Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO Project Location ID .49 SE MASS 606729 TAUNTON Description CURRENT Source Total Federal REVISED Non Federal TAUNTON - COUNTY ST (RTE 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA Year Source Total Federal FINANCIAL CONSTRAINT NonFederal Year Amendment Description Date 2015 STP $636,283 $509,027 $127,257 2015 ADJUSTMENT:Add Funding Source 09/09/15 $900,000 $720,000 $180,000 2015 ADJUSTMENT::Change Addl Info 09/09/15 $766,096 2015 ADJUSTMENT::Change Addl Info 09/09/15 $35,753 2015 ADJUSTMENT::Change Addl Info 09/09/15 Increase cost by $636,283 to $4,191,198. (HSIP $1,560,000 / STP $1,151,849 / Statewide TE $843,066 / Statewide Infrastructure $636,283. .50 CAPECOD 606394 BARNSTABLE BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY CMAQ $900,000 $900,000 $29,753 2015 CMAQ STP $3,830,482 $3,064,386 $766,096 2015 STP TAP $178,764 $143,011 $35,753 2015 TAP HSIP $1,560,000 $1,404,000 $156,000 2015 HSIP $1,560,000 $1,404,000 $156,000 2015 ADJUSTMENT::Change Addl Info 09/09/15 STP $1,151,849 $921,479 $230,370 2015 STP $1,151,849 $230,370 2015 ADJUSTMENT::Change Addl Info 09/09/15 STP-BROFF $10,404,940 $8,323,952 $2,080,988 Increase cost by $700,000 to $6,209, 246 ($3,830,482 STP + $900,000 Regional CMAQ + $700,000 Statewide CMAQ + $600,000 Statewide HSIP + $178,764 TAP). 100% design submitted .51 CAPECOD 606394 BARNSTABLE BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY $3,830,482 $3,064,386 Increase cost by $700,000 to $6,209, 246 ($3,830,482 STP + $900,000 Regional CMAQ + $700,000 Statewide CMAQ + $600,000 Statewide HSIP + $178,764 TAP). 100% design submitted .52 CAPECOD 606394 BARNSTABLE BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY $178,764 $143,011 Increase cost by $700,000 to $6,209, 246 ($3,830,482 STP + $900,000 Regional CMAQ + $700,000 Statewide CMAQ + $600,000 Statewide HSIP + $178,764 TAP). 100% design submitted .53 SE MASS 606729 TAUNTON TAUNTON - COUNTY ST (RTE 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA Increase cost by $636,283 to $4,191,198. (HSIP $1,560,000 / STP $1,151,849 / Statewide TE $843,066 / Statewide Infrastructure $636,283. .54 SE MASS 606729 TAUNTON TAUNTON - COUNTY ST (RTE 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA $921,479 Increase cost by $636,283 to $4,191,198. (HSIP $1,560,000 / STP $1,151,849 / Statewide TE $843,066 / Statewide Infrastructure $636,283. .55 N. 607123 CHELMSFORD MIDDLESEX CHELMSFORD - HUNT RD OVER I-495 (BR-OFF) Estimate decreased from $10.4 to $8.5 with 100% submission. 2015 STP-BR-OFF $8,559,241 $6,847,393 $1,711,848 2015 ADJUSTMENT:Decrease Cost Date: 9/10/2015 09/09/15 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO .56 CAPECOD Project Location ID 606394 BARNSTABLE CURRENT Federal REVISED Non Federal Year Source Total Federal FINANCIAL CONSTRAINT NonFederal Year Amendment Description Description Source Total Date BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY HSIP $600,000 $540,000 $60,000 2015 HSIP $600,000 $540,000 $60,000 2015 ADJUSTMENT::Change Addl Info 09/09/15 STP-TE $843,066 $674,453 $168,613 2015 STP-TE $843,066 $674,453 $168,613 2015 ADJUSTMENT::Change Addl Info 09/09/15 HSIP $2,000,000 $1,800,000 $200,000 2015 HSIP $150,000 2015 ADJUSTMENT:Decrease Cost 09/09/15 Increase cost by $700,000 to $6,209, 246 ($3,830,482 STP + $900,000 Regional CMAQ + $700,000 Statewide CMAQ + $600,000 Statewide HSIP + $178,764 TAP). 100% design submitted .57 SE MASS 606729 TAUNTON TAUNTON - COUNTY ST (RTE 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA Increase cost by $636,283 to $4,191,198. (HSIP $1,560,000 / STP $1,151,849 / Statewide TE $843,066 / Statewide Infrastructure $636,283. .58 STATEWIDE 607072 STATEWIDE STATEWIDE- IMPLEMENTATION (PHASE III) OF THE FLASHING YELLOW ARROW AT SIGNALIZED INTERSECTIONS--ONE OF THE FHWA NINE PROVEN COUNTERMEASURES $1,500,000 $1,350,000 ADJUSTMENT::Change Addl Info Decrease project by $500,000 and move District 4 and 6 locations to new project. .59 STATEWIDE 607424 STATEWIDE STATEWIDE- ITS ADVANCED TRANSPORTATION MANAGEMENT SYSTEM (ATMS) SOFTWARE CMAQ $4,324,577 $3,459,662 $864,915 2015 CMAQ $6,330,577 $5,064,462 $1,266,115 2015 ADJUSTMENT:Increase Cost 09/09/15 ADJUSTMENT::Change Addl Info AC Year 1 of 3. Increase to $11,272,511 .60 STATEWIDE 607483 TAUNTON DISTRICT 5- ITS CAMERA & VMS CONSTRUCTION ON ROUTE 24, FROM RANDOLPH TO FALL RIVER (39 MILES) CMAQ $3,728,000 $2,982,400 $745,600 2015 CMAQ $1,722,000 $1,377,600 $344,400 2015 ADJUSTMENT:Decrease Cost 09/09/15 ADJUSTMENT::Change Addl Info AC Year 1 of 2 . Decrease project cost from $7,506,000 to $5,500,000 .61 STATEWIDE 608024 STATEWIDE STATEWIDE- CONVERSION OF INTERSTATE AND FREEWAY EXIT NUMBERS TO MILEPOSTBASED HSIP $3,555,556 $3,200,000 $355,556 2015 HSIP $2,448,385 $2,203,547 $244,839 2015 ADJUSTMENT:Decrease Cost 09/09/15 ADJUSTMENT::Change Addl Info Decrease project from $6,000,000 to $2,448,385 and eliminate 2016 funding. Reduce 2015 from 3,555,555 to $2,448,385. .62 STATEWIDE 607424 STATEWIDE STATEWIDE- ITS ADVANCED TRANSPORTATION MANAGEMENT SYSTEM (ATMS) SOFTWARE CMAQ $731,000 $584,800 $146,200 2016 CMAQ $731,000 $584,800 $146,200 2016 ADJUSTMENT::Change Addl Info 09/09/15 CMAQ $750,000 $600,000 $150,000 2016 CMAQ $87,000 $69,600 $17,400 09/09/15 AC Year 2 of 3. Increase to $11,272,511 .63 STATEWIDE 607482 STATEWIDE DISTRICT 4- ITS CONSTRUCTION ON I-93, FROM WOBURN TO NEW HAMPSHIRE BORDER (21 MILES) 2016 ADJUSTMENT:Decrease Cost ADJUSTMENT::Change Addl Info AC Year 1 of 2. Decrease cost from $9,075,000 to $6,337,000 Date: 9/10/2015 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # .64 MPO Project Location ID STATEWIDE 607483 STATEWIDE Description DISTRICT 5- ITS CAMERA & VMS CONSTRUCTION ON ROUTE 24, FROM RANDOLPH TO FALL RIVER (39 MILES) CURRENT Source Total CMAQ $3,778,000 REVISED Federal Non Federal $3,022,400 $755,600 Year Source Total Federal FINANCIAL CONSTRAINT NonFederal Year Amendment Description Date 2016 CMAQ $3,778,000 $3,022,400 $755,600 2016 ADJUSTMENT::Change Addl Info 09/09/15 2017 CMAQ $4,210,934 $3,368,747 $842,187 2017 ADJUSTMENT:Add Funding Source 09/09/15 AC Year 2 of 2 . Decrease project cost from $7,506,000 to $5,500,000 .65 STATEWIDE 607424 STATEWIDE STATEWIDE- ITS ADVANCED TRANSPORTATION MANAGEMENT SYSTEM (ATMS) SOFTWARE ADJUSTMENT::Change Addl Info AC Year 3 of 3. Increase to $11,272,511 .66 STATEWIDE 607482 STATEWIDE DISTRICT 4- ITS CONSTRUCTION ON I-93, FROM WOBURN TO NEW HAMPSHIRE BORDER (21 MILES) CMAQ $8,325,000 $6,660,000 $1,665,000 2017 CMAQ $6,250,000 $5,000,000 $1,250,000 2017 ADJUSTMENT:Decrease Cost 09/09/15 ADJUSTMENT::Change Addl Info AC Year 2 of 2. Decrease cost from $9,075,000 to $6,337,000 33.01 BOSTON 606284 BOSTON BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET CMAQ $5,000,000 $4,000,000 $1,000,000 2015 CMAQ $5,000,000 $4,000,000 $1,000,000 2015 AMENDMENT:Change Addl Info 09/09/15 STP $7,446,852 $5,957,482 $1,489,370 2015 STP $7,446,852 $5,957,482 $1,489,370 2015 AMENDMENT:Change Addl Info 09/09/15 HPP $1,114,501 $891,601 $222,900 2015 HPP $1,114,501 $891,601 09/09/15 SEC 129 $980,000 $980,000 $0 2015 SEC 129 $980,000 $980,000 anticipated project cost increase of $1,686,625; STP+CMAQ+Earmarks (SAFETEALU, Section 125 and 129, STPP, TCSP) Total Cost = $18,552,875; previously $16,866,250 33.02 BOSTON 606284 BOSTON BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET anticipated project cost increase of $1,686,625; STP+CMAQ+Earmarks (SAFETEALU, Section 125 and 129, STPP, TCSP) Total Cost = $18,552,875; previously $16,866,250 33.03 BOSTON 606284 BOSTON BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET $222,900 2015 AMENDMENT:Change Addl Info anticipated project cost increase of $1,686,625; Construction; HPP 682 (MA124); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $18,552,875; previously $16,866,250 33.04 BOSTON 606284 BOSTON BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET $0 2015 AMENDMENT:Change Addl Info anticipated project cost increase of $1,686,625; Construction; Section 129 (MA246); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $18,552,875; previously $16,866,250 Date: 9/10/2015 09/09/15 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO 33.05 BOSTON Project Location ID 606284 BOSTON Description BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET CURRENT Federal REVISED Source Total Non Federal SEC 125 $475,000 $475,000 $0 STPP $599,897 $599,897 TCSP $1,250,000 $1,000,000 Year Federal FINANCIAL CONSTRAINT NonFederal Year Amendment Description Source Total Date 2015 SEC 125 $475,000 $475,000 $0 2015 AMENDMENT:Change Addl Info 09/09/15 $0 2015 STPP $599,897 $599,897 $0 2015 AMENDMENT:Change Addl Info 09/09/15 $250,000 2015 TCSP $250,000 2015 AMENDMENT:Change Addl Info 09/09/15 2015 SBYWY $74,000 09/09/15 $38,000,000 2015 NHPP anticipated project cost increase of $1,686,625; Construction; Section 125 (MA252); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $18,552,875; previously $16,866,250 33.06 BOSTON 606284 BOSTON BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET anticipated project cost increase of $1,686,625; Construction; STPP (MA267); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $18,552,875; previously $16,866,250 33.07 BOSTON 606284 BOSTON BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET $1,250,000 $1,000,000 anticipated project cost increase of $1,686,625; Construction; TCSP (11MA008); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $18,552,875; previously $16,866,250 33.08 BOSTON N/A ESSEX Essex Coastal Scenic Byway Visitor Center Kiosk System $370,000 $296,000 2015 AMENDMENT:Add Project Construction; National Scenic Byways Program (NSBP) Program 2012 award; MassDOT match 33.09 BOSTON 606146 MULTIPLE CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON DEDHAM ST/CANTON STREET, INCLUDES REPLACEMENT OF C-02034, REHAB OF C-02-024, C-02-002=N-25016=W-31-002, NEW PED BRIDGES C-02-049 & C-02-050 & 3 SIGNALIZED INTERSECTIONS NFA $38,000,000 $0 $15,172,085 $13,654,876 $1,517,209 2015 AMENDMENT:Change Funding Src 09/09/15 AMENDMENT:Change Addl Info 90% Interstate portion. NHPP Interstate+NHPP Bridge+NHPP Intersections+CMAQ+STP Total Cost=$53,014,560; previously funded with NFA 33.10 BOSTON 606146 MULTIPLE CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON DEDHAM ST/CANTON STREET, INCLUDES REPLACEMENT OF C-02034, REHAB OF C-02-024, C-02-002=N-25016=W-31-002, NEW PED BRIDGES C-02-049 & C-02-050 & 3 SIGNALIZED INTERSECTIONS 2015 NHPP $16,259,735 $13,007,788 $3,251,947 2015 AMENDMENT:Add Funding Source 80% Bridge portion. NHPP Interstate+NHPP Bridge+NHPP Intersections+CMAQ+STP Total Cost=$53,014,560; previously funded with NFA Date: 9/10/2015 09/09/15 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION MPO Project Location ID 33.11 BOSTON 606146 MULTIPLE # Description CURRENT Source Total Federal REVISED Non Federal CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON DEDHAM ST/CANTON STREET, INCLUDES REPLACEMENT OF C-02034, REHAB OF C-02-024, C-02-002=N-25016=W-31-002, NEW PED BRIDGES C-02-049 & C-02-050 & 3 SIGNALIZED INTERSECTIONS Year Source Total Federal FINANCIAL CONSTRAINT NonFederal Year Amendment Description Date 2015 NHPP $11,890,885 $9,512,708 $2,378,177 2015 AMENDMENT:Add Funding Source 09/09/15 2015 CMAQ $5,357,850 $4,286,280 $1,071,570 2015 AMENDMENT:Add Funding Source 09/09/15 2015 STP $4,334,005 $3,467,204 09/09/15 2015 CMAQ 80% NHS Intersections portion. NHPP Interstate+NHPP Bridge+NHPP Intersections+CMAQ+STP Total Cost=$53,014,560; previously funded with NFA 33.12 BOSTON 606146 MULTIPLE CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON DEDHAM ST/CANTON STREET, INCLUDES REPLACEMENT OF C-02034, REHAB OF C-02-024, C-02-002=N-25016=W-31-002, NEW PED BRIDGES C-02-049 & C-02-050 & 3 SIGNALIZED INTERSECTIONS Pedestrian bridge, sidewalks and bicycle lanes. NHPP Interstate+NHPP Bridge+NHPP Intersections+CMAQ+STP Total Cost=$53,014,560; previously funded with NFA 33.13 BOSTON 606146 MULTIPLE CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON DEDHAM ST/CANTON STREET, INCLUDES REPLACEMENT OF C-02034, REHAB OF C-02-024, C-02-002=N-25016=W-31-002, NEW PED BRIDGES C-02-049 & C-02-050 & 3 SIGNALIZED INTERSECTIONS $866,801 2015 AMENDMENT:Add Funding Source Bridge widening necessary to accommodate sidewalks and bike lanes, and meet Complete Streets requirements. NHPP Interstate+NHPP Bridge+NHPP Intersections+CMAQ+STP Total Cost=$53,014,560; previously funded with NFA 33.14 BOSTON 604531 MULTIPLE ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL CMAQ $5,976,941 $4,781,553 $1,195,388 $6,602,569 $5,282,055 $1,320,514 2015 AMENDMENT:Increase Cost cost increase of $625,628; Statewide TE+Statewide CMAQ Total Cost = $7,849,648; previously $6,510,045 (CMAQ was $5,976,941) 33.15 BOSTON 606284 BOSTON BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 09/09/15 AMENDMENT:Change Addl Info 2015 CMAQ $1,686,625 $1,349,300 $337,325 2015 AMENDMENT:Add Funding Source 09/09/15 2015 CMAQ $2,609,514 $2,087,611 $521,903 2015 AMENDMENT:Add Project 09/09/15 anticipated project cost increase of $1,686,625; STP+CMAQ+Earmarks (SAFETEALU, Section 125 and 129, STPP, TCSP) Total Cost = $18,552,875; previously $16,866,250 33.16 BOSTON 602000 WESTON WESTON- INTERSECTION & SIGNAL IMPROVEMENTS AT ROUTE 30 (SOUTH AVE) & WELLESLEY STREET new addition Date: 9/10/2015 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO Project Location ID 33.17 BOSTON 608068 BURLINGTON Description CURRENT Source Total Federal REVISED Non Federal BURLINGTON- ADAPTIVE TRAFFIC CONTROL SIGNAL SYSTEM INSTALLATION ON CAMBRIDGE STREET, MIDDLESEX TURNPIKE & BURLINGTON MALL ROAD Year Source Total Federal FINANCIAL CONSTRAINT NonFederal Year Amendment Description Date 2015 CMAQ $2,100,000 $1,680,000 $420,000 2015 AMENDMENT:Add Project 09/09/15 2015 STP-TE $1,247,079 $249,416 2015 AMENDMENT:Increase Cost 09/09/15 new addition 33.18 BOSTON 604531 MULTIPLE ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL STP-TE $533,104 $426,483 $106,621 $997,663 AMENDMENT:Change Addl Info cost increase of $713,975; Statewide TE+Statewide CMAQ Total Cost = $7,849,648; previously $6,510,045 (STP-TE was $533,104) 34.01 STATEWIDE 608269 STATEWIDE DISTRICT 4- DISTRICT 6- IMPLEMENTATION OF FLASHING YELLOW ARROWS 2015 HSIP $500,000 $450,000 $50,000 2015 AMENDMENT:Add Project 2015 CMAQ $700,000 $560,000 $140,000 2015 AMENDMENT:Add Funding Source 09/09/15 2015 STP-TE $495,625 2015 AMENDMENT:Add Project 09/09/15 STP 09/09/15 Add new project. 34.02 CAPECOD 606394 BARNSTABLE BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY Increase cost by $700,000 to $6,209, 246 ($3,830,482 STP + $900,000 Regional CMAQ + $700,000 Statewide CMAQ + $600,000 Statewide HSIP + $178,764 TAP). 100% design submitted 34.03 607734 WEST BOYLSTON WEST BOYLSTON- REHABILITATION & STORMWATER IMPROVEMENTS ON STERLING STREET (ROUTE 12/140) AT THE WACHUSETT RESERVOIR $2,478,125 $1,982,500 One of three projects scheduled for possible advertisement using August Redistribution Obligation Authority. 34.04 STATEWIDE EWO WEST BOYLSTON AWARD ADJUSTMENTS, CHANGE ORDERS, ETC STP $22,614,754 $18,091,803 $4,522,951 2015 $19,614,754 $15,691,803 $3,922,951 2015 AMENDMENT:Decrease Cost HSIP $2,444,444 $2,200,000 $244,444 2016 AMENDMENT:Remove Project CMAQ $6,500,000 $5,200,000 $1,300,000 2017 AMENDMENT:Remove Project 09/09/15 Reduce from $22,614,754 to $19,614,754 34.05 STATEWIDE 608024 STATEWIDE STATEWIDE - CONVERSION OF INTERSTATE AND FREEWAY EXIT NUMBERS TO MILEPOSTBASED AC Yr 2 of 2. Total TFPC = $6,000,000. Increase 2016 by $444,444. 34.06 STATEWIDE 606936 STATEWIDE STATEWIDE- EXPANSION OF CCTV, VMS AND THE TRAFFIC SENSOR NETWORK 34.07 PIONEER Jacobss Ladder Trail Blanche Barlow Acres/Goose Pond Recreational Access N/A LEE 2015 SBYWY $136,000 $108,800 $27,200 2015 AMENDMENT:Add Project 09/10/15 2015 SBYWY $317,000 $253,600 $63,400 2015 AMENDMENT:Add Project 09/10/15 Construction; National Scenic Byways Program (NSBP) Program; MassDOT match 34.08 BERKSHIRE N/A LEE Lee Bikeway Phase II Project Construction; National Scenic Byways Program (NSBP) Program; MassDOT match Date: 9/10/2015 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO Project Location ID Description 34.09 STATEWIDE 608031 STATEWIDE STATEWIDE ITS DESIGN CONSULTANT SERVICES 34.10 STATEWIDE 606914 STATEWIDE STATEWIDE- ITS DESIGN AND SUPPORT SERVICES CURRENT Source Total STP $1,000,000 Federal $800,000 REVISED Non Federal $200,000 Year Source Total Federal 2015 2015 FINANCIAL CONSTRAINT NonFederal Year Amendment Description Date AMENDMENT:Remove Project STP $1,000,000 $800,000 $200,000 2015 AMENDMENT:Add Project Replaces 608031- STATEWIDE ITS DESIGN CONSULTANT SERVICES Date: 9/10/2015 09/10/15 2015 - 2018 Statewide Transportation Improvement Program, STIP Action #10 Fiscal Constraint Charts Federal Fiscal Year 2015 I ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY NATIONAL HIGHWAY PERFORMANCE STP FLEX II ACTUAL BALANCE FROM FY 2014 $305,023,572 $53,776,670 $2,766,821 $15,939,977 BRIDGE-OFF SYSTEM $28,456,838 STP NON-FLEX $72,218,612 III TRANSFER OF FUNDS IV TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY VI ESTIMATED BALANCE REMAINING NET CHANGE IN PROGRAMMED OBLIGATIONS FROM PREVIOUS ACTION $332,790,393 $44,716,647 $312,768,599 $32,170,294 $20,021,793 $12,546,352 $36,175,372 ($2,400,000) $215,116,118 $243,572,956 $17,517,726 $85,748,867 $1,745,439 $18,671,504 $90,890,116 $77,732,407 $13,157,709 $3,556,235 $45,136,794 $3,316 $45,140,110 $45,140,109 $1 $3,976,231 -BARNSTABLE URBAN AREA $2,724,025 $7,349,935 $10,073,960 $3,064,386 $7,009,574 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $5,869,846 $4,162,993 $10,032,839 $10,032,838 $1 $0 -WORCESTER URBAN AREA $5,008,531 $7,155,261 $12,163,792 $8,443,306 $3,720,485 $0 -BOSTON URBAN AREA -PROVIDENCE, PAWTUCKET $25,000,000 ($25,000,000) V PROGRAMMED OBLIGATIONS $2,873,988 $6,074,567 $8,948,555 $446,340 $8,502,215 $0 $10,605,428 $0 $10,605,428 $10,605,428 $0 ($419,996) STP-ENHANCEMENT $0 $46,651,144 $46,651,144 $15,384,600 $31,266,544 $2,505,681 SAFE ROUTES TO SCHOOLS PGM. TAP RECREATIONAL TRAILS $0 $847,732 $847,732 $600,000 $247,732 $0 $1,186,729 $3,296,728 $4,483,457 $800,000 $3,683,457 $0 TAP FLEX $5,268,579 $9,696,702 $14,965,281 $2,648,799 $12,316,483 $0 TAP NON-FLEX $5,268,579 $7,873,084 $13,141,663 $3,985,003 $9,156,660 $0 $3,289,194 $6,041,263 $9,330,457 $2,920,743 $5,509,714 $0 $198,504 $393,616 $592,120 $175,953 $416,167 $0 -OTHER AREAS (RURAL & SMALL URBAN) -BOSTON URBAN AREA -BARNSTABLE URBAN AREA -SPRINGFIELD, CHICOPEE, HOLYOKE $427,746 $848,182 $1,275,928 $379,151 $896,777 $0 -WORCESTER URBAN AREA $364,980 $723,724 $1,088,704 $323,517 $765,187 $0 -PROVIDENCE, PAWTUCKET $209,432 $415,286 $624,718 $185,639 $439,079 $0 -OTHER AREAS (RURAL & SMALL URBAN) $338,467 $851,013 $1,189,480 $0 $1,189,480 $0 $32,218,108 $14,316 $32,232,424 $28,175,470 $4,056,954 ($996,454) $0 $5,304,843 $5,304,843 $0 $5,304,843 $0 $1,212,443 $12,372,204 $13,584,647 $3,900,000 $9,684,647 $0 HWY SAFETY IMPROVEMENT PGM. HSIP - High Risk Rural RLWY/HWY CROSSINGS- HAZARD ELIMINATION RLWY/HWY CROSSINGS- PROTECTIVE DEVICES CMAQ PLANNING FEDERAL AID SUB-TOTAL: Federal Aid Programming and Reimbursement Office September 8, 2015 $1,212,443 $8,015,029 $9,227,472 $3,900,000 $5,327,472 $0 $60,820,818 $20,038,477 $40,086,735 $33,674,246 $100,907,553 $53,712,723 $75,615,540 $24,800,000 $25,292,014 $28,912,723 $10,463,693 $0 $586,701,868 $364,226,737 $1,001,724,209 $599,998,438 $266,724,251 $51,049,967 FEDERAL OBLIGATION LIMITATION GUIDANCE $600,000,000 $0 Page 1 of 8 2015 - 2018 Statewide Transportation Improvement Program, STIP Action #10 Fiscal Constraint Charts Federal Fiscal Year 2015 I ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY II ACTUAL BALANCE FROM FY 2014 III TRANSFER OF FUNDS IV TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY HIGH PRIORITY PROJECTS $0 $147,060,180 $0 $147,060,180 FERRY BOAT DESC SECTION 115 PROJECTS $0 $0 $87,262 $777,603 $0 $0 $87,262 $777,603 SECTION 117 PROJECTS $0 $186,027 $0 $186,027 SECTION 125 PROJECTS MISCELLANEOUS / OTHER / UNDETERMINED $0 $0 $0 $4,142,809 $8,813,446 $48,709,245 $0 $57,522,690 $0 $1,211,500,780 FEDERAL AID TOTAL > STATE MATCH FOR FEDERAL AID $595,515,313 $ 561,047,054 $ 112,209,411 NON-FEDERAL AID + FEDERAL AID TOTAL > V PROGRAMMED OBLIGATIONS VI ESTIMATED BALANCE REMAINING $11,068,170 $0 $0 $0 $950,000 NET CHANGE IN PROGRAMMED OBLIGATIONS FROM PREVIOUS ACTION $135,992,010 $0 $87,262 $777,603 $0 $0 $186,027 $0 $3,192,809 $0 $10,284,475 $47,238,215 $658,480 $622,301,083 $454,198,177 $51,708,447 $133,017,326 $755,318,409 NOTES: MISCELLANEOUS / OTHER / UNDETERMINED Apportionment Includes estimated NHPP Exempt. Federal Aid Programming and Reimbursement Office September 8, 2015 Page 2 of 8 2015 - 2018 Statewide Transportation Improvement Program, STIP Action #10 Fiscal Constraint Charts Federal Fiscal Year 2016 I ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY NATIONAL HIGHWAY PERFORMANCE STP FLEX II ESTIMATED BALANCE FROM FY 2015 III ANTICIPATED TRANSFER OF FUNDS $305,023,572 $43,842,580 $20,021,793 $12,546,352 BRIDGE-OFF SYSTEM $28,456,838 STP NON-FLEX $72,218,612 IV TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY V PROGRAMMED OBLIGATIONS VI ESTIMATED BALANCE REMAINING NET CHANGE IN PROGRAMMED OBLIGATIONS FROM PREVIOUS ACTION $325,045,365 $56,388,932 $263,904,973 $50,612,284 $61,140,392 $5,776,648 $0 $0 $85,748,867 $114,205,705 $28,779,296 $85,426,409 $0 $13,157,709 $85,376,321 $72,218,612 $13,157,709 $0 $45,136,794 $1 $45,136,795 $45,136,794 $1 $0 -BARNSTABLE URBAN AREA $2,724,025 $7,009,574 $9,733,599 $2,724,025 $7,009,574 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $5,869,846 $1 $5,869,847 $5,869,846 $1 $0 -WORCESTER URBAN AREA $5,008,531 $3,720,485 $8,729,016 $5,008,531 $3,720,485 $0 $0 -BOSTON URBAN AREA -PROVIDENCE, PAWTUCKET -OTHER AREAS (RURAL & SMALL URBAN) STP-ENHANCEMENT $0 $2,873,988 $8,502,215 $11,376,203 $2,873,988 $8,502,215 $10,605,428 $0 $10,605,428 $10,605,428 $0 $0 $0 $31,266,544 $31,266,544 $10,805,308 $20,461,236 $0 SAFE ROUTES TO SCHOOLS PGM. TAP RECREATIONAL TRAILS $0 $0 $1,186,729 $3,683,457 $4,870,186 $800,000 $4,070,186 $0 TAP FLEX $5,268,579 $12,316,483 $17,585,062 $6,475,572 $11,109,489 $0 TAP NON-FLEX $5,268,579 $9,156,660 $14,425,239 $3,985,003 $10,440,236 $0 $3,289,194 $5,509,714 $8,798,908 $2,920,743 $5,878,165 $0 -BARNSTABLE URBAN AREA $198,504 $416,167 $614,671 $175,953 $438,718 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $427,746 $896,777 $1,324,523 $379,151 $945,372 $0 -WORCESTER URBAN AREA $364,980 $765,187 $1,130,167 $323,517 $806,650 $0 -PROVIDENCE, PAWTUCKET $209,432 $439,079 $648,511 $185,639 $462,872 $0 -BOSTON URBAN AREA -OTHER AREAS (RURAL & SMALL URBAN) HWY SAFETY IMPROVEMENT PGM. HSIP - High Risk Rural RLWY/HWY CROSSINGS- HAZARD ELIMINATION RLWY/HWY CROSSINGS- PROTECTIVE DEVICES CMAQ PLANNING FEDERAL AID SUB-TOTAL: Federal Aid Programming and Reimbursement Office September 8, 2015 $0 $338,467 $1,189,480 $1,527,947 $32,218,108 $4,056,954 $36,275,062 $0 $32,024,683 $0 $1,527,947 $0 $4,250,379 ($2,200,000) $0 $5,304,843 $5,304,843 $561,600 $4,743,243 $0 $1,212,443 $9,684,647 $10,897,090 $400,000 $10,497,090 $0 $1,212,443 $5,327,472 $6,539,915 $400,000 $6,139,915 $0 $60,820,818 $20,038,477 $25,292,014 $28,912,723 $86,112,832 $48,951,200 $82,828,865 $24,800,000 $3,283,967 $24,151,200 ($530,400) $0 $576,767,778 $266,476,520 $843,244,298 $578,596,197 $264,648,101 ($2,730,400) FEDERAL OBLIGATION LIMITATION GUIDANCE $600,000,000 $0 Page 3 of 8 2015 - 2018 Statewide Transportation Improvement Program, STIP Action #10 Fiscal Constraint Charts Federal Fiscal Year 2016 HIGH PRIORITY PROJECTS $135,992,010 $135,992,010 $113,135,966 $0 FERRY BOAT DESC SECTION 115 PROJECTS $450,000 $0 $450,000 $0 $450,000 $0 $0 $0 $0 SECTION 117 PROJECTS $186,027 $186,027 $0 $186,027 $0 $0 $0 $0 $0 $0 $47,238,215 $47,239,175 $2,512,638 $44,726,537 $0 $1,027,111,510 $604,414,879 $422,696,631 ($2,730,400) SECTION 125 PROJECTS MISCELLANEOUS / OTHER / UNDETERMINED $960 FEDERAL AID TOTAL > STATE MATCH FOR FEDERAL AID NON-FEDERAL AID + FEDERAL AID TOTAL > $450,342,772 $90,068,554 $0 $205,422,302 $22,856,044 $127,630,868 $77,791,434 $732,045,747 NOTES: MISCELLANEOUS / OTHER / UNDETERMINED Apportionment Includes estimated NHPP Exempt. Federal Aid Programming and Reimbursement Office September 8, 2015 Page 4 of 8 2015 - 2018 Statewide Transportation Improvement Program, STIP Action #10 Fiscal Constraint Charts Federal Fiscal Year 2017 I ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY NATIONAL HIGHWAY PERFORMANCE STP FLEX II ESTIMATED BALANCE FROM FY 2016 $305,023,572 $43,842,580 $61,140,392 $5,776,648 BRIDGE-OFF SYSTEM $28,456,838 STP NON-FLEX $72,218,612 III ANTICIPATED TRANSFER OF FUNDS IV TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY VI ESTIMATED BALANCE REMAINING NET CHANGE IN PROGRAMMED OBLIGATIONS FROM PREVIOUS ACTION $351,163,964 $54,619,228 $279,639,842 $47,810,225 $71,524,122 $6,809,003 $0 $0 $85,426,409 $113,883,247 $28,456,768 $85,426,479 $0 $13,157,709 $85,376,321 $72,218,612 $13,157,709 $0 $45,136,794 $1 $45,136,795 $45,136,794 $1 $0 -BARNSTABLE URBAN AREA $2,724,025 $7,009,574 $9,733,599 $2,724,025 $7,009,574 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $5,869,846 $1 $5,869,847 $5,869,846 $1 $0 -WORCESTER URBAN AREA $5,008,531 $3,720,485 $8,729,016 $5,008,531 $3,720,485 $0 $0 -BOSTON URBAN AREA -PROVIDENCE, PAWTUCKET -OTHER AREAS (RURAL & SMALL URBAN) STP-ENHANCEMENT ($15,000,000) $5,000,000 V PROGRAMMED OBLIGATIONS $2,873,988 $8,502,215 $11,376,203 $2,873,988 $8,502,215 $10,605,428 $0 $10,605,428 $10,605,428 $0 $0 $0 $20,461,236 $20,461,236 $14,350,000 $6,111,236 $0 SAFE ROUTES TO SCHOOLS PGM. TAP RECREATIONAL TRAILS $0 $0 $1,186,729 $4,070,186 $5,256,915 $800,000 $4,456,915 $0 TAP FLEX $5,268,579 $11,109,489 $16,378,068 $4,747,559 $11,630,509 $0 TAP NON-FLEX $5,268,579 $10,440,236 $15,708,815 $3,985,003 $11,723,812 $0 $3,289,194 $5,878,165 $9,167,359 $2,920,743 $6,246,616 $0 -BARNSTABLE URBAN AREA $198,504 $438,718 $637,222 $175,953 $461,269 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $427,746 $945,372 $1,373,118 $379,151 $993,967 $0 -WORCESTER URBAN AREA $364,980 $806,650 $1,171,630 $323,517 $848,113 $0 -PROVIDENCE, PAWTUCKET $209,432 $462,872 $672,304 $185,639 $486,665 $0 -OTHER AREAS (RURAL & SMALL URBAN) $338,467 $1,527,947 $1,866,414 $0 $1,866,414 $0 $32,218,108 $4,250,379 $8,783,781 $0 -BOSTON URBAN AREA HWY SAFETY IMPROVEMENT PGM. HSIP - High Risk Rural RLWY/HWY CROSSINGS- HAZARD ELIMINATION RLWY/HWY CROSSINGS- PROTECTIVE DEVICES CMAQ PLANNING FEDERAL AID SUB-TOTAL: Federal Aid Programming and Reimbursement Office September 8, 2015 $0 $5,000,000 $41,468,487 $32,684,706 $0 $0 $4,743,243 $4,743,243 $561,600 $4,181,643 $0 $1,212,443 $10,497,090 $11,709,533 $2,000,000 $9,709,533 $0 $1,212,443 $6,139,915 $60,820,818 $20,038,477 $3,283,967 $24,151,200 $576,767,778 $264,648,101 $7,352,358 $2,000,000 $5,352,358 $0 $5,000,000 $69,104,785 $44,189,677 $67,886,881 $25,800,000 $1,217,903 $18,389,677 ($3,491,253) $0 $0 $841,415,879 $582,941,196 $258,474,683 ($3,491,253) FEDERAL OBLIGATION LIMITATION GUIDANCE $600,000,000 Page 5 of 8 2015 - 2018 Statewide Transportation Improvement Program, STIP Action #10 Fiscal Constraint Charts Federal Fiscal Year 2017 HIGH PRIORITY PROJECTS $113,135,966 $113,135,966 $106,599,993 $0 FERRY BOAT DESC SECTION 115 PROJECTS $0 $0 $0 $0 $0 $0 $0 $0 $0 SECTION 117 PROJECTS $186,027 $186,027 $0 $186,027 $0 $0 $0 $44,726,537 $44,726,537 $999,464,409 SECTION 125 PROJECTS MISCELLANEOUS / OTHER / UNDETERMINED FEDERAL AID TOTAL > STATE MATCH FOR FEDERAL AID $0 $422,696,631 $84,539,326 NON-FEDERAL AID + FEDERAL AID TOTAL > $0 $199,892,882 $6,535,973 $0 $0 $0 $0 $44,726,537 $0 $589,477,169 $409,987,240 ($3,491,253) $109,894,464 $89,998,418 $699,371,633 NOTES: MISCELLANEOUS / OTHER / UNDETERMINED Apportionment Includes estimated NHPP Exempt. Federal Aid Programming and Reimbursement Office September 8, 2015 Page 6 of 8 2015 - 2018 Statewide Transportation Improvement Program, STIP Action #10 Fiscal Constraint Charts Federal Fiscal Year 2018 I ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY NATIONAL HIGHWAY PERFORMANCE STP FLEX II ESTIMATED BALANCE FROM FY 2017 III ANTICIPATED TRANSFER OF FUNDS $305,023,572 $43,842,580 $112,699,494 $3,409,003 BRIDGE-OFF SYSTEM $28,456,838 STP NON-FLEX $72,218,612 V PROGRAMMED OBLIGATIONS VI ESTIMATED BALANCE REMAINING NET CHANGE IN PROGRAMMED OBLIGATIONS FROM PREVIOUS ACTION $397,723,066 $52,251,583 $305,161,481 $51,562,658 $92,561,585 $688,925 $0 $0 $85,426,479 $113,883,317 $28,456,837 $85,426,480 $0 $16,713,944 $88,932,556 $72,218,612 $16,713,944 $0 $45,136,794 $3,976,232 $49,113,026 $45,136,794 $3,976,232 $0 -BARNSTABLE URBAN AREA $2,724,025 $7,009,574 $9,733,599 $2,724,025 $7,009,574 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $5,869,846 $1 $5,869,847 $5,869,846 $1 $0 -WORCESTER URBAN AREA $5,008,531 $3,720,485 $8,729,016 $5,008,531 $3,720,485 $0 $0 -BOSTON URBAN AREA -PROVIDENCE, PAWTUCKET -OTHER AREAS (RURAL & SMALL URBAN) STP-ENHANCEMENT ($20,000,000) $5,000,000 IV TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY $2,873,988 $8,502,215 $11,376,203 $2,873,988 $8,502,215 $10,605,428 ($419,996) $10,185,432 $10,605,428 ($419,996) $0 $0 $8,616,917 $8,616,917 $0 $8,616,917 $0 SAFE ROUTES TO SCHOOLS PGM. TAP RECREATIONAL TRAILS $0 $0 $0 $0 $0 $0 $1,186,729 $4,456,915 $5,643,644 $800,000 $4,843,644 $0 TAP FLEX $5,268,579 $11,630,509 $16,899,088 $2,964,717 $13,934,371 $0 TAP NON-FLEX $5,268,579 $11,723,812 $16,992,391 $3,985,003 $13,007,388 $0 $3,289,194 $6,246,616 $9,535,810 $2,920,743 $6,615,067 $0 -BARNSTABLE URBAN AREA $198,504 $461,269 $659,773 $175,953 $483,820 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $427,746 $993,967 $1,421,713 $379,151 $1,042,562 $0 -WORCESTER URBAN AREA $364,980 $848,113 $1,213,093 $323,517 $889,576 $0 -PROVIDENCE, PAWTUCKET $209,432 $486,665 $696,097 $185,639 $510,458 $0 -OTHER AREAS (RURAL & SMALL URBAN) $338,467 $1,866,414 $2,204,881 $0 $2,204,881 $0 $32,218,108 $6,587,327 $38,805,435 $11,559,144 $0 -BOSTON URBAN AREA HWY SAFETY IMPROVEMENT PGM. HSIP - High Risk Rural RLWY/HWY CROSSINGS- HAZARD ELIMINATION RLWY/HWY CROSSINGS- PROTECTIVE DEVICES CMAQ PLANNING FEDERAL AID SUB-TOTAL: Federal Aid Programming and Reimbursement Office September 8, 2015 $27,246,291 $0 $4,181,643 $4,181,643 $0 $4,181,643 $0 $1,212,443 $9,709,533 $10,921,976 $400,000 $10,521,976 $0 $1,212,443 $5,352,358 $60,820,818 $20,038,477 $2,659,944 $18,389,677 $576,767,778 $292,940,641 $6,564,801 $400,000 $6,164,801 $0 $15,000,000 $78,480,762 $38,428,154 $72,557,188 $24,800,000 $5,923,574 $13,628,154 $0 $0 $0 $869,708,419 $590,552,787 $279,155,631 $0 FEDERAL OBLIGATION LIMITATION GUIDANCE $600,000,000 Page 7 of 8 2015 - 2018 Statewide Transportation Improvement Program, STIP Action #10 Fiscal Constraint Charts Federal Fiscal Year 2018 HIGH PRIORITY PROJECTS $0 $106,599,993 $106,599,993 $98,107,989 $0 FERRY BOAT DESC SECTION 115 PROJECTS $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 SECTION 117 PROJECTS $0 $186,027 $186,027 $0 $186,027 $0 SECTION 125 PROJECTS MISCELLANEOUS / OTHER / UNDETERMINED $0 $0 $0 $0 $45,385,017 $45,385,017 $1,021,879,455 FEDERAL AID TOTAL > STATE MATCH FOR FEDERAL AID NON-FEDERAL AID + FEDERAL AID TOTAL > $445,111,677 $89,022,335 $0 $204,375,891 $8,492,004 $0 $0 $0 $0 $45,385,017 $0 $599,044,791 $422,834,664 $0 $112,054,244 $92,321,647 $711,099,035 NOTES: MISCELLANEOUS / OTHER / UNDETERMINED Apportionment Includes estimated NHPP Exempt. Federal Aid Programming and Reimbursement Office September 8, 2015 Page 8 of 8 2015 Statewide Categories Transportation Improvement Program Amendment/Adjustment Type ▼ MassD OT Project MPO ▼ MassDOT Project Description▼ 08/04/2015 Draft Released 09/03/2015 Endorsed MassD OT District Funding Source ▼ Total Programmed Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Federal Funds ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program ADJUSTMENT:Change 606729 SOUTHEASTERN MASSACHUSETTTAUNTON - COUNTY ST (RTE Additional Information 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA 5 HSIP $ 1,560,000 $ 1,404,000 $ 5 CMAQ $ 900,000 $ 720,000 $ 180,000 Increase cost by $700,000 to $6,209, 246 ($3,830,482 STP + $900,000 Regional CMAQ + $700,000 Statewide CMAQ + $600,000 Statewide HSIP + $178,764 TAP). 100% design submitted BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY TAP $ 178,764 $ 143,011 $ 35,753 Increase cost by $700,000 to $6,209, 246 ($3,830,482 STP + $900,000 Regional CMAQ + $700,000 Statewide CMAQ + $600,000 Statewide HSIP + $178,764 TAP). 100% design submitted BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY STP $ 3,830,482 $ 3,064,386 $ 766,096 Increase cost by $700,000 to $6,209, 246 ($3,830,482 STP + $900,000 Regional CMAQ + $700,000 Statewide CMAQ + $600,000 Statewide HSIP + $178,764 TAP). 100% design submitted 5 STP $ 1,151,849 $ 921,479 $ 4 STP-BR-OFF $ 8,559,241 $ 6,847,393 $ ►CMAQ - Congestion Mitigation and Air Quality Improvement Program ADJUSTMENT:Change 606394 CAPE COD BARNSTABLE- INTERSECTION Additional Information IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY ►TAP - Transportation Alternatives Program ADJUSTMENT:Change 606394 CAPE COD Additional Information ►Non-CMAQ/HSIP/TAP (Other) ADJUSTMENT:Change 606394 CAPE COD Additional Information ADJUSTMENT:Change Additional Information 606729 SOUTHEASTERN MASSACHUSETTTAUNTON - COUNTY ST (RTE 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA 156,000 Increase cost by $636,283 to $4,191,198. (HSIP $1,560,000 / STP $1,151,849 / Statewide TE $843,066 / Statewide Infrastructure $636,283. 230,370 Increase cost by $636,283 to $4,191,198. (HSIP $1,560,000 / STP $1,151,849 / Statewide TE $843,066 / Statewide Infrastructure $636,283. ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program ►On System ►Off-System ADJUSTMENT:Decrease Cost 607123 NORTHERN MIDDLESEX CHELMSFORD - HUNT RD OVER I-495 (BR-OFF) 1,711,848 Estimate decreased from $10.4 to $8.5 with 100% submission. ► Statewide Bridge Inspection Program No Projects Programmed $ - - - 1 SBYWY $ 136,000 $ 108,800 $ 27,200 1 SBYWY $ 317,000 $ 253,600 $ 63,400 Construction; National Scenic Byways Program (NSBP) Program; MassDOT match ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid AMENDMENT:Add Project PIONEER VALLEY N/A AMENDMENT:Add Project N/A BERKSHIRE ►Section 1D / Federal Aid Major & State Category Projects ► Regional Major Infrastructure Program ► Statewide Infrastructure Program Jacobs's Ladder Trail Blanche Barlow Acres/Goose Pond Recreational Access Lee Bikeway Phase II Project Construction; National Scenic Byways Program (NSBP) Program; MassDOT match ADJUSTMENT:Add Funding Source 606729 SOUTHEASTERN MASSACHUSETTTAUNTON - COUNTY ST (RTE 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA 5 STP $ 636,283 $ 509,027 $ 0 HSIP $ 1,500,000 $ 1,350,000 $ 0 HSIP $ 500,000 $ 450,000 $ HSIP $ 2,448,385 $ 2,203,547 $ 127,257 Increase cost by $636,283 to $4,191,198. (HSIP $1,560,000 / STP $1,151,849 / Statewide TE $843,066 / Statewide Infrastructure $636,283. ► Statewide HSIP Program ADJUSTMENT:Decrease Cost,ADJUSTMENT:Change Additional Information 607072 STATEWIDE AMENDMENT:Add Project 608269 STATEWIDE ADJUSTMENT:Decrease Cost,ADJUSTMENT:Change Additional Information 608024 STATEWIDE ADJUSTMENT:Change Additional Information 606394 CAPE COD STATEWIDEIMPLEMENTATION (PHASE III) OF THE FLASHING YELLOW ARROW AT SIGNALIZED INTERSECTIONS--ONE OF THE FHWA NINE PROVEN COUNTERMEASURES DISTRICT 4- DISTRICT 6IMPLEMENTATION OF FLASHING YELLOW ARROWS STATEWIDE- CONVERSION OF INTERSTATE AND FREEWAY EXIT NUMBERS TO MILEPOSTBASED 0 150,000 Decrease project by $500,000 and move District 4 and 6 locations to new project. 50,000 Add new project. 244,839 Decrease project from $6,000,000 to $2,448,385 and eliminate 2016 funding. Reduce 2015 from 3,555,555 to $2,448,385. BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY 5 HSIP $ 600,000 $ 540,000 $ 60,000 Increase cost by $700,000 to $6,209, 246 ($3,830,482 STP + $900,000 Regional CMAQ + $700,000 Statewide CMAQ + $600,000 Statewide HSIP + $178,764 TAP). 100% design submitted BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY 5 CMAQ $ 700,000 $ 560,000 $ 140,000 Increase cost by $700,000 to $6,209, 246 ($3,830,482 STP + $900,000 Regional CMAQ + $700,000 Statewide CMAQ + $600,000 Statewide HSIP + $178,764 TAP). 100% design submitted 5 STP-TE $ 843,066 $ 674,453 $ 168,613 Increase cost by $636,283 to $4,191,198. (HSIP $1,560,000 / STP $1,151,849 / Statewide TE $843,066 / Statewide Infrastructure $636,283. ► Statewide Safe Routes to Schools Program ► Statewide CMAQ AMENDMENT:Add Funding Source 606394 CAPE COD ►Statewide Transportation Enhancements ADJUSTMENT:Change 606729 SOUTHEASTERN MASSACHUSETTTAUNTON - COUNTY ST (RTE Additional Information 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA ►Statewide ITS ADJUSTMENT:Decrease Cost,ADJUSTMENT:Change Additional Information 607483 Statewide DISTRICT 5- ITS CAMERA & VMS CONSTRUCTION ON ROUTE 24, FROM RANDOLPH TO FALL RIVER (39 MILES) 5 CMAQ $ 1,722,000 $ 1,377,600 $ ADJUSTMENT:Increase Cost,ADJUSTMENT:Change Additional Information 607424 STATEWIDE STATEWIDE- ITS ADVANCED TRANSPORTATION MANAGEMENT SYSTEM (ATMS) SOFTWARE 0 CMAQ $ 6,330,577 $ 5,064,462 $ AMENDMENT:Remove Project 608031 STATEWIDE STATEWIDE- ITS DESIGN AND SUPPORT SERVICES 0 STP $ 1,000,000 $ 800,000 $ 200,000 Change to 608031- STATEWIDE ITS DESIGN CONSULTANT SERVICES AMENDMENT:Add Project 606914 STATEWIDE STATEWIDE- ITS DESIGN AND SUPPORT SERVICES 0 STP $ 1,000,000 $ 800,000 $ 200,000 Replaces 608031- STATEWIDE ITS DESIGN CONSULTANT SERVICES ►Statewide Interstate Maintenance Program 344,400 AC Year 1 of 2 . Decrease project cost from $7,506,000 to $5,500,000 1,266,115 AC Year 1 of 3. Increase to $11,272,511 ►Statewide NHS Preservation Program+ No Projects Programmed $ Statewide NHS Preservation Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Statewide RR Grade Crossings ►Statewide Stormwater Retrofits AMENDMENT:Add Project 607734 CENTRAL MASS WEST BOYLSTONREHABILITATION & STORMWATER IMPROVEMENTS ON STERLING STREET (ROUTE 12/140) AT THE WACHUSETT RESERVOIR STP-TE No Projects Programmed $ $ 2,478,125 $ - 1,982,500 $ - 495,625 One of three projects scheduled for possible advertisement using August Redistribution Obligation Authority. - ►Other Statewide Items AMENDMENT:Decrease Cost EWO STATEWIDE AWARD ADJUSTMENTS, CHANGE ORDERS, ETC 0 STP $ 19,614,754 $ 15,691,803 $ 3,922,951 Reduce from $22,614,754 to $19,614,754 No Projects Programmed NFA $ - $ - No Projects Programmed NFA $ - $ - ►Section 2A / Non-Federal Projects ►Non Federal Aid ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2016 Statewide Categories Transportation Improvement Program 08/04/2015 Draft Released 09/03/2015 Endorsed MassDOT Amendment/Adjust Project ID ment Type ▼ ▼ MPO ▼ MassDOT Project Description▼ MassDOT District ▼ Funding Source ▼ Total Programmed Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Federal Funds ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program No Projects No Projects $ $ - - - ►CMAQ - Congestion Mitigation and Air Quality Improvement Program No Projects No Projects $ $ - - - No Projects No Projects $ $ - - - No Projects $ - - - No Projects No Projects $ $ - - - No Projects No Projects $ $ - - - No Projects No Projects $ $ - - - No Projects No Projects $ $ - - - $ - - - $ - - - ►TAP - Transportation Alternatives Program ►Non-CMAQ/HSIP/TAP (Other) ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program ►On System ►Off-System ► Statewide Bridge Inspection Program ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed No Projects Programmed ►Section 1D / Federal Aid Major & State Category Projects ► Regional Major Infrastructure Program ► Statewide Infrastructure Program No Projects No Projects $ $ - - - $ 2,444,444 No Projects $ - - - No Projects No Projects $ $ - - - CMAQ $ 3,778,000 $ 3,022,400 $ 755,600 AC Year 2 of 2 . Decrease project cost from $7,506,000 to $5,500,000 CMAQ $ 731,000 $ 584,800 $ 146,200 AC Year 2 of 3. Increase to $11,272,511 CMAQ $ 87,000 $ 69,600 $ No Projects No Projects $ $ - - - No Projects No Projects $ $ - - - No Projects No Projects $ $ - - - No Projects No Projects $ $ - - - ► Statewide HSIP Program AMENDMENT:Rem ove Project 608024 STATEWIDE STATEWIDECONVERSION OF INTERSTATE AND FREEWAY EXIT NUMBERS TO MILEPOST-BASED 0 HSIP $ 2,200,000 $ 244,444 Decrease project from $6,000,000 to $2,448,385. Remove FFY 2016 funding. ► Statewide Safe Routes to Schools Program ► Statewide CMAQ ►Statewide Transportation Enhancements ►Statewide ITS ADJUSTMENT:Cha nge Additional Information 607483 Statewide DISTRICT 5- ITS CAMERA & VMS CONSTRUCTION ON ROUTE 24, FROM RANDOLPH TO FALL RIVER (39 MILES) ADJUSTMENT:Cha nge Additional Information 607424 STATEWIDE STATEWIDE- ITS ADVANCED TRANSPORTATION MANAGEMENT SYSTEM (ATMS) SOFTWARE ADJUSTMENT:Decr ease Cost,ADJUSTMENT :Change Additional Information 607482 STATEWIDE DISTRICT 4- ITS CONSTRUCTION ON I93, FROM WOBURN TO NEW HAMPSHIRE BORDER (21 MILES) 5 Statewide 4 17,400 AC Year 1 of 2. Decrease cost from $9,075,000 to $6,337,000 ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ ►Statewide RR Grade Crossings ►Statewide Stormwater Retrofits ►Statewide ADA Implementation Plan ►Other Statewide Items ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects No Projects NFA NFA $ $ - $ $ - No Projects No Projects NFA NFA $ $ - $ $ - ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2017 Statewide Categories Transportation Improvement Program 08/04/2015 Draft Released 09/03/2015 Endorsed MassDOT Amendment/Adjust Project ID ment Type ▼ ▼ MPO ▼ MassDOT Project Description▼ MassDOT District ▼ Funding Source ▼ Total Programmed Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Federal Funds ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program No Projects No Projects $ $ - - - ►CMAQ - Congestion Mitigation and Air Quality Improvement Program No Projects No Projects $ $ - - - No Projects No Projects $ $ - - - No Projects No Projects $ $ - - - No Projects No Projects $ $ - - - No Projects No Projects $ $ - - - No Projects No Projects $ $ - - - $ - - - $ - - - ►TAP - Transportation Alternatives Program ►Non-CMAQ/HSIP/TAP (Other) ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program ►On System ►Off-System ► Statewide Bridge Inspection Program ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed No Projects Programmed ►Section 1D / Federal Aid Major & State Category Projects ► Regional Major Infrastructure Program ► Statewide Infrastructure Program No Projects No Projects $ $ - - - No Projects $ - - - No Projects No Projects $ $ - - - ► Statewide HSIP Program ► Statewide Safe Routes to Schools Program ► Statewide CMAQ ►Statewide Transportation Enhancements ►Statewide ITS ADJUSTMENT:Add Funding Source,ADJUSTME NT:Change Additional Information 607424 STATEWIDE STATEWIDE- ITS ADVANCED TRANSPORTATION MANAGEMENT SYSTEM (ATMS) SOFTWARE 0 CMAQ $ 4,210,934 $ 3,368,747 $ AMENDMENT:Rem ove Project 606936 STATEWIDE 0 CMAQ $ 6,500,000 $ 5,200,000 $ 1,300,000 Remove project. ADJUSTMENT:Decr ease Cost,ADJUSTMENT :Change Additional Information 607482 STATEWIDE STATEWIDEEXPANSION OF CCTV, VMS AND THE TRAFFIC SENSOR DISTRICT 4- ITS CONSTRUCTION ON I93, FROM WOBURN TO NEW HAMPSHIRE BORDER (21 MILES) 4 CMAQ $ 6,250,000 $ 5,000,000 $ 1,250,000 AC Year 2 of 2. Decrease cost from $9,075,000 to $6,337,000 No Projects No Projects $ $ - - - No Projects No Projects $ $ - - - No Projects No Projects $ $ - - - No Projects No Projects $ $ - - - $ - 842,187 AC Year 3 of 3. Increase to $11,272,511 ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ ►Statewide RR Grade Crossings ►Statewide Stormwater Retrofits ►Statewide ADA Implementation Plan ►Other Statewide Items ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects NFA $ - No Projects NFA $ - $ - No Projects No Projects NFA NFA $ $ - $ $ - ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects The file you have accessed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Transportation Improvement Program.” Contained in the file are the Massachusetts Department of Transportation’s project identification number, project description, district number, funding source, programmed funds, and the split between federal and non-federal funds for each of the years of the highway section. Similar information is contained for the transit section. This file is not currently available in an accessible format. The Massachusetts Department of Transportation is working collaboratively with each of the state’s regional planning agencies to address this issue. While this work is ongoing, alternative formats are available by calling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjus MassDOT tment Type ▼ Project ID ▼ MassDOT Project Description▼ 09/03/2015 Proposed Update to Draft Amendment Five MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates a project moved out to another TIP element (cost not reflected in total) Indicates a new addition to the TIP (action taken as denoted) Indicates a new funding category ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 605146 SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE 4 HSIP $ 1,955,000 $ 1,759,500 $ 195,500 STP+HSIP+CMAQ+Statewide CMAQ Total Cost = $9,724,081; previously $7,867,762 605657 MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 3 HSIP $ 3,000,000 $ 2,700,000 $ 300,000 STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 HSIP Subtotal ► $ 4,955,000 $ 4,459,500 $ 495,500 ◄ 90% Federal + 10% Non-Federal 4 CMAQ $ 2,000,000 $ 1,600,000 $ 400,000 ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 605146 AMENDMENT:Cha nge Additional Information SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE STP+HSIP+CMAQ+Statewide CMAQ Total Cost = $9,724,081; previously $7,867,762 1559 INTERSECTION IMPROVEMENT PROGRAM N/A CMAQ $ 400,000 $ 320,000 $ 80,000 604652 STONEHAM- WINCHESTER- WOBURN- TRICOMMUNITY BIKEWAY 4 CMAQ $ 5,429,110 $ 4,343,288 $ 1,085,822 606284 BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 CMAQ $ 5,000,000 $ 4,000,000 $ 1,000,000 anticipated project cost increase of $1,686,625; STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP, TCSP) Total Cost = $18,552,875; previously $16,866,250 605657 MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 3 CMAQ $ 5,000,000 $ 4,000,000 $ 1,000,000 STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 CMAQ Subtotal ► $ 17,829,110 $ 14,263,288 $ 3,565,822 ◄ 80% Federal + 20% Non-Federal The file you have accessed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Transportation Improvement Program.” Contained in the file are the Massachusetts Department of Transportation’s project identification number, project description, district number, funding source, programmed funds, and the split between federal and non-federal funds for each of the years of the highway section. Similar information is contained for the transit section. This file is not currently available in an accessible format. The Massachusetts Department of Transportation is working collaboratively with each of the state’s regional planning agencies to address this issue. While this work is ongoing, alternative formats are available by calling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjus MassDOT tment Type ▼ Project ID ▼ MassDOT Project Description▼ 09/03/2015 Proposed Update to Draft Amendment Five Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ $ 2,548,719 $ 2,038,975 $ 509,744 TAP Subtotal ► $ 2,548,719 $ 2,038,975 $ 509,744 ◄ 80% Federal + 20% Non-Federal STP 3,867,884 $ 3,094,307 $ 773,577 STP+HSIP+CMAQ+Statewide CMAQ Total Cost = $9,724,081; previously $7,867,762 anticipated project cost increase of $1,686,625; STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP, TCSP) Total Cost = $18,552,875; previously $16,866,250 MassDOT Funding District ▼ Source ▼ Additional Information ▼ ►TAP - Transportation Alternatives Program 605657 MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 3 TAP STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 ►Non-CMAQ/HSIP/TAP (Other) AMENDMENT:Cha nge Additional Information 605146 SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE 606284 BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 STP $ 7,446,852 $ 5,957,482 $ 1,489,370 605657 MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 3 STP $ 1,513,848 $ 1,211,078 $ 302,770 603711 NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADDA-LANE - CONTRACT V) 6 STP $ 26,250,000 $ 21,000,000 $ 5,250,000 AC Yr 2 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 2015-18 TIP) 603711 NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADDA-LANE - CONTRACT V) 6 NHPP $ 3,750,000 $ 3,000,000 $ 750,000 AC Yr 2 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 2015-18 TIP) Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 42,828,584 $ 34,262,867 $ Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 68,161,413 42,828,584 $ $ 68,221,673 ◄Total Target 44,786,168 ◄ Max. NonCMAQ/HSIP/TAP $ $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 4,955,000 17,829,110 2,548,719 $ $ $ 4,774,123 ◄ Min. HSIP 16,112,664 ◄ Min. CMAQ 2,548,719 ◄ Min. TAP $ $ $ 4 $ STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 8,565,717 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis HSIP, CMAQ, TAP Overprogrammed $ (1,897,323) 60,260 Target Funds Available 60,261 Non-CMAQ/HSIP/TAP (Other) Available (180,877) HSIP Minimum Met (1,716,446) CMAQ Minimum Met - TAP Minimum Met The file you have accessed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Transportation Improvement Program.” Contained in the file are the Massachusetts Department of Transportation’s project identification number, project description, district number, funding source, programmed funds, and the split between federal and non-federal funds for each of the years of the highway section. Similar information is contained for the transit section. This file is not currently available in an accessible format. The Massachusetts Department of Transportation is working collaboratively with each of the state’s regional planning agencies to address this issue. While this work is ongoing, alternative formats are available by calling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjus MassDOT tment Type ▼ Project ID ▼ MassDOT Project Description▼ 09/03/2015 Proposed Update to Draft Amendment Five MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects Programmed $ - $ - $ - Statewide Bridge Maintenance Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►On System 600703 LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95 (ROUTE 128) 4 NHPP $ 14,886,555 $ 11,909,244 $ 2,977,311 AC Yr 3 of 4; Total Cost = $35,108,000 607338 GLOUCESTER- BRIDGE PRESERVATION, G-05-017, ROUTE 128 OVER ANNISQUAM RIVER (PHASE II) 4 NHPP $ 2,064,424 $ 1,651,539 $ 412,885 AC Yr 2 of 2; Total Cost = $10,514,424 3 NHPP $ 1,780,272 $ 1,424,218 $ 356,054 6 NHPP $ 3,918,939 $ 3,135,151 $ 783,788 6 NHPP $ 6,000,000 $ 4,800,000 $ 1,200,000 On System Subtotal ► $ 28,650,190 $ 22,920,152 $ 5,730,038 ◄ 80% Federal + 20% Non-Federal 607273 605883 608019 FRANKLIN- BRIDGE DEMOLITION, F-08-005, OLD STATE ROUTE 140 OVER MBTA/CSX & NEW PEDESTRIAN BRIDGE CONSTRUCTION DEDHAM- BRIDGE REPLACEMENT, D-05-003 (33K), NEEDHAM STREET OVER GREAT DITCH BOSTON- ADVANCED UTILITY RELOCATIONS FOR BRIDGE B-16-237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE ►Off-System No Projects Programmed $ - $ - $ - Off-System Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal The file you have accessed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Transportation Improvement Program.” Contained in the file are the Massachusetts Department of Transportation’s project identification number, project description, district number, funding source, programmed funds, and the split between federal and non-federal funds for each of the years of the highway section. Similar information is contained for the transit section. This file is not currently available in an accessible format. The Massachusetts Department of Transportation is working collaboratively with each of the state’s regional planning agencies to address this issue. While this work is ongoing, alternative formats are available by calling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjus MassDOT tment Type ▼ Project ID ▼ MassDOT Project Description▼ 09/03/2015 Proposed Update to Draft Amendment Five MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid BOSTON- IMPROVEMENTS ALONG GAINSBOROUGH AND ST. BOTOLPH STREETS 6 HPP $ 1,012,389 $ 809,911 $ 606889 BOSTON- IMPROVEMENTS ALONG GAINSBOROUGH AND ST. BOTOLPH STREETS 6 TI $ 2,505,854 $ 2,004,683 $ 4 HPP $ 2,587,214 $ 2,069,771 $ 517,443 $ anticipated project cost increase of $1,686,625; Construction; HPP 682 (MA124); 222,900 STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $18,552,875; previously $16,866,250 $ - anticipated project cost increase of $1,686,625; Construction; Section 129 (MA246); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $18,552,875; previously $16,866,250 - anticipated project cost increase of $1,686,625; Construction; Section 125 (MA252); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $18,552,875; previously $16,866,250 - anticipated project cost increase of $1,686,625; Construction; STPP (MA267); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $18,552,875; previously $16,866,250 606284 SOMERVILLE- RECONSTRUCTION OF BEACON STREET, FROM OXFORD STREET TO CAMBRIDGE C.L. BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 606284 BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 606284 BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 606284 BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 606284 BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 TCSP $ 1,250,000 $ 1,000,000 $ 607839 MEDFORD CLIPPERSHIP LINEAR PARK AND BIKEWAY 4 Sec 125 $ 475,000 $ 475,000 $ N/A MEDFORD WATER TAXI, Phase 1 - Feasibility Analysis 4 FBD $ 155,000 $ 124,000 $ N/A Essex Coastal Scenic Byway Visitor Center Kiosk System 4 SBYWY $ 370,000 $ 296,000 $ Other Federal Aid Subtotal ► $ 11,524,855 $ 9,725,863 $ 607209 AMENDMENT:Cha nge Additional Information AMENDMENT:Cha nge Additional Information AMENDMENT:Cha nge Additional Information AMENDMENT:Cha nge Additional Information AMENDMENT:Cha nge Additional Information AMENDMENT:Add Project Construction; HPP 2012 (MA153); SAFETEA-LU Earmark + HPP TI 180 Earmark Total Cost = $3,518,243 Construction; TI 180 (MA216); SAFETEA-LU Earmark + HPP TI Earmark Total Cost = 501,171 $3,518,243 606889 6 6 6 6 HPP Sec 129 Sec 125 STPP $ $ $ $ 1,114,501 980,000 475,000 599,897 $ $ $ $ 891,601 980,000 475,000 599,897 $ $ 202,478 Construction; HPP 431 (MA118); SAFETEA-LU Earmark+NFA Total Cost = $8,940,346. anticipated project cost increase of $1,686,625; Construction; TCSP (11MA008); 250,000 STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $18,552,875; previously $16,866,250 Construction; Section 125 (MA250) of $475,000 + local funding sources of $502,487 Total Cost = $977,487 Feasibility Study Analysis and Preliminary Engineering; Ferry Boat Discretionary (FBD) 31,000 Program; City of Medford match Construction; National Scenic Byways Program 74,000 (NSBP) Program 2012 award; MassDOT match - 1,798,992 ◄ Funding Split Varies by Funding Source The file you have accessed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Transportation Improvement Program.” Contained in the file are the Massachusetts Department of Transportation’s project identification number, project description, district number, funding source, programmed funds, and the split between federal and non-federal funds for each of the years of the highway section. Similar information is contained for the transit section. This file is not currently available in an accessible format. The Massachusetts Department of Transportation is working collaboratively with each of the state’s regional planning agencies to address this issue. While this work is ongoing, alternative formats are available by calling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjus MassDOT tment Type ▼ Project ID ▼ MassDOT Project Description▼ 09/03/2015 Proposed Update to Draft Amendment Five MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Regional Major Infrastructure Program AMENDMENT:Cha nge Funding Source,AMENDME NT:Change Additional Information 606146 CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON DEDHAM ST/CANTON STREET, INCLUDES REPLACEMENT OF C-02-034, REHAB OF C-02-024, C02-002=N-25-016=W-31-002, NEW PED BRIDGES C02-049 & C-02-050 & 3 SIGNALIZED INTERSECTIONS 5/6 NHPP $ 15,172,085 $ 13,654,876 $ 90% Interstate portion. NHPP Interstate+NHPP 1,517,209 Bridge+NHPP Intersections+CMAQ+STP Total Cost=$53,014,560; previously funded with NFA 606146 CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON DEDHAM ST/CANTON STREET, INCLUDES REPLACEMENT OF C-02-034, REHAB OF C-02-024, C02-002=N-25-016=W-31-002, NEW PED BRIDGES C02-049 & C-02-050 & 3 SIGNALIZED INTERSECTIONS 5/6 NHPP $ 16,259,735 $ 13,007,788 $ 80% Bridge portion. NHPP Interstate+NHPP 3,251,947 Bridge+NHPP Intersections+CMAQ+STP Total Cost=$53,014,560; previously funded with NFA 606146 CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON DEDHAM ST/CANTON STREET, INCLUDES REPLACEMENT OF C-02-034, REHAB OF C-02-024, C02-002=N-25-016=W-31-002, NEW PED BRIDGES C02-049 & C-02-050 & 3 SIGNALIZED INTERSECTIONS 5/6 NHPP $ 11,890,885 $ 9,512,708 $ 2,378,177 606146 CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON DEDHAM ST/CANTON STREET, INCLUDES REPLACEMENT OF C-02-034, REHAB OF C-02-024, C02-002=N-25-016=W-31-002, NEW PED BRIDGES C02-049 & C-02-050 & 3 SIGNALIZED INTERSECTIONS $ Pedestrian bridge, sidewalks and bicycle lanes. NHPP Interstate+NHPP Bridge+NHPP 1,071,570 Intersections+CMAQ+STP Total Cost=$53,014,560; previously funded with NFA 606146 CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON DEDHAM ST/CANTON STREET, INCLUDES REPLACEMENT OF C-02-034, REHAB OF C-02-024, C02-002=N-25-016=W-31-002, NEW PED BRIDGES C02-049 & C-02-050 & 3 SIGNALIZED INTERSECTIONS Bridge widening necessary to accommodate sidewalks and bike lanes, and meet Complete 866,801 Streets requirements. NHPP Interstate+NHPP Bridge+NHPP Intersections+CMAQ+STP Total Cost=$53,014,560; previously funded with NFA AMENDMENT:Add Funding Source AMENDMENT:Add Funding Source AMENDMENT:Add Funding Source AMENDMENT:Add Funding Source 5/6 5/6 CMAQ STP $ 5,357,850 $ 4,286,280 80% NHS Intersections portion. NHPP Interstate+NHPP Bridge+NHPP Intersections+CMAQ+STP Total Cost=$53,014,560; previously funded with NFA $ 4,334,005 $ 3,467,204 $ Statewide Regional Major Infrastructure Program Subtotal ► $ 53,014,560 $ 43,928,856 $ ► Statewide Infrastructure Program DISTRICT 4- HIGHWAY LIGHTING BRANCH CIRCUIT RE-CABLING FROM SIX (6) LIGHTING LOAD 607700 4 STP $ CENTERS ALONG ROUTE I-95 (128) LEXINGTONWOBURN Statewide Infrastructure Program Subtotal ► $ 2,500,000 $ 2,000,000 $ 500,000 2,500,000 $ 2,000,000 $ 500,000 ◄ 80% Federal + 20% Non-Federal 9,085,704 ◄ Funding Split Varies by Funding Source The file you have accessed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Transportation Improvement Program.” Contained in the file are the Massachusetts Department of Transportation’s project identification number, project description, district number, funding source, programmed funds, and the split between federal and non-federal funds for each of the years of the highway section. Similar information is contained for the transit section. This file is not currently available in an accessible format. The Massachusetts Department of Transportation is working collaboratively with each of the state’s regional planning agencies to address this issue. While this work is ongoing, alternative formats are available by calling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjus MassDOT tment Type ▼ Project ID ▼ MassDOT Project Description▼ 09/03/2015 Proposed Update to Draft Amendment Five MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ $ $ $ $ Additional Information ▼ ► Statewide HSIP Program No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - - - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program 607920 607892 MILTON- SAFE ROUTES TO SCHOOL (GLOVER 6 TAP $ ELEMENTARY SCHOOL) SOMERVILLE- SAFE ROUTES TO SCHOOL (HEALEY 4 TAP $ SCHOOL) Statewide Safe Routes to Schools Program Subtotal ► $ 725,000 $ 580,000 $ 145,000 80% Federal + 20% Non-Federal 700,000 $ 560,000 $ 140,000 80% Federal + 20% Non-Federal 1,425,000 $ 1,140,000 $ 285,000 ◄ Funding Split Varies by Funding Source ► Statewide CMAQ AMENDMENT:Incr ease Cost,AMENDMENT :Change Additional Information ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL 604531 605146 AMENDMENT:Add Funding Source 606284 AMENDMENT:Add Project 602000 AMENDMENT:Add Project 608068 SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 3 CMAQ $ 6,602,569 $ 5,282,055 $ 4 CMAQ $ 1,901,197 $ 1,520,957 $ cost increase of $625,628; Statewide TE+Statewide CMAQ Total Cost = $7,849,648; 1,320,514 previously $6,510,045 (CMAQ was $5,976,941) 380,239 STP+HSIP+CMAQ+Statewide CMAQ Total Cost = $9,724,081; previously $7,867,762 6 CMAQ $ 1,686,625 $ 1,349,300 $ 337,325 anticipated project cost increase of $1,686,625; STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP, TCSP) Total Cost = $18,552,875; previously $16,866,250 WESTON- INTERSECTION & SIGNAL IMPROVEMENTS AT ROUTE 30 (SOUTH AVE) & WELLESLEY STREET 6 CMAQ $ 2,609,514 $ 2,087,611 $ 521,903 new addition BURLINGTON- ADAPTIVE TRAFFIC CONTROL SIGNAL SYSTEM INSTALLATION ON CAMBRIDGE STREET, MIDDLESEX TURNPIKE & BURLINGTON MALL ROAD 4 CMAQ $ 2,100,000 $ 1,680,000 $ 420,000 new addition Statewide CMAQ ► $ 14,899,905 $ 11,919,924 $ 2,979,981 ◄ 80% Federal + 20% Non-Federal ►Statewide Transportation Enhancements ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL AMENDMENT:Incr ease Cost,AMENDMENT :Change Additional Information 3 604531 STP-TE $ 1,247,079 Statewide Transportation Enhancements Subtotal ► $ 1,247,079 997,663 249,416 $ 997,663 $ cost increase of $713,975; Statewide TE+Statewide CMAQ Total Cost = $7,849,648; previously $6,510,045 (STP-TE was $533,104) 249,416 ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects Programmed $ Statewide ITS Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal Statewide Interstate Maintenance Program Subtotal ► $ - $ - $ - ◄ 90% Federal + 10% Non-Federal ►Statewide Interstate Maintenance Program No Projects Programmed The file you have accessed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Transportation Improvement Program.” Contained in the file are the Massachusetts Department of Transportation’s project identification number, project description, district number, funding source, programmed funds, and the split between federal and non-federal funds for each of the years of the highway section. Similar information is contained for the transit section. This file is not currently available in an accessible format. The Massachusetts Department of Transportation is working collaboratively with each of the state’s regional planning agencies to address this issue. While this work is ongoing, alternative formats are available by calling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjus MassDOT tment Type ▼ Project ID ▼ MassDOT Project Description▼ 09/03/2015 Proposed Update to Draft Amendment Five MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ ►Statewide NHS Preservation Program+ CHELSEA- REVERE- RESURFACING & RELATED 607174 4 NHPP $ WORK ON ROUTE 1 BEVERLY - RESURFACING & RELATED WORK ON 607891 4 NHPP $ ROUTE 128 Statewide NHS Preservation Program Subtotal ► $ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ 10,490,952 8,392,762 2,098,190 5,718,991 4,575,193 1,143,798 16,209,943 $ 12,967,954 $ $ - $ NHPP+TAP Total Cost = $10,815,386 NHPP+TAP Total Cost = $5,938,411 3,241,989 ◄ 80% Federal + 20% Non-Federal ►Statewide RR Grade Crossings No Projects Programmed $ Statewide RR Grade Crossings Subtotal ► $ - - ◄ 80% Federal + 20% Non-Federal ►Statewide Stormwater Retrofits NHPP+TAP Total Cost = $10,815,386 607174 CHELSEA- REVERE- RESURFACING & RELATED WORK ON ROUTE 1 4 STP-TE $ 324,434 259,547 64,887 607891 BEVERLY - RESURFACING & RELATED WORK ON ROUTE 128 4 STP-TE $ 219,420 175,536 43,884 2,950,000 2,360,000 590,000 1,620,450 1,296,360 324,090 608131 606997 NHPP+TAP Total Cost = $5,938,411 DANVERS- MEDFORD- STORMWATER 4 STP-TE $ IMPROVEMENTS ALONG ROUTE 1/I-95/I-93 BRAINTREE- MILTON- BOSTON- WEYMOUTHSTORMWATER RETROFITS ON I-93, ROUTE 3 & 6 STP-TE $ ROUTE 18 Statewide Stormwater Retrofits Subtotal ► $ ►Statewide ADA Implementation Plan No Projects Programmed 5,114,304 $ 4,091,443 $ 1,022,861 ◄ 80% Federal + 20% Non-Federal $ Statewide ADA Implementation Plan Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal Other Statewide Items Subtotal ► $ - $ - $ - ◄ Funding Split Varies by Funding Source ►Other Statewide Items No Projects Programmed The file you have accessed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Transportation Improvement Program.” Contained in the file are the Massachusetts Department of Transportation’s project identification number, project description, district number, funding source, programmed funds, and the split between federal and non-federal funds for each of the years of the highway section. Similar information is contained for the transit section. This file is not currently available in an accessible format. The Massachusetts Department of Transportation is working collaboratively with each of the state’s regional planning agencies to address this issue. While this work is ongoing, alternative formats are available by calling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjus MassDOT tment Type ▼ Project ID ▼ MassDOT Project Description▼ 09/03/2015 Proposed Update to Draft Amendment Five MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 2A / Non-Federal Projects ►Non Federal Aid 606146 1568 CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON CANTON STREET/DEDHAM STREET, INCLUDES REPLACEMENT OF C-02-034, REHAB OF C-02-024, C02-002=N-25-016=W-31-002 & 5 SIGNALIZED INTERSECTIONS FAIRMOUNT IMPROVEMENTS 5/6 NFA $ N/A NFA $ - $ 4,863,082 $ - 4,863,082 Lists cash flows (based on state fiscal year) for Fairmount Improvements MassDOT made a formal request on Aug. 1, 2011, to remove this project from the State Implementation Plan regulation. The MPO is continuing to reference this project in the document until the process is complete. RED LINE-BLUE LINE CONNECTOR DESIGN 1572 N/A NFA previously funded with Non-federal aid; project cost increase of $15,014,560; previously $38,000,000 $ 10,000,000 $ 10,000,000 Non-Federal Aid Subtotal► $ 14,863,082 $ 14,863,082 ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed 2015 Boston Region MPO TIP Summary NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - TIP Section 1: ▼ Total ► $ 149,732,689 Federal Funds ► $ 120,787,630 Non-Federal Funds ► $ 28,945,058 $ $ - TIP Section 2: ▼ Total of All Projects ▼ $ 14,863,082 $ 14,863,082 $ $ $ ◄100% Non-Federal 164,595,771 ◄ Total Spending in Region 120,787,630 ◄ Total Federal Spending in Region 43,808,140 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx