600 Additional Information ▼ Federal Aid Non-Target Projects 606908 Berkshire Pittsfield 606521 Boston Braintree 606516 Boston Wakefield 606519 Old Colony Brockton Statewide Pittsfield - Safe Routes To School (Conte School) Braintree- Safe Routes To School (Ross Elementary School) Wakefield- Safe Routes To Schools (Dolbeare School) Brockton- Safe Routes To School (Brookfield Elementary School) SRTS - Education And Planning & Design Statewide Safe Routes To Schools Statewide Recreational Trails Total Construction 25% Design; Total Cost YOE is $618,125 Earmarks Arlington- Reconstruction Of Massachusetts Avenue, From Pond Lane To The Cambridge C.L. 4 HPP (2005) $ 1,445,400 $ 1,164,320 $ Boston- Improvements Along Gainsborough And St. Botolph Streets Boston- Reconstruction Of Rutherford Avenue, From City Square To Sullivan Square Cambridge- Common Improvements At Waterhouse Street, Mass Ave & Garden Street 6 HPP (2005) $ 500,000 $ 400,000 $ 281,080 Construction; CMAQ+TE+Statewide TE+SAFETEALU Earmark+Section 129 Earmark Total Cost = $5,887,336 100,000 Construction; HPP 2012 6 HPP (2005) $ 1,124,874 $ 899,899 $ 224,975 design; HPP 3568; local match 6 HPP (2005) $ 1,124,874 $ 899,899 $ 3 HPP (1998) $ 3,983,545 $ 3,186,836 $ 224,975 Construction; TE+Statewide TE+SAFETEA-LU Earmark Total Cost = $2,764,874; Total Cost was $2,164,874. HPP 3536 796,709 Construction; HPP 684; TEA-21 Earmark+Section 129 Earmark+Local Funds Total Cost = $8,347,738 3 HPP (2005) $ 5,754,819 $ 4,603,855 $ 1,150,964 Construction; HPP 4279 6 4 HPP (2005) HPP (2005) $ $ 6,711,062 2,587,214 $ $ 5,368,850 $ 2,069,771 $ 6 HPP (1998) $ 7,999,380 $ 6,399,504 $ 1,342,212 Construction; HPP 4272 517,443 Construction; HPP 431; STP+SAFETEA-LU Earmark Total Cost = $4,056,000 1,599,876 Construction; HPP 1236; AC Yr 1 of 3; STP+TEA-21 Earmark Total Cost = $38,340,000 4 HPP (2005) $ 329,258 $ 263,406 $ 604687 Boston Arlington 606889 Boston Boston 606226 Boston Boston 605188 Boston Cambridge 606209 Boston Framingham- Reconstruction Of Route 126 (Concord Framingham Street) 604988 Boston Franklin 606235 Boston Quincy 607209 Boston Somerville 601630 Boston Weymouth etc Franklin- Reconstruction Of Route 140, Main Street & Emmons Street (Downtown Enhancements) Quincy- Adams Green Transportation Improvements Somerville- Reconstruction Of Beacon Street, From Oxford Street To Cambridge C.L. Weymouth- Abington- Reconstruction & Widening On Route 18 (Main Street) From Highland Place To Route 139 (4.0 Miles) Includes Rehab Of W-32-013, Route 18 Over The Old Colony Railroad (MBTA) Methuen- Interchange Reconstruction On I-93 At Route 110/113 Rotary, Including Removal Of M-17-017 & M-17018, Rehab Of M-17-007 & New Bridge Construction Of M17-040 Merrimack Methuen Valley 605181 O f f i c e o f T r a n s p o r t a t i o n P l a n n i n g FFY 2013 65,852 Total Project Cost = $59,892,000 FY 2013, 2014 & 2015 Statewide CMAQ & TE + 2013 HPP #2434 (2005) + 2013 IM (2010 Discretionary) + FY 2013 and FY 2015 STP, CMAQ & HSIP + FY 2014 STP + HSIP (Construction). TEC = 9.63 out of 18. ( C ) Page 11 of 15, July 2012 MassDOT Project ID ▼ District ▼ Funding Source ▼ Total Programmed Funds ▼ Newbury - Repair, Reconstruction & Resurfacing Of Sunset Drive In Newbury 4 HPP (2005) $ 224,975 $ 179,980 $ West Bridgewater- Intersection Improvements At Route 106 & Route 28 (Central Square) 5 HPP (2005) $ 1,349,850 $ 1,079,880 $ Amherst- Belchertown- Hadley- Northampton- Norwottuck Rail Trail Improvements Holyoke- Canal Walk Extension (2Nd Level Canal), From Appleton Street To Dwight Street (Phase Ii) HPP Total 2 HPP (2005) $ 4,449,450 $ 3,559,560 $ 44,995 HPP # 2891, Total cost = $619,995 FY 2013 HPP + FY 2013 US F&WS Rural Roads Program. US F&WS Rural Roads Program Funding is 100% Federal Funds, does not require a match. 269,970 25% Design; HPP-1931; Total Cost YOE is $2,805,960; Funded by SAFETEA-LU HPP Earmark, HSIP, and CMAQ 889,890 HPP-1773 2 HPP (2005) $ 4,381,454 $ 3,505,163 $ 876,291 HPP-4274 Conway- Retaining Wall Replacement On Route 116 Along The South River 1 S 115 (2004) $ 826,551 $ 826,551 $ - Holyoke- Canal Walk Extension (2Nd Level Canal), From Appleton Street To Dwight Street (Phase Ii) Section 115 Total 2 § 115 (2004) $ 215,997 $ 215,997 $ - Conway- Retaining Wall Replacement On Route 116 Along The South River 1 MassDOT Project Description▼ Municipality Name ▼ MPO ▼ USFWS20 Merrimack Newbury 1301 Valley 603457 West Bridgwater Old Colony Pioneer Valley Pioneer Valley 605065 603263 Amherst Holyoke 80822 Franklin Conway 603263 Pioneer Valley Holyoke 80822 Franklin $41,966,155 S 125 (2009) f f i c e o f T r a $ 1,615,000 Non-Federal Funds ▼ $33,580,924 $1,042,548 $1,042,548 $ 1,615,000 $ n s p o r t a t i o n P l a n n i n g $1,615,000 FFY 2013 $1,615,000 Additional Information ▼ $8,385,231 $2.5 m earmark. $1,673,449 used with Ashfield Walls in 2012. Remainder used here for Conway. Total project cost estimated at $3.3 million. Design status = Pre-25%. Project using STP, Sec 115 and Sec 125 funding sources. Mass DEMO ID # 275. AC year 1 of 2 $0 - Conway Section 125 Total O Federal Funds ▼ 2009 earmark of $1,615,000. Total project cost estimated at $3.3 million. Design status = Pre-25%. Project using STP, Sec 115 and Sec 125 funding sources. Mass DEMO ID # 275. AC year 1 of 2. $0 Page 12 of 15, July 2012 MassDOT Project ID ▼ MassDOT Project Description▼ MPO ▼ Municipality Name ▼ SB10MA3 Berkshire North Adams 604687 Boston Arlington 606226 Boston 606209 605792 605181 Funding Source ▼ Mohawk Bike/ Pedestrian Trail Phase - II (Sb-2010-Ma-03) 1 SBYWY $ 701,000 $ 560,800 $ Arlington- Reconstruction Of Massachusetts Avenue, From Pond Lane To The Cambridge C.L. 4 § 129 (2008) $ 735,000 $ 735,000 $ Boston- Reconstruction Of Rutherford Avenue, From City Square To Sullivan Square Framingham- Reconstruction Of Route 126 (Concord Boston Framingham Street) Cape Cod NPS Cape Cod National Seashore projects Methuen- Interchange Reconstruction On I-93 At Route 110/113 Rotary, Including Removal Of M-17-017 & M-17Merrimack 018, Rehab Of M-17-007 & New Bridge Construction Of MMethuen Valley 17-040 6 TI (2005) $ 3,000,000 $ 2,400,000 $ 3 § 129 (2008) $ 490,000 $ 490,000 $ 5 4 FLHP IM-disc $ $ 587,000 1,000,000 $ $ 587,000 $ 900,000 $ Newbury - Repair, Reconstruction & Resurfacing Of Sunset Drive In Newbury 4 Other $ 350,025 $ 350,025 Brockton- Downtown Road & Streetscape Improvements (Phase I) CT Scenic Byway 2011 access & interpretation 5 TI (2005) $ 2,142,205 $ 1,713,764 $ 428,441 TI-178 2 Sc Bwy $ 203,364 $ 162,691 $ 40,673 NSBG Jacob's Ladder Scenic Byway 2011 Blanche Barlow Acres/Goose Pond recreational access Miscellaneous / Other Total 2 Sc Bwy $ 170,100 $ 136,080 $ 34,020 NSBG Boston USFWS20 Merrimack Newbury 1301 Valley 603675 Old Colony Brockton Pioneer Valley Pioneer Valley Regionwide Regionwide Non-Target Projects O Total Programmed Funds ▼ District ▼ f f i c e o f T r a n s p o r t a t i o n P l a n n i n g FFY 2013 Federal Funds ▼ $9,378,694 $8,035,360 $58,397,522 $48,512,357 Non-Federal Funds ▼ Additional Information ▼ 140,200 Planning and Design - Construction; CMAQ+TE+Statewide TE+SAFETEALU Earmark+Section 129 Earmark Total Cost = $5,887,336 600,000 Design; HPP TI 174; local match - Construction; TEA-21 Earmark+Section 129 Earmark+Local Funds Total Cost = $8,347,738 - construction 100,000 Total Project Cost = $59,892,000 FY 2013, 2014 & 2015 Statewide CMAQ & TE + 2013 HPP #2434 (2005) + 2013 IM (2010 Discretionary) + FY 2013 and FY 2015 STP, CMAQ & HSIP + FY 2014 STP + HSIP (Construction). TEC = 9.63 out of 18. ( C ) HPP # 2891, Total cost = $619,995 FY 2013 HPP + FY 2013 US F&WS Rural Roads Program. US F&WS Rural Roads Program Funding is 100% Federal Funds, does not require a match. © $503,134 $9,044,965 ◄ Funding Split Varies by Earmark Page 13 of 15, July 2012 MassDOT Project ID ▼ MassDOT Project Description▼ Municipality Name ▼ MPO ▼ Federal Aid Major & State Category Projects IM - Interstate Maintenance Franklin- Interstate Maintenance & Related Work On I-495 607179 Boston Franklin 605596 Boston Foxboro 606170 Boston Lexington 605597 Boston Lynnfield 604879 Boston Wilmington Statewide Statewide 605444 Foxborough- Interstate Maintenance & Related Work On I95 Lexington- Burlington- Interstate Maintenance & Related Work On I-95 Lynnfield- Wakefield- Interstate Maintenance & Related Work On I-95 Wilmington- Woburn- Interstate Maintenance & Related Work On Route I-93 Seekonk- Dartmouth- Guide & Traffic Sign Replacement On I-195 & Sr 24 Total Programmed Funds ▼ District ▼ Funding Source ▼ 3 IM $ 5,154,240 $ 4,638,816 $ 515,424 5 IM $ 9,440,000 $ 8,496,000 $ 944,000 4 IM $ 33,205,200 $ 29,884,680 $ 3,320,520 4 IM $ 12,685,000 $ 11,416,500 $ 1,268,500 4 IM $ 14,480,960 $ 13,032,864 $ 1,448,096 5 IM $ 400,000 $ 360,000 $ IM total Federal Funds ▼ $75,365,400 Non-Federal Funds ▼ $67,828,860 Additional Information ▼ 40,000 AC 1 of 2. TFPC $5.3M $7,536,540 ◄ 90% Federal + 10% Non-Federal NHS - National Highway System 603711 Boston Needham etc 606126 605602 Boston Boston Middleton Weymouth 606286 Cape Cod Bourne etc 604255 Boston Boston Needham- Wellesley- Rehab/Replacement Of 6 Bridges On I-95/Route 128: N-04-020, N-04-021, N-04-022, N-04-026, N-04-027 & W-13-023 (Add-A-Lane - Contract V) NHS Regional Targets Subtotal Middleton- Resurfacing & Related Work On Route 114 Weymouth- Resurfacing & Related Work On Route 3 Bourne-Sandwich --Resurfacing Of Route 6 (Mid-Cape Highway) Statewide NHS Preservation Program Boston - Central Artery / Third Harbor Tunnel 6 NHS-AC $ 26,000,000 $ 20,800,000 $ 4 6 5 NHS NHS NHS $ $ $ $26,000,000 1,769,976 3,552,640 8,200,948 $ $ $ $20,800,000 1,415,981 $ 2,842,112 $ 6,560,758 $ $5,200,000 353,995 National Highway Preservation Program funds 710,528 National Highway Preservation Program funds 1,640,190 $13,523,564 $50,295,000 $89,818,564 $10,818,851 $50,295,000 $81,913,851 $2,704,713 $0 100% match $7,904,713 ◄ 80% Federal + 20% Non-Federal $23,000,000 $18,400,000 $4,600,000 OTP and MPO planning activities $751,895,462 $640,789,482 6 NHS total 5,200,000 AC Yr 1 of 5; NHS+BR Total Cost = $127,500,000 ($120,000,000 programmed within FFYs 2013-16 TIP, AC Yr 5 of 5 will be programmed in FFY 2017) Planning Statewide Statewide Statewide Planning Activities PL, SPR TOTAL ALL FEDERAL PROJECTS PROGRAMMED O f f i c e o f T r a n s p o r t a t i o n P l a n n i n g FFY 2013 $145,159,339 Page 14 of 15, July 2012 MassDOT Project ID ▼ District ▼ Funding Source ▼ Total Programmed Funds ▼ 4 ABP-GANS $ 46,853,664 $ 5 ABP-GANS $ 10,555,222 $ 10,555,222 Total cost $10,555,222 3 Other $ 6,500,000 $ 6,500,000 Construction / Design Status = Pre 25% / Total Project Cost = $6,500,000; ABP NFA bridge combined with CMAQ project $17,055,222 MassDOT Project Description▼ Municipality Name ▼ MPO ▼ Non-Federal Aid Target Projects Non-Federally Aided Bridge Projects Everett- Medford- Bridge Replacements, Revere Beach Parkway (Route 16), E-12-004=M-12-018 Over The Malden 604660 Boston Everett etc River (Woods Memorial Bridge) & M-12-017 Over MBTA And Rivers Edge Drive Chatham- Bridge Replacement, C-07-01, Bridge Street 603690 Cape Cod Chatham Over The Mitchell River Millbury - Bridge Replacement, M-22-020, Route 146 (Nb & Central 605964 Millbury Sb) Over West Main Street Mass NFA Bridge Total Federal Funds ▼ $63,908,886 Non-Federal Funds ▼ $0 - Additional Information ▼ Bundled with 604660 Design status 25% Other N/A Boston Somerville N/A Boston Boston N/A Boston Boston 606110 Central Mass Sutton Green Line Extension Project- Extension To College Avenue With The Union Square Spur N/A Other $ 79,300,000 Fairmount Improvements N/A Other $ 24,139,099 Red Line-Blue Line Connector Design N/A Other 3 Other Sutton - Intersection Improvements @ Route 146 & Boston Road Other Total Total Non-Federally Funded Projects Programmed ► $109,439,099 79,300,000 The Green Line Extension project is currently in the New Starts pipeline and the Commonwealth anticipates a decision in a Full Funding Grant Agreement in FFY 2015. The cash flows for the project, therefore, provide 100% bond funding for FFY 2013-14 and begin programming New Starts funding in FFY 2015. The Commonwealth is committed to fully funding this project with bond funds if New Starts is not awarded. $ 24,139,099 Lists cash flows (based on state fiscal year) for Fairmount Improvements $ - MassDOT made a formal request on Aug. 1, 2011, to remove this project from the State Implementation Plan regulation. The MPO is continuing to reference this project in the document until the process is complete. $ 6,000,000 Construction / TEC Score = 7.7 / Total Project Cost = $6,000,000 / For Informational Purposes $0 $109,439,099 ◄100% Non-Federal $173,347,985 $0 $ $ - 6,000,000 $ $126,494,321 Project estimated total costs are BY YEAR OF EXPENDITURE (YOE), for years 2013-2016 an annual inflation rate of 4% is assumed. 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx O f f i c e o f T r a n s p o r t a t i o n P l a n n i n g FFY 2013 Page 15 of 15, July 2012