U.S. Department of Transportation Federal Transit Administration Region I 55 Broadway Suite 920 Cambridge, MA 02142-1093 617-494-2055 617-494-2865 (fax) Federal Highway Administration MA Division 55 Broadway 10th Floor Cambridge, MA 02142-1093 617-494-3657 617-494-3355 (fax) Mr. David J. Mohler Executive Director Office of Transportation Planning Massachusetts Department of Transportation 10 Park Plaza, Room 4150 Boston, MA 02116-3969 Re: April 24, 2015 Massachusetts FY15-18 STIP Amendment #5 (Transit Only) Dear Mr. Mohler: The Federal Transit Administration (FTA) has reviewed the transit portions of the Fiscal Years 2015-2018 Statewide Transportation Improvement Program (STIP) Amendment #5 sent by the Massachusetts Department of Transportation on April 14, 2015. In accordance with the 1990 Clean Air Act Amendments and §450.324(b), a conformity determination is not needed since the projects in this amendment fall under the air quality conformity exemption for Mass Transit (40 CFR §93.126, Table 2). Furthermore, we make the following determinations: 1. The projects in the STIP are based on a planning process that substantially meets the requirements of Title 23 U.S.C., the Federal Transit Act, and 23 CFR 450 A-C. 2. The component TIPs are based on a continuing, comprehensive transportation planning process carried on cooperatively with the State, the MPOs, and the transit operators in accordance with the provisions of 23 U.S.C. 134 and §5303 of the Federal Transit Act. 3. The changes called for in this STIP amendment maintain financial constraint as required under 23 CFR 450.216 (m). On behalf of the Federal Highway Administration, the FTA has determined that the STIP, as revised, substantially meets all requirements and is hereby approved. If you have any questions please send them to Nicolas Garcia (617-494-3940 | nicolas.garcia@dot.gov). Sincerely, ___________________________ Mary Beth Mello Regional Administrator Federal Transit Administration cc: Donald O. Cooke, Environmental Scientist, EPA Michael Chong, FHWA Charlie Baker, Governor Karyn Polito, Lt. Governor Stephanie Pollack, MassDOT Secretary & CEO April 14, 2015 Pamela Stephenson Division Administrator Federal Highway Administration 55 Broadway – 10th floor Cambridge, Massachusetts 02142 Dear Ms. Stephenson: On behalf of Secretary Stephanie Pollack, I am writing to request your approval of the attached regional and statewide highway actions pertaining to the Federal Fiscal Years 20152018 State Transportation Improvement Program, as endorsed by the Berkshire Metropolitan Planning Organization, Central Massachusetts Metropolitan Planning Organization, Franklin County Transportation Planning Organization, Old Colony Metropolitan Planning Organization, Nantucket Planning and Economic Development Commission, and Pioneer Valley Metropolitan Planning Organization: .19-.20 10.01-10.02 11.01-11.05 12.01-12.03 13.01 14.01-14.03 15.01-15.09 Adjustments Franklin Pioneer Valley Old Colony Nantucket Berkshire Statewide March 11, 2015 March 12, 2015 March 12, 2015 March 17, 2015 March 23, 2015 March 31, 2015 April 2, 2015 These actions do not require an air quality conformity determination. If you have any questions, please call me at (857)368-8865. Sincerely, David J. Mohler Executive Director Office of Transportation Planning Leading the Nation in Transportation Excellence Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 www.mass.gov/massdot cc: Clinton Bench, Deputy Executive Director Steve Woelfel, Director of Strategic Planning Trey Wadsworth, Manager of MPO Activities Bryan K. Pounds, MPO Activities William Betts, FAPO Federal Transit Administration Federal Highway Administration Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # .19 MPO Project Location ID CENTRAL MA606434 WORCESTER Description WORCESTER - CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENT CURRENT Source Total STP-TE SBYWY REVISED Federal Non Federal Year Source Total $1,652,015 $1,321,612 $330,403 2015 STP-TE $990,000 $792,000 $198,000 2015 SBYWY $996,800 2015 CMAQ SEC 115 Federal $1,652,015 $1,321,612 FINANCIAL CONSTRAINT NonFederal Year Amendment Description Date $330,403 2016 ADJUSTMENT:Move Project 03/11/15 $797,440 $199,360 2015 ADJUSTMENT:Increase Cost 03/31/15 $281,136 $224,909 $56,227 2015 AMENDMENT:Add Funding Source 03/12/15 $450,000 $450,000 $0 2016 AMENDMENT:Increase Cost 03/12/15 Design & Construction / Design Status = Pre 25% / STP-TE+HPP Total Project Cost = $7,277,015 / Moved STP-TE portion of the project from FY 2015 to FY 2016 .20 BERKSHIRE 605930 ADAMS ADAMS - MOUNT GREYLOCK SCENIC BYWAYS IMPROVEMENTS AT BASCOM LODGE AND WAR MEMORIAL TOWER Design Cost = $150,095 & Construction Cost = $846,705; Total Cost = $996,800 10.01 FRANKLIN 607222 GREENFIELD GREENFIELD- INTERSECTION IMPROVEMENTS AT ROUTE 5/10 & CHEAPSIDE STREET This project will be funded with a combination of STP, CMAQ, HSIP, and Statewide HSIP funds. Total project cost = $599,331. Design Status - 75%. TEC = 10.3. 10.02 FRANKLIN 607253 ERVING ERVING- STREETSCAPE & PEDESTRIAN IMPROVEMENTS ON ROUTE 63, FROM RIVER STREET TO 1,200 FT. NORTH OF LILLIAN WAY (1 MILE) SEC 115 $359,000 $359,000 $0 2016 STP $1,800,000 $1,440,000 $360,000 2015 CMAQ $1,592,248 $1,273,798 $318,450 2015 CMAQ 2015 STP-TE 2015 STP 2016 STP-TE 2004 Earmark - 100% Federal. 11.01 PIONEER 606663 MULTIPLE MONSON- PALMER- RESURFACING & RELATED WORK ON ROUTE 32, FROM MM 5.69 TO MM 6.88 AND FROM MM 8.24 TO MM 8.80 AT ROUTE 20 (1.69 MILES) AMENDMENT:Remove Project 03/12/15 3.52 TEC Score PSE $1,800,000 STP 11.02 PIONEER 605066 NORTHAMPTON NORTHAMPTON- INTERSECTION IMPROVEMENTS AT ROUTE 5 (PLEASANT STREET) AND CONZ STREET - Roundabout $2,106,590 $1,685,272 $421,318 2015 AMENDMENT:Increase Cost 03/12/15 $40,000 03/12/15 SW-CMAQ 100% Design Public Hearing Held on April 24, 2013, 11/12/14 Cost has increased at 100% $2,106,590 (old cost $1592,248) 11.03 PIONEER 603730 WEST SPRINGFIELD WEST SPRINGFIELD- CONNECTICUT RIVERWALK & BIKEWAY EXTENSION, FROM ELM STREET TO DOTY CIRCLE, INCLUDES PEDESTRIAN BRIDGE W-21-020 $200,000 $160,000 2015 AMENDMENT:Add Funding Source 5.12 TEC Score 100% ($1,840,736) 11.04 PIONEER 605222 SPRINGFIELD SPRINGFIELD- NORTH END & BRIGHTWOOD INFRASTRUCTURE IMPROVEMENTS, FROM OSGOOD STREET TO THE CHICOPEE CITY LINE (NORTHERLY SEGMENT) STP $2,027,589 $1,622,071 $405,518 $3,658,269 $2,926,615 $731,654 2015 AMENDMENT:Increase Cost 03/12/15 $20,000 03/12/15 10.50 TEC 75% STP, CMAQ, TAP , Update Cost from $4,233,000 to $6,033,000 11.05 PIONEER 608136 SOUTH HADLEY SOUTH HADLEY-ROUTE 116 $100,000 $80,000 2016 AMENDMENT:Add Project Date: 4/3/2015 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO Project Location ID 12.01 OLD COLONY608025 BROCKTON Description CURRENT Source Total Federal REVISED Non Federal BROCKTON- CORRIDOR IMPROVEMENTS ON ROUTE 123 (BELMONT STREET), INCLUDING TRAFFIC SIGNALS UPGRADING AT MANLEY STREET AND THE V.A. HOSPITAL Year Source Total 2015 HSIP $455,954 2015 STP 2015 STP $767,557 2015 CMAQ 2015 STP 2015 CMAQ 2015 STP 2016 STP -TE Federal $410,359 FINANCIAL CONSTRAINT NonFederal $45,595 Year Amendment Description Date 2015 AMENDMENT:Add Project 03/17/15 $569,595 2015 AMENDMENT:Add Project 03/17/15 $614,046 $153,511 2015 AMENDMENT:Add Project 03/17/15 $600,000 $480,000 $120,000 2015 AMENDMENT:Add Funding Source 03/23/15 $660,062 $528,050 $132,012 2015 AMENDMENT:Decrease Cost 03/31/15 $1,500,000 $1,200,000 $300,000 2015 AMENDMENT:Add Funding Source 03/31/15 $3,261,435 $2,609,148 $652,287 2015 AMENDMENT:Increase Cost 04/03/15 $109,060 2016 AMENDMENT:Add Project 04/02/15 HSIP/ STP/ Statewide Infrastructure Program; 100 Percent Design; YOE is $4,071,487.60; Formerly 602606 12.02 OLD COLONY608025 BROCKTON BROCKTON- CORRIDOR IMPROVEMENTS ON ROUTE 123 (BELMONT STREET), INCLUDING TRAFFIC SIGNALS UPGRADING AT MANLEY STREET AND THE V.A. HOSPITAL $2,847,976 $2,278,381 HSIP/ STP/ Statewide Infrastructure Program; 100 Percent Design; YOE is $4,071,487.60; Formerly 602606 12.03 OLD COLONY608025 BROCKTON BROCKTON- CORRIDOR IMPROVEMENTS ON ROUTE 123 (BELMONT STREET), INCLUDING TRAFFIC SIGNALS UPGRADING AT MANLEY STREET AND THE V.A. HOSPITAL HSIP/ STP/ Statewide Infrastructure Program; 100 Percent Design; YOE is $4,071,487.60; Formerly 602606 13.01 NANTUCKET 606433 NANTUCKET NANTUCKET- MULTI-USE PATH CONSTRUCTION, FROM WASHINGTON STREET TO ORANGE STREET Current TFPC iis $1,278,456.75 14.01 BERKSHIRE 601320 LEE LEE- RECONSTRUCTION OF TYRINGHAM ROAD, FROM THE TYRINGHAM T.L. TO ROUTE 102 (2.0 MILES) STP $1,139,304 $911,443 $227,861 Reduce STP to $660,062; $1,139,304 (current) - $660,062 (proposed) = $479,242 STP remaining; AC - Year 3 of 3; Total Project Cost = 5,900,000; MPO evaluation score 3 of 7; Design Status: 100% 14.02 BERKSHIRE 602280 DALTON DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 Add $1,500,000 Statewide CMAQ; AC - Year 1 of 3; STP + CMAQ + Statewide CMAQ; Total Cost = 11,181,141; MPO evaluation score 4 of 7; Design Status: 100% 14.03 BERKSHIRE 602280 DALTON DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 STP $2,782,193 $2,225,754 $556,439 Increase STP by 479,242; AC - Year 1 of 3; STP + CMAQ + Statewide CMAQ; Total Cost = 11,181,141; MPO evaluation score 4 of 7; Design Status: 100% 15.01 CENTRAL MA608060 GARDNER GARDNER - SHREWSBURY - SUTTON STORMWATER IMPROVEMENTS ALONG ROUTE 68/ROUTE 70/ROUTE 146 $545,300 $436,240 replaced 606994 Date: 4/3/2015 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO Project Location ID 15.02 CENTRAL MA608133 GRAFTON Description CURRENT Source Total Federal REVISED Non Federal GRAFTON - MILFORD - STORMWATER IMPROVEMENTS ALONG ROUTE 122/ROUTE 140 Year Federal FINANCIAL CONSTRAINT NonFederal Year Amendment Description Source Total Date 2016 STP-TE $401,300 $321,040 $80,260 2016 AMENDMENT:Add Project 04/02/15 2016 STP-TE $125,000 $100,000 $25,000 2016 AMENDMENT:Add Project 04/02/15 2016 STP-TE $588,760 2016 AMENDMENT:Add Project 04/02/15 2016 STP-TE $479,100 $383,280 $95,820 2016 AMENDMENT:Add Project 04/02/15 2016 STP-TE $480,000 $384,000 $96,000 2016 AMENDMENT:Add Project 04/02/15 replaced 607003 15.03 BOSTON 608059 SALEM SALEM - STORMWATER IMPROVEMENTS ALONG ROUTE 107 (SALEM BYPASS ROAD) replaced 606996 15.04 CENTRAL MA608057 WORCESTER WORCESTER - STORMWATER IMPROVEMENTS ALONG I-290 AND ROUTE 122A $2,943,800 $2,355,040 New Project 15.05 BOSTON 608134 HINGHAM HINGHAM - BROCKTON - STORMWATER IMPROVEMENTS ALONG ROUTE 3A/ROUTE 28 New Project 15.06 SE MASS 608135 NEW BEDFORD NEW BEDFORD - STORMWATER IMPROVEMENTS ALONG ROUTE 6/ROUTE 18 New Project 15.07 STATEWIDE 606996 MULTIPLE DISTRICT 5- STORMWATER RETROFITS AT VARIOUS LOCATIONS STP $800,000 $640,000 $160,000 2016 AMENDMENT:Remove Project 04/02/15 15.08 STATEWIDE 606994 MULTIPLE DISTRICT 3- STORMWATER RETROFITS AT VARIOUS LOCATIONS STP $1,000,000 $800,000 $200,000 2016 AMENDMENT:Remove Project 04/02/15 15.09 STATEWIDE 607003 MULTIPLE DISTRICT 4- STORMWATER RETROFITS AT VARIOUS LOCATIONS STP $1,500,000 $1,200,000 $300,000 2016 AMENDMENT:Remove Project 04/02/15 Date: 4/3/2015 2015 Franklin Transportation Improvement Program 5/12/2014 Draft Released 6/18/2014 Endorsed MassDOT Amendment/Adjustmen MassDOT t Type ▼ Project ID ▼ Project Description▼ 2/3/2015 Draft Amendment 1 Released 3/12/2015 Amendment 1 Endorsed Funding Source ▼ Total Programmed Federal Funds ▼ Funds ▼ Non-Federal Funds ▼ HSIP $ 282,194 $ 253,975 $ HSIP Subtotal ► $ 282,194 $ 253,975 $ MassDOT District ▼ Additional Information ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 607222 GREENFIELD- INTERSECTION IMPROVEMENTS AT ROUTE 5/10 & CHEAPSIDE STREET 2 This project will be funded with a combination of STP, CMAQ, HSIP, and Statewide HSIP funds. Total project cost = $599,331. Design Status - 75%. TEC = 10.3. Road Safety Audit completed Nov. 2011. 28,219 ◄ 90% Federal + 10% Non-Federal 28,219 ►CMAQ - Congestion Mitigation and Air Quality Improvement Program AMENDMENT:Add Funding Source 607239 MONTAGUE- CANALSIDE BIKE PATH & PEDESTRIAN CROSSING IMPROVEMENTS, MONTAGUE CITY ROAD AT SOLAR AVENUE & DEPOT STREET (850 FEET) 2 CMAQ $ 590,000 $ 472,000 $ 118,000 Design Public Hearing held 2/28/2014. Design Status - 75%. TEC = 9.6 607222 GREENFIELD- INTERSECTION IMPROVEMENTS AT ROUTE 5/10 & CHEAPSIDE STREET 2 CMAQ $ 281,136 $ 224,909 $ 56,227 This project will be funded with a combination of STP, CMAQ, HSIP, and Statewide HSIP funds. Total project cost = $599,331. Design Status - 75%. TEC = 10.3. CMAQ Subtotal ► $ 871,136 $ 696,909 $ ►TAP - Transportation Alternatives Program No Projects Programmed $ TAP Subtotal ► $ - $ $ - 174,227 ◄ 80% Federal + 20% Non-Federal $ $ - ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 601657 MONTAGUE- RECONSTRUCTION ON GREENFIELD ROAD, FROM 195' SOUTH OF SHERMAN DRIVE TO HATCHERY RD (2.0 MILES) 2 STP $ 2,780,175 $ 2,224,140 $ 556,035 607222 GREENFIELD- INTERSECTION IMPROVEMENTS AT ROUTE 5/10 & CHEAPSIDE STREET 2 STP $ $ 14,197 $ 3,549 $ 2,238,337 $ 17,746 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 2,797,921 Project will be funded AC over three years. Project advertised for construction 4/26/2014. AC year 2/3. Total project cost is $5,904,070. $574,180 was programmed in 2014. This project will be funded with a combination of STP, CMAQ, HSIP, and Statewide HSIP funds. Total project cost = $599,331. Design Status - 75%. TEC = 10.3. 559,584 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis Total Federal Aid Target Funds Programmed ► $ 3,951,251 Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 2,797,921 Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 282,194 871,136 - $ 4,032,520 ◄Total Target $ 2,797,921 ◄ Max. NonCMAQ/HSIP/TAP $ 282,194 ◄ Min. HSIP $ 952,405 ◄ Min. CMAQ $ - ◄ Min. TAP $ $ 81,269 Target Funds Available - Non-CMAQ/HSIP/TAP (Other) Available $ $ $ - HSIP Minimum Met 81,269 CMAQ Minimum Not Met - TAP Minimum Met ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects Programmed $ Statewide Bridge Maintenance Program Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal ►On System 606551 COLRAIN- BRIDGE REPLACEMENT, C-18-028, ST 112 (JACKSONVILLE ROAD) OVER EAST BRANCH OF NORTH RIVER 1 NHPP Design Status - 25%. $ 10,604,205 $ 8,483,364 $ 2,120,841 On System Subtotal ► $ 10,604,205 $ 8,483,364 $ 2,120,841 ◄ 80% Federal + 20% Non-Federal ►Off-System 607117 HAWLEY - BRIDGE REPLACEMENT, H-13-003, SAVOY ROAD OVER THE CHICKLEY RIVER STP-BR$ 2,692,422 OFF Off-System Subtotal ► $ 2,692,422 1 Design Status - 25% $ 2,153,938 $ 538,484 $ 2,153,938 $ 538,484 ◄ 80% Federal + 20% Non-Federal $ $ ► Statewide Bridge Inspection Program No Projects Programmed Franklin County Transportation Planning Organization 2015‐2018 TIP Amendment 1 FINAL 3/12/2015 $ - - - Page 1 of 3 2015 Franklin Transportation Improvement Program MassDOT Amendment/Adjustmen MassDOT t Type ▼ Project ID ▼ Project Description▼ 5/12/2014 Draft Released 6/18/2014 Endorsed Total MassDOT Funding Programmed Federal District ▼ Source ▼ Funds ▼ Funds ▼ $ Statewide Bridge Inspection Program Subtotal ► $ 2/3/2015 Draft Amendment 1 Released 3/12/2015 Amendment 1 Endorsed Non-Federal Funds ▼ $ - Additional Information ▼ ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed $ Other Federal Aid Subtotal ► $ - $ $ - $ $ - ◄ Funding Split Varies by Funding Source $ Statewide Infrastructure Program Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed ► Statewide HSIP Program 607222 GREENFIELD- INTERSECTION IMPROVEMENTS AT ROUTE 5/10 & CHEAPSIDE STREET ► Statewide Safe Routes to Schools Program No Projects Programmed 2 HSIP $ 18,255 $ 16,430 $ Statewide HSIP Program Subtotal ► $ 18,255 $ 16,430 $ This project will be funded with a combination of STP, CMAQ, HSIP, and Statewide HSIP funds. Total project cost = $599,331. Design Status - 75%. TEC = 10.3. Road Safety Audit completed Nov. 2011. 1,826 ◄ 90% Federal + 10% Non-Federal 1,826 $ Statewide Safe Routes to Schools Program Subtotal ► $ - $ $ - $ $ - ◄ Funding Split Varies by Funding Source $ Statewide CMAQ ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal $ Statewide Transportation Enhancements Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal $ Statewide ITS Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal $ Statewide Interstate Maintenance Program Subtotal ► $ - $ $ - $ $ - ◄ 90% Federal + 10% Non-Federal $ Statewide NHS Preservation Program Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal $ Statewide RR Grade Crossings Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal $ Statewide Stormwater Retrofits Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal $ Statewide ADA Implementation Plan Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal ► Statewide CMAQ No Projects Programmed ►Statewide Transportation Enhancements No Projects Programmed ►Statewide ITS No Projects Programmed ►Statewide Interstate Maintenance Program No Projects Programmed ►Statewide NHS Preservation Program+ No Projects Programmed ►Statewide RR Grade Crossings No Projects Programmed ►Statewide Stormwater Retrofits No Projects Programmed ►Statewide ADA Implementation Plan No Projects Programmed ►Section 2A / Non-Federal Projects Franklin County Transportation Planning Organization 2015‐2018 TIP Amendment 1 FINAL 3/12/2015 Page 2 of 3 2015 Franklin Transportation Improvement Program MassDOT Amendment/Adjustmen MassDOT t Type ▼ Project ID ▼ Project Description▼ 5/12/2014 Draft Released 6/18/2014 Endorsed MassDOT District ▼ Funding Source ▼ Total Programmed Federal Funds ▼ Funds ▼ 2/3/2015 Draft Amendment 1 Released 3/12/2015 Amendment 1 Endorsed Non-Federal Funds ▼ Additional Information ▼ ►Non Federal Aid No Projects Programmed $ Non-Federal Aid Subtotal► $ - $ $ - ◄100% Non-Federal $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ $ - ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed 2015 Franklin TIP Summary TIP Section 1: ▼ TIP Section 2: ▼ Total ► $ 17,266,133 $ Federal Funds ► $ 13,842,951 Non-Federal Funds ► $ 3,423,182 $ - Total of All Projects ▼ $ $ $ 17,266,133 ◄ Total Spending in Region 13,842,951 ◄ Total Federal Spending in Region 3,423,182 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx Franklin County Transportation Planning Organization 2015‐2018 TIP Amendment 1 FINAL 3/12/2015 Page 3 of 3 2015 Pioneer Valley Transportation Improvement Program Amendment/Adjustment Type▼ MassDOT Project ID ▼ MPO ▼ 05/02/2014 Draft Released 03/12/2015 Endorsed Municipality Name ▼ MassDOT Project Description▼ MassDOT District ▼ Funding Source ▼ Total Programmed Funds ▼ Non-Federal Funds Additional ▼ Information ▼ Federal Funds ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 604035 Pioneer Valley Hadley HADLEY- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 9 (RUSSELL STREET) & ROUTE 47 (MIDDLE STREET) $ 2 HSIP $ $ HSIP Subtotal ► $ ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 604035 Pioneer Valley Hadley 605222 Pioneer Valley Springfield Pioneer Valley Springfield HADLEY- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 9 (RUSSELL STREET) & ROUTE 47 (MIDDLE STREET) SPRINGFIELD- NORTH END & BRIGHTWOOD INFRASTRUCTURE IMPROVEMENTS, FROM OSGOOD STREET TO THE CHICOPEE CITY LINE (NORTHERLY SEGMENT) SPRINGFIELD - UNION STATION REDEVELOPMENT $ 2 1,201,102 - $ $ CMAQ 2 CMAQ $ CMAQ Subtotal ► $ - $ 1,080,992 $ 120,110 120,110 ◄ 90% Federal + 10% Non-Federal 1,836,958 CMAQ 2 $ 1,201,102 $ 1,080,992 $ 1,469,566 $ 8.02 TEC 25% $3,038,060 HSIP, CMAQ, Design Public Hearing scheduled for June 9, 2014 367,392 8.02 TEC 25% $3,038,060 HSIP, CMAQ, Design Public Hearing scheduled for June 9, 2014 10.50 TEC 75% STP, CMAQ, TAP , Update Cost from $4,233,000 to $6,033,000 1,900,792 $ 1,520,634 $ 380,158 $ 252,776 $ 63,194 4,053,720 $ 3,242,976 $ 315,970 $1.7M CMAQ commitment over 3 years toward Phase I of project $65.7 total 810,744 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program 605222 Pioneer Valley Springfield SPRINGFIELD- NORTH END & BRIGHTWOOD INFRASTRUCTURE IMPROVEMENTS, FROM OSGOOD STREET TO THE CHICOPEE CITY LINE (NORTHERLY SEGMENT) No Projects Programmed 10.50 TEC 75% STP, CMAQ, TAP , Update Cost from $4,233,000 to $6,033,000 2 TAP $ $ TAP Subtotal ► $ 473,939 $ - $ 473,939 $ 379,151 $ - $ 379,151 $ 94,788 94,788 ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 607207 605222 AMENDMENT:Increase Cost Pioneer Valley Pioneer Valley Pelham Springfield PELHAMRECONSTRUCTION OF AMHERST ROAD, FROM 800 FEET EAST OF ENFIELD ROAD TO ROUTE 202 (2.5 MILES - PHASE II) SPRINGFIELD- NORTH END & BRIGHTWOOD INFRASTRUCTURE IMPROVEMENTS, FROM OSGOOD STREET TO THE CHICOPEE CITY LINE (NORTHERLY SEGMENT) $ 2 STP $ $ 2 STP 5.55 TEC 100% $4,200,000 STP 4,200,000 3,360,000 $ 840,000 3,658,269 10.50 TEC 75% STP, CMAQ, TAP , Update Cost from $4,233,000 to $6,033,000 $ 2,926,615 $ 731,654 607869 606417 606663 Pioneer Valley Pioneer Valley Pioneer Valley Wilbraham Cummington Multiple AMENDMENT:Remove Project WILBRAHAMRECONSTRUCTION OF BOSTON ROAD (ROUTE 20) FROM DUDLEY STREET TO 400FT. EAST OF DUMAINE STREET (0 28MILES) CUMMINGTONRETAINING WALL REPLACEMENT ON ROUTE 9 ADJACENT TO C-21-023 OVER WESTFIELD BROOK MONSON- PALMERRESURFACING & RELATED WORK ON ROUTE 32, FROM MM 5.69 TO MM 6.88 AND FROM MM 8.24 TO MM 8.80 AT ROUTE 20 (1.69 MILES) $ 2 STP 1,522,786 $ 380,696 1,500,000 STP 4.60 TEC Score PSE $1,500,000 STP, Advertised 11/5/14 - Letting 3/17/15 $ $ 2 7.27 TEC Score 75% $1,903,482 STP $ $ 1 1,903,482 1,200,000 $ 300,000 3.52 TEC Score PSE $1,800,000 STP 1,800,000 STP $ 1,440,000 $ 360,000 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 13,061,751 $ 10,449,401 $ Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 18,790,512 $ 13,061,751 $ 17,163,614 ◄Total Target 11,434,853 ◄ Max. NonCMAQ/HSIP/TAP Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 1,201,102 $ 4,053,720 $ 473,939 $ 2,612,350 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis $ $ 1,201,102 ◄ Min. HSIP 4,053,720 ◄ Min. CMAQ 473,939 ◄ Min. TAP $ $ $ (1,626,898) Funds Over Programmed (1,626,898) Non-CMAQ/HSIP/TAP (Other) E - HSIP Minimum Met CMAQ Minimum Met TAP Minimum Met Remaining HSIP, CMAQ, and TAP Funds $ ‐ ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program 607515 Pioneer Valley Multiple 607468 Pioneer Valley Multiple ►On System ►Off-System ► Statewide Bridge Inspection Program DISTRICT 2 2 NHPP $ SYSTEMATIC BRIDGE DISTRICT 2 SYSTEMATIC BRIDGE 2 NHPP $ MAINTENANCE AT VARIOUS LOCATIONS Statewide Bridge Maintenance Program Subtotal ► $ No Projects Programmed No Projects Programmed No Projects Programmed No Projects Programmed 1,849,536 $ 1,479,629 $ 369,907 2,771,540 $ 2,217,232 $ 554,308 4,621,076 $ 3,696,861 $ 924,215 ◄ 80% Federal + 20% Non-Federal $ - $ - $ - $ - $ - $ - On System Subtotal ► $ - $ - $ - $ - $ - $ - $ - $ - $ - Off-System Subtotal ► $ - $ - $ - - $ - $ - - $ - $ - - $ - $ - $ - $ - $ - $ - $ - $ - No Projects $ Programmed No Projects $ Programmed Statewide Bridge Inspection Program Subtotal ► $ ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed No Projects Programmed ◄ 80% Federal + 20% Non-Federal ◄ 80% Federal + 20% Non-Federal ◄ 80% Federal + 20% Non-Federal Other Federal Aid Subtotal ► $ - $ - $ - ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Regional Major Infrastructure Program 607731 Pioneer Valley Springfield SPRINGFIELDVIADUCT DECK 2 NHPP $ REPLACEMENT OF S24-061 ON I-91 (EARLY ACTION) No Projects $ Programmed Regional Major Infrastructure Program Subtotal ► $ 100% Design, Funds will be disbursed from FFY 2014 through FFY 2017 149,006,250 $ - 119,205,000 $ $ 149,006,250 $ - 29,801,250 $ 119,205,000 $ 29,801,250 ◄ 80% Federal + 20% Non-Federal ► Statewide Infrastructure Program No Projects Programmed No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program 605833 Pioneer Valley Multiple BERNARDSTON WEST SPRINGFIELD No Projects Programmed 2 $4,064,580 $ HSIP $ Statewide HSIP Program Subtotal ► $ $ 4,064,580 $ Statewide HSIP 75% 3,658,122 $ 406,458 $ 3,658,122 $ 406,458 ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program 607453 Pioneer Valley Southampton SOUTHAMPTON SOUTHAMPTON SAFE ROUTES TO SCHOOL NORRIS ELEMENTARY SCHOOL ($800,000) $0 2 TAP $ $ Statewide Safe Routes to Schools Program Subtotal ► $ - $ $ - $ - $ $ - - 80% Federal + 20% Non-Federal - - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source ► Statewide CMAQ AMENDMENT:Increase Cost 605066 Pioneer Valley Northampton NORTHAMPTONINTERSECTION IMPROVEMENTS AT ROUTE 5 (PLEASANT STREET) AND CONZ STREET - Roundabout $ 2 No Projects Programmed ►Statewide Transportation Enhancements 603730 Pioneer Valley West Springfield WEST SPRINGFIELDCONNECTICUT RIVERWALK & BIKEWAY EXTENSION, FROM ELM STREET TO DOTY CIRCLE, INCLUDES PEDESTRIAN BRIDGE W-21-020 2,106,590 CMAQ $ $ Statewide CMAQ ► $ STP-TE $ $ 2,106,590 $ 1,640,736 SW-CMAQ 100% Design Public Hearing Held on April 24, 2013, 11/12/14 Cost has increased at 100% $2,106,590 (old cost $1592,248) 1,685,272 $ 421,318 $ 1,685,272 $ 421,318 ◄ 80% Federal + 20% Non-Federal 1,312,588.8 328,147.2 5.12 TEC Score 100% ($1,840,736) 2 No Projects $ Statewide Transportation Enhancements Subtotal ► $ 1,640,736 $ 1,312,589 $ 328,147 ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects No Projects $ $ Statewide ITS Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal No Projects $ Statewide Interstate Maintenance Program Subtotal ► $ - $ - $ - ◄ 90% Federal + 10% Non-Federal No Projects - ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ $ - - No Projects $ Statewide NHS Preservation Program Subtotal ► $ - No Projects No Projects - $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ - ◄ 80% Federal + 20% Non-Federal ►Statewide RR Grade Crossings ►Statewide Stormwater Retrofits 607001 AMENDMENT:Add Funding Source 603730 Pioneer Valley Pioneer Valley Multiple West Springfield $ $ Statewide RR Grade Crossings Subtotal ► $ DISTRICT 2 STORMWATER RETROFITS AT VARIOUS LOCATIONS WEST SPRINGFIELDCONNECTICUT RIVERWALK & BIKEWAY EXTENSION, FROM ELM STREET TO DOTY CIRCLE, INCLUDES PEDESTRIAN BRIDGE W-21-020 STP-TE $ 1,500,000 1,200,000.0 300,000.0 STP-TE $ 200,000 160,000.0 40,000.0 1,360,000 $ 340,000 ◄ 80% Federal + 20% Non-Federal 2 5.12 TEC Score 100% ($1,840,736) 2 Statewide Stormwater Retrofits Subtotal ► $ 1,700,000 $ ►Statewide ADA Implementation Plan No Projects $ No Projects $ Statewide ADA Implementation Plan Subtotal ► $ - ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails $ $ - - - $ - - - $ $ - - - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Other Statewide Items $ - Other Statewide Items Subtotal ► $ - NFA $ NFA $ Non-Federal Aid Subtotal► $ No Projects NFA $ No Projects NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ $ - $ - ◄ Funding Split Varies by Funding Source - $ $ $ - ◄100% Non-Federal - $ $ $ - ◄100% Non-Federal ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects No Projects ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2015Pioneer Valley TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ Total of All Projects ▼ TIP Section 2: ▼ 181,929,744 $ 146,070,363 35,859,381 $ - $ $ $ 181,929,744 ◄ Total Spending in Region 146,070,363 ◄ Total Federal Spending in Region 35,859,381 ◄ Total Non-Federal Spending in Region 2016 Pioneer Valley Transportation Improvement Program Amendment/Adjustment Type▼ MassDOT Project ID ▼ MPO ▼ 05/02/2014 Draft Released 03/12/2015 Endorsed Municipality Name ▼ MassDOT Project Description▼ MassDOT District ▼ Funding Source ▼ Total Programmed Funds ▼ Non-Federal Funds Additional ▼ Information ▼ Federal Funds ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 180525 Pioneer Valley Northampton NORTHAMPTONRECONSTRUCTION OF DAMON ROAD, FROM ROUTE 9 INTERSECTION TO ROUTE 5 INTERSECTION (1.1 MILES) 8.55 TEC Score 25% ( YOE $5,200,000) STP, CMAQ, HSIP, TAP 2 HSIP $ $ HSIP Subtotal ► $ ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 180525 Pioneer Valley Northampton 605385 Pioneer Valley Springfield 604968 Pioneer Valley Westfield Pioneer Valley Springfield NORTHAMPTONRECONSTRUCTION OF DAMON ROAD, FROM ROUTE 9 INTERSECTION TO ROUTE 5 INTERSECTION (1.1 MILES) SPRINGFIELDSIGNAL & INTERSECTION IMPROVEMENTS @ ROOSEVELT AVENUE & ISLAND POND ROAD, ROOSEVELT WESTFIELDAVENUE & ALDEN COLUMBIA GREENWAY RAIL TRAIL CONSTRUCTION, NORTH SECTION FROM COWLES COURT ACCESS RAMPS TO THE WESTFIELD RIVER BRIDGE INCLUDES REHAB OF W-25-036 (WESTFIELD RIVER SPRINGFIELD - UNION STATION REDEVELOPMENT $ 2 - CMAQ 2 CMAQ CMAQ Subtotal ► $ $ 108,099 ◄ 90% Federal + 10% Non-Federal 828,974 $ 207,243 1,289,079 5.47 TEC Score 25% (YOE $1,976,000) STP, CMAQ $ $ - 972,893 $ 108,099 8.55 TEC Score 25% ( YOE $5,200,000) STP, CMAQ, HSIP, TAP $ $ 972,893 $ 1,036,217 CMAQ 2 $ 1,080,992 $ CMAQ $ 2 1,080,992 $ 1,031,263 $ 257,816 300,000 75% 6.58 TEC HPP funds remaining (HPP 1656) $1,857,506 (Federal) (Total Cost $2,696,964) Total funding available $2,575,000, city will scale back project to the funding available. HPP, CMAQ $ 240,000 $ 60,000 $ 600,698 $ 150,175 3,376,169 $ 2,700,935 $ 750,873 $1.7M CMAQ commitment over 3 years toward Phase I of project $65.7 total 675,234 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program 180525 Pioneer Valley Northampton NORTHAMPTONRECONSTRUCTION OF DAMON ROAD, FROM ROUTE 9 INTERSECTION TO ROUTE 5 INTERSECTION (1.1 MILES) $ 2 TAP 8.55 TEC Score 25% ( YOE $5,200,000) STP, CMAQ, HSIP, TAP $ $ TAP Subtotal ► $ ►Non-CMAQ/HSIP/TAP (Other) 809,741 - $ 809,741 $ 647,793 $ - $ 647,793 $ 161,948 161,948 ◄ 80% Federal + 20% Non-Federal 605011 $ Ludlow LUDLOWRECONSTRUCTION OF CENTER STREET (ROUTE 21) - FROM 35' WEST OF BEACHSIDE DRIVE WESTERLY TO GAS LINE BESIDE MTA OVERPASS (3,500 FEET) Pioneer Valley Northampton NORTHAMPTONRECONSTRUCTION OF DAMON ROAD, FROM ROUTE 9 INTERSECTION TO ROUTE 5 INTERSECTION (1.1 MILES) 2 STP Pioneer Valley Westfield WESTFIELDRECONSTRUCTION OF ROUTE 187 (LITTLE RIVER ROAD) AND SHAKER ROAD 2 STP Pioneer Valley 180525 604446 605385 Pioneer Valley Springfield 2 9.65 TEC Score 25% (YOE $4,918,051) STP 4,918,051 STP $ $ $ 3,934,441 $ 983,610 8.55 TEC Score 25% ( YOE $5,200,000) STP, CMAQ, HSIP, TAP 2,273,050 $ 1,818,440 $ 454,610 $ 4,579,649 $ 1,144,912 8.37% TEC 75% (YOE $5,724,561) STP 5,724,561 5.47 TEC Score 25% (YOE $1,976,000) STP, CMAQ $ SPRINGFIELDSIGNAL & INTERSECTION IMPROVEMENTS @ 2 STP ROOSEVELT AVENUE & ISLAND POND ROAD, ROOSEVELT AVENUE & ALDEN Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 686,921 $ 549,537 $ 13,602,583 $ 10,882,067 $ Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 18,869,485 $ 13,602,583 $ 18,871,416 ◄Total Target 13,602,583 ◄ Max. NonCMAQ/HSIP/TAP Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 1,080,992 $ 3,376,169 $ 809,741 $ 137,384 2,720,517 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis 1,080,992 ◄ Min. HSIP 3,378,100 ◄ Min. CMAQ 809,741 ◄ Min. TAP $ $ 1,931 Target Funds Available (0) Non-CMAQ/HSIP/TAP (Other) E $ $ $ - HSIP Minimum Met 1,931 CMAQ Minimum Not Met - TAP Minimum Met Remaining HSIP, CMAQ, and TAP Funds $ 1,931 ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program 607516 Pioneer Valley Multiple ►On System DISTRICT 2 2 NHPP $ SYSTEMATIC BRIDGE No Projects $ Programmed Statewide Bridge Maintenance Program Subtotal ► $ No Projects Programmed No Projects Programmed ►Off-System 604626 Pioneer Valley Multiple BELCHERTOWN WARREN- BRIDGE 2 - $ 1,849,978 $ 1,479,982 $ - $ 1,479,982 $ 369,996 369,996 ◄ 80% Federal + 20% Non-Federal - $ - $ - $ - $ - $ - On System Subtotal ► $ - $ - $ - $2,477,738 $ STP-BR-OFF Off-System Subtotal ► $ No Projects $ Programmed No Projects $ Programmed Statewide Bridge Inspection Program Subtotal ► $ - $ 2,477,738 $ 1,982,190 $ - $ 1,982,190 $ Pres 25% - $ $ ► Statewide Bridge Inspection Program 1,849,978 $ 495,548 ◄ 80% Federal + 20% Non-Federal Pre 25% 495,548 ◄ 80% Federal + 20% Non-Federal - $ - $ - - $ - $ - - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid 604968 Pioneer Valley Westfield WESTFIELDCOLUMBIA GREENWAY RAIL HPP $ 2,275,000 $ 1,857,506 $ 417,494 2 $ Other Federal Aid Subtotal ► $ - $ - $ 2,275,000 $ 1,857,506 $ 71,993,750 $ 57,595,000 $ 75% 6.58 TEC HPP funds remaining (HPP 1656) $1,857,506 (Federal) (Total Cost $2,696,964) Total funding available $2,575,000, 417,494 ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Regional Major Infrastructure Program 607731 Pioneer Valley Springfield SPRINGFIELD2 NHPP $ VIADUCT DECK No Projects $ Programmed Regional Major Infrastructure Program Subtotal ► $ - $ 71,993,750 $ - 14,398,750 $ 57,595,000 $ 100% Design, Funds will be disbursed from FFY 2014 through FFY 2017 14,398,750 ◄ 80% Federal + 20% Non-Federal ► Statewide Infrastructure Program $ Statewide Infrastructure Program Subtotal ► $ - $ $ - $ $ ◄ 80% Federal + 20% Non-Federal - ► Statewide HSIP Program No Projects Programmed No Projects Programmed $ - $ - $ $ Statewide HSIP Program Subtotal ► $ - $ $ - $ $ - - - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program 607453 Pioneer Valley Southampton SOUTHAMPTON SOUTHAMPTON SAFE ROUTES TO SCHOOL 2 TAP $ NORRIS ELEMENTARY SCHOOL No Projects $ Programmed Statewide Safe Routes to Schools Program Subtotal ► $ 800,000 $ 640,000 $ 160,000 80% Federal + 20% Non-Federal $ 800,000 $ $ 640,000 $ - Funding Split Varies by Funding Source 160,000 ◄ Funding Split Varies by Funding Source ► Statewide CMAQ 606450 Pioneer Valley Holyoke 603477 Pioneer Valley Southwick 606555 Pioneer Valley Northampton 602911 Pioneer Valley Chicopee HOLYOKE- TRAFFIC SIGNAL UPGRADES SOUTHWICKINTERSECTION NORTHAMPTONROUNDABOUT CHICOPEECONNECTICUT 2 CMAQ $ 2 CMAQ $ 1,564,867 $ 3,617,872 $ 1,251,894 $ 312,973 5.98 TEC Score Pre 25% ($1,504,680) 2,894,298 $ 723,574 2 7.75 TEC Score Pre 25% ($2,160,000) CMAQ $2,874,896 $ 2,299,917 $ 574,979 2 6.28 TEC Score 25% ($2,917,000) CMAQ $ Statewide CMAQ ► $ 3,261,288 $ 11,318,923 $ 2,609,030 $ 9,055,138 $ 4.85 TEC Score Pre 25% ($3,261,288) 652,258 2,263,785 ◄ 80% Federal + 20% Non-Federal ►Statewide Transportation Enhancements No Projects Programmed Statewide Transportation Enhancements Subtotal ► $ - $ - $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects No Projects ►Statewide Interstate Maintenance Program 606577 Pioneer Valley Multiple HATFIELD- WHATELYINTERSTATE MAINTENANCE & RELATED WORK ON I91 $ $ Statewide ITS Subtotal ► $ $ 2 NHPP - 11,597,040 10,437,336.0 1,159,704.0 Pre 25% 607182 Pioneer Valley Multiple BERNARDSTONGREENFIELDINTERSTATE MAINTENANCE & RELATED WORK ON ROUTE I-91 FROM MM 48.6 TO MM 50.4 (1.8 MILES) $ 2 2,796,543 2,516,888.7 279,654.3 12,954,225 $ 1,439,358 ◄ 90% Federal + 10% Non-Federal NHPP Statewide Interstate Maintenance Program Subtotal ► $ 14,393,583 $ ►Statewide NHS Preservation Program+ No Projects $ No Projects $ Statewide NHS Preservation Program Subtotal ► $ - No Projects No Projects - $ - $ - ◄ 80% Federal + 20% Non-Federal $ - $ - ◄ 80% Federal + 20% Non-Federal ►Statewide RR Grade Crossings ►Statewide Stormwater Retrofits 607001 AMENDMENT:Add Project 608136 Pioneer Valley Pioneer Valley Multiple South Hadley $ $ Statewide RR Grade Crossings Subtotal ► $ DISTRICT 2 STORMWATER RETROFITS AT VARIOUS LOCATIONS 2 SOUTH HADLEYROUTE 116 2 STP-TE $ 1,500,000 1,200,000.0 300,000.0 STP-TE $ 100,000 80,000.0 20,000.0 $ Statewide Stormwater Retrofits Subtotal ► $ ►Statewide ADA Implementation Plan 607036 Pioneer Valley Multiple DISTRICT 2 - ADA RETROFITS AT VARIOUS LOCATIONS STP $ 100,000 $ 740,000 80,000 $ 592,000.0 20,000 ◄ 80% Federal + 20% Non-Federal 148,000.0 2 $ Statewide ADA Implementation Plan Subtotal ► $ 740,000 $ 592,000 $ 148,000 ◄ 80% Federal + 20% Non-Federal ►Other Statewide Items ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails $ $ - - - $ - - - $ $ - - - $ - Other Statewide Items Subtotal ► $ - NFA $ NFA $ Non-Federal Aid Subtotal► $ No Projects NFA $ No Projects NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ $ - $ - ◄ Funding Split Varies by Funding Source - $ $ $ - ◄100% Non-Federal - $ $ $ - ◄100% Non-Federal ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects No Projects ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2016 Pioneer Valley TIP Summary TIP Section 1: ▼ TIP Section 2: ▼ Total of All Projects ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ 124,818,457 $ 101,439,729 23,378,728 $ - $ $ $ 124,818,457 ◄ Total Spending in Region 101,439,729 ◄ Total Federal Spending in Region 23,378,728 ◄ Total Non-Federal Spending in Region 2015 Old Colony Transportation Improvement Program MassDOT Project ID ▼ MPO ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program Amendment/Adjustment Type ▼ Municipality Name ▼ AMENDMENT 1: Add Project 608087 Old Colony Brockton AMENDMENT 2: Add Project 608025 Old Colony Brockton 05/20/2014 Draft Released 12/16/2014 TIP Amendment 1 Released 01/29/2015 TIP Amendment 2 Released 06/24/2014 Endorsed 01/29/2015 TIP Amendment 1 Endorsed XX/XX/2015 TIP Amendment 2 Endorsed Funding Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds Additional ▼ Information ▼ 5 HSIP $ 506,616 $ 455,954 $ 50,662 HSIP, YOE IS $506,616 5 HSIP $ 455,954 $ 410,359 $ 45,595 HSIP/ STP/ Statewide Infrastructure Program; 100 Percent Design; YOE is $4,071,487.60; Formerly 602606 HSIP Subtotal ► $ 962,570 $ 866,313 $ 96,257 $ 1,709,829 $ 1,367,863 $ 341,966 CMAQ Subtotal ► $ 1,709,829 $ 1,367,863 $ 341,966 $ 300,009 $ 240,007 $ 60,002 TAP Subtotal ► $ 300,009 $ 240,007 $ 60,002 2,847,976 $ 2,278,381 $ 569,595 HSIP/ STP/ Statewide Infrastructure Program; 100 Percent Design; YOE is $4,071,487.60; Formerly 602606 4,723,031 $ 3,778,425 $ 944,606 CMAQ/ TAP/ STP; YOE is $6,732,869; 100 Percent Design; TEC Score is 7 7,571,007 $ 6,056,806 $ 1,514,201 10,543,415 7,571,007 $ $ 7,239,485 4,723,031 ◄Total Target ◄ Max. NonCMAQ/HSIP/TAP $ $ $ 962,570 $ $ 1,709,829 $ $ 300,009 $ $ (455,954) 506,616 1,709,829 300,009 ◄ Min. HSIP ◄ Min. CMAQ ◄ Min. TAP $ $ $ MassDOT Project Description▼ BROCKTONPEDESTRIAN IMPROVEMENTS AT VARIOUS LOCATIONS BROCKTONCORRIDOR IMPROVEMENTS ON ROUTE 123 (BELMONT STREET), INCLUDING TRAFFIC SIGNALS UPGRADING AT MANLEY STREET AND THE V.A. HOSPITAL MassDOT District ▼ ◄ 90% Federal + 10% Non-Federal ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 604957 Old Colony Pembroke PEMBROKERECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 53) AC PHASE 1 OF 2 Pembroke PEMBROKERECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 53) AC PHASE 1 OF 2 5 CMAQ CMAQ/ TAP/ STP; YOE is $6,732,869; 100 Percent Design; TEC Score is 7 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program 604957 Old Colony ►Non-CMAQ/HSIP/TAP (Other) AMENDMENT 2: Add Project 608025 Old Colony Brockton 604957 Old Colony Pembroke 5 TAP BROCKTONCORRIDOR IMPROVEMENTS ON ROUTE 123 (BELMONT STREET), 5 STP $ INCLUDING TRAFFIC SIGNALS UPGRADING AT MANLEY STREET AND THE V.A. HOSPITAL PEMBROKERECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO 5 STP $ WASHINGTON STREET (ROUTE 53) AC PHASE 1 OF 2 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ CMAQ/ TAP/ STP; YOE is $6,732,869; 100 Percent Design; TEC Score is 7 ◄ 80% Federal + 20% Non-Federal ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ Total HSIP Programmed ► Total CMAQ Programmed ► Total TAP Programmed ► HSIP, CMAQ, TAP Overprogrammed (3,303,930) Funds Over Programmed (3,303,930) Non-CMAQ/HSIP/TAP (Other) E (455,954) HSIP Minimum Met - CMAQ Minimum Met - TAP Minimum Met ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program ►On System No Projects $ Programmed Statewide Bridge Maintenance Program Subtotal ► $ - $ - $ - - $ - $ - No Projects Programmed - $ - $ - $ Page 1 ◄ 80% Federal + 20% Non-Federal ►Off-System No Projects Programmed ► Statewide Bridge Inspection Program On System Subtotal ► $ - $ - $ - $ - $ - $ - Off-System Subtotal ► $ - $ - $ - No Projects $ Programmed Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - - $ - $ - $ - $ - $ - Other Federal Aid Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ◄ 80% Federal + 20% Non-Federal ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program AMENDMENT 2: Add Project 608025 ► Statewide HSIP Program ► Statewide Safe Routes to Schools Program ► Statewide CMAQ Old Colony Brockton BROCKTONCORRIDOR IMPROVEMENTS ON ROUTE 123 (BELMONT STREET), $ INCLUDING TRAFFIC SIGNALS UPGRADING AT MANLEY STREET AND THE V.A. HOSPITAL Statewide Infrastructure Program Subtotal ► $ No Projects Programmed 767,557 $ 614,046 $ 153,511 767,557 $ 614,046 $ 153,511 $ Statewide HSIP Program Subtotal ► $ - $ $ - No Projects $ Programmed Statewide Safe Routes to Schools Program Subtotal ► $ - - $ $ - $ $ - - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal No Projects $ Statewide Transportation Enhancements Subtotal ► $ - $ - $ - No Projects $ Statewide ITS Subtotal ► $ - ◄ 80% Federal + 20% Non-Federal $ - $ - No Projects $ Statewide Interstate Maintenance Program Subtotal ► $ - ◄ 80% Federal + 20% Non-Federal $ - $ - ◄ 90% Federal + 10% Non-Federal No Projects $ Statewide NHS Preservation Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal No Projects $ Statewide RR Grade Crossings Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide Stormwater Retrofits Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal No Projects $ Statewide ADA Implementation Plan Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails $ $ - - - $ - - - $ $ - - - $ - - - Other Statewide Items Subtotal ► $ - $ Statewide CMAQ ► $ - - - ◄ 80% Federal + 20% Non-Federal $ $ No Projects Programmed - HSIP/ STP/ Statewide Infrastructure Program; 100 Percent Design; YOE is $4,071,487.60; Formerly 602606 - - ◄ 90% Federal + 10% Non-Federal - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source - ►Statewide Transportation Enhancements ►Statewide ITS ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ ►Statewide RR Grade Crossings ►Statewide Stormwater Retrofits No Projects ►Statewide ADA Implementation Plan ►Other Statewide Items ►Section 2A / Non-Federal Projects Page 2 $ - $ - ◄ Funding Split Varies by Funding Source ►Non Federal Aid No Projects NFA $ Non-Federal Aid Subtotal► $ - $ $ - No Projects NFA $ Section 2B / Non-Federal Bridge Projects Subtotal ► $ - $ $ ◄100% Non-Federal Total of All Projects ▼ ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2015 Old Colony TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ Page 3 11,310,972 9,145,035 2,165,937 TIP Section 2: ▼ $ - $ - $ $ $ 11,310,972 9,145,035 2,165,937 ◄ Total Spending in Region ◄ Total Federal Spending in Region ◄ Total Non-Federal Spending in Region 2015 NP&EDC Transportation Improvement Program Amendment/Adjustment Type▼ MassDOT Project ID ▼ MPO ▼ 05/08/2014 Draft Released 06/09/2014 Endorsed Municipality Name ▼ MassDOT Project Description▼ MassDOT District ▼ Funding Source ▼ Non-Federal Funds Additional ▼ Information ▼ Total Programmed Funds ▼ Federal Funds ▼ $ - $ - $ - HSIP Subtotal ► $ - $ - $ - ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program No Projects Programmed ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 606433 Nantucket Nantucket ►TAP - Transportation Alternatives Program No Projects Programmed ►Non-CMAQ/HSIP/TAP (Other) 606433 NANTUCKET- MULTIUSE PATH CONSTRUCTION, FROM WASHINGTON STREET TO ORANGE STREET Nantucket Nantucket 5 CMAQ ◄ 90% Federal + 10% Non-Federal $ 82,492 $ 65,994 $ 16,498 CMAQ Subtotal ► $ 82,492 $ 65,994 $ 16,498 ◄ 80% Federal + 20% Non-Federal $ - $ - $ - TAP Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal NANTUCKET- MULTIUSE PATH CONSTRUCTION, 5 STP $ FROM WASHINGTON STREET TO ORANGE STREET Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 242,340 $ 193,872 $ 48,468 242,340 $ 193,872 $ 48,468 ◄ 80% Federal + 20% Non-Federal Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 324,832 $ 242,340 $ 349,273 ◄Total Target 242,340 ◄ Max. NonCMAQ/HSIP/TAP Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ $ 82,492 $ $ ►Section 1A / Fiscal Constraint Analysis 24,442 ◄ Min. HSIP 82,492 ◄ Min. CMAQ - ◄ Min. TAP $ $ 24,441 Target Funds Available - Non-CMAQ/HSIP/TAP (Other) A $ $ $ 24,442 HSIP Minimum Not Met - CMAQ Minimum Met - TAP Minimum Met Remaining HSIP, CMAQ, and TAP Funds $ 24,442 ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects $ Programmed No Projects $ Programmed Statewide Bridge Maintenance Program Subtotal ► $ ►On System ►Off-System ► Statewide Bridge Inspection Program No Projects Programmed No Projects Programmed No Projects Programmed No Projects Programmed No Projects Programmed No Projects Programmed - $ - $ - - $ - $ - - $ - $ - $ - $ - $ - $ - $ - $ - On System Subtotal ► $ - $ - $ - $ - $ - $ - $ - $ - $ - Off-System Subtotal ► $ - $ - $ - $ - $ - $ - $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ◄ 80% Federal + 20% Non-Federal ◄ 80% Federal + 20% Non-Federal Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed No Projects Programmed $ $ - $ - $ - Other Federal Aid Subtotal ► $ - $ - $ - ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed No Projects $ - $ - $ Programmed $ Statewide Infrastructure Program Subtotal ► $ - $ $ - $ $ No Projects Programmed No Projects - - - ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program $ - $ - $ Programmed $ Statewide HSIP Program Subtotal ► $ - $ $ - $ $ No Projects Programmed No Projects $ - $ - $ $ Programmed Statewide Safe Routes to Schools Program Subtotal ► $ - $ $ - $ $ - - - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program - - - Funding Split Varies by Funding Source - - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source ► Statewide CMAQ AMENDMENT:Add Funding Source 606433 Nantucket Nantucket NANTUCKET- MULTIUSE PATH CONSTRUCTION, FROM WASHINGTON STREET TO ORANGE STREET No Projects Programmed 600,000 $ 480,000 $ 120,000 Current TFPC iis $1,278,456.75 $ 600,000 $ $ 480,000 $ 120,000 ◄ 80% Federal + 20% Non-Federal No Projects $ No Projects $ Statewide Transportation Enhancements Subtotal ► $ - $ - No Projects No Projects $ $ Statewide ITS Subtotal ► $ - No Projects $ No Projects $ Statewide Interstate Maintenance Program Subtotal ► $ - No Projects $ No Projects $ Statewide NHS Preservation Program Subtotal ► $ - No Projects No Projects $ $ Statewide RR Grade Crossings Subtotal ► $ $ $ Statewide Stormwater Retrofits Subtotal ► $ 5 CMAQ $ $ Statewide CMAQ ► $ ►Statewide Transportation Enhancements $ - ◄ 80% Federal + 20% Non-Federal $ - $ - ◄ 80% Federal + 20% Non-Federal $ - $ - ◄ 90% Federal + 10% Non-Federal $ - $ - ◄ 80% Federal + 20% Non-Federal - $ - $ - ◄ 80% Federal + 20% Non-Federal - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Statewide ITS ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ ►Statewide RR Grade Crossings ►Statewide Stormwater Retrofits No Projects No Projects ►Statewide ADA Implementation Plan No Projects $ No Projects $ Statewide ADA Implementation Plan Subtotal ► $ - ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails $ $ - - - $ - - - $ $ - - - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Other Statewide Items $ - Other Statewide Items Subtotal ► $ - NFA $ NFA $ Non-Federal Aid Subtotal► $ No Projects NFA $ No Projects NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ $ - $ - ◄ Funding Split Varies by Funding Source - $ $ $ - ◄100% Non-Federal - $ $ $ - ◄100% Non-Federal ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects No Projects ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2015 REGION X TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ Total of All Projects ▼ TIP Section 2: ▼ 924,832 $ 739,866 184,966 $ - $ $ $ 924,832 ◄ Total Spending in Region 739,866 ◄ Total Federal Spending in Region 184,966 ◄ Total Non-Federal Spending in Region 05/20/2014 Draft Released 2015 Berkshire MPO Transportation Improvement Program MassDOT Amendment/Adjustmen Project ID t Type ▼ ▼ MPO ▼ Municipality Name ▼ Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ MassDOT Project Description▼ 06/24/2014 Endorsed 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released 02/03/2015 3rd Amendment Released Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ $ $ CMAQ + HSIP; Total Cost = 1,470,000; MPO evaluation score 6 of 7; Design Status: <25% ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 607900 Berkshire Pittsfield PITTSFIELD- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT CENTER STREET AND WEST HOUSATONIC STREET (ROUTE 20) 1 HSIP $ $ HSIP Subtotal ► $ 395,516 - $ 355,964 - 39,552 $ - 395,516 $ 355,964 $ 39,552 ◄ 90% Federal + 10% Non-Federal ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 607900 Berkshire Pittsfield PITTSFIELD- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT CENTER STREET AND WEST HOUSATONIC STREET (ROUTE 20) 1 CMAQ $ 1,074,484 $ 859,587 $ 214,897 602280 Berkshire Dalton DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 1 CMAQ $ 260,383 $ 208,306 $ AC - Year 1 of 3; STP + CMAQ + Statewide 52,077 CMAQ; Total Cost = 11,181,141; MPO evaluation score 4 of 7; Design Status: 100% CMAQ Subtotal ► $ 1,334,867 $ 1,067,894 $ 266,973 ◄ 80% Federal + 20% Non-Federal CMAQ + HSIP; Total Cost = 1,470,000; MPO evaluation score 6 of 7; Design Status: <25% ►TAP - Transportation Alternatives Program No Projects Programmed $ - $ - $ - TAP Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) AMENDMENT:Decrease 601320 Cost Berkshire AMENDMENT:Increase Cost Berkshire 602280 Lee LEE- RECONSTRUCTION OF TYRINGHAM ROAD, FROM THE TYRINGHAM T.L. TO ROUTE 102 (2.0 MILES) 1 STP $ 660,062 $ 528,050 $ Reduce STP to $660,062; $1,139,304 (current) - $660,062 (proposed) = $479,242 STP 132,012 remaining; AC - Year 3 of 3; Total Project Cost = 5,900,000; MPO evaluation score 3 of 7; Design Status: 100% Dalton DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 1 STP $ 3,261,435 $ 2,609,148 $ 652,287 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 3,921,497 $ 3,137,198 $ 784,299 ◄ 80% Federal + 20% Non-Federal Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 5,651,880 3,921,497 $ $ 5,651,880 ◄Total Target 3,921,497 ◄ Max. NonCMAQ/HSIP/TAP $ $ - Target Funds Available Non-CMAQ/HSIP/TAP (Other) Available Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 395,516 1,334,867 - $ $ $ 395,516 ◄ Min. HSIP 1,334,867 ◄ Min. CMAQ - ◄ Min. TAP $ $ $ - HSIP Minimum Met CMAQ Minimum Met TAP Minimum Met Increase STP by 479,242; AC - Year 1 of 3; STP + CMAQ + Statewide CMAQ; Total Cost = 11,181,141; MPO evaluation score 4 of 7; Design Status: 100% ►Section 1A / Fiscal Constraint Analysis Remaining HSIP, CMAQ, and TAP Funds $ ‐ Page 1 of 4 05/20/2014 Draft Released 2015 Berkshire MPO Transportation Improvement Program MassDOT Amendment/Adjustmen Project ID t Type ▼ ▼ MPO ▼ ►Section 1B / Federal Aid Bridge Projects Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ Municipality Name ▼ MassDOT Project Description▼ Sandisfield SANDISFIELD- SYSTEMATIC BRIDGE MAINTENANCE, S-03-033, ROUTE 8 (S.MAIN ST.) OVER W. BRANCH FARMINGTON RIVER (PHASE II) 06/24/2014 Endorsed 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released 02/03/2015 3rd Amendment Released Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ $ $ ►Statewide Bridge Maintenance Program 607510 Berkshire 1 NHPP $ $ Statewide Bridge Maintenance Program Subtotal ► $ 309,920 - $ 247,936 - $ 309,920 $ 247,936 $ 5,904,802 $ 4,723,842 $ 61,984 61,984 ◄ 80% Federal + 20% Non-Federal ►On System 605299 Berkshire Great Barrington GREAT BARRINGTON- BRIDGE REPLACEMENT, G-11-005, SR 183 (PARK STREET) OVER HOUSATONIC RIVER 1 NHPP $ $ On System Subtotal ► $ - $ - $ 5,904,802 $ 4,723,842 $ 2,589,860 $ 2,071,888 $ 1,180,960 1,180,960 ◄ 80% Federal + 20% Non-Federal ►Off-System 607121 Berkshire Savoy SAVOY- BRIDGE REPLACEMENT, S-06004, RIVER ROAD OVER THE WESTFIELD RIVER 1 STP-BROFF $ $ Off-System Subtotal ► $ 2,589,860 $ $ 2,071,888 $ $ 517,972 517,972 ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid ADJUSTMENT:Increase 605930 Cost Berkshire Adams 608071 Berkshire Adams 1 SBYWY $ 996,800 $ 797,440 $ 199,360 Design Cost = $150,095 & Construction Cost = $846,705; Total Cost = $996,800 1 HPP $ 3,360,000 $ 2,688,000 $ 672,000 Construction; SAFETEA-LU, HPP 2850 - MA Berkshire County Bike Paths, Design & Construction - $5,000,000 (Earmark Total) Other Federal Aid Subtotal ► $ 4,356,800 $ 3,485,440 $ 871,360 ◄ Funding Split Varies by Funding Source ADAMS - MOUNT GREYLOCK SCENIC BYWAYS IMPROVEMENTS AT BASCOM LODGE AND WAR MEMORIAL TOWER ADAMS- ASHUWILLTICOOK RAIL TRAIL EXTENSION Page 2 of 4 05/20/2014 Draft Released 2015 Berkshire MPO Transportation Improvement Program MassDOT Municipality Amendment/Adjustmen Project ID t Type ▼ ▼ MPO ▼ Name ▼ ►Section 1D / Federal Aid Major & State Category Projects Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ MassDOT Project Description▼ 06/24/2014 Endorsed 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released 02/03/2015 3rd Amendment Released Federal Funds ▼ Additional Information ▼ Non-Federal Funds ▼ ► Statewide Infrastructure Program No Projects Programmed $ - $ - $ No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ - $ $ - $ $ - - ◄ 80% Federal + 20% Non-Federal - ► Statewide HSIP Program No Projects Programmed $ - $ - $ No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - $ $ - $ $ - - ◄ 90% Federal + 10% Non-Federal - ► Statewide Safe Routes to Schools Program No Projects Programmed $ - $ - $ No Projects Programmed $ Statewide Safe Routes to Schools Program Subtotal ► $ - $ $ - $ $ - - - Funding Split Varies by Funding Source - - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source ► Statewide CMAQ AMENDMENT:Add Funding Source 602280 Berkshire Dalton DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 No Projects Programmed 1 CMAQ $ $ Statewide CMAQ ► $ Add $1,500,000 Statewide CMAQ; AC - Year 1 of 3; STP + CMAQ + Statewide CMAQ; Total Cost = 11,181,141; MPO evaluation score 4 of 7; Design Status: 100% 1,500,000 $ 1,200,000 $ 300,000 1,500,000 $ $ 1,200,000 300,000 ◄ 80% Federal + 20% Non-Federal $ $ ►Statewide Transportation Enhancements No Projects Programmed $ No Projects Programmed $ Statewide Transportation Enhancements Subtotal ► $ - No Projects Programmed No Projects Programmed $ $ Statewide ITS Subtotal ► $ - No Projects Programmed $ No Projects Programmed $ Statewide Interstate Maintenance Program Subtotal ► $ - $ - $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ - ◄ 80% Federal + 20% Non-Federal $ - ◄ 90% Federal + 10% Non-Federal ►Statewide ITS ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ Berkshire 605887 606544 Berkshire Multiple Multiple NHPP $ 6,641,040 5,312,832 1,328,208 NHPP $ 3,422,162 2,737,730 684,432 Statewide NHS Preservation Program Subtotal ► $ 10,063,202 SHEFFIELD - GREAT BARRINGTON RESURFACING AND RELATED WORK ROUTE 7 LENOX- PITTSFIELD RESURFACING AND RELATED WORK ROUTE 7 1 1 $ 8,050,562 $ 2,012,640 ◄ 80% Federal + 20% Non-Federal Page 3 of 4 2015 Berkshire MPO Transportation Improvement Program MassDOT Amendment/Adjustmen Project ID t Type ▼ ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ 05/20/2014 Draft Released Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ 06/24/2014 Endorsed 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released 02/03/2015 3rd Amendment Released Federal Funds ▼ Additional Information ▼ Non-Federal Funds ▼ ►Statewide RR Grade Crossings No Projects Programmed $ No Projects Programmed $ Statewide RR Grade Crossings Subtotal ► $ - $ - $ - $ - $ - ◄ 80% Federal + 20% Non-Federal No Projects Programmed $ No Projects Programmed $ Statewide Stormwater Retrofits Subtotal ► $ - $ - ◄ 80% Federal + 20% Non-Federal No Projects Programmed $ No Projects Programmed $ Statewide ADA Implementation Plan Subtotal ► $ - $ - ◄ 80% Federal + 20% Non-Federal ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails Other Statewide Items Subtotal ► $ $ - - - $ - - - $ $ $ $ - - $ - ◄ Funding Split Varies by Funding Source NFA $ NFA $ Non-Federal Aid Subtotal► $ - $ $ $ - ◄100% Non-Federal No Projects Programmed NFA $ No Projects Programmed NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ $ $ - ◄100% Non-Federal ►Statewide Stormwater Retrofits ►Statewide ADA Implementation Plan ►Other Statewide Items $ ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects Programmed No Projects Programmed ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2015 Berkshire MPO TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ 30,376,464 24,340,723 6,035,741 TIP Section 2: ▼ Total of All Projects ▼ $ - $ - $ $ $ 30,376,464 ◄ Total Spending in Region 24,340,723 ◄ Total Federal Spending in Region 6,035,741 ◄ Total Non-Federal Spending in Region Page 4 of 4 2016 Statewide Categories Transportation Improvement Program Amendment/ MassDO T Adjustment Type ▼ Project MPO ▼ MassDOT Project Description▼ xx/xx/xxxx Draft Released xx/xx/xxxx Endorsed MassD OT Funding Source Total Programmed District ▼ Funds ▼ Additional Non-Federal Funds ▼ ▼ Federal Funds ▼ ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - ►Statewide Transportation Enhancements No Projects Programmed No Projects Programmed $ $ - ►On System ►Off-System ► Statewide Bridge Inspection Program ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed ►Section 1D / Federal Aid Major & State Category Projects ► Regional Major Infrastructure Program ► Statewide Infrastructure Program ► Statewide HSIP Program ► Statewide Safe Routes to Schools Program ► Statewide CMAQ ►Statewide ITS - - Information No Projects Programmed ►Statewide Interstate Maintenance Program No Projects Programmed $ - $ - $ - ►Statewide NHS Preservation Program+ No Projects Programmed $ Statewide NHS Preservation Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Statewide RR Grade Crossings No Projects Programmed ►Statewide Stormwater Retrofits AMENDME 608060 Central Mass NT:Add Project GARDNER - SHREWSBURY SUTTON - STORMWATER IMPROVEMENTS ALONG GRAFTON - MILFORD AMENDME 608133 Central Mass STORMWATER NT:Add Project IMPROVEMENTS ALONG SALEM - STORMWATER AMENDME 608059 Boston IMPROVEMENTS ALONG NT:Add Project ROUTE 107 (SALEM BYPASS WORCESTER - STORMWATER AMENDME 608057 Central Mass IMPROVEMENTS ALONG I-290 NT:Add Project AND ROUTE 122A HINGHAM - BROCKTON AMENDME 608134 Boston STORMWATER NT:Add Project IMPROVEMENTS ALONG AMENDME 608135 Southeast Mass NEW BEDFORD STORMWATER NT:Add Project IMPROVEMENTS ALONG DISTRICT 5- STORMWATER AMENDME 606996 District 5 RETROFITS AT VARIOUS NT:Remove Project LOCATIONS DISTRICT 3- STORMWATER AMENDME 606994 District 3 RETROFITS AT VARIOUS NT:Remove Project LOCATIONS DISTRICT 4- STORMWATER AMENDME 607003 District 4 RETROFITS AT VARIOUS NT:Remove Project LOCATIONS 3 STP ‐TE $ 545,300 $ 436,240 $ 109,060 replaced 606994 3 STP‐TE $ 401,300 $ 321,040 $ 80,260 replaced 607003 4 STP‐TE $ 125,000 $ 100,000 $ 25,000 replaced 606996 3 STP‐TE $ 2,943,800 $ 2,355,040 $ 588,760 New Project 5 STP‐TE $ 479,100 $ 383,280 $ 95,820 New Project 5 STP‐TE $ 480,000 $ 384,000 $ 96,000 New Project 5 STP remove 3 STP remove 4 STP-TE remove ►Statewide ADA Implementation Plan No Projects Programmed $ - - - ►Other Statewide Items No Projects Programmed NFA $ - $ - No Projects Programmed NFA $ - $ - ►Section 2A / Non-Federal Projects ►Non Federal Aid ►Section 2B / Non-Federal Bridge Projects Charlie Baker, Governor Karyn Polito, Lt. Governor Stephanie Pollack, MassDOT Secretary & CEO April 14, 2015 Mary Beth Mello Regional Administrator Federal Transit Administration 55 Broadway – 9th floor Cambridge, Massachusetts 02142 Dear Ms. Mello: On behalf of Secretary Stephanie Pollack, I am writing to request your approval of the attached transit actions pertaining to the Federal Fiscal Years 2015-2018 State Transportation Improvement Program, as endorsed by the Pioneer Valley Metropolitan Planning Organization. These transit actions, which include project additions and deletions, are highlighted in green and pink, respectively. These actions do not require an air quality conformity determination. If you have any questions, please call me at (857)368-8865. Sincerely, David J. Mohler Executive Director Office of Transportation Planning cc: Clinton Bench, Deputy Executive Director Steve Woelfel, Director of Strategic Planning Trey Wadsworth, Manager of MPO Activities Bryan K. Pounds, MPO Activities Tom Schiavone, Manager of Transit Programs Federal Transit Administration Federal Highway Administration Leading the Nation in Transportation Excellence Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 www.mass.gov/massdot Fiscal Constraint Analysis - 2015 Federal Funding Source Current Year Available Carryover Programmed Funds Unprogrammed Funds Change from prior STIP Action State Funding Current Year Source Available Programmed Funds Unprogrammed Funds 5307 $372,364,357 $199,553,260 $141,161,527 $430,756,090 $5,914,596 RTACAP $18,153,021 $18,153,021 $0 5309 $3,670,154 $100,000,000 $100,000,000 $3,670,154 $0 SCA $23,428,222 $21,686,697 $0 n/a 5310 $908,805 $0 $908,805 $0 $0 TDC n/a $952,552 5311 $2,734,326 $2,761,670 $2,734,326 $2,761,670 $0 MAP $93,491 $93,491 $0 5337 $240,253,324 $121,965,273 $124,213,575 $238,005,022 $0 ITCCAP $0 $0 $0 5339 $14,318,379 $7,703,009 $8,983,071 $13,038,317 $0 Local $362,666,387 $362,666,387 n/a $0 $55,615,132 $55,615,132 $0 $0 $634,249,345 $431,983,212 $378,001,304 $688,231,253 $5,914,596 Total NonFederal Aid $404,341,121 $402,599,596 $0 Discr. Federal Funds Change from prior STIP Action $0 $0 $0 $0 $0 $0 Fiscal Constraint Analysis - 2016 Federal Funding Source Current Year Available Carryover 5307 5309 5310 5311 5337 5339 Programmed Funds Unprogrammed Funds Change from prior STIP Action $430,756,090 $201,548,794 $133,297,659 $499,007,225 $3,670,154 $150,000,000 $150,000,000 $3,670,154 $0 $0 $0 $0 $0 $0 $2,761,670 $2,789,286 $2,498,397 $3,052,559 $0 $238,005,022 $123,184,924 $124,226,215 $236,963,731 $0 $13,038,317 $7,780,038 $8,983,071 $11,835,284 $0 $0 $1,042,292 $1,042,292 $0 $0 $688,231,253 $485,303,042 $419,005,342 $754,528,953 $0 Discr. Federal Funds State Funding Current Year Source Available RTACAP SCA TDC MAP ITCCAP Local Total NonFederal Aid $16,015,665 Programmed Funds Unprogrammed Funds Change from prior STIP Action $16,015,665 $0 $0 $21,569,237 $21,569,237 $0 $0 n/a $467,522 n/a $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Cost Total Cost n/a $0 $37,584,902 $37,584,902 $0 $0 Fiscal Constraint Analysis - 2017 Federal Funding Source Current Year Available Carryover 5307 5309 5310 5311 5337 5339 Programmed Funds Unprogrammed Funds Change from prior STIP Action $499,007,225 $203,564,284 $98,066,616 $604,504,893 $0 $3,670,154 $150,000,000 $150,000,000 $3,670,154 $0 $0 $0 $0 $0 $0 $3,052,559 $2,817,180 $2,523,223 $3,346,516 $0 $236,963,731 $124,416,773 $123,587,796 $237,792,708 $0 $11,835,284 $7,857,836 $6,253,054 $13,440,066 $0 $754,528,953 $488,656,073 $380,430,689 $862,754,337 $0 State Funding Current Year Source Available RTACAP SCA TDC MAP ITCCAP Local Total NonFederal Aid Programmed Funds Unprogrammed Funds $56,550,513 $56,550,513 $0 $21,554,775 $21,554,775 n/a n/a $378,000 n/a $0 $0 $0 $0 $0 $0 $397,270,070 $397,270,070 n/a $475,375,358 $475,375,358 $0 Change from prior STIP Action Fiscal Constraint Analysis - 2018 Federal Funding Source Current Year Available Carryover 5307 5309 5310 5311 5337 5339 Programmed Funds Unprogrammed Funds Change from prior STIP Action $604,504,893 $205,599,926 $95,642,959 $714,461,860 $0 $3,670,154 $150,000,000 $150,000,000 $3,670,154 $0 $0 $0 0 $0 $0 $3,346,516 $2,845,350 $2,548,297 $3,643,569 $0 $237,792,708 $125,660,941 $124,311,768 $239,141,881 $0 $13,440,066 $7,936,418 $6,262,715 $15,113,769 $0 $862,754,337 $492,042,635 $378,765,739 $976,031,233 $0 State Funding Current Year Source Available RTACAP SCA TDC MAP ITCCAP Local Total NonFederal Aid Programmed Funds Unprogrammed Funds Change from prior STIP Action $0 $13,118,605 $13,118,605 $0 $19,206,508 $19,206,508 $0 $0 n/a $0 n/a $0 $0 $0 $0 $0 $0 $0 $0 $0 $386,905,906 $386,905,906 n/a $0 $419,231,019 $419,231,019 $0 $0 Transportation Improvement Program (TIP) Project List (FY2015) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 BUY REPLACEMENT 40‐FT BUS (6) ‐ Match in 111201 FY 16 BUY REPLACEMENT 35‐FT BUS (5) ‐ Match in 111202 FY16 BUY 40‐FT BUS FOR EXPANSION (4) Match 111301 in FY16 113303 Westfield Intermodal Center 113303 Rehab/Renovations: Roof Designs 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority $2,373,838 $0 $0 $0 $0 $0 $0 $2,373,838 $1,958,199 $0 $0 $0 $0 $0 $0 $1,958,199 $1,582,559 $1,700,000 $280,000 $0 $0 $70,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,582,559 $1,700,000 $350,000 $114,999 $230,139 $313,590 $28,750 $57,535 $78,398 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $143,749 $287,674 $391,988 $871,448 $304,000 $657,362 $76,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,528,810 $380,000 $8,000 $2,000 $0 $0 $0 $0 $0 $10,000 113307 Rehab/Renovation: Surveillance Systems 112220 Farebox 111216 Purchase ‐ Replacement: Vans (6) Purchase ‐ Buses for Expanded Service, 40' 111301 (8) 111204 BUY < 30' mini bus, Replacements (4) CONSTRUCT BICYCLE ACCESS, FACIL & 119306 EQUIP ON BUSES REHAB/RENOVATE ‐ Environmental 114402 Compliance 119308 Transit Enhancements: Signs/Lighting Rehab/Renovation: Communications 114220 Systems (ITS) 442301 Planning ADA Operating Projects Preventive Maintenance $76,252 $292,664 $19,063 $73,166 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $95,315 $365,830 $1,402,929 $180,000 $1,183,574 $2,500,000 $350,732 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $45,000 $0 $295,894 $0 $625,000 $0 $0 $0 $0 $1,753,661 $225,000 $1,479,468 $3,125,000 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 116220 Rehab/Renovation: Misc. Communications 114402 Rehab/Renovations: Northampton 111202 BUY REPLACEMENT 35‐FT BUS, (5) 111304 BUY <30‐FT BUS FOR EXPANSION, (4) $710,742 $320,000 $1,614,045 $304,000 $177,686 $80,000 $403,511 $76,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $888,428 $400,000 $2,017,556 $380,000 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 114211 Rehab/Renovation: Support Vehicles (2) 114206 Rehab/Renovation: Shop Equipment 119302 Transit Enhancements: Shelters $100,026 $25,006 $80,000 $20,000 $16,037 $4,010 $18,517,041 $2,199,219 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $965,894 $0 $125,032 $0 $100,000 $0 $20,047 $0 $21,682,154 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 5307 Pioneer Valley Transit Authority 117C00 117A00 Subtotal $0 $0 $0 $0 5309 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $100,862 $100,862 $25,216 $25,216 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $126,078 $126,078 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 $1,654,259 $413,565 $0 $0 $0 $0 $0 $2,067,824 Subtotal $25,644 $804,733 $832,224 $3,316,860 $6,411 $201,183 $0 $621,159 $0 $0 $0 $0 $0 $0 $0 $0 $0 $166,445 $0 $166,445 $0 $0 $0 $0 $0 $0 $0 $0 $32,055 $1,005,916 $832,224 $3,938,019 Subtotal $0 $0 $0 $0 $0 $0 $0 5310 5310 Pioneer Valley Transit Authority Rehab/Renovation: Communications 114220 System (ITS) 5311 5337 5339 5339 Pioneer Valley Transit Authority 5339 Pioneer Valley Transit Authority 5339 Pioneer Valley Transit Authority 5339 Springfield Redevelopment Authority TERMINAL, INTERMODAL (TRANSIT), 113303 Westfield REHAB/RENOVATE ‐ Environmental 114103 Compliance & Misc. 111216 Purchase ‐ Replacement: Vans (18) 113303 TERMINAL, INTERMODAL (TRANSIT) 5320 Other Federal $0 Subtotal Other Non‐Federal Other Non‐Federal Other Non‐Federal Pioneer Valley Transit Authority Pioneer Valley Transit Authority 114303 Construction:Springfield O&M, Year 1 113111 Rehab:Renovations: Roof construction Subtotal Total $0 $0 $0 $0 $0 $0 $0 $2,330,000 $0 $641,471 $0 $2,971,471 $21,934,763 $5,817,065 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $166,445 $965,894 $0 $0 $0 $2,330,000 $0 $641,471 $0 $2,971,471 $0 $28,717,722