Charles D. Baker, Governor Karyn Polito, Lt. Governor Stephanie Pollack, MassDOT Secretary & CEO June 25, 2015 Pamela Stephenson Division Administrator Federal Highway Administration 55 Broadway – 10th floor Cambridge, Massachusetts 02142 Dear Ms. Stephenson: On behalf of Secretary Stephanie Pollack, I am writing to request your approval of the attached statewide and regional highway actions pertaining to the Federal Fiscal Years 20152018 State Transportation Improvement Program, as advanced by the Massachusetts Department of Transportation (MassDOT), Cape Cod Metropolitan Planning Organization (MPO), Franklin Transportation Planning Organization (TPO), Northern Middlesex MPO, and Pioneer Valley MPO. 0.22-0.40 23.01-23.08 24.01-24.09 25.01-25.04 26.01-26.04 Adjustments Cape Cod Pioneer Valley Northern Middlesex Statewide Amendments June 25, 2015 June 15, 2015 June 23, 2015 June 16, 2015 June 25, 2015 These actions do not require an air quality conformity determination. If you have any questions, please call me at (857)368-8865. Sincerely, David J. Mohler Executive Director Office of Transportation Planning Leading the Nation in Transportation Excellence Ten Park Plaza, Suite 4150, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 www.mass.gov/massdot cc: Steve Woelfel, Director of Strategic Planning Trey Wadsworth, Manager of MPO Activities Bryan K. Pounds, MPO Activities William Betts, FAPO Federal Transit Administration Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO .22 PIONEER Project Location ID 605222 SPRINGFIELD Description SPRINGFIELD- NORTH END & BRIGHTWOOD INFRASTRUCTURE IMPROVEMENTS, FROM OSGOOD STREET TO THE CHICOPEE CITY LINE (NORTHERLY SEGMENT) CURRENT Source Total CMAQ REVISED Federal Non Federal Year Source $1,900,792 $1,520,634 $380,158 2015 CMAQ TAP $473,939 $379,151 $94,788 2015 TAP STP $3,658,269 $2,926,615 $731,654 2015 STP Total Federal $1,900,792 $1,520,634 FINANCIAL CONSTRAINT NonFederal Year Amendment Description Date $380,158 2015 ADJUSTMENT::Change Addl Info 06/25/15 $94,788 06/25/15 10.50 TEC 75% STP, CMAQ, TAP , Update Cost from $4,233,000 to $6,033,000 .23 PIONEER 605222 SPRINGFIELD SPRINGFIELD- NORTH END & BRIGHTWOOD INFRASTRUCTURE IMPROVEMENTS, FROM OSGOOD STREET TO THE CHICOPEE CITY LINE (NORTHERLY SEGMENT) $473,939 $379,151 2015 ADJUSTMENT::Change Addl Info 10.50 TEC 75% STP, CMAQ, TAP , Update Cost from $4,233,000 to $6,033,000 .24 PIONEER 605222 SPRINGFIELD SPRINGFIELD- NORTH END & BRIGHTWOOD INFRASTRUCTURE IMPROVEMENTS, FROM OSGOOD STREET TO THE CHICOPEE CITY LINE (NORTHERLY SEGMENT) $3,847,632 $3,078,106 $769,526 2015 ADJUSTMENT:Increase Cost 06/25/15 ADJUSTMENT::Change Addl Info 10.50 TEC 75% STP, CMAQ, TAP , Update Cost from $6,033,000 to $6,222,363 .25 FRANKLIN 607117 HAWLEY HAWLEY - BRIDGE REPLACEMENT, H-13-003, SAVOY ROAD OVER THE CHICKLEY RIVER STP-BROFF $2,692,422 $2,153,938 $538,484 2015 STP-BR-OFF SRTS $863,268 $863,268 $0 2015 STP-TE CMAQ $2,500,000 $2,000,000 $500,000 2016 STP $1,344,114 $1,075,291 $268,823 2015 ADJUSTMENT:Decrease Cost 06/25/15 Design Status - 75%. Cost adjusted from $2,692,422 to $1,344,114 .26 STATEWIDE SRTS SRTS - Education $863,268 $863,268 $0 2015 ADJUSTMENT:Change Funding Src 06/25/15 $808,000 2016 ADJUSTMENT:Change Funding Src 06/25/15 Change from SRTS to STP-TE .27 STATEWIDE 607484 WORCESTER DISTRICT 3- INSTALLATION OF CCTV CAMERAS AND VMS ON I-290 BETWEEN I-495 AND I-90 $4,040,000 $3,232,000 ADJUSTMENT::Change Addl Info AC Year 2 of 2. Increase 2016 by $1,040,000 for new Total Project Cost of $6,540,000. Changed from CMAQ to STP. .28 STATEWIDE 607424 STATEWIDE STATEWIDE- ITS ADVANCED TRANSPORTATION MANAGEMENT SYSTEM (ATMS) SOFTWARE CMAQ $4,324,577 $3,459,662 $864,915 2015 CMAQ $4,324,577 $3,459,662 $864,915 2015 ADJUSTMENT::Change Addl Info 06/25/15 STP $500,000 $400,000 $100,000 2016 CMAQ $3,464,000 $2,771,200 $692,800 2016 ADJUSTMENT:Increase Cost 06/25/15 AC Year 1 of 2. Increase by $2,324,577. Total Project Cost decrease to $5,055,577 due to reduction in 2016. .29 STATEWIDE 606927 STATEWIDE STATEWIDE- REPLACEMENT OF VARIABLE MESSAGE SIGNS (VMS) ADJUSTMENT::Change Addl Info Approved via consultation in January 2014. AC Year 2 of 2 . Increase 2016 by $3,228,000. Decrease Total Cost to $3,464,800. .30 STATEWIDE 607483 STATEWIDE DISTRICT 5- ITS CAMERA & VMS CONSTRUCTION ON ROUTE 24, FROM RANDOLPH TO FALL RIVER (39 MILES) ADJUSTMENT:Change Funding Src CMAQ $500,000 $400,000 $100,000 2015 CMAQ $3,728,000 $2,982,400 $745,600 2015 ADJUSTMENT:Increase Cost ADJUSTMENT::Change Addl Info AC Year 1 of 2. Increase from $500,000. New Total Cost of $7,506,000. Date: 6/25/2015 06/25/15 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO .31 SE MASS Project Location ID 608132 MANSFIELD Description MANSFIELD-SWANSEA-SOMERSET-NEW BEDFORD - STORMWATER IMPROVEMENTS ALONG I-495 AND I-195 CURRENT Source Total STP-TE $1,885,161 REVISED Federal Non Federal $1,508,129 $377,032 Year 2015 Source STP-TE Total Federal $1,327,236 $1,061,789 FINANCIAL CONSTRAINT NonFederal Year Amendment Description $265,447 2015 ADJUSTMENT:Decrease Cost Date 06/25/15 ADJUSTMENT::Change Addl Info Change funding category by moving $557,925 from STP-TE to STP for the Lee River, Swansea/Somerset portion of the project. $1,327,236 STP-TE + $557,925 STP = $1,885,161. .32 SE MASS 608132 MANSFIELD MANSFIELD-SWANSEA-SOMERSET-NEW BEDFORD - STORMWATER IMPROVEMENTS ALONG I-495 AND I-195 2015 STP $557,925 $446,340 $111,585 2015 ADJUSTMENT:Add Funding Source 06/25/15 ADJUSTMENT::Change Addl Info Chagne funding category by moving $557,925 from STP-TE to STP for the Lee River, Swansea/Somerset portion of the project. $1,327,236 STP-TE + $557,925 STP = $1,885,161. .33 STATEWIDE 607484 WORCESTER DISTRICT 3- INSTALLATION OF CCTV CAMERAS AND VMS ON I-290 BETWEEN I-495 AND I-90 CMAQ $2,500,000 $2,400,000 $600,000 2015 STP $2,500,000 $2,000,000 $500,000 2015 ADJUSTMENT:Change Funding Src 06/25/15 ADJUSTMENT::Change Addl Info AC Year 1 of 2. Total Project Cost increase to $6,540,000. Changed from CMAQ to STP. .34 STATEWIDE 607424 STATEWIDE STATEWIDE- ITS ADVANCED TRANSPORTATION MANAGEMENT SYSTEM (ATMS) SOFTWARE CMAQ $1,000,000 $800,000 $200,000 2016 CMAQ $731,000 $584,800 $146,200 2016 ADJUSTMENT:Decrease Cost 06/25/15 ADJUSTMENT::Change Addl Info AC Year 2 of 2. Decrease by $269,000 in 2016 for a revised Total Cost of $5,055,577. .35 STATEWIDE 607483 STATEWIDE DISTRICT 5- ITS CAMERA & VMS CONSTRUCTION ON ROUTE 24, FROM RANDOLPH TO FALL RIVER (39 MILES) CMAQ $6,000,000 $4,800,000 $1,200,000 2016 CMAQ $3,778,000 $3,022,400 $755,600 2016 ADJUSTMENT:Decrease Cost 06/25/15 ADJUSTMENT::Change Addl Info AC Year 2 of 2. Decrease from $6,000,000. Increase Total Project Cost to $7,506,000 .36 STATEWIDE 608024 STATEWIDE - CONVERSION OF INTERSTATE AND FREEWAY EXIT NUMBERS TO MILEPOSTBASED HSIP $2,000,000 $1,800,000 $200,000 2016 HSIP $2,444,444 $2,200,000 $244,444 2016 ADJUSTMENT:Increase Cost 06/25/15 TAP $904,283 $723,426 $180,857 2016 STP-TE $904,823 $723,426 $180,857 2016 ADJUSTMENT:Change Funding Src 06/25/15 TAP $800,000 $640,000 $160,000 2016 STP-TE $904,823 $723,426 $180,857 2016 ADJUSTMENT:Change Funding Src 06/25/15 CMAQ $3,228,800 $2,583,040 $645,760 2015 CMAQ $800 $640 AC Yr 2 of 2. Total TFPC = $6,000,000. Increase 2016 by $444,444. .37 STATEWIDE SRTS SRTS - Planning & Design Change from TAP to STP-TE .38 STATEWIDE SRTS SRTS - Planning & Design Change from TAP to STP-TE .39 STATEWIDE 606927 STATEWIDE STATEWIDE- REPLACEMENT OF VARIABLE MESSAGE SIGNS (VMS) $160 2015 ADJUSTMENT:Decrease Cost ADJUSTMENT::Change Addl Info Approved via consultation in January 2014. AC Year 1 of 2 . Move $3,228,000 to 2016. Decrease Total Cost to $3,464,800. Date: 6/25/2015 06/25/15 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # .40 MPO Project Location ID STATEWIDE ABPGA STATEWIDE N CURRENT Federal REVISED Description Source Total Non Federal Year ACCELERATED BRIDGE PROGRAM- GANS DEBT SERVICE NHPP $51,753,864 $51,753,864 $0 2016 CMAQ $3,203,376 $2,562,701 $640,675 2015 Source NHPP Total Federal $44,116,799 $44,116,799 FINANCIAL CONSTRAINT NonFederal $0 Year Amendment Description 2016 ADJUSTMENT:Decrease Cost Date 06/25/15 ABP GANs payments begin in FFY 2015. Decrease from $51,753,864 align with current GANS debt schedule. 23.01 CAPECOD 606461 ORLEANS ORLEANS- INTERSECTION IMPROVEMENTS AT 2 LOCATIONS: CRANBERRY HIGHWAY (ROUTE 6A) AND MAIN STREET; CHATHAM ROAD (ROUTE 28) AND MAIN STREET. AMENDMENT:Remove Project 06/25/15 CONSTRUCTION Total cost $3,382,140 [$3,203,376 CMAQ + $178,764 TAP]. 25% design submitted to MassDOT., CMAQ analysis completed. 23.02 CAPECOD 606394 BARNSTABLE BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY 2015 CMAQ $900,000 $900,000 $29,753 2015 AMENDMENT:Add Funding Source 06/25/15 AMENDMENT:Change Addl Info CONSTRUCTION Total Cost $5,509,246 [$3,830,482 + $900,000 CMAQ + $600,000 Statewide HSIP + $178,764 TAP]. 75% design submitted 23.03 CAPECOD 606461 ORLEANS ORLEANS- INTERSECTION IMPROVEMENTS AT 2 LOCATIONS: CRANBERRY HIGHWAY (ROUTE 6A) AND MAIN STREET; CHATHAM ROAD (ROUTE 28) AND MAIN STREET. TAP $178,764 $143,011 $35,753 2015 AMENDMENT:Remove Project 06/25/15 CONSTRUCTION Total cost $3,382,140 [$3,203,376 CMAQ + $178,764 TAP]. 25% design submitted to MassDOT., CMAQ analysis completed. 23.04 CAPECOD 606394 BARNSTABLE BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY 2015 TAP $178,764 $143,011 $35,753 2015 AMENDMENT:Add Funding Source 06/25/15 AMENDMENT:Change Addl Info CONSTRUCTION Total Cost $5,509,246 [$3,830,482 + $900,000 CMAQ + $600,000 Statewide HSIP + $178,764 TAP]. 75% design submitted 23.05 CAPECOD 606179 MULTIPLE DENNIS- HARWICH - RESURFACING & RELATED WORK ON ROUTE 6 NHPP $8,493,876 $6,795,101 $1,698,775 2017 STP $2,283,272 $1,826,618 $456,654 2015 AMENDMENT:Move Project 06/25/15 AMENDMENT:Decrease Cost TOTAL COST $2,283,272 for 2015, preliminary design. AMENDMENT:Change Funding Src AMENDMENT:Change Project Desc AMENDMENT:Change Addl Info 23.06 CAPECOD 606394 BARNSTABLE BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY CONSTRUCTION Total Cost $5,509,246 [$3,830,482 + $900,000 CMAQ + $600,000 Statewide HSIP + $178,764 TAP]. 75% design submitted HSIP $3,637,130 $3,273,417 $363,713 2015 STP $3,830,482 $3,064,386 $766,096 2015 AMENDMENT:Increase Cost AMENDMENT:Change Funding Src AMENDMENT:Change Addl Info Date: 6/25/2015 06/25/15 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO 23.07 CAPECOD Project Location ID 606394 BARNSTABLE CURRENT Federal REVISED Non Federal Year Source Source Total BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY HSIP $600,000 $540,000 $60,000 2015 TI (2005) TI173 $2,096,080 $2,096,080 $0 2015 HSIP $1,201,102 $1,080,992 $120,110 2015 HSIP $1,201,102 $1,080,992 $120,110 2015 AMENDMENT:Change Addl Info 06/25/15 CMAQ $1,836,958 $1,469,566 $367,392 2015 CMAQ $1,836,958 $1,469,566 $367,392 2015 AMENDMENT:Change Addl Info 06/25/15 STP $1,903,482 $1,522,786 $380,696 2015 $600,000 Federal $540,000 NonFederal $60,000 Year Amendment Description Description HSIP Total FINANCIAL CONSTRAINT 2015 AMENDMENT:Change Addl Info Date 06/25/15 CONSTRUCTION Total Cost $5,509,246 [$3,830,482 + $900,000 CMAQ + $600,000 Statewide HSIP + $178,764 TAP]. 75% design submitted 23.08 CAPECOD 607571 MULTIPLE DENNIS- YARMOUTH- CONSTRUCTION OF A MULTI-USE PATH OVER THE BASS RIVER, INCLUDES NEW PEDESTRIAN BRIDGE D-07007=Y-01-010 AMENDMENT:Remove Project Earmark to cover Bass River Bridge portion of CCRT extension ($2,096,080 from TI 173 MA 209), Entire CCRT extension project TIP funding (2014+2015) = $9,508,979. Concerns regarding permit timing from Coast Guard. 24.01 PIONEER 604035 HADLEY HADLEY- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 9 (RUSSELL STREET) & ROUTE 47 (MIDDLE STREET) 8.02 TEC 100% $4,038,060 HSIP, CMAQ, STP, Design Public Hearing held on June 9, 2014 24.02 PIONEER 604035 HADLEY HADLEY- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 9 (RUSSELL STREET) & ROUTE 47 (MIDDLE STREET) 8.02 TEC 100% $4,038,060 HSIP, CMAQ, STP, Design Public Hearing held on June 9, 2014 24.03 PIONEER 607869 WILBRAHAM WILBRAHAM- RECONSTRUCTION OF BOSTON ROAD (ROUTE 20) FROM DUDLEY STREET TO 400FT. EAST OF DUMAINE STREET (0.28MILES) AMENDMENT:Remove Project 06/25/15 7.27 TEC Score 75% $1,903,482 STP 24.04 PIONEER PVTA01 MULTIPLE PVTA - Purchase of 2 Electric Buses 2015 STP $887,221 $709,777 $177,444 2015 AMENDMENT:Add Project 06/25/15 2015 STP $1,000,000 $800,000 $200,000 2015 AMENDMENT:Add Funding Source 06/25/15 Match provided by MassDOT Rail & Transit (RTACAP) 24.05 PIONEER 604035 HADLEY HADLEY- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 9 (RUSSELL STREET) & ROUTE 47 (MIDDLE STREET) 8.02 TEC 100% $4,038,060 HSIP, CMAQ, STP, Design Public Hearing held on June 9, 2014 24.06 PIONEER 607731 SPRINGFIELD SPRINGFIELD- VIADUCT DECK REPLACEMENT OF S-24-061 ON I-91 (EARLY ACTION) NHPP $149,006,250 $119,205,000 $29,801,250 2015 NHPP $130,256,250$104,205,000 $26,051,250 2015 AMENDMENT:Decrease Cost AMENDMENT:Change Addl Info 100% Design, Funds will be disbursed from FFY 2014 through FFY 2017, Decrease from $149,006,250 to $136,506,250 move difference ($12,500,000) to FFY 2016 Date: 6/25/2015 06/25/15 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO 24.07 PIONEER Project Location ID 607731 SPRINGFIELD Description CURRENT Source Total Federal REVISED Non Federal SPRINGFIELD- VIADUCT DECK REPLACEMENT OF S-24-061 ON I-91 (EARLY ACTION) Year Source Total Federal FINANCIAL CONSTRAINT NonFederal Year Amendment Description Date 2015 STP $6,250,000 $5,000,000 $1,250,000 2015 AMENDMENT:Add Funding Source 06/25/15 2015 CMAQ $12,000,000 $9,600,000 $2,400,000 2015 AMENDMENT:Add Funding Source 06/25/15 $14,398,750 2016 NHPP $84,493,750 $67,595,000 $16,898,750 2016 AMENDMENT:Increase Cost 06/25/15 100% Design, Funds will be disbursed from FFY 2014 through FFY 2017, Decrease from $149,006,250 to $136,506,250 move difference ($12,500,000) to FFY 2017 24.08 PIONEER USR01 SPRINGFIELD SPRINGFIELD - UNION STATION REDEVELOPMENT $1.7M CMAQ commitment over 3 years toward Phase I of project $65.7 total 24.09 PIONEER 607731 SPRINGFIELD SPRINGFIELD- VIADUCT DECK REPLACEMENT OF S-24-061 ON I-91 (EARLY ACTION) NHPP $71,993,750 $57,595,000 AMENDMENT:Change Addl Info 100% Design, Funds will be disbursed from FFY 2014 through FFY 2017 Cost was $71,993,750 25.01 N. 601426 BILLERICA MIDDLESEX BILLERICA - RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) CMAQ $1,789,585 $1,431,668 $357,917 2015 CMAQ TAP $245,303 $196,242 $49,061 2015 TAP STP $1,677,251 $1,341,801 $335,450 2015 STP STP $3,312,639 $2,650,111 $662,528 2016 STP $1,789,585 $1,431,668 $357,917 2015 AMENDMENT:Change Project Desc 06/25/15 $49,061 2015 AMENDMENT:Change Project Desc 06/25/15 $1,677,251 $1,341,801 $335,450 2015 AMENDMENT:Change Project Desc 06/25/15 $2,887,861 $2,310,289 $577,572 2016 AMENDMENT:Change Project Desc 06/25/15 AC Year 1 of 2. Total project cost at 100% design $6,600,000 (Funding Sources - STP, CMAQ, TAP) TEC = 5.52 25.02 N. 601426 BILLERICA MIDDLESEX BILLERICA - RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) $245,303 $196,242 AC Year 1 of 2. Total project cost at 100% design $6,600,000 (Funding Sources - STP, CMAQ, TAP) TEC = 5.52 25.03 N. 601426 BILLERICA MIDDLESEX BILLERICA - RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) AC Year 1 of 2. Total project cost at 100% design $6,600,000 (Funding Sources - STP, CMAQ, TAP) TEC = 5.52 25.04 N. 601426 BILLERICA MIDDLESEX BILLERICA - RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) AMENDMENT:Decrease Cost AC Year 2 of 2. Total project cost at 100% design $6,600,000 (Funding Sources - STP, CMAQ, TAP) TEC = 5.52 26.01 STATEWIDE RTA001 BusPlus Route 2 & Commuter Service AC Year 1 of 2. 100% FA using Toll Credits. This funding will be used to operate three separate bus services along different segments of the Route 2 Corridor, including a Marlborough to Boston service. 2015 CMAQ $2,900,000 $2,900,000 $0 2015 AMENDMENT:Increase Cost AMENDMENT:Add Funding Source Date: 6/25/2015 06/25/15 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO Project Location ID 26.02 STATEWIDE RTA001 Description CURRENT Source Total Federal REVISED Non Federal BusPlus Route 2 & Commuter Service Year 2016 Source CMAQ Total Federal $2,900,000 $2,900,000 FINANCIAL CONSTRAINT NonFederal $0 Year Amendment Description 2016 AMENDMENT:Add Project Date 06/25/15 AC Year 2 of 2. 100% FA using Toll Credits. This funding will be used to operate three separate bus services along different segments of the Route 2 Corridor, including a Marlborough to Boston service. 26.03 STATEWIDE ABPGA N ACCELERATED BRIDGE PROGRAM- GANS DEBT SERVICE STP-TE $14,350,000 $14,350,000 $0 2016 AMENDMENT:Remove Funding Src 06/25/15 2016 AMENDMENT:Add Funding Source 06/25/15 Accelerated Bridge Program (ABP) GANs payments begin in FFY 2015. 26.04 STATEWIDE ABPGA STATEWIDE N ACCELERATED BRIDGE PROGRAM- GANS DEBT SERVICE 2016 STP-BR-OFF $323,201 $323,201 $0 Add Off-System funding source Date: 6/25/2015 2015 - 2018 Statewide Transportation Improvement Program Fiscal Constraint Charts Includes Actions 1 through 8 2015 FEDERAL APPORTIONMENTS Federal Fiscal Year 2015 I ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY NATIONAL HIGHWAY PERFORMANCE STP FLEX II III IV V VI ACTUAL BALANCE FROM FY 2014 ANTICIPATED TRANSFER OF FUNDS TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY PROGRAMMED OBLIGATIONS ESTIMATED BALANCE REMAINING $305,023,572 $53,776,670 $2,766,821 $15,939,977 BRIDGE-OFF SYSTEM $28,456,838 $215,116,118 $243,572,956 $21,621,211 $85,748,867 STP NON-FLEX $72,218,612 $18,671,504 $90,890,116 $53,780,931 $37,109,186 -BOSTON URBAN AREA $36,000,000 ($36,000,000) $343,790,393 $33,716,647 $342,199,822 $30,700,429 $1,590,571 $3,016,218 $45,136,794 $3,315.97 $45,140,110 $23,583,756 $21,556,354 -BARNSTABLE URBAN AREA $2,724,025 $7,349,935 $10,073,960 $3,064,386 $7,009,574 -SPRINGFIELD, CHICOPEE, HOLYOKE $5,869,846 $4,162,993 $10,032,839 $10,032,838 $1 -WORCESTER URBAN AREA $5,008,531 $7,155,261 $12,163,792 $6,048,183 $6,115,609 $8,502,215 -PROVIDENCE, PAWTUCKET -OTHER AREAS (RURAL & SMALL URBAN) STP-ENHANCEMENT SAFE ROUTES TO SCHOOLS PGM. $2,873,988 $6,074,567 $8,948,555 $446,340 $10,605,428 $0.00 $10,605,428 $10,605,428 $0 $0 $46,651,144 $46,651,144 $12,821,100 $33,830,044 $0 $847,732 $847,732 $600,000 $247,732 TAP RECREATIONAL TRAILS $1,186,729 $3,296,728 $4,483,457 $800,000 $3,683,457 TAP FLEX $5,268,579 $9,696,702 $14,965,281 $3,163,882 $11,801,400 TAP NON-FLEX $5,268,579 $7,873,084 $13,141,663 $3,985,003 $9,156,660 $3,289,194 $6,041,263 $9,330,457 $2,920,743 $5,509,714 -BARNSTABLE URBAN AREA $198,504 $393,616 $592,120 $175,953 $416,167 -SPRINGFIELD, CHICOPEE, HOLYOKE $427,746 $848,182 $1,275,928 $379,151 $896,777 -WORCESTER URBAN AREA $364,980 $723,724 $1,088,704 $323,517 $765,187 -PROVIDENCE, PAWTUCKET $209,432 $415,286 $624,718 $185,639 $439,079 $0 $1,189,480 -BOSTON URBAN AREA -OTHER AREAS (RURAL & SMALL URBAN) HWY SAFETY IMPROVEMENT PGM. $338,467 $851,013 $1,189,480 $32,218,108 $14,316 $32,232,424 $28,673,864 $3,558,559 $0 $5,304,843 HSIP - High Risk Rural RLWY/HWY CROSSINGS- HAZARD ELIMINATION $0 $5,304,843 $5,304,843 $1,212,443 $12,372,204 $13,584,647 $3,900,000 $9,684,647 RLWY/HWY CROSSINGS- PROTECTIVE DEVICES $1,212,443 $8,015,029 $9,227,472 $3,900,000 $5,327,472 $505,842,573 $290,465,755 $0 $847,103,932 $506,146,242 $210,059,656 $60,820,818 $20,038,477 $40,086,735 $33,674,246 $0 $100,907,553 $53,712,723 $65,723,878 $24,800,000 $35,183,675 $28,912,723 $586,701,868 $364,226,737 $0 $1,001,724,209 $596,670,120 $274,156,054 FEDERAL OBLIGATION LIMITATION GUIDANCE $600,000,000 SUB-TOTAL> CMAQ PLANNING FEDERAL AID SUB-TOTAL: Federal Aid and Programming Office June 24, 2015 Page 1 of 8 2015 - 2018 Statewide Transportation Improvement Program Fiscal Constraint Charts Includes Actions 1 through 8 Federal Fiscal Year 2015 I II ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS III ANTICIPATED TRANSFER OF FUNDS IV V VI TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY PROGRAMMED OBLIGATIONS $0 $147,060,180 $12,970,490 $0 $87,262 $0 $0 $0 ACTUAL BALANCE FROM FY 2014 $147,060,180 $87,262 SECTION 115 PROJECTS $0 $777,603 $0 $777,603 $0 SECTION 117 PROJECTS $0 $186,027 $0 $186,027 $0 SECTION 125 PROJECTS MISCELLANEOUS / OTHER / UNDETERMINED $0 $0 $0 $4,142,809 FUNDING CATEGORY HIGH PRIORITY PROJECTS FERRY BOAT DESC FEDERAL AID TOTAL > STATE MATCH FOR FEDERAL AID $8,813,446 $48,709,245 $0 $57,522,690 $595,515,313 $561,047,054 $0 $1,211,500,780 $112,209,411 NON-FEDERAL AID + FEDERAL AID TOTAL > ESTIMATED BALANCE REMAINING $134,089,690 $87,262 $777,603 $186,027 $950,000 $3,192,809 $10,846,826 $46,675,864 $621,437,436 $459,165,309 $134,294,735 $755,732,171 NOTES: MISCELLANEOUS / OTHER / UNDETERMINED Apportionment Includes estimated NHPP Exempt. Federal Aid and Programming Office June 24, 2015 Page 2 of 8 2015 - 2018 Statewide Transportation Improvement Program Fiscal Constraint Charts Includes Actions 1 through 8 2016 FEDERAL APPORTIONMENTS Federal Fiscal Year 2016 I ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY NATIONAL HIGHWAY PERFORMANCE STP FLEX II III IV V VI ESTIMATED BALANCE FROM FY 2015 ANTICIPATED TRANSFER OF FUNDS TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY PROGRAMMED OBLIGATIONS ESTIMATED BALANCE REMAINING $305,023,572 $43,842,580 $1,590,571 $3,016,218 BRIDGE-OFF SYSTEM $28,456,838 STP NON-FLEX $72,218,612 $301,614,143 $51,858,798 $268,278,772 $46,932,799 $33,335,371 $4,925,999 $2,362,935 ($339,822) $85,748,867 $114,205,705 $28,779,296 $85,426,409 $323,201 $37,109,186 $109,327,798 $72,218,612 $37,109,186 $0 $45,136,794 $21,556,354 $66,693,148 $45,136,794 $21,556,354 $0 -BARNSTABLE URBAN AREA $2,724,025 $7,009,574 $9,733,599 $2,724,025 $7,009,574 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $5,869,846 $1 $5,869,847 $5,869,846 $1 $0 -WORCESTER URBAN AREA $5,008,531 $6,115,609 $11,124,140 $5,008,531 $6,115,609 $0 $0 -BOSTON URBAN AREA -PROVIDENCE, PAWTUCKET -OTHER AREAS (RURAL & SMALL URBAN) STP-ENHANCEMENT SAFE ROUTES TO SCHOOLS PGM. ($5,000,000) $5,000,000 NET CHANGE IN PROGRAMMED OBLIGATIONS $2,873,988 $8,502,215 $11,376,203 $2,873,988 $8,502,215 $10,605,428 $0 $10,605,428 $10,605,428 $0 $0 $0 $33,830,044 $33,830,044 $10,909,548 $22,920,496 ($12,986,574) $0 $0 TAP RECREATIONAL TRAILS $1,186,729 $0 $3,683,457 $4,870,186 $800,000 $4,070,186 $0 TAP FLEX $5,268,579 $11,801,400 $17,069,979 $6,475,572 $10,594,406 ($2,266,978) TAP NON-FLEX $5,268,579 $9,156,660 $14,425,239 $3,985,003 $10,440,236 $0 $3,289,194 $5,509,714 $8,798,908 $2,920,743 $5,878,165 $0 -BARNSTABLE URBAN AREA $198,504 $416,167 $614,671 $175,953 $438,718 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $427,746 $896,777 $1,324,523 $379,151 $945,372 $0 -WORCESTER URBAN AREA $364,980 $765,187 $1,130,167 $323,517 $806,650 $0 -PROVIDENCE, PAWTUCKET $209,432 $439,079 $648,511 $185,639 $462,872 $0 -OTHER AREAS (RURAL & SMALL URBAN) $338,467 $1,189,480 $1,527,947 $0 $1,527,947 $0 $32,218,108 $3,558,559 $35,776,667 $34,545,051 $1,231,616 $400,000 $0 $5,304,843 $5,304,843 $561,600 $4,743,243 $1,212,443 $9,684,647 $10,897,090 $400,000 $10,497,090 $0 $0 -BOSTON URBAN AREA HWY SAFETY IMPROVEMENT PGM. HSIP - High Risk Rural RLWY/HWY CROSSINGS- HAZARD ELIMINATION RLWY/HWY CROSSINGS- PROTECTIVE DEVICES SUB-TOTAL> CMAQ PLANNING FEDERAL AID SUB-TOTAL: Federal Aid and Programming Office June 24, 2015 $1,212,443 $5,327,472 $495,908,483 $209,811,924 $60,820,818 $20,038,477 $35,183,675 $28,912,723 $576,767,778 $273,908,323 $0 $6,539,915 $400,000 $6,139,915 $0 $705,720,407 $474,286,253 $231,434,154 ($12,507,238) $96,004,493 $48,951,200 $85,919,265 $24,800,000 $10,085,228 $24,151,200 $3,879,098 $0 $850,676,101 $585,005,518 $265,670,582 ($8,628,140) FEDERAL OBLIGATION LIMITATION GUIDANCE $600,000,000 $0 $0 Page 3 of 8 2015 - 2018 Statewide Transportation Improvement Program Fiscal Constraint Charts HIGH PRIORITY PROJECTS FERRY BOAT DESC Includes Actions 1 through 8 $134,089,690 $134,089,690 $0 SECTION 115 PROJECTS $450,000 $450,000 SECTION 117 PROJECTS $186,027 $186,027 $0 $0 $46,675,864 $46,676,824 $1,032,078,642 SECTION 125 PROJECTS MISCELLANEOUS / OTHER / UNDETERMINED $960 FEDERAL AID TOTAL > STATE MATCH FOR FEDERAL AID NON-FEDERAL AID + FEDERAL AID TOTAL > $455,309,904 $91,061,981 $0 $206,415,728 $28,805,728 $0 $105,283,962 $0 ($449,576) $0 $450,000 $0 $0 $0 $186,027 $0 $0 $0 $0 $2,512,638 $44,164,186 $0 $616,773,884 $415,304,757 ($9,077,716) $130,344,508 $76,071,220 $747,118,392 NOTES: MISCELLANEOUS / OTHER / UNDETERMINED Apportionment Includes estimated NHPP Exempt. Federal Aid and Programming Office June 24, 2015 Page 4 of 8 2015 - 2018 Statewide Transportation Improvement Program Fiscal Constraint Charts Includes Actions 1 through 8 2017 FEDERAL APPORTIONMENTS Federal Fiscal Year 2017 I II ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY NATIONAL HIGHWAY PERFORMANCE STP FLEX III ESTIMATED BALANCE FROM FY 2016 $305,023,572 $43,842,580 $33,335,371 $4,925,999 BRIDGE-OFF SYSTEM $28,456,838 STP NON-FLEX $72,218,612 IV TOTAL FUNDS AVAILABLE ANTICIPATED (10/1) SUBJECT TO TRANSFER OF FUNDS OBLIGATION AUTHORITY VI PROGRAMMED OBLIGATIONS ESTIMATED BALANCE REMAINING NET CHANGE IN PROGRAMMED OBLIGATIONS $333,358,943 $53,768,579 $279,242,442 $47,810,225 $54,116,501 $5,958,354 ($6,795,101) $0 $85,426,409 $113,883,247 $28,456,768 $85,426,479 $0 $37,109,186 $109,327,798 $72,218,612 $37,109,186 $0 $45,136,794 $21,556,354 $66,693,148 $45,136,794 $21,556,354 $0 -BARNSTABLE URBAN AREA $2,724,025 $7,009,574 $9,733,599 $2,724,025 $7,009,574 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $5,869,846 $1 $5,869,847 $5,869,846 $1 $0 -WORCESTER URBAN AREA $5,008,531 $6,115,609 $11,124,140 $5,008,531 $6,115,609 $0 -PROVIDENCE, PAWTUCKET $2,873,988 $8,502,215 $11,376,203 $2,873,988 $8,502,215 $0 $10,605,428 $0 $10,605,428 $10,605,428 $0 $0 STP-ENHANCEMENT $0 $22,920,496 $22,920,496 $14,350,000 $8,570,496 SAFE ROUTES TO SCHOOLS PGM. $0 $0 $0 -BOSTON URBAN AREA -OTHER AREAS (RURAL & SMALL URBAN) ($5,000,000) $5,000,000 V $0 $0 TAP RECREATIONAL TRAILS $1,186,729 $4,070,186 $5,256,915 $800,000 $4,456,915 $0 TAP FLEX $5,268,579 $10,594,406 $15,862,985 $4,747,559 $11,115,426 $0 TAP NON-FLEX $5,268,579 $10,440,236 $15,708,815 $3,985,003 $11,723,812 $0 $3,289,194 $5,878,165 $9,167,359 $2,920,743 $6,246,616 $0 -BARNSTABLE URBAN AREA $198,504 $438,718 $637,222 $175,953 $461,269 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $427,746 $945,372 $1,373,118 $379,151 $993,967 $0 -WORCESTER URBAN AREA $364,980 $806,650 $1,171,630 $323,517 $848,113 $0 -PROVIDENCE, PAWTUCKET $209,432 $462,872 $672,304 $185,639 $486,665 $0 -OTHER AREAS (RURAL & SMALL URBAN) $338,467 $1,527,947 $1,866,414 $0 $1,866,414 $0 $32,218,108 $1,231,616 $33,449,724 $32,684,706 $765,018 $0 $0 $4,743,243 $4,743,243 $561,600 $4,181,643 -BOSTON URBAN AREA HWY SAFETY IMPROVEMENT PGM. HSIP - High Risk Rural RLWY/HWY CROSSINGS- HAZARD ELIMINATION $1,212,443 $0 $1,212,443 $2,000,000 ($787,557) $0 $0 RLWY/HWY CROSSINGS- PROTECTIVE DEVICES $1,212,443 $0 $1,212,443 $2,000,000 ($787,557) $0 $495,908,483 $214,797,149 $0 $710,705,632 $488,856,915 $221,848,717 ($6,795,101) $60,820,818 $20,038,477 $10,085,228 $24,151,200 $0 $70,906,046 $44,189,677 $71,378,134 $25,800,000 ($472,088) $18,389,677 $0 $0 $576,767,778 $249,033,577 $0 $825,801,355 $586,035,049 $239,766,306 ($6,795,101) FEDERAL OBLIGATION LIMITATION GUIDANCE $600,000,000 SUB-TOTAL> CMAQ PLANNING FEDERAL AID SUB-TOTAL: Federal Aid and Programming Office June 24, 2015 Page 5 of 8 2015 - 2018 Statewide Transportation Improvement Program Fiscal Constraint Charts HIGH PRIORITY PROJECTS FERRY BOAT DESC $105,283,962 Includes Actions 1 through 8 $105,283,962 $0 $6,535,973 $0 $98,747,989 $0 $0 $0 $0 SECTION 115 PROJECTS $0 $0 $0 $0 SECTION 117 PROJECTS $186,027 $186,027 $0 $186,027 $0 $0 $0 $0 $0 SECTION 125 PROJECTS MISCELLANEOUS / OTHER / UNDETERMINED $0 FEDERAL AID TOTAL > STATE MATCH FOR FEDERAL AID NON-FEDERAL AID + FEDERAL AID TOTAL > $44,164,186 $398,667,752 $79,733,550 $0 $0 $44,164,186 $0 $44,164,186 $0 $975,435,530 $592,571,022 $382,864,508 ($6,795,101) $195,087,106 $110,667,927 $84,419,179 $703,238,949 NOTES: MISCELLANEOUS / OTHER / UNDETERMINED Apportionment Includes estimated NHPP Exempt. Federal Aid and Programming Office June 24, 2015 Page 6 of 8 2015 - 2018 Statewide Transportation Improvement Program Fiscal Constraint Charts Includes Actions 1 through 8 2018 FEDERAL APPORTIONMENTS Federal Fiscal Year 2018 I II ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY NATIONAL HIGHWAY PERFORMANCE STP FLEX III IV TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO ESTIMATED BALANCE FROM ANTICIPATED TRANSFER OF FUNDS OBLIGATION AUTHORITY FY 2017 $305,023,572 $43,842,580 $54,116,501 $5,958,354 BRIDGE-OFF SYSTEM $28,456,838 STP NON-FLEX $72,218,612 VI PROGRAMMED OBLIGATIONS ESTIMATED BALANCE REMAINING NET CHANGE IN PROGRAMMED OBLIGATIONS $352,140,073 $56,800,934 $305,161,481 $51,562,658 $46,978,591 $5,238,276 $0 $0 $85,426,479 $113,883,317 $28,456,837 $85,426,480 $0 $37,109,186 $109,327,798 $72,218,612 $37,109,186 $0 $45,136,794 $21,556,354 $66,693,148 $45,136,794 $21,556,354 $0 -BARNSTABLE URBAN AREA $2,724,025 $7,009,574 $9,733,599 $2,724,025 $7,009,574 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $5,869,846 $1 $5,869,847 $5,869,846 $1 $0 -WORCESTER URBAN AREA $5,008,531 $6,115,609 $11,124,140 $5,008,531 $6,115,609 $0 $0 -BOSTON URBAN AREA -PROVIDENCE, PAWTUCKET -OTHER AREAS (RURAL & SMALL URBAN) STP-ENHANCEMENT SAFE ROUTES TO SCHOOLS PGM. ($7,000,000) $7,000,000 V $2,873,988 $8,502,215 $11,376,203 $2,873,988 $8,502,215 $10,605,428 $0 $10,605,428 $10,605,428 $0 $0 $0 $8,570,496 $8,570,496 $0 $8,570,496 $0 $0 $0 $0 $0 $0 $0 TAP RECREATIONAL TRAILS $1,186,729 $4,456,915 $5,643,644 $800,000 $4,843,644 $0 TAP FLEX $5,268,579 $11,115,426 $16,384,005 $2,964,717 $13,419,288 $0 TAP NON-FLEX $5,268,579 $11,723,812 $16,992,391 $3,985,003 $13,007,388 $0 $3,289,194 $6,246,616 $9,535,810 $2,920,743 $6,615,067 $0 -BARNSTABLE URBAN AREA $198,504 $461,269 $659,773 $175,953 $483,820 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $427,746 $993,967 $1,421,713 $379,151 $1,042,562 $0 -WORCESTER URBAN AREA $364,980 $848,113 $1,213,093 $323,517 $889,576 $0 -PROVIDENCE, PAWTUCKET $209,432 $486,665 $696,097 $185,639 $510,458 $0 -BOSTON URBAN AREA -OTHER AREAS (RURAL & SMALL URBAN) HWY SAFETY IMPROVEMENT PGM. HSIP - High Risk Rural $338,467 $1,866,414 $2,204,881 $0 $2,204,881 $0 $32,218,108 $765,018 $32,983,126 $27,246,291 $5,736,835 $0 $0 $4,181,643 $4,181,643 $0 $4,181,643 RLWY/HWY CROSSINGS- HAZARD ELIMINATION $1,212,443 ($787,557) $424,886 $400,000 $24,886 $0 $0 RLWY/HWY CROSSINGS- PROTECTIVE DEVICES $1,212,443 ($787,557) $424,886 $400,000 $24,886 $0 $495,908,483 $213,278,221 $0 $709,186,704 $493,195,599 $215,991,104 $0 $60,820,818 $20,038,477 ($472,088) $18,389,677 $0 $60,348,730 $38,428,154 $72,557,188 $24,800,000 ($12,208,458) $13,628,154 $0 $0 $576,767,778 $231,195,810 $0 $807,963,588 $590,552,787 $217,410,801 $0 FEDERAL OBLIGATION LIMITATION GUIDANCE $600,000,000 SUB-TOTAL> CMAQ PLANNING FEDERAL AID SUB-TOTAL: Federal Aid and Programming Office June 24, 2015 Page 7 of 8 2015 - 2018 Statewide Transportation Improvement Program Fiscal Constraint Charts Includes Actions 1 through 8 HIGH PRIORITY PROJECTS FERRY BOAT DESC $0 $0 SECTION 115 PROJECTS $0 $0 $0 $0 $0 $0 SECTION 117 PROJECTS $0 $186,027 $186,027 $0 $186,027 $0 SECTION 125 PROJECTS MISCELLANEOUS / OTHER / UNDETERMINED $0 $0 $0 $0 $0 $0 $44,164,186 $44,164,186 $0 $44,164,186 $0 $951,061,790 $591,192,787 $359,869,003 $0 $190,212,358 $110,091,243 $80,121,115 FEDERAL AID TOTAL > STATE MATCH FOR FEDERAL AID NON-FEDERAL AID + FEDERAL AID TOTAL > $98,747,989 $0 $374,294,012 $74,858,802 $98,747,989 $0 $0 $640,000 $0 $0 $98,107,989 $0 $0 $0 $701,284,030 NOTES: MISCELLANEOUS / OTHER / UNDETERMINED Apportionment Includes estimated NHPP Exempt. Federal Aid and Programming Office June 24, 2015 Page 8 of 8 2015 Statewide Categories Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID MPO ▼ ▼ MassDOT Project Description▼ 5/21/2015 Draft Released 6/25/2015 Endorsed MassDOT District ▼ Funding Source Total Programmed ▼ Funds ▼ Federal Funds ▼ Non-Federal Funds▼ Additional ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program ►CMAQ - Congestion Mitigation and Air Quality Improvement Program ►TAP - Transportation Alternatives Program TAP Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - ►Non-CMAQ/HSIP/TAP (Other) ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program ►On System ►Off-System ► Statewide Bridge Inspection Program ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid ►Section 1D / Federal Aid Major & State Category Projects ► Regional Major Infrastructure Program ► Statewide Infrastructure Program No Projects Programmed ► Statewide HSIP Program ► Statewide Safe Routes to Schools Program $ - $ - $ - Information ▼ ADJUSTMENT:Change Funding Source SRTS STATEWIDE SRTS - Education 0 STP‐TE $ 863,268.00 $ 690,614.40 $ BusPlus Route 2 & Commuter Service 0 CMAQ $ 2,900,000.00 $ 2,900,000.00 $ 172,653.60 Change from SRTS to STP-TE ► Statewide CMAQ AMENDMENT:Increase Cost,AMENDMENT:Add Funding Source RTA001 STATEWIDE - AC Year 1 of 2. 100% FA using Toll Credits. This funding will be used to operate three separate bus services along different segments of the Route 2 Corridor, including a Marlborough to Boston service. ►Statewide Transportation Enhancements No Projects Programmed $ - - - ►Statewide ITS ADJUSTMENT:Change Funding Source,ADJUSTMENT:Change Additional Information 607484 CENTRAL MASS DISTRICT 3- INSTALLATION OF CCTV CAMERAS AND VMS ON I-290 BETWEEN I-495 AND I-90 3 STP $ 2,500,000.00 $ 2,000,000.00 $ 500,000.00 AC Year 1 of 2. Total Project Cost increase to $6,540,000. Changed from CMAQ to STP. ADJUSTMENT:Change Additional Information 607424 STATEWIDE STATEWIDE- ITS ADVANCED TRANSPORTATION MANAGEMENT SYSTEM (ATMS) SOFTWARE 0 CMAQ $ 4,324,577.00 $ 3,459,662.00 $ 864,915.00 AC Year 1 of 2. Increase by $2,324,577. Total Project Cost decrease to $5,055,577 due to reduction in 2016. ADJUSTMENT:Decrease Cost,ADJUSTMENT:Change Additional Information 606927 Statewide STATEWIDE- REPLACEMENT OF VARIABLE MESSAGE SIGNS (VMS) Statewide CMAQ $ 800.00 $ 640.00 $ 160.00 Approved via consultation in January 2014. AC Year 1 of 2 . Move $3,228,000 to 2016. Decrease Total Cost to $3,464,800. ADJUSTMENT:Increase Cost,ADJUSTMENT:Change Additional Information 607483 Statewide DISTRICT 5- ITS CAMERA & VMS CONSTRUCTION ON ROUTE 24, FROM RANDOLPH TO FALL RIVER (39 MILES) Statewide CMAQ $ 3,728,000.00 $ 2,982,400.00 $ 745,600.00 AC Year 1 of 2. Increase from $500,000. New Total Cost of $7,506,000. ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ No Projects Programmed $ Statewide NHS Preservation Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Statewide RR Grade Crossings ►Statewide Stormwater Retrofits ADJUSTMENT:Decrease Cost,ADJUSTMENT:Change Additional Information 608132 SOUTHEASTERN MASS MANSFIELD-SWANSEA-SOMERSETNEW BEDFORD - STORMWATER IMPROVEMENTS ALONG I-495 AND I195 5 STP-TE $ ADJUSTMENT:Add Funding Source,ADJUSTMENT:Change Additional Information 608132 SOUTHEASTERN MASS MANSFIELD-SWANSEA-SOMERSETNEW BEDFORD - STORMWATER IMPROVEMENTS ALONG I-495 AND I195 5 STP $ 1,327,236.00 557,925 $ 1,061,788.80 $ 265,447.20 Change funding category by moving $557,925 from STP-TE to STP for the Lee River, Swansea/Somerset portion of the project. $1,327,236 STPTE + $557,925 STP = $1,885,161. $ 446,340.00 $ 111,585.00 Chagne funding category by moving $557,925 from STP‐TE to STP for the Lee River, Swansea/Somerset portion of the project. $1,327,236 STP‐TE + $557,925 STP = $1,885,161. ►Statewide ADA Implementation Plan No Projects Programmed $ - $ - - - ►Other Statewide Items ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects Programmed NFA $ - 2016 Statewide Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ MassDOT Project Description▼ 05/21/2015 Draft Released 06/25/2015 Endorsed MassDOT District ▼ Funding Source ▼ Total Programmed Funds ▼ Non-Federal Funds Additional ▼ Information ▼ Federal Funds ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - ►CMAQ - Congestion Mitigation and Air Quality Improvement Program ►TAP - Transportation Alternatives Program ►Non-CMAQ/HSIP/TAP (Other) ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program ►On System ►Off-System ► Statewide Bridge Inspection Program ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid ►Section 1D / Federal Aid Major & State Category Projects ► Regional Major Infrastructure Program ► Statewide Infrastructure Program No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - ► Statewide HSIP Program ADJUSTMENT:Increase Cost 608024 STATEWIDE 0 STATEWIDE - CONVERSION OF INTERSTATE AND FREEWAY EXIT NUMBERS TO MILEPOST-BASED HSIP $ 2,444,444.44 $ 2,200,000.00 $ 244,444.44 AC Yr 2 of 2. Total TFPC = $6,000,000. Increase 2016 by $444,444. ► Statewide Safe Routes to Schools Program ADJUSTMENT:Change Funding Source SRTS STATEWIDE SRTS - Education 0 STP-TE $ 904,283.00 $ 723,426.00 $ 180,857.00 Change from TAP to STP-TE ADJUSTMENT:Change Funding Source SRTS STATEWIDE SRTS - Planning & Design 0 STP-TE $ 800,000.00 $ 640,000.00 $ 160,000.00 Change from TAP to STP-TE BusPlus Route 2 & Commuter Service 0 CMAQ $ 2,900,000.00 $ ► Statewide CMAQ AMENDMENT:Add Project RTA001 STATEWIDE No Projects Programmed 2,900,000.00 $ - $ $ - $ AC Year 2 of 2. 100% FA using Toll Credits. This funding will be used to operate three separate bus services along different segments of the Route 2 Corridor, including a Marlborough to Boston service. - - ►Statewide Transportation Enhancements No Projects Programmed No Projects Programmed $ $ - - - ►Statewide ITS ADJUSTMENT:Change Funding Source,ADJUSTMENT:Change Additional Information 607484 CENTRAL MASS DISTRICT 3- INSTALLATION OF CCTV CAMERAS AND VMS ON I-290 BETWEEN I-495 AND I-90 3 STP $ 4,040,000.00 $ 3,232,000.00 $ 808,000.00 AC Year 2 of 2. Increase 2016 by $1,040,000 for new Total Project Cost of $6,540,000. Changed from CMAQ to STP. ADJUSTMENT:Decrease Cost,ADJUSTMENT:Change Additional Information 607424 STATEWIDE STATEWIDE- ITS ADVANCED TRANSPORTATION MANAGEMENT SYSTEM (ATMS) SOFTWARE 0 CMAQ $ 731,000.00 $ 584,800.00 $ 146,200.00 AC Year 2 of 2. Decrease by $269,000 in 2016 for a revised Total Cost of $5,055,577. ADJUSTMENT:Increase Cost,ADJUSTMENT:Change Additional Information 606927 STATEWIDE STATEWIDE- REPLACEMENT OF VARIABLE MESSAGE SIGNS (VMS) Statewide CMAQ $ 3,464,000.00 $ 2,771,200.00 $ 692,800.00 Approved via consultation in January 2014. AC Year 2 of 2 . Increase 2016 by $3,228,000. Decrease Total Cost to $3,464,800. ADJUSTMENT:Decrease Cost,ADJUSTMENT:Change Additional Information 607483 Statewide DISTRICT 5- ITS CAMERA & VMS CONSTRUCTION ON ROUTE 24, FROM RANDOLPH TO FALL RIVER (39 MILES) Statewide CMAQ $ 3,778,000.00 $ 3,022,400.00 $ 755,600.00 AC Year 2 of 2. Decrease from $6,000,000. Increase Total Project Cost to $7,506,000 No Projects Programmed $ - - - No Projects Programmed No Projects Programmed $ $ - - - No Projects Programmed No Projects Programmed $ $ - - - No Projects Programmed No Projects Programmed $ $ - - - ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ ►Statewide RR Grade Crossings ►Statewide Stormwater Retrofits ►Statewide ADA Implementation Plan No Projects Programmed No Projects Programmed $ $ - - - ►Other Statewide Items AMENDMENT:Remove Funding Source ABPGAN STATEWIDE ACCELERATED BRIDGE PROGRAM- 0 STP-TE $ 14,350,000.00 $ 14,350,000.00 $ - ABP GANs payments begin in FFY 2015. Remove funding category to align with actual GANS expenditures. AMENDMENT:Add Funding Source ABPGAN STATEWIDE ACCELERATED BRIDGE PROGRAM- 0 STP-BR-OFF $ 323,201 $ 323,201 $ - Add Off-System funding source ADJUSTMENT:Decrease Cost ABPGAN STATEWIDE ACCELERATED BRIDGE PROGRAM- 0 NHPP $ 44,116,799.00 $ 44,116,799.00 $ - ABP GANs payments begin in FFY 2015. Decrease from $51,753,864 align with current GANS debt schedule. ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects Programmed No Projects Programmed NFA NFA $ $ - $ $ - No Projects Programmed No Projects Programmed NFA NFA $ $ - $ $ - ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2015 REGION X TIP Summary TIP Section 1: ▼ Total ► Federal Funds ► Non-Federal Funds ► #REF! #REF! #REF! TIP Section 2: ▼ #REF! #REF! Total of All Projects ▼ #REF! #REF! #REF! ◄ Total Spending in Region ◄ Total Federal Spending in Region ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx 2015 Cape Cod Transportation Improvement Program Amendment/Adjustment Type MassDOT ▼ Project ID ▼ MPO ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 606394 Cape Cod 05/19/2014 Draft Released 06/23/2014 Endorsed MassDOT Funding Total Programmed Federal Non-Federal District ▼ Source ▼ Funds ▼ Funds ▼ Funds ▼ Municipality MassDOT Name ▼ Project Description▼ Barnstable BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY 5 HSIP HSIP Subtotal ► $ - $ - Additional Information ▼ $ - $ - $ - CONSTRUCTION Total Cost $5,509,246 [$3,830,482 + $900,000 CMAQ + $600,000 Statewide HSIP + $178,764 TAP]. 75% design submitted ◄ 90% Federal + 10% Non-Federal ►CMAQ - Congestion Mitigation and Air Quality Improvement Program AMENDMENT:Remove Project AMENDMENT:Add Funding Source,AMENDMENT:Change Additional Information 606461 Cape Cod Orleans ORLEANS- INTERSECTION IMPROVEMENTS AT 2 LOCATIONS: CRANBERRY HIGHWAY (ROUTE 6A) AND MAIN STREET; CHATHAM ROAD (ROUTE 28) AND MAIN STREET. 5 CMAQ 201501 Cape Cod Multiple CCNS- NEW TRANSIT SERVICE DEMONSTRATION OUTER CAPE BIKE SHUTTLE 5 CMAQ $ 87,610 $ 87,610 $ 29,753 Transfer to FTA for CCNS, $87,610 CMAQ with $29,753 TDC match for a total project cost of $87,610. (100% federal funds) Year 3 of 3, 100% design 606394 Cape Cod Barnstable BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY 5 CMAQ $ 900,000 $ 900,000 $ 29,753 CONSTRUCTION Total Cost $5,509,246 [$3,830,482 + $900,000 CMAQ + $600,000 Statewide HSIP + $178,764 TAP]. 75% design submitted CMAQ Subtotal ► $ 987,610 $ 987,610 $ 59,506 ◄ 80% Federal + 20% Non-Federal MOVED TO 2016 - See 2019-2019 TIP for up to date information ►TAP - Transportation Alternatives Program AMENDMENT:Remove Project 606461 Cape Cod Orleans ORLEANS- INTERSECTION IMPROVEMENTS AT 2 LOCATIONS: CRANBERRY HIGHWAY (ROUTE 6A) AND MAIN STREET; CHATHAM ROAD (ROUTE 28) AND MAIN STREET. 5 TAP AMENDMENT:Add Funding Source,AMENDMENT:Change Additional Information 606394 Cape Cod Barnstable BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY 5 TAP ►Non-CMAQ/HSIP/TAP (Other) 606179 Cape Cod Multiple AMENDMENT:Move Project (FROM 2017),AMENDMENT:Decrease Cost,AMENDMENT:Change Funding Source,AMENDMENT:Change Project Description,AMENDMENT:Chan ge Additional Information AMENDMENT:Increase Cost,AMENDMENT:Change Funding Source,AMENDMENT:Change Additional Information 606394 Cape Cod Barnstable MOVED TO 2016 - See 2019-2019 TIP for up to date information CONSTRUCTION Total Cost $5,509,246 [$3,830,482 + $900,000 CMAQ + $600,000 Statewide HSIP + $178,764 TAP]. 75% design submitted $ 178,764 $ 143,011 $ 35,753 TAP Subtotal ► $ 178,764 $ 143,011 $ 35,753 ◄ 80% Federal + 20% Non-Federal TOTAL COST $2,283,272 for 2015, preliminary design. DENNIS- HARWICH - RESURFACING & RELATED WORK ON ROUTE 6 5 STP $ 2,283,272 $ 1,826,618 $ 456,654 5 STP $ 3,830,482 $ 3,064,386 $ 766,096 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 6,113,754 $ 4,891,003 $ Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 7,280,128 6,113,754 $ 7,280,128 ◄Total Target $ $ 4,872,476 ◄ Max. Non$ CMAQ/HSIP/TAP BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY CONSTRUCTION Total Cost $5,509,246 [$3,830,482 + $900,000 CMAQ + $600,000 Statewide HSIP + $178,764 TAP]. 75% design submitted 1,222,751 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis Total HSIP Programmed ► Total CMAQ Programmed ► Total TAP Programmed ► Remaining HSIP, CMAQ, and TAP Funds $ $ 509,460 ◄ Min. HSIP $ 987,610 $ 1,719,428 ◄ Min. CMAQ $ 178,764 $ 178,764 ◄ Min. TAP $ 1,241,278 $ $ $ - Target Funds Available (1,241,278) Non-CMAQ/HSIP/TAP (Other) Exceeds Maximum 509,460 HSIP Minimum Not Met 731,818 CMAQ Minimum Not Met - TAP Minimum Met ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects Programmed $ Statewide Bridge Maintenance Program Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal No Projects Programmed $ On System Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal No Projects Programmed $ Off-System Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal No Projects Programmed $ - $ - $ - ►On System ►Off-System ► Statewide Bridge Inspection Program Statewide Bridge Inspection Program Subtotal ► $ ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid AMENDMENT:Remove Cape Cod 607571 Multiple Project,AMENDMENT:Change Additional Information DENNIS- YARMOUTH- CONSTRUCTION OF A MULTI-USE PATH OVER THE BASS RIVER, INCLUDES NEW PEDESTRIAN BRIDGE D-07-007=Y-01-010 5 TI (2005) TI173 $ - $ 2,096,080 - $ 2,096,080 $ - $ - ◄ 80% Federal + 20% Non-Federal MOVED TO 2016 - See 2019-2019 TIP for up to date information Other Federal Aid Subtotal ► $ 2,096,080 $ 2,096,080 $ - $ $ $ $ - ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ - - ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program AMENDMENT:Change Additional Information 606394 Cape Cod Barnstable BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY 5 HSIP CONSTRUCTION Total Cost $5,509,246 [$3,830,482 + $900,000 CMAQ + $600,000 Statewide HSIP + $178,764 TAP]. 75% design submitted $ 600,000 $ 540,000 $ 60,000 Statewide HSIP Program Subtotal ► $ 600,000 $ 540,000 $ 60,000 ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program No Projects Programmed $ Statewide Safe Routes to Schools Program Subtotal ► $ - - $ $ - $ Statewide CMAQ ► $ - - $ $ $ Statewide Transportation Enhancements Subtotal ► $ - $ Statewide ITS Subtotal ► $ - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source $ $ - - $ $ - $ - $ - ◄ 80% Federal + 20% Non-Federal - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide Interstate Maintenance Program Subtotal ► $ - $ - $ - ◄ 90% Federal + 10% Non-Federal $ Statewide NHS Preservation Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide RR Grade Crossings Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide Stormwater Retrofits Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide ADA Implementation Plan Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ - $ - ◄ Funding Split Varies by Funding Source $ $ - ◄100% Non-Federal $ $ - ◄100% Non-Federal ► Statewide CMAQ No Projects Programmed - - ◄ 80% Federal + 20% Non-Federal ►Statewide Transportation Enhancements No Projects Programmed ►Statewide ITS No Projects Programmed ►Statewide Interstate Maintenance Program No Projects Programmed ►Statewide NHS Preservation Program+ No Projects Programmed ►Statewide RR Grade Crossings No Projects Programmed ►Statewide Stormwater Retrofits No Projects Programmed ►Statewide ADA Implementation Plan No Projects Programmed ►Other Statewide Items ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails Other Statewide Items Subtotal ► $ $ $ $ $ $ $ - NFA $ Non-Federal Aid Subtotal► $ - NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects Programmed ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed 2015 Cape Cod TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ 10,035,714 8,657,704 1,378,010 TIP Section 2: ▼ Total of All Projects ▼ $ - $ - $ $ $ 10,035,714 ◄ Total Spending in Region 8,657,704 ◄ Total Federal Spending in Region 1,378,010 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx 2017 Cape Cod Transportation Improvement Program MassDOT Project ID ▼ MPO ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program Amendment/Adjustment Type ▼ 607444 Cape Cod 05/19/2014 Draft Released 06/23/2014 Endorsed MassDOT Funding Total Programmed Federal Non-Federal District ▼ Source ▼ Funds ▼ Funds ▼ Funds ▼ Municipality MassDOT Name ▼ Project Description▼ Falmouth FALMOUTH- INTERSECTION IMPROVEMENTS & RELATED WORK AT NORTH FALMOUTH HIGHWAY (ROUTE 28A),NATHAN ELLIS HIGHWAY (ROUTE 151) AND COUNTY ROAD 5 HSIP Additional Information ▼ CONSTRUCTION Total Cost $2,080,000 (8% inflation applied = $2,240,000) 25% design submission expected Spring 2015. Possible HSIP - RSA to be conducted. $ 2,240,000 $ 2,016,000 $ 224,000 HSIP Subtotal ► $ 2,240,000 $ 2,016,000 $ 224,000 ◄ 90% Federal + 10% Non-Federal $ 5,471,548 $ 4,377,238 $ CMAQ Subtotal ► $ 5,471,548 $ 4,377,238 $ ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 606272 Cape Cod Barnstable BARNSTABLE- INTERSECTION IMPROVEMENTS AT IYANOUGH ROAD (ROUTE 28) AND YARMOUTH ROAD 5 CMAQ Construction Total Cost $5,250,000 (8% inflation = $5,670,000 = $5,471,548 CMAQ + $198,452 TAP). 25% desing submission expected Spring 2014. HSIP - RSA performed; CMAQ Analysis to be performed upon completion of FDR. 1,094,310 ◄ 80% Federal + 20% Non-Federal 1,094,310 ►TAP - Transportation Alternatives Program 606272 Cape Cod Barnstable BARNSTABLE- INTERSECTION IMPROVEMENTS AT IYANOUGH ROAD (ROUTE 28) AND YARMOUTH ROAD 5 TAP $ 198,452 $ 158,762 $ TAP Subtotal ► $ 198,452 $ 158,762 $ Construction Total Cost $5,250,000 (8% inflation = $5,670,000 = $5,471,548 CMAQ + $198,452 TAP). 25% desing submission expected Spring 2014. HSIP - RSA performed; CMAQ Analysis to be performed upon completion of FDR. 39,690 ◄ 80% Federal + 20% Non-Federal 39,690 ►Non-CMAQ/HSIP/TAP (Other) No Projects Programmed $ Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis Total Federal Aid Target Funds Programmed ► Total Non-CMAQ/HSIP/TAP (Other) Programmed ► Total HSIP Programmed ► Total CMAQ Programmed ► Total TAP Programmed ► HSIP, CMAQ, TAP Overprogrammed $ 7,910,000 $ $ 2,240,000 $ 5,471,548 $ 198,452 $ (5,820,177) $ 8,004,511 $ 5,914,688 $ 458,514 $ 1,432,857 $ 198,452 ◄Total Target ◄ Max. Non◄ Min. HSIP ◄ Min. CMAQ ◄ Min. TAP $ $ $ $ $ 94,511 94,511 (1,781,486) (4,038,691) - Target Funds Available Non-CMAQ/HSIP/TAP (Other) Available HSIP Minimum Met CMAQ Minimum Met TAP Minimum Met ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects Programmed $ Statewide Bridge Maintenance Program Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal No Projects Programmed $ On System Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal No Projects Programmed $ Off-System Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal No Projects Programmed $ Statewide Bridge Inspection Program Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal Other Federal Aid Subtotal ► $ - $ $ - $ $ - ◄ Funding Split Varies by Funding Source $ $ - $ $ - $ $ - $ $ - $ $ - $ $ - ►On System ►Off-System ► Statewide Bridge Inspection Program ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ - - $ Statewide HSIP Program Subtotal ► $ - $ Statewide Safe Routes to Schools Program Subtotal ► $ - - ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program No Projects Programmed - - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program No Projects Programmed - - - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source ► Statewide CMAQ 607398 Cape Cod Multiple YARMOUTH- BARNSTABLE- CAPE COD RAIL TRAIL EXTENSION, FROM STATION AVENUE (YARMOUTH) TO ROUTE 132 (BARNSTABLE) 5 CMAQ $ 8,100,000 $ 6,480,000 $ Statewide CMAQ ► $ 8,100,000 $ 6,480,000 $ CONSTRUCTION Statewide CMAQ funding for $8,100,000. Project 1,620,000 limits to be adjusted based on available funding. Land acquisition, survey, and design in process. 1,620,000 ◄ 80% Federal + 20% Non-Federal ►Statewide Transportation Enhancements No Projects Programmed $ Statewide Transportation Enhancements Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide ITS Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide Interstate Maintenance Program Subtotal ► $ - $ - $ - ◄ 90% Federal + 10% Non-Federal ►Statewide ITS No Projects Programmed ►Statewide Interstate Maintenance Program No Projects Programmed ►Statewide NHS Preservation Program+ AMENDMENT:Remove Cape Cod 606179 Project Multiple DENNIS- HARWICH- BREWSTER- ORLEANS- RESURFACING & RELATED WORK ON ROUTE 6 5 NHPP $ 8,493,876 6,795,101 1,698,775 TOTAL COST $8,357,798 for 2017 (31 total lane miles, 2.5 lanes/shoulder from milemarker 78.5 to 90.9), preliminary design. Statewide NHS Preservation Program Subtotal ► $ 8,493,876 $ 6,795,101 $ 1,698,775 ◄ 80% Federal + 20% Non-Federal ►Statewide RR Grade Crossings No Projects Programmed $ Statewide RR Grade Crossings Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide Stormwater Retrofits Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide ADA Implementation Plan Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ - $ - ◄ Funding Split Varies by Funding Source $ $ - ◄100% Non-Federal - ◄100% Non-Federal ►Statewide Stormwater Retrofits No Projects Programmed ►Statewide ADA Implementation Plan No Projects Programmed ►Other Statewide Items ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails Other Statewide Items Subtotal ► $ $ $ $ $ $ $ - NFA $ Non-Federal Aid Subtotal► $ - NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects Programmed ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed 2017 Cape Cod TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ 24,503,876 19,827,101 4,676,775 $ $ TIP Section Total of All 2: ▼ Projects ▼ $ - $ - $ $ $ 24,503,876 ◄ Total Spending in Region 19,827,101 ◄ Total Federal Spending in Region 4,676,775 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx 2015 Franklin Transportation Improvement Program 2/3/2015 Draft Amendment 1 Released 3/12/2015 Amendment 1 Endorsed 5/12/2014 Draft Released 6/18/2014 Endorsed MassDOT MassDOT Amendment/Adjustment Type ▼ Project ID ▼ Project Description▼ Funding Source ▼ Total Programmed Federal Funds ▼ Funds ▼ Non-Federal Funds ▼ HSIP $ 282,194 $ 253,975 $ HSIP Subtotal ► $ 282,194 $ 253,975 $ MassDOT District ▼ Additional Information ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 607222 GREENFIELD- INTERSECTION IMPROVEMENTS AT ROUTE 5/10 & CHEAPSIDE STREET 2 This project will be funded with a combination of STP, CMAQ, HSIP, and Statewide HSIP funds. Total project cost = $599,331. Design Status - 75%. TEC = 10.3. Road Safety Audit completed Nov. 2011. 28,219 ◄ 90% Federal + 10% Non-Federal 28,219 ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 607239 MONTAGUE- CANALSIDE BIKE PATH & PEDESTRIAN CROSSING IMPROVEMENTS, MONTAGUE CITY ROAD AT SOLAR AVENUE & DEPOT STREET (850 FEET) 2 CMAQ $ 590,000 $ 472,000 $ 118,000 Design Public Hearing held 2/28/2014. Design Status - 75%. TEC = 9.6 607222 GREENFIELD- INTERSECTION IMPROVEMENTS AT ROUTE 5/10 & CHEAPSIDE STREET 2 CMAQ $ 281,136 $ 224,909 $ 56,227 This project will be funded with a combination of STP, CMAQ, HSIP, and Statewide HSIP funds. Total project cost = $599,331. Design Status - 75%. TEC = 10.3. CMAQ Subtotal ► $ 871,136 $ 696,909 $ ►TAP - Transportation Alternatives Program No Projects Programmed $ TAP Subtotal ► $ - $ $ - 174,227 ◄ 80% Federal + 20% Non-Federal $ $ - ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 601657 MONTAGUE- RECONSTRUCTION ON GREENFIELD ROAD, FROM 195' SOUTH OF SHERMAN DRIVE TO HATCHERY RD (2.0 MILES) 2 STP $ 2,780,175 $ 2,224,140 $ 556,035 Project will be funded AC over three years. Project advertised for construction 4/26/2014. AC year 2/3. Total project cost is $5,904,070. $574,180 was programmed in 2014. 607222 GREENFIELD- INTERSECTION IMPROVEMENTS AT ROUTE 5/10 & CHEAPSIDE STREET 2 STP $ $ 14,197 $ 3,549 This project will be funded with a combination of STP, CMAQ, HSIP, and Statewide HSIP funds. Total project cost = $599,331. Design Status - 75%. TEC = 10.3. $ 2,238,337 $ 17,746 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 2,797,921 559,584 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis Total Federal Aid Target Funds Programmed ► $ 3,951,251 Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 2,797,921 Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 282,194 871,136 - $ 4,032,520 ◄Total Target $ 2,797,921 ◄ Max. NonCMAQ/HSIP/TAP $ 282,194 ◄ Min. HSIP $ 952,405 ◄ Min. CMAQ $ - ◄ Min. TAP $ $ 81,269 Target Funds Available - Non-CMAQ/HSIP/TAP (Other) Available $ $ $ - HSIP Minimum Met 81,269 CMAQ Minimum Not Met - TAP Minimum Met ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects Programmed $ Statewide Bridge Maintenance Program Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal ►On System 606551 COLRAIN- BRIDGE REPLACEMENT, C-18-028, ST 112 (JACKSONVILLE ROAD) OVER EAST BRANCH OF NORTH RIVER Franklin County Transportation Planning Organization 2015‐2018 TIP Amendment 1 FINAL 3/12/2015 1 NHPP Design Status - 25%. $ 10,604,205 $ 8,483,364 $ 2,120,841 On System Subtotal ► $ 10,604,205 $ 8,483,364 $ 2,120,841 ◄ 80% Federal + 20% Non-Federal Page 1 of 3 2015 Franklin Transportation Improvement Program 5/12/2014 Draft Released 6/18/2014 Endorsed MassDOT MassDOT Amendment/Adjustment Type ▼ Project ID ▼ Project Description▼ MassDOT District ▼ Funding Source ▼ Total Programmed Federal Funds ▼ Funds ▼ 2/3/2015 Draft Amendment 1 Released 3/12/2015 Amendment 1 Endorsed Non-Federal Funds ▼ Additional Information ▼ ►Off-System ADJUSTMENT:Decrease Cost 607117 HAWLEY - BRIDGE REPLACEMENT, H-13-003, SAVOY ROAD OVER THE CHICKLEY RIVER STP-BR$ 1,344,114 OFF Off-System Subtotal ► $ 1,344,114 1 Design Status - 75%. Cost adjusted from $2,692,422 to $1,344,114 $ 1,075,291 $ 268,823 $ 1,075,291 $ 268,823 ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects Programmed $ Statewide Bridge Inspection Program Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal $ Other Federal Aid Subtotal ► $ - $ $ - $ $ - ◄ Funding Split Varies by Funding Source $ Statewide Infrastructure Program Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed ► Statewide HSIP Program 607222 GREENFIELD- INTERSECTION IMPROVEMENTS AT ROUTE 5/10 & CHEAPSIDE STREET ► Statewide Safe Routes to Schools Program No Projects Programmed 2 HSIP $ 18,255 $ 16,430 $ Statewide HSIP Program Subtotal ► $ 18,255 $ 16,430 $ This project will be funded with a combination of STP, CMAQ, HSIP, and Statewide HSIP funds. Total project cost = $599,331. Design Status - 75%. TEC = 10.3. Road Safety Audit completed Nov. 2011. 1,826 ◄ 90% Federal + 10% Non-Federal 1,826 $ Statewide Safe Routes to Schools Program Subtotal ► $ - $ $ - $ $ - ◄ Funding Split Varies by Funding Source $ Statewide CMAQ ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal $ Statewide Transportation Enhancements Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal $ Statewide ITS Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal $ Statewide Interstate Maintenance Program Subtotal ► $ - $ $ - $ $ - ◄ 90% Federal + 10% Non-Federal $ Statewide NHS Preservation Program Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal ► Statewide CMAQ No Projects Programmed ►Statewide Transportation Enhancements No Projects Programmed ►Statewide ITS No Projects Programmed ►Statewide Interstate Maintenance Program No Projects Programmed ►Statewide NHS Preservation Program+ No Projects Programmed Franklin County Transportation Planning Organization 2015‐2018 TIP Amendment 1 FINAL 3/12/2015 Page 2 of 3 2015 Franklin Transportation Improvement Program MassDOT MassDOT Amendment/Adjustment Type ▼ Project ID ▼ Project Description▼ ►Statewide RR Grade Crossings No Projects Programmed 5/12/2014 Draft Released 6/18/2014 Endorsed MassDOT District ▼ Funding Source ▼ Total Programmed Federal Funds ▼ Funds ▼ 2/3/2015 Draft Amendment 1 Released 3/12/2015 Amendment 1 Endorsed Non-Federal Funds ▼ Additional Information ▼ $ Statewide RR Grade Crossings Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal $ Statewide Stormwater Retrofits Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal $ Statewide ADA Implementation Plan Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal $ Non-Federal Aid Subtotal► $ - $ $ - ◄100% Non-Federal $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ $ - ◄100% Non-Federal ►Statewide Stormwater Retrofits No Projects Programmed ►Statewide ADA Implementation Plan No Projects Programmed ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects Programmed ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed 2015 Franklin TIP Summary TIP Section 1: ▼ Total ► $ 15,917,825 Federal Funds ► $ 12,764,305 Non-Federal Funds ► $ 3,153,520 TIP Section 2: ▼ Total of All Projects ▼ $ - $ - $ $ $ 15,917,825 ◄ Total Spending in Region 12,764,305 ◄ Total Federal Spending in Region 3,153,520 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx Franklin County Transportation Planning Organization 2015‐2018 TIP Amendment 1 FINAL 3/12/2015 Page 3 of 3 05/20/2014 Draft Released 06/24/2014 Endorsed 2015 Northern Middlesex MPO Transportation Improvement Program Amendment/Adju MassDOT stment Type ▼ Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program No Projects Programmed ►CMAQ - Congestion Mitigation and Air Quality Improvement Program BILLERICA RECONSTRUCTION AMENDMENT:Cha OF ALLEN ROAD, nge Project 601426 Northern Middlesex Billerica FROM ROUTE 3A TO Description WEBB BROOK ROAD (5,400 FEET) 4 $ - $ - $ - HSIP Subtotal ► $ - $ - $ - CMAQ ◄ 90% Federal + 10% Non- AC Year 1 of 2. Total project cost at 100% design $6,600,000 (Funding Sources - STP, CMAQ, TAP) TEC = 5.52 $ 1,789,585 $ 1,431,668 $ 357,917 CMAQ Subtotal ► $ 1,789,585 $ 1,431,668 $ 357,917 ◄ 80% Federal + 20% Non- ►TAP - Transportation Alternatives Program AMENDMENT:Cha nge Project 601426 Description Northern Middlesex Billerica BILLERICA RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) 4 TAP AC Year 1 of 2. Total project cost at 100% design $6,600,000 (Funding Sources - STP, CMAQ, TAP) TEC = 5.52 $ 245,303 $ 196,242 $ 49,061 TAP Subtotal ► $ 245,303 $ 196,242 $ 49,061 ◄ 80% Federal + 20% Non- ►Non-CMAQ/HSIP/TAP (Other) AMENDMENT:Cha nge Project 601426 Description 606238 Northern Middlesex Billerica Northern Middlesex Tewksbury BILLERICA RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) 1,677,251 $ 1,341,801 $ 335,450 AC Year 1 of 2. Total project cost at 100% design $6,600,000 (Funding Sources - STP, CMAQ, TAP) TEC = 5.52 2,061,000 $ 1,648,800 $ 412,200 Total Estimated Cost at 75% Design is $2,061,000. TEC = 4.77. 3,738,251 $ 2,990,601 $ 747,650 ◄ 80% Federal + 20% Non- Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 5,773,139 $ 3,738,251 $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ - $ 1,789,585 $ 245,303 $ 6,207,540 ◄Total Target $ 4,061,733 ◄ Max. Non$ CMAQ/HSIP/TA P 434,401 ◄ Min. HSIP $ 1,466,103 ◄ Min. CMAQ $ 245,303 ◄ Min. TAP $ 4 STP $ TEWKSBURY RESURFACING & 4 STP $ RELATED WORK ON ROUTE 38 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ ►Section 1A / Fiscal Constraint Analysis 434,401 Target Funds 323,482 Non-CMAQ/HSIP/ 434,401 HSIP Minimum (323,482) CMAQ Minimum - TAP Minimum ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program $ No Projects $ Programmed Statewide Bridge Maintenance Program Subtotal ► $ - $ - $ - - $ - $ - - $ - $ - ◄ 80% Federal + 20% NonFederal ►On System 604537 Northern Middlesex Lowell LOWELL-BRIDGE REPLACEMENT, L-15045, MARKET STREET OVER THE WESTERN CANAL (BR-ON) 4 NHPP $ On System Subtotal ► $ 3,792,941 $ 3,792,941 $ 3,034,353 $ 3,034,353 $ 758,588 Total project cost estimate for FY 2015 $3,792,941 758,588 ◄ 80% Federal + 20% NonFederal ►Off-System No Projects Programmed ► Statewide Bridge Inspection Program $ - $ - $ - Off-System Subtotal ► $ - $ - $ - - $ - $ - - $ - $ - - $ - $ - No Projects $ Programmed No Projects $ Programmed Statewide Bridge Inspection Program Subtotal ► $ ◄ 80% Federal + 20% NonFederal ◄ 80% Federal + 20% NonFederal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid Northern Middlesex Lowell Merrimack Riverwalk Other FA $ 4 Phase II - FLAP Project No Projects $ Programmed Other Federal Aid Subtotal ► $ 293,311 $ - $ 293,311 $ 235,000 $ - $ 235,000 $ 58,311 58,311 ◄ Funding Split Varies by Funding ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed No Projects $ - $ - $ $ Programmed Statewide Infrastructure Program Subtotal ► $ - $ $ - $ $ - - - ◄ 80% Federal + 20% Non- ► Statewide HSIP Program No Projects Programmed No Projects $ - $ - $ Programmed $ Statewide HSIP Program Subtotal ► $ - $ $ - $ $ No Projects Programmed No Projects $ - - ◄ 90% Federal + 10% Non- - ► Statewide Safe Routes to Schools Program $ Programmed Statewide Safe Routes to Schools Program Subtotal ► $ - $ - $ $ - - $ - $ $ - - Funding Split Varies by Funding Source Split Varies by Funding Funding Source ◄ Funding Split Varies by Funding ► Statewide CMAQ No Projects Programmed No Projects Programmed $ - $ - $ $ Statewide CMAQ ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non- $ - $ - ◄ 80% Federal + 20% Non- $ - $ - ◄ 80% Federal + 20% Non- $ - $ - ◄ 90% Federal + 10% Non- $ - $ - ◄ 80% Federal + 20% Non- $ - $ - ◄ 80% Federal + 20% Non- $ - $ - ◄ 80% Federal + 20% Non- $ - $ - ◄ 80% Federal + 20% Non- - - ►Statewide Transportation Enhancements No Projects $ No Projects $ Statewide Transportation Enhancements Subtotal ► $ - No Projects No Projects $ $ Statewide ITS Subtotal ► $ - No Projects $ No Projects $ Statewide Interstate Maintenance Program Subtotal ► $ - No Projects $ No Projects $ Statewide NHS Preservation Program Subtotal ► $ - No Projects $ No Projects $ Statewide RR Grade Crossings Subtotal ► $ - No Projects $ No Projects $ Statewide Stormwater Retrofits Subtotal ► $ - No Projects $ No Projects $ Statewide ADA Implementation Plan Subtotal ► $ - ►Statewide ITS ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ ►Statewide RR Grade Crossings ►Statewide Stormwater Retrofits ►Statewide ADA Implementation Plan ►Other Statewide Items ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails Other Statewide Items Subtotal ► $ $ - - - $ - - - $ $ - - - $ - - - $ - NFA $ NFA $ Non-Federal Aid Subtotal► $ No Projects NFA $ No Projects NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ $ - ◄ Funding Split Varies by Funding - $ $ $ - ◄100% Non-Federal - $ $ $ - ◄100% Non-Federal $ - ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects No Projects ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2015 Northern Middlesex MPO TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ TIP Section 2: ▼ 9,859,391 $ 7,887,864 1,971,527 $ Total of All Projects ▼ - $ $ $ 9,859,391 ◄ Total Spending in Region 7,887,864 ◄ Total Federal Spending in 1,971,527 ◄ Total Non-Federal Spending in 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx 05/20/2014 Draft Released 06/24/2014 Endorsed 2016 Northern Middlesex MPO Transportation Improvement Program Amendment/Adjus tment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ MassDOT District ▼ Chelmsford CHELMSFORD-TRAFFIC SIGNAL INSTALLATION AT ROUTE 110 & ROUTE 495 (2 LOCATIONS) Funding Source Total Programmed ▼ Funds ▼ Federal Funds ▼ Non-Federal Funds Additional ▼ Information ▼ HSIP ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 607401 Northern Middlesex 4 $ 675,548 $ 607,993 $ 67,555 Total Project Cost at 2016 YOE $1,219,400 ($1,172,500); Funding : STP, HSIP; TEC = 5.82 HSIP Subtotal ► $ 675,548 $ 607,993 $ 67,555 ◄ 90% Federal + 10% Non-Federal $ 1,703,240 $ 1,362,592 $ 340,648 CMAQ Subtotal ► $ 1,703,240 $ 1,362,592 $ 340,648 $ 418,360 $ 334,688 $ 83,672 TAP Subtotal ► $ 418,360 $ 334,688 $ 83,672 ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 607251 Northern Middlesex Westford WESTFORD-INTERSECTION & SIGNAL IMPROVEMENTS @ ROUTE 110 & TADMUCK ROAD 3 CMAQ Total Project Cost FFY 2016 YOE $2,121,600 (2,040,000) Funding CMAQ, TAP; TEC =6.50 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program 607251 Northern Middlesex Westford WESTFORD-INTERSECTION & SIGNAL IMPROVEMENTS @ ROUTE 110 & TADMUCK ROAD 3 TAP Total Project Cost FFY 2016 YOE $2,121,600 (2,040,000) Funding CMAQ, TAP; TEC =6.50 ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) AMENDMENT:Decr ease Cost,AMENDMENT 601426 :Change Project Description Northern Middlesex Billerica BILLERICA - RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) 4 STP $ 2,887,861 $ 2,310,289 $ 577,572 AC Year 2 of 2. Total project cost at 100% design $6,600,000 (Funding Sources - STP, CMAQ, TAP) TEC = 5.52 607401 Northern Middlesex Chelmsford CHELMSFORD-TRAFFIC SIGNAL INSTALLATION AT ROUTE 110 & ROUTE 495 (2 LOCATIONS) 4 STP $ 543,852 $ 435,082 $ 108,770 Total Project Cost at 2016 YOE $1,219,400 ($1,172,500); Funding : STP, HSIP; TEC = 5.82 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 3,431,713 $ 2,745,370 $ 686,343 ◄ 80% Federal + 20% Non-Federal Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 6,228,861 3,431,713 $ $ 6,825,200 4,794,126 ◄Total Target ◄ Max. NonCMAQ/HSIP/TAP $ $ 596,339 Target Funds Available 596,339 Non-CMAQ/HSIP/TAP (Other) Available Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 675,548 1,703,240 418,360 $ $ $ 390,961 1,221,753 418,360 ◄ Min. HSIP ◄ Min. CMAQ ◄ Min. TAP $ $ $ (284,587) HSIP Minimum Met (481,487) CMAQ Minimum Met - TAP Minimum Met ►Section 1A / Fiscal Constraint Analysis HSIP, CMAQ, TAP Overprogrammed $ (766,074) 2015 Pioneer Valley Transportation Improvement Program Amendment/Adjustment Type▼ MassDOT Project ID ▼ MPO ▼ 05/02/2014 Draft Released 06/23/2015 Endorsed Municipality Name ▼ MassDOT Project Description▼ MassDOT District ▼ Funding Source ▼ Total Programmed Funds ▼ Non-Federal Funds Additional ▼ Information ▼ Federal Funds ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program AMENDMENT:Change Additional Information 604035 Pioneer Valley Hadley HADLEY- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 9 (RUSSELL STREET) & ROUTE 47 (MIDDLE STREET) $ 2 HSIP $ $ HSIP Subtotal ► $ ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 604035 AMENDMENT:Change Additional Information Pioneer Valley Hadley 605222 ADJUSTMENT:Change Additional Information Pioneer Valley Pioneer Valley Springfield Springfield HADLEY- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 9 (RUSSELL STREET) & ROUTE 47 (MIDDLE STREET) SPRINGFIELD- NORTH END & BRIGHTWOOD INFRASTRUCTURE IMPROVEMENTS, FROM OSGOOD STREET TO THE CHICOPEE CITY LINE (NORTHERLY SEGMENT) SPRINGFIELD - UNION STATION REDEVELOPMENT $ 2 $ - $ 1,080,992 $ 120,110 120,110 ◄ 90% Federal + 10% Non-Federal 8.02 TEC 100% $4,038,060 HSIP, CMAQ, STP, Design Public Hearing held on June 9, 2014 1,469,566 $ 367,392 10.50 TEC 75% STP, CMAQ, TAP , Update Cost from $4,233,000 to $6,033,000 1,900,792 CMAQ $ 1,520,634 $ 380,158 $1.7M CMAQ commitment over 3 years toward Phase I of project $65.7 total 315,970 CMAQ CMAQ Subtotal ► $ 1,080,992 $ 1,836,958 $ $ 2 - 1,201,102 $ CMAQ $ 2 8.02 TEC 100% $4,038,060 HSIP, CMAQ, STP, Design Public Hearing held on June 9, 2014 1,201,102 $ 252,776 $ 4,053,720 $ 3,242,976 $ 63,194 810,744 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program ADJUSTMENT:Change Additional Information 605222 Pioneer Valley Springfield SPRINGFIELD- NORTH END & BRIGHTWOOD INFRASTRUCTURE IMPROVEMENTS, FROM OSGOOD STREET TO THE CHICOPEE CITY LINE (NORTHERLY SEGMENT) No Projects Programmed 10.50 TEC 75% STP, CMAQ, TAP , Update Cost from $4,233,000 to $6,033,000 2 TAP $ $ TAP Subtotal ► $ 473,939 $ - $ 473,939 $ 379,151 $ - $ 379,151 $ 94,788 94,788 ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 607207 Pioneer Valley Pelham PELHAMRECONSTRUCTION OF AMHERST ROAD, FROM 800 FEET EAST OF ENFIELD ROAD TO ROUTE 202 (2.5 MILES - PHASE II) 5.55 TEC 100% $4,200,000 STP 2 STP $ 4,200,000 $ 3,360,000 $ 840,000 605222 Pioneer Valley Springfield ADJUSTMENT:Increase Cost,ADJUSTMENT:Change Additional Information 607869 Pioneer Valley Wilbraham AMENDMENT:Remove Project 606417 PVTA01 Pioneer Valley Pioneer Valley Cummington SPRINGFIELD- NORTH END & BRIGHTWOOD INFRASTRUCTURE IMPROVEMENTS, FROM OSGOOD STREET TO THE CHICOPEE CITY LINE (NORTHERLY SEGMENT) WILBRAHAMRECONSTRUCTION OF BOSTON ROAD (ROUTE 20) FROM DUDLEY STREET TO 400FT. EAST OF DUMAINE STREET (0.28MILES) CUMMINGTONRETAINING WALL REPLACEMENT ON ROUTE 9 ADJACENT TO C-21-023 OVER WESTFIELD BROOK AMENDMENT:Add Funding Source Pioneer Valley 2 2 STP $ 3,847,632 $ STP $ $ 1 STP 2 STP 3,078,106 $ - 769,526 $ - 7.27 TEC Score 75% $1,903,482 STP, Project will not be ready for advertisment if FFY2015 project will be in the 2016 of the FFY2016-2019 TIP 4.60 TEC Score PSE $1,500,000 STP, Advertised 11/5/14 - Letting 3/17/15 1,500,000 $ 1,200,000 $ 300,000 887,221 $ 709,777 $ 177,444 Multiple Match provided by MassDOT Rail & Transit (RTACAP) AMENDMENT:Add Project 604035 10.50 TEC 75% STP, CMAQ, TAP , Update Cost from $6,033,000 to $6,222,363 Hadley PVTA - Purchase of 2 Electric Buses HADLEY- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 9 (RUSSELL STREET) & ROUTE 47 (MIDDLE STREET) $ 8.02 TEC 100% $4,038,060 HSIP, CMAQ, STP, Design Public Hearing held on June 9, 2014 2 STP $ 1,000,000 $ 800,000 $ Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 11,434,853 $ 9,147,882 $ Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 17,163,614 $ 11,434,853 $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 1,201,102 $ 4,053,720 $ 473,939 $ 200,000 2,286,971 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis 17,163,614 ◄Total Target 11,434,853 ◄ Max. NonCMAQ/HSIP/TAP 1,201,102 ◄ Min. HSIP 4,053,720 ◄ Min. CMAQ 473,939 ◄ Min. TAP $ $ - Target Funds Available Non-CMAQ/HSIP/TAP (Other) A $ $ $ - HSIP Minimum Met CMAQ Minimum Met TAP Minimum Met Remaining HSIP, CMAQ, and TAP Funds $ ‐ ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects $ Programmed Statewide Bridge Maintenance Program Subtotal ► $ ►On System ►Off-System ► Statewide Bridge Inspection Program No Projects Programmed No Projects Programmed No Projects Programmed No Projects Programmed No Projects Programmed No Projects Programmed - $ - $ - - $ - $ - $ - $ - $ - $ - $ - $ - On System Subtotal ► $ - $ - $ - $ - $ - $ - $ - $ - $ - Off-System Subtotal ► $ - $ - $ - $ - $ - $ - $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ◄ 80% Federal + 20% Non-Federal ◄ 80% Federal + 20% Non-Federal Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed No Projects Programmed $ $ - $ - $ - Other Federal Aid Subtotal ► $ - $ - $ - ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Regional Major Infrastructure Program AMENDMENT:Decrease Cost,AMENDMENT:Change Additional Information 607731 Pioneer Valley Springfield AMENDMENT:Add Funding Source 607731 Pioneer Valley Springfield SPRINGFIELDVIADUCT DECK REPLACEMENT OF S24-061 ON I-91 (EARLY ACTION) 2 NHPP $ SPRINGFIELDVIADUCT DECK 2 STP $ REPLACEMENT OF S24-061 ON I-91 (EARLY ACTION) Regional Major Infrastructure Program Subtotal ► $ 130,256,250 $ 104,205,000 $ 6,250,000 $ 5,000,000 $ 136,506,250 $ 109,205,000 $ 100% Design, Funds will be disbursed from FFY 2014 through FFY 2017, Decrease from 26,051,250 $149,006,250 to $136,506,250 move difference ($12,500,000) to FFY 2016 100% Design, Funds will be disbursed from FFY 2014 through FFY 2017, Decrease from 1,250,000 $149,006,250 to $136,506,250 move difference ($12,500,000) to FFY 2017 27,301,250 ◄ 80% Federal + 20% Non-Federal ► Statewide Infrastructure Program No Projects Programmed No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program 605833 Pioneer Valley Multiple BERNARDSTON WEST SPRINGFIELD No Projects Programmed 2 $4,064,580 $ HSIP $ Statewide HSIP Program Subtotal ► $ $ 4,064,580 $ Statewide HSIP 75% 3,658,122 $ 406,458 $ 3,658,122 $ 406,458 ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program $ Statewide Safe Routes to Schools Program Subtotal ► $ - $ $ - $ $ - - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source ► Statewide CMAQ 605066 Pioneer Valley Northampton AMENDMENT:Add Funding Source USR01 ►Statewide Transportation Enhancements 603730 Pioneer Valley Pioneer Valley Springfield West Springfield NORTHAMPTONINTERSECTION IMPROVEMENTS AT ROUTE 5 (PLEASANT STREET) AND CONZ STREET - Roundabout SPRINGFIELD - UNION STATION REDEVELOPMENT WEST SPRINGFIELDCONNECTICUT RIVERWALK & BIKEWAY EXTENSION, FROM ELM STREET TO DOTY CIRCLE, INCLUDES PEDESTRIAN BRIDGE W-21-020 $ 2 2,106,590 CMAQ $ 1,685,272 $ 421,318 SW-CMAQ 100% Design Public Hearing Held on April 24, 2013, 11/12/14 Cost has increased at 100% $2,106,590 (old cost $1592,248) $1.7M CMAQ commitment over 3 years toward Phase I of project $65.7 total 2 CMAQ $ 12,000,000 $ 9,600,000 $ Statewide CMAQ ► $ 14,106,590 $ 11,285,272 $ 2,821,318 ◄ 80% Federal + 20% Non-Federal 1,312,588.8 328,147.2 STP-TE $ 1,640,736 2,400,000 5.12 TEC Score 100% ($1,840,736) 2 No Projects $ Statewide Transportation Enhancements Subtotal ► $ 1,640,736 $ 1,312,589 $ 328,147 ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects No Projects $ $ Statewide ITS Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal No Projects $ Statewide Interstate Maintenance Program Subtotal ► $ - $ - $ - ◄ 90% Federal + 10% Non-Federal No Projects $ No Projects $ Statewide NHS Preservation Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal No Projects No Projects - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ ►Statewide RR Grade Crossings ►Statewide Stormwater Retrofits 603730 Pioneer Valley West Springfield $ $ Statewide RR Grade Crossings Subtotal ► $ WEST SPRINGFIELDCONNECTICUT RIVERWALK & BIKEWAY EXTENSION, FROM ELM STREET TO DOTY CIRCLE, INCLUDES PEDESTRIAN BRIDGE W-21-020 STP-TE $ 200,000 160,000.0 40,000.0 5.12 TEC Score 100% ($1,840,736) 2 Statewide Stormwater Retrofits Subtotal ► $ 200,000 $ 160,000 $ 40,000 ◄ 80% Federal + 20% Non-Federal ►Statewide ADA Implementation Plan No Projects $ No Projects $ Statewide ADA Implementation Plan Subtotal ► $ - ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails $ $ - - - $ - - - $ $ - - - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Other Statewide Items $ - Other Statewide Items Subtotal ► $ - NFA $ NFA $ Non-Federal Aid Subtotal► $ No Projects NFA $ No Projects NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ - ◄ Funding Split Varies by Funding Source - $ $ $ - ◄100% Non-Federal - $ $ $ - ◄100% Non-Federal $ - ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects No Projects ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2015Pioneer Valley TIP Summary TIP Section 1: ▼ Total ► $ Total of All Projects ▼ TIP Section 2: ▼ 173,681,770 $ - $ 173,681,770 ◄ Total Spending in Region 2016 Pioneer Valley Transportation Improvement Program Amendment/Adjustment Type▼ MassDOT Project ID ▼ MPO ▼ 05/02/2014 Draft Released 03/12/2015 Endorsed Municipality Name ▼ MassDOT Project Description▼ MassDOT District ▼ Funding Source ▼ Total Programmed Funds ▼ Non-Federal Funds Additional ▼ Information ▼ Federal Funds ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 180525 Pioneer Valley Northampton NORTHAMPTONRECONSTRUCTION OF DAMON ROAD, FROM ROUTE 9 INTERSECTION TO ROUTE 5 INTERSECTION (1.1 MILES) 8.55 TEC Score 25% ( YOE $5,200,000) STP, CMAQ, HSIP, TAP 2 HSIP $ $ HSIP Subtotal ► $ ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 180525 Pioneer Valley Northampton 605385 Pioneer Valley Springfield 604968 Pioneer Valley Westfield Pioneer Valley Springfield NORTHAMPTONRECONSTRUCTION OF DAMON ROAD, FROM ROUTE 9 INTERSECTION TO ROUTE 5 INTERSECTION (1.1 MILES) SPRINGFIELDSIGNAL & INTERSECTION IMPROVEMENTS @ ROOSEVELT AVENUE & ISLAND POND ROAD, ROOSEVELT WESTFIELDAVENUE & ALDEN COLUMBIA GREENWAY RAIL TRAIL CONSTRUCTION, NORTH SECTION FROM COWLES COURT ACCESS RAMPS TO THE WESTFIELD RIVER BRIDGE INCLUDES REHAB OF W-25-036 (WESTFIELD RIVER CROSSING) SPRINGFIELD - UNION STATION REDEVELOPMENT $ 2 - CMAQ 2 CMAQ CMAQ Subtotal ► $ $ 108,099 ◄ 90% Federal + 10% Non-Federal 828,974 $ 207,243 1,289,079 5.47 TEC Score 25% (YOE $1,976,000) STP, CMAQ $ $ - 972,893 $ 108,099 8.55 TEC Score 25% ( YOE $5,200,000) STP, CMAQ, HSIP, TAP $ $ 972,893 $ 1,036,217 CMAQ 2 $ 1,080,992 $ CMAQ $ 2 1,080,992 $ 1,031,263 $ 257,816 300,000 75% 6.58 TEC HPP funds remaining (HPP 1656) $1,857,506 (Federal) (Total Cost $2,696,964) Total funding available $2,575,000, city will scale back project to the funding available. HPP, CMAQ $ 240,000 $ 60,000 $ 600,698 $ 150,175 3,376,169 $ 2,700,935 $ 750,873 $1.7M CMAQ commitment over 3 years toward Phase I of project $65.7 total 675,234 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program 180525 Pioneer Valley Northampton NORTHAMPTONRECONSTRUCTION OF DAMON ROAD, FROM ROUTE 9 INTERSECTION TO ROUTE 5 INTERSECTION (1.1 MILES) $ 2 TAP 8.55 TEC Score 25% ( YOE $5,200,000) STP, CMAQ, HSIP, TAP $ $ TAP Subtotal ► $ ►Non-CMAQ/HSIP/TAP (Other) 809,741 - $ 809,741 $ 647,793 $ - $ 647,793 $ 161,948 161,948 ◄ 80% Federal + 20% Non-Federal 605011 $ Ludlow LUDLOWRECONSTRUCTION OF CENTER STREET (ROUTE 21) - FROM 35' WEST OF BEACHSIDE DRIVE WESTERLY TO GAS LINE BESIDE MTA OVERPASS (3,500 FEET) Pioneer Valley Northampton NORTHAMPTONRECONSTRUCTION OF DAMON ROAD, FROM ROUTE 9 INTERSECTION TO ROUTE 5 INTERSECTION (1.1 MILES) 2 STP Pioneer Valley Westfield WESTFIELDRECONSTRUCTION OF ROUTE 187 (LITTLE RIVER ROAD) AND SHAKER ROAD 2 STP Pioneer Valley 180525 604446 605385 Pioneer Valley Springfield 2 9.65 TEC Score 25% (YOE $4,918,051) STP 4,918,051 STP $ $ $ 3,934,441 $ 983,610 8.55 TEC Score 25% ( YOE $5,200,000) STP, CMAQ, HSIP, TAP 2,273,050 $ 1,818,440 $ 454,610 $ 4,579,649 $ 1,144,912 8.37% TEC 75% (YOE $5,724,561) STP 5,724,561 5.47 TEC Score 25% (YOE $1,976,000) STP, CMAQ $ SPRINGFIELDSIGNAL & INTERSECTION IMPROVEMENTS @ 2 STP ROOSEVELT AVENUE & ISLAND POND ROAD, ROOSEVELT AVENUE & ALDEN Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 686,921 $ 549,537 $ 13,602,583 $ 10,882,067 $ Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 18,869,485 $ 13,602,583 $ 18,871,416 ◄Total Target 13,602,583 ◄ Max. NonCMAQ/HSIP/TAP Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 1,080,992 $ 3,376,169 $ 809,741 $ 137,384 2,720,517 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis 1,080,992 ◄ Min. HSIP 3,378,100 ◄ Min. CMAQ 809,741 ◄ Min. TAP $ $ 1,931 Target Funds Available (0) Non-CMAQ/HSIP/TAP (Other) E $ $ $ - HSIP Minimum Met 1,931 CMAQ Minimum Not Met - TAP Minimum Met Remaining HSIP, CMAQ, and TAP Funds $ 1,931 ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program 607516 Pioneer Valley Multiple ►On System DISTRICT 2 2 NHPP $ SYSTEMATIC BRIDGE No Projects $ Programmed Statewide Bridge Maintenance Program Subtotal ► $ No Projects Programmed No Projects Programmed ►Off-System 604626 Pioneer Valley Multiple BELCHERTOWN WARREN- BRIDGE 2 - $ 1,849,978 $ 1,479,982 $ - $ 1,479,982 $ 369,996 369,996 ◄ 80% Federal + 20% Non-Federal - $ - $ - $ - $ - $ - On System Subtotal ► $ - $ - $ - $2,477,738 $ STP-BR-OFF Off-System Subtotal ► $ No Projects $ Programmed No Projects $ Programmed Statewide Bridge Inspection Program Subtotal ► $ - $ 2,477,738 $ 1,982,190 $ - $ 1,982,190 $ Pres 25% - $ $ ► Statewide Bridge Inspection Program 1,849,978 $ 495,548 ◄ 80% Federal + 20% Non-Federal Pre 25% 495,548 ◄ 80% Federal + 20% Non-Federal - $ - $ - - $ - $ - - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid 604968 Pioneer Valley Westfield WESTFIELDCOLUMBIA GREENWAY RAIL HPP $ 2,275,000 $ 1,857,506 $ 417,494 2 $ Other Federal Aid Subtotal ► $ - $ - $ 2,275,000 $ 1,857,506 $ 84,493,750 $ 67,595,000 $ 75% 6.58 TEC HPP funds remaining (HPP 1656) $1,857,506 (Federal) (Total Cost $2,696,964) Total funding available $2,575,000, 417,494 ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Regional Major Infrastructure Program AMENDMENT:Increase Cost,AMENDMENT:Change Additional Information 607731 Pioneer Valley Springfield SPRINGFIELDVIADUCT DECK 2 NHPP $ REPLACEMENT OF S24-061 ON I-91 (EARLY ACTION) No Projects $ Programmed Regional Major Infrastructure Program Subtotal ► $ 100% Design, Funds will be disbursed from FFY 2014 through FFY 2017 Cost was $71,993,750 - $ 84,493,750 $ - 16,898,750 $ 67,595,000 $ 16,898,750 ◄ 80% Federal + 20% Non-Federal ► Statewide Infrastructure Program $ Statewide Infrastructure Program Subtotal ► $ - $ $ - $ $ ◄ 80% Federal + 20% Non-Federal - ► Statewide HSIP Program No Projects Programmed No Projects Programmed $ - $ - $ $ Statewide HSIP Program Subtotal ► $ - $ $ - $ $ - - - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program 607453 Pioneer Valley Southampton SOUTHAMPTON SOUTHAMPTON SAFE ROUTES TO SCHOOL 2 TAP $ NORRIS ELEMENTARY SCHOOL No Projects $ Programmed Statewide Safe Routes to Schools Program Subtotal ► $ 800,000 $ 640,000 $ 160,000 80% Federal + 20% Non-Federal $ 800,000 $ $ 640,000 $ - Funding Split Varies by Funding Source 160,000 ◄ Funding Split Varies by Funding Source ► Statewide CMAQ 606450 Pioneer Valley Holyoke 603477 Pioneer Valley Southwick 606555 Pioneer Valley Northampton 602911 Pioneer Valley Chicopee HOLYOKE- TRAFFIC SIGNAL UPGRADES SOUTHWICKINTERSECTION NORTHAMPTONROUNDABOUT CHICOPEECONNECTICUT 1,564,867 $ 3,617,872 $ 1,251,894 $ 312,973 5.98 TEC Score Pre 25% ($1,504,680) 2,894,298 $ 723,574 7.75 TEC Score Pre 25% ($2,160,000) CMAQ $2,874,896 $ 2,299,917 $ 574,979 6.28 TEC Score 25% ($2,917,000) CMAQ $ Statewide CMAQ ► $ 3,261,288 $ 11,318,923 $ 2,609,030 $ 9,055,138 $ 2 CMAQ $ 2 CMAQ $ 2 2 4.85 TEC Score Pre 25% ($3,261,288) 652,258 2,263,785 ◄ 80% Federal + 20% Non-Federal ►Statewide Transportation Enhancements No Projects Programmed Statewide Transportation Enhancements Subtotal ► $ - ◄ 80% Federal + 20% Non-Federal - $ - $ - - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects No Projects ►Statewide Interstate Maintenance Program 606577 Pioneer Valley Multiple HATFIELD- WHATELYINTERSTATE MAINTENANCE & RELATED WORK ON I91 $ $ Statewide ITS Subtotal ► $ $ 2 NHPP 11,597,040 10,437,336.0 1,159,704.0 Pre 25% 607182 Pioneer Valley Multiple BERNARDSTONGREENFIELDINTERSTATE MAINTENANCE & RELATED WORK ON ROUTE I-91 FROM MM 48.6 TO MM 50.4 (1.8 MILES) $ 2 2,796,543 2,516,888.7 279,654.3 12,954,225 $ 1,439,358 ◄ 90% Federal + 10% Non-Federal NHPP Statewide Interstate Maintenance Program Subtotal ► $ 14,393,583 $ ►Statewide NHS Preservation Program+ No Projects $ No Projects $ Statewide NHS Preservation Program Subtotal ► $ - No Projects No Projects - $ - $ - ◄ 80% Federal + 20% Non-Federal $ - $ - ◄ 80% Federal + 20% Non-Federal ►Statewide RR Grade Crossings $ $ Statewide RR Grade Crossings Subtotal ► $ ►Statewide Stormwater Retrofits 608136 Pioneer Valley South Hadley SOUTH HADLEYROUTE 116 2 STP-TE $ $ Statewide Stormwater Retrofits Subtotal ► $ ►Statewide ADA Implementation Plan 607036 Pioneer Valley Multiple DISTRICT 2 - ADA RETROFITS AT VARIOUS LOCATIONS STP $ 100,000 80,000.0 100,000 $ 740,000 20,000.0 80,000 $ 592,000.0 20,000 ◄ 80% Federal + 20% Non-Federal 148,000.0 2 $ Statewide ADA Implementation Plan Subtotal ► $ 740,000 $ 592,000 $ 148,000 ◄ 80% Federal + 20% Non-Federal ►Other Statewide Items ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails $ $ - - - $ - - - $ $ - - - $ - Other Statewide Items Subtotal ► $ - NFA $ NFA $ Non-Federal Aid Subtotal► $ No Projects NFA $ No Projects NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ - ◄ Funding Split Varies by Funding Source - $ $ $ - ◄100% Non-Federal - $ $ $ - ◄100% Non-Federal $ - ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects No Projects ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2016 Pioneer Valley TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ Total of All Projects ▼ TIP Section 2: ▼ 137,318,457 $ 111,439,729 25,878,728 $ - $ $ $ 137,318,457 ◄ Total Spending in Region 111,439,729 ◄ Total Federal Spending in Region 25,878,728 ◄ Total Non-Federal Spending in Region