Charlie Bal<er, Governor J<aryn Polito, Lt. Governor Stephanie Pollacl<, MassDOT Secretary & CEO massDOT Massachusetts Department of Transportation February 6, 20 15 Pamela Stephenson Division Administrator Federal Highway Administration 55 Broadway- I 01h floor Cambridge, Massachusetts 02142 Dear Ms. Stephenson: On behalf of Secretary Stephanie Pollack, I am writing to request your approval of the attached regional and statewide highway actions pertaining to the Federal Fiscal Years 20 1520 18 State Transportation Improvement Program, as endorsed by the Berkshire Metropolitan Planning Organization, Boston Metropolitan Planning Organization, Northern Middlesex Metropolitan Planning Organization and Old Colony Metropolitan Planning Organization: .08-.13 3.01 4.01 -4.13 5.01 6.0 1 7.01-7.11 Adjustments Berkshire Boston Northern Middlesex Old Colony Statewide Amendments February 3, 20 I 5 February 5, 20 15 January 20, 20 15 January 29, 20 I 5 February 5, 20 I 5 These actions do not require an air quality conformity determination. If y0u have any questions, please call me at (857)368-8865. Sincerely, 0~ Executiv Dir ctor Office of Tr sportation Planning cc: Clinton Bench, Deputy Executive Director Steve Woelfel, Director of Strategic Planning Trey Wadsworth, Manager of MPO Activities Bryan 1<. Pounds, MPO Activities William Betts, FAPO Federal Transit Administration Federal Highway Administration Ten Park Plaza, Suite 4 I 60, Bosto n, MA 02 I I 6 Tel: 85 7-368-4636, TTY: 857-368-0655 Leading the Nation in Transportation Excellence www.mass.govj massdot Charlie Baker, Governor Karyn Polito, Lt. Governor Stephanie Pollack, MassDOT Secretary & CEO February 6, 2015 Pamela Stephenson Division Administrator Federal Highway Administration 55 Broadway – 10th floor Cambridge, Massachusetts 02142 Dear Ms. Stephenson: On behalf of Secretary Stephanie Pollack, I am writing to request your approval of the attached regional and statewide highway actions pertaining to the Federal Fiscal Years 20152018 State Transportation Improvement Program, as endorsed by the Berkshire Metropolitan Planning Organization, Boston Metropolitan Planning Organization, Northern Middlesex Metropolitan Planning Organization and Old Colony Metropolitan Planning Organization: .08 -.13 3.01 4.01 -4.13 5.01 6.01 7.01-7.11 Adjustments Berkshire Boston Northern Middlesex Old Colony Statewide Amendments February 3, 2015 February 5, 2015 January 20, 2015 January 29, 2015 February 5, 2015 These actions do not require an air quality conformity determination. If you have any questions, please call me at (857)368-8865. Sincerely, David J. Mohler Executive Director Office of Transportation Planning cc: Clinton Bench, Deputy Executive Director Steve Woelfel, Director of Strategic Planning Trey Wadsworth, Manager of MPO Activities Bryan K. Pounds, MPO Activities William Betts, FAPO Federal Transit Administration Federal Highway Administration Leading the Nation in Transportation Excellence Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 www.mass.gov/massdot Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # .08 MPO Project Location ID STATEWIDE 607072 CURRENT Description Source Total STATEWIDE- IMPLEMENTATION (PHASE III) OF THE FLASHING YELLOW ARROW AT SIGNALIZED INTERSECTIONS--ONE OF THE FHWA NINE PROVEN COUNTERMEASURES HSIP REVISED Federal Non Federal Year Source $1,500,000 $1,350,000 $150,000 2015 HSIP CMAQ $3,500,000 $2,800,000 $700,000 2015 CMAQ $2,000,000 $1,600,000 $400,000 RRHE $500,000 $400,000 RRPD $500,000 STP-TE $2,500,000 Total Federal FINANCIAL CONSTRAINT NonFederal Year Amendment Description Date $2,000,000 $1,800,000 $200,000 2015 ADJUSTMENT:Increase Cost 02/05/15 CMAQ $1,246,623 $249,325 2015 ADJUSTMENT:Decrease Cost 02/05/15 2015 CMAQ $4,324,577 $3,459,662 $864,915 2015 ADJUSTMENT:Increase Cost 02/05/15 $100,000 2015 RRHE $4,875,000 $3,900,000 $975,000 2015 ADJUSTMENT:Increase Cost 02/05/15 $400,000 $100,000 2015 RRPD $4,875,000 $3,900,000 $975,000 2015 ADJUSTMENT:Increase Cost 02/05/15 $2,000,000 $500,000 2015 STP-TE $2,152,030 $1,721,624 $430,406 2015 ADJUSTMENT:Decrease Cost 02/05/15 Increase project by $500,000. .09 STATEWIDE 607422 STATEWIDE DISTRICT 1- DISTRICT 2- DISTRICT 3- DISTRICT 4- DISTRICT 5- DISTRICT 6- REAL TIME TRAVEL MONITORING SYSTEM (RTTM) $997,298 Decrease funding by $2,253,377 due to award adjustment .10 STATEWIDE 607424 STATEWIDE STATEWIDE- ITS ADVANCED TRANSPORTATION MANAGEMENT SYSTEM (ATMS) SOFTWARE Increase by $2,324,577. AC Year 1 of 2. Total Project Cost $5,324,577. .11 STATEWIDE RRC BRAINTREE STATEWIDE RAILROAD CROSSING HAZARD ELIMINATION CONTRACTS Increase cost from $500,000. .12 STATEWIDE RRC BRAINTREE STATEWIDE RAILROAD CROSSING PROTECTIVE DEVICES CONTRACTS Increase cost from $500,000. .13 BOSTON 606997 BRAINTREE BRAINTREE- MILTON- BOSTON- WEYMOUTHSTORMWATER RETROFITS ON I-93, ROUTE 3 & ROUTE 53 ADJUSTMENT:Change Project Desc MANSFIELD LOCATION MOVED FROM 606997 to 608132. Project description updated. 3.01 BERKSHIRE 608071 ADAMS ADAMS- ASHUWILLTICOOK RAIL TRAIL EXTENSION 2015 HPP $3,360,000 $2,688,000 $672,000 2015 AMENDMENT:Add Project 02/03/15 Construction; SAFETEA-LU, HPP 2850 - MA Berkshire County Bike Paths, Design & Construction - $5,000,000 (Earmark Total) 4.01 BOSTON 604796 DEDHAM DEDHAM- BRIDGE REPLACEMENT, D-05-033, PROVIDENCE HIGHWAY OVER MOTHER BROOK NHPP $1,192,805 $954,244 $238,561 2015 AMENDMENT:Remove Project 02/05/15 AC Yr 2 of 2; Total Cost = $7,051,805 4.02 BOSTON 1560 BOSTON MEDFORD WATER TAXI, Phase 1 - Feasibility Analysis 2015 FBD $155,000 $124,000 $31,000 2015 AMENDMENT:Add Project 02/05/15 Feasibility Study Analysis and Preliminary Engineering; Ferry Boat Discretionary (FBD) Program; City of Medford match 4.03 BOSTON 604531 MULTIPLE ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL CMAQ $4,042,873 $3,234,298 $808,575 2015 CMAQ $5,976,941 $4,781,553 $1,195,388 2015 AMENDMENT:Increase Cost 02/05/15 $8,663,824 $6,931,059 $1,732,765 2015 NHPP $10,490,952 $8,392,762 $2,098,190 2015 AMENDMENT:Increase Cost 02/05/15 cost increase of $1,934,068; Statewide TE+Statewide CMAQ Total Cost = $6,510,045; Statewide CMAQ was $4,042,873 4.04 BOSTON 607174 MULTIPLE CHELSEA- REVERE- RESURFACING & RELATED WORK ON ROUTE 1 NHPP cost increase of $2,151,562; NHPP+TAP Total Cost = $10,815,386; NHPP was $8,663,824 Date: 2/6/2015 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO 4.05 BOSTON Project Location ID 607891 BEVERLY Description BEVERLY - RESURFACING & RELATED WORK ON ROUTE 128 CURRENT Source Total NHPP $5,805,600 REVISED Federal Non Federal $4,644,480 $1,161,120 Year Source Total Federal FINANCIAL CONSTRAINT NonFederal Year Amendment Description $5,718,991 $4,575,193 $1,143,798 2015 AMENDMENT:Increase Cost Date 2015 NHPP 2015 TAP $324,434 $259,547 $64,887 2015 AMENDMENT:Add Funding Source 02/05/15 2015 TAP $219,420 $175,536 $43,884 2015 AMENDMENT:Add Funding Source 02/05/15 2015 TAP 02/05/15 cost increase of $132,811; NHPP+TAP Total Cost = $5,938,411; NHPP was $5,805,600 4.06 BOSTON 607174 MULTIPLE CHELSEA- REVERE- RESURFACING & RELATED WORK ON ROUTE 1 Stormwater retrofits components of 607174 now funded under TAP; NHPP+TAP Total Cost = $10,815,386 4.07 BOSTON 607891 BEVERLY BEVERLY - RESURFACING & RELATED WORK ON ROUTE 128 Stormwater retrofits components of 607891 now funded under TAP; NHPP+TAP Total Cost = $5,938,411 4.08 BOSTON 608131 BEVERLY DANVERS- MEDFORD- STORMWATER IMPROVEMENTS ALONG ROUTE 1/I-95/I-93 $2,950,000 $2,360,000 $590,000 2015 AMENDMENT:Add Project 02/05/15 new addition 4.09 BOSTON 1569 MULTIPLE GREEN LINE EXTENSION PROJECT (PHASE II), COLLEGE AVENUE TO MYSTIC VALLEY PARKWAY/ROUTE 16 CMAQ $8,100,000 $6,480,000 $1,620,000 2016 CMAQ $8,100,000 $6,480,000 $1,620,000 2016 AMENDMENT:Change Project Desc 02/05/15 CMAQ $13,427,220 $10,741,776 $2,685,444 2017 CMAQ $13,427,220 $10,741,776 $2,685,444 2017 AMENDMENT:Change Project Desc 02/05/15 STP $16,472,780 $13,178,224 $3,294,556 2017 STP $16,472,780 $13,178,224 $3,294,556 2017 AMENDMENT:Change Project Desc 02/05/15 CMAQ $13,427,220 $10,741,776 $2,685,444 2018 CMAQ $13,427,220 $10,741,776 $2,685,444 2018 AMENDMENT:Change Project Desc 02/05/15 STP $26,572,780 $21,258,224 $5,314,556 2018 STP $26,572,780 $21,258,224 $5,314,556 2018 AMENDMENT:Change Project Desc 02/05/15 Yr 1 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 4.10 BOSTON 1569 MULTIPLE GREEN LINE EXTENSION PROJECT (PHASE II), COLLEGE AVENUE TO MYSTIC VALLEY PARKWAY/ROUTE 16 Yr 2 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 4.11 BOSTON 1569 MULTIPLE GREEN LINE EXTENSION PROJECT (PHASE II), COLLEGE AVENUE TO MYSTIC VALLEY PARKWAY/ROUTE 16 Yr 2 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 4.12 BOSTON 1569 MULTIPLE GREEN LINE EXTENSION PROJECT (PHASE II), COLLEGE AVENUE TO MYSTIC VALLEY PARKWAY/ROUTE 16 Yr 3 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 4.13 BOSTON 1569 MULTIPLE GREEN LINE EXTENSION PROJECT (PHASE II), COLLEGE AVENUE TO MYSTIC VALLEY PARKWAY/ROUTE 16 Yr 3 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 5.01 N. MIDDLESEX 1561 LOWELL Merrimack Riverwalk Phase II - FLAP Project 2015 OTHER FA $293,311 $235,000 $58,311 2015 AMENDMENT:Add Project Date: 2/6/2015 01/20/15 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO 6.01 OLD COLONY Project Location ID 608087 BROCKTON Description CURRENT Source Total Federal REVISED Non Federal BROCKTON- PEDESTRIAN IMPROVEMENTS AT VARIOUS LOCATIONS Year Source Total Federal $506,616 $455,954 2015 HSIP 2015 NHPP 2015 HSIP $575,317 2015 HSIP $536,556 2015 HSIP 2015 HSIP FINANCIAL CONSTRAINT NonFederal $50,662 Year Amendment Description Date 2015 AMENDMENT:Add Project 01/29/15 $554,308 2015 AMENDMENT:Add Project 02/05/15 $517,785 $57,532 2015 AMENDMENT:Add Project 02/05/15 $482,901 $53,656 2015 AMENDMENT:Add Project 02/05/15 $112,526 2015 AMENDMENT:Add Project 02/05/15 $72,666 02/05/15 HSIP, YOE IS $506,616 7.01 STATEWIDE 607468 DISTRICT 2- SYSTEMATIC BRIDGE MAINTENANCE AT VARIOUS LOCATIONS $2,771,540 $2,217,232 Re-advertisement 7.02 STATEWIDE 608110 DISTRICT 2- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) Project 607071 STATEWIDE- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) was withdrawn and replaced by 4 separate projects. 7.03 STATEWIDE 608111 DISTRICT 3- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) Project 607071 STATEWIDE- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) was withdrawn and replaced by 4 separate projects. 7.04 STATEWIDE 608112 DISTRICT 4- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) $1,125,258 $1,012,733 Project 607071 STATEWIDE- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) was withdrawn and replaced by 4 separate projects. 7.05 STATEWIDE 608113 DISTRICT 5- DISTRICT 6- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) $726,663 $653,996 2015 AMENDMENT:Add Project Project 607071 STATEWIDE- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) was withdrawn and replaced by 4 separate projects. 7.06 STATEWIDE 606432 BURLINGTON BURLINGTON- WOBURN- READINGEXPANSION OF FIBER, CCTV, VMS & TRAFFIC SENSOR NETWORK ON I-95 CMAQ $500,000 $400,000 $100,000 2015 STP $1,728,800 $1,383,040 $345,760 2015 AMENDMENT:Remove Project 02/05/15 AC Year 2 of 2 Total Project Cost $5,407,070 7.07 STATEWIDE 606927 STATEWIDE STATEWIDE- REPLACEMENT OF VARIABLE MESSAGE SIGNS (VMS) CMAQ $3,228,800 $2,583,040 $645,760 2015 AMENDMENT:Increase Cost AMENDMENT:Change Funding Src Increase by $1,500,000. Change funding from STP to CMAQ. Approved via consultation in January 2014. AC Year 1 of 2 Total Project Cost $3,728,800. Date: 2/6/2015 02/05/15 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO Project Location ID 7.08 STATEWIDE 606916 Description STATEWIDE- HOC OPERATIONS AND MAINTENANCE SUPPORT ITS CONTRACT CURRENT Federal REVISED Non Federal Year Source Total Federal FINANCIAL CONSTRAINT NonFederal Year Amendment Description Source Total Date STP $613,600 $490,880 $122,720 2015 AMENDMENT:Remove Project 02/05/15 STP $228,800 $183,040 $45,760 2015 AMENDMENT:Remove Project 02/05/15 STP $228,800 $183,040 $45,760 2015 AMENDMENT:Remove Project 02/05/15 STP-TE $3,300,000 $2,640,000 $660,000 2015 AMENDMENT:Remove Project 02/05/15 AC Year 1 of 2. Total Cost = $1,313,600 7.09 STATEWIDE 606930 BRAINTREE BRAINTREE- QUINCY- BOSTON- HOV LANE TOW TRUCK SERVICES & BTV OPERATOR CONTRACT AC Year 1 of 2. Total Cost = $578,800 7.10 STATEWIDE 606931 BRAINTREE BRAINTREE- QUINCY- BOSTON- HOV LANE TOW TRUCK SERVICES & BTV OPERATOR CONTRACT AC Year 1 of 2. Total Cost = $1,028,800 7.11 STATEWIDE 606999 STATEWIDE- STORMWATER RETROFITS AT VARIOUS LOCATIONS (IM/NHS) Date: 2/6/2015 2015 Berkshire MPO Transportation Improvement Program Amendment/Adjust ment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ MassDOT Project Description▼ 05/20/2014 Draft Released 06/24/2014 Endorsed 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released Federal Funds ▼ Additional Information ▼ Non-Federal Funds ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 607900 Berkshire Pittsfield PITTSFIELD- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT CENTER STREET AND WEST HOUSATONIC STREET (ROUTE 20) 1 HSIP CMAQ + HSIP; Total Cost = 1,470,000; MPO evaluation score 6 of 7; Design Status: <25% $ 395,516 $ 355,964 $ 39,552 $ HSIP Subtotal ► $ - $ 395,516 $ - $ 355,964 $ 39,552 ◄ 90% Federal + 10% Non-Federal - ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 607900 Berkshire Pittsfield PITTSFIELD- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT CENTER STREET AND WEST HOUSATONIC STREET (ROUTE 20) 1 CMAQ $ 1,074,484 $ 859,587 $ 602280 Berkshire Dalton DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 1 CMAQ $ 260,383 $ 208,306 $ CMAQ Subtotal ► $ 1,334,867 $ 1,067,894 $ 214,897 CMAQ + HSIP; Total Cost = 1,470,000; MPO evaluation score 6 of 7; Design Status: <25% AC - Year 1 of 3; STP + CMAQ; Total Cost 52,077 = 9,681,141; MPO evaluation score 4 of 7; Design Status: 100% 266,973 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program No Projects Programmed $ - $ - $ - TAP Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 601320 Berkshire Lee LEE- RECONSTRUCTION OF TYRINGHAM ROAD, FROM THE TYRINGHAM T.L. TO ROUTE 102 (2.0 MILES) 1 STP $ 1,139,304 $ 911,443 $ 602280 Berkshire Dalton DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 1 STP $ 2,782,193 $ 2,225,754 $ AC - Year 1 of 3; STP + CMAQ; Total Cost 556,439 = 9,681,141; MPO evaluation score 4 of 7; Design Status: 100% Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 3,921,497 $ 3,137,198 $ 784,299 ◄ 80% Federal + 20% Non-Federal Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 5,651,880 $ 3,921,497 $ 5,651,880 ◄Total Target 3,921,497 ◄ Max. NonCMAQ/HSIP/TAP $ $ - Target Funds Available Non-CMAQ/HSIP/TAP (Other) Available Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 395,516 $ 1,334,867 $ - $ 395,516 ◄ Min. HSIP 1,334,867 ◄ Min. CMAQ - ◄ Min. TAP $ $ $ - HSIP Minimum Met CMAQ Minimum Met TAP Minimum Met AC - Year 3 of 3; Total Project Cost = 227,861 5,900,000; MPO evaluation score 3 of 7; Design Status: 100% ►Section 1A / Fiscal Constraint Analysis Remaining HSIP, CMAQ, and TAP Funds $ ‐ - Page 1 of 4 2015 Berkshire MPO Transportation Improvement Program MassDOT Project ID Municipality ▼ MPO ▼ Name ▼ ►Section 1B / Federal Aid Bridge Projects Amendment/Adjust ment Type ▼ Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ MassDOT Project Description▼ 05/20/2014 Draft Released 06/24/2014 Endorsed 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released Federal Funds ▼ Additional Information ▼ Non-Federal Funds ▼ ►Statewide Bridge Maintenance Program 607510 Berkshire Sandisfield SANDISFIELD- SYSTEMATIC BRIDGE MAINTENANCE, S-03-033, ROUTE 8 (S.MAIN ST.) OVER W. BRANCH FARMINGTON RIVER (PHASE II) 1 NHPP $ 309,920 $ 247,936 $ 61,984 $ Statewide Bridge Maintenance Program Subtotal ► $ - $ 309,920 $ - $ 247,936 $ 61,984 ◄ 80% Federal + 20% Non-Federal $ 5,904,802 $ 4,723,842 $ 1,180,960 $ On System Subtotal ► $ - $ 5,904,802 $ - $ 4,723,842 $ 1,180,960 ◄ 80% Federal + 20% Non-Federal $ 2,589,860 $ 2,071,888 $ 517,972 $ Off-System Subtotal ► $ - $ 2,589,860 $ - $ 2,071,888 $ 517,972 ◄ 80% Federal + 20% Non-Federal - ►On System 605299 Berkshire Great Barrington GREAT BARRINGTON- BRIDGE REPLACEMENT, G-11-005, SR 183 (PARK STREET) OVER HOUSATONIC RIVER 1 NHPP - ►Off-System 607121 Berkshire Savoy SAVOY- BRIDGE REPLACEMENT, S-06004, RIVER ROAD OVER THE WESTFIELD RIVER 1 STP-BROFF - ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid AMENDMENT:Add Project 605930 Berkshire Adams ADAMS - MOUNT GREYLOCK SCENIC BYWAYS IMPROVEMENTS AT BASCOM LODGE AND WAR 1 SBYWY $ 990,000 $ 792,000 $ AMENDMENT:Add Project 608071 Berkshire Adams ADAMS- ASHUWILLTICOOK RAIL TRAIL EXTENSION 1 HPP $ 3,360,000 $ 2,688,000 $ 672,000 Construction; SAFETEA-LU, HPP 2850 - MA Berkshire County Bike Paths, Design & Construction - $5,000,000 (Earmark Total) Other Federal Aid Subtotal ► $ 4,350,000 $ 3,480,000 870,000 ◄ Funding Split Varies by Funding Source $ 198,000 Design & construction Page 2 of 4 2015 Berkshire MPO Transportation Improvement Program Amendment/Adjust ment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ MassDOT Project Description▼ 05/20/2014 Draft Released 06/24/2014 Endorsed 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released Federal Funds ▼ Additional Information ▼ Non-Federal Funds ▼ ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed $ - $ - $ No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ - $ $ - $ $ - - ◄ 80% Federal + 20% Non-Federal - ► Statewide HSIP Program No Projects Programmed $ - No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - $ - $ $ $ - $ $ - ◄ 90% Federal + 10% Non-Federal - ► Statewide Safe Routes to Schools Program $ - No Projects Programmed $ Statewide Safe Routes to Schools Program Subtotal ► $ No Projects Programmed - - Funding Split Varies by Funding Source $ - $ $ - $ $ $ - $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal No Projects Programmed $ No Projects Programmed $ Statewide Transportation Enhancements Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal No Projects Programmed No Projects Programmed $ $ Statewide ITS Subtotal ► $ - - -$ - ◄ 80% Federal + 20% Non-Federal No Projects Programmed $ No Projects Programmed $ Statewide Interstate Maintenance Program Subtotal ► $ - - -$ - ◄ 90% Federal + 10% Non-Federal - - $ - Funding Split Varies by Funding Source - ◄ Funding Split Varies by Funding Source ► Statewide CMAQ No Projects Programmed $ - No Projects Programmed $ Statewide CMAQ ► $ - - ►Statewide Transportation Enhancements ►Statewide ITS $ ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ Berkshire Multiple 605887 606544 Berkshire Multiple SHEFFIELD - GREAT BARRINGTON RESURFACING AND RELATED WORK ROUTE 7 LENOX- PITTSFIELD RESURFACING AND RELATED WORK ROUTE 7 $ NHPP $ 6,641,040 - NHPP $ 3,422,162 1 - 5,312,832 1,328,208 1 Statewide NHS Preservation Program Subtotal ► $ 2,737,730 10,063,202 $ 8,050,562 $ 2,012,640 ◄ 80% Federal + 20% Non-Federal 684,432 Page 3 of 4 2015 Berkshire MPO Transportation Improvement Program Amendment/Adjust ment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ 05/20/2014 Draft Released 06/24/2014 Endorsed 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released Federal Funds ▼ Additional Information ▼ Non-Federal Funds ▼ ►Statewide RR Grade Crossings No Projects Programmed $ No Projects Programmed $ Statewide RR Grade Crossings Subtotal ► $ - No Projects Programmed $ No Projects Programmed $ Statewide Stormwater Retrofits Subtotal ► $ - No Projects Programmed $ No Projects Programmed $ Statewide ADA Implementation Plan Subtotal ► $ - - ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails Other Statewide Items Subtotal ► $ $ - - $ - $ $ $ $ - $ - $ - ◄ 80% Federal + 20% Non-Federal - -$ - ◄ 80% Federal + 20% Non-Federal - -$ - ◄ 80% Federal + 20% Non-Federal - ◄ Funding Split Varies by Funding Source ►Statewide Stormwater Retrofits $ ►Statewide ADA Implementation Plan $ ►Other Statewide Items - $ - - ►Section 2A / Non-Federal Projects $ - ►Non Federal Aid No Projects Programmed No Projects Programmed NFA $ NFA $ Non-Federal Aid Subtotal► $ - $ $ $ - ◄100% Non-Federal No Projects Programmed NFA $ No Projects Programmed NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ $ $ - ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2015 Berkshire MPO TIP Summary TIPSection 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ TIP Section 2: ▼ 28,869,664 $ 23,135,283 5,734,381 $ - Total of All Projects ▼ $ $ $ 28,869,664 ◄ Total Spending in Region 23,135,283 ◄ Total Federal Spending in Region 5,734,381 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx Page 4 of 4 The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates a project moved out to another TIP element (cost not reflected in total) Indicates a new addition to the TIP (action taken as denoted) Indicates a new funding category ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 605146 SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE 4 HSIP $ 2,000,000 $ 1,800,000 $ 200,000 STP+HSIP+CMAQ Total Cost = $7,867,762 605657 MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 3 HSIP $ 3,000,000 $ 2,700,000 $ 300,000 STP+HSIP+CMAQ+TAP Total Cost = $12,062,567; HSIP pending Road Safety Audit HSIP Subtotal ► $ 5,000,000 $ 4,500,000 $ 500,000 ◄ 90% Federal + 10% Non-Federal 4 CMAQ $ 2,000,000 $ 1,600,000 $ 400,000 N/A CMAQ $ 400,000 $ 320,000 $ 80,000 4 CMAQ $ 5,429,110 $ 4,343,288 $ 1,085,822 6 CMAQ $ 5,000,000 $ 4,000,000 $ 1,000,000 STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP, TCSP) Total Cost = $16,866,250 3 CMAQ $ 5,000,000 $ 4,000,000 $ 1,000,000 STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 CMAQ Subtotal ► $ 17,829,110 $ 14,263,288 $ ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 605146 1559 604652 606284 605657 SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE INTERSECTION IMPROVEMENT PROGRAM STONEHAM- WINCHESTER- WOBURN- TRICOMMUNITY BIKEWAY BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 STP+HSIP+CMAQ Total Cost = $7,867,762 3,565,822 ◄ 80% Federal + 20% Non-Federal The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►TAP - Transportation Alternatives Program 605657 MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 3 TAP STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 $ 2,548,719 $ 2,038,975 $ 509,744 TAP Subtotal ► $ 2,548,719 $ 2,038,975 $ 509,744 ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 605146 SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE 4 STP $ 3,867,762 $ 3,094,210 $ 773,552 606284 BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 STP $ 7,446,852 $ 5,957,482 $ 1,489,370 605657 MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 3 STP $ 1,513,848 $ 1,211,078 $ 302,770 603711 NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADDA-LANE - CONTRACT V) 6 NHPP $ 30,000,000 $ 24,000,000 $ 6,000,000 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 42,828,462 $ 34,262,770 $ 8,565,692 ◄ 80% Federal + 20% Non-Federal Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 68,206,291 $ 42,828,462 $ 68,221,673 ◄Total Target 44,786,168 ◄ Max. NonCMAQ/HSIP/TAP $ $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 5,000,000 $ 17,829,110 $ 2,548,719 $ 4,774,123 ◄ Min. HSIP 16,112,664 ◄ Min. CMAQ 2,548,719 ◄ Min. TAP $ $ $ STP+HSIP+CMAQ Total Cost = $7,867,762 STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP, TCSP) Total Cost = $16,866,250 STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 AC Yr 2 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 2015-18 TIP) ►Section 1A / Fiscal Constraint Analysis 15,382 Target Funds Available 15,383 Non-CMAQ/HSIP/TAP (Other) Available (225,877) HSIP Minimum Met (1,716,446) CMAQ Minimum Met TAP Minimum Met HSIP, CMAQ, TAP Overprogrammed $ (1,942,323) - The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ 2/5/2015 Proposed Update to Draft Amendment Two Total Programmed Funds ▼ Federal Funds ▼ $ - $ - $ - Statewide Bridge Maintenance Program Subtotal ► $ - $ - $ - MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects Programmed ◄ 80% Federal + 20% Non-Federal ►On System AMENDMENT:Remove Project 600703 LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95 (ROUTE 128) 4 NHPP $ 14,886,555 $ 11,909,244 $ 2,977,311 AC Yr 3 of 4; Total Cost = $35,108,000 607338 GLOUCESTER- BRIDGE PRESERVATION, G-05-017, ROUTE 128 OVER ANNISQUAM RIVER (PHASE II) 4 NHPP $ 5,506,585 $ 4,405,268 $ 1,101,317 AC Yr 2 of 2; Total Cost = $13,956,585 604796 DEDHAM- BRIDGE REPLACEMENT, D-05-033, PROVIDENCE HIGHWAY OVER MOTHER BROOK 6 NHPP $ 1,192,805 $ 954,244 $ 238,561 3 NHPP $ 1,780,272 $ 1,424,218 $ 356,054 6 NHPP $ 3,918,939 $ 3,135,151 $ 783,788 607273 605883 FRANKLIN- BRIDGE DEMOLITION, F-08-005, OLD STATE ROUTE 140 OVER MBTA/CSX & NEW PEDESTRIAN BRIDGE CONSTRUCTION DEDHAM- BRIDGE REPLACEMENT, D-05-003 (33K), NEEDHAM STREET OVER GREAT DITCH 603008 WOBURN- BRIDGE REPLACEMENT, W-43-003, SALEM STREET OVER MBTA 4 NHPP $ 5,018,477 $ 4,014,782 $ 1,003,695 608019 BOSTON- ADVANCED UTILITY RELOCATIONS FOR BRIDGE B-16-237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE 6 NHPP $ 6,000,000 $ 4,800,000 $ 1,200,000 On System Subtotal ► $ 38,303,633 $ 30,642,906 $ removed from TIP; all funds were obligated in FFY 2014; was $1,192,805 in FFY 2015 7,660,727 ◄ 80% Federal + 20% Non-Federal ►Off-System No Projects Programmed $ - $ - $ - Off-System Subtotal ► $ - $ - $ - $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects Programmed ◄ 80% Federal + 20% Non-Federal The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program MassDOT MassDOT Project ID ▼ Project Description▼ ►Section 1C / Federal Aid Non-Target Projects Amendment/Adjustment Type ▼ 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Other Federal Aid 6 HPP $ - $ - $ - 605789 BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284) BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284) 6 HPP $ - $ - $ - 606134 BOSTON- TRAFFIC SIGNAL IMPROVEMENTS ON BLUE HILL AVENUE AND WARREN STREET 6 HPP $ 2,377,900 $ 1,902,320 $ 475,580 606889 BOSTON- IMPROVEMENTS ALONG GAINSBOROUGH AND ST. BOTOLPH STREETS 6 HPP $ 1,012,389 $ 809,911 $ 202,478 606889 BOSTON- IMPROVEMENTS ALONG GAINSBOROUGH AND ST. BOTOLPH STREETS 6 TI $ 2,505,854 $ 2,004,683 $ 4 HPP $ 2,587,214 $ 2,069,771 $ 605789 606284 SOMERVILLE- RECONSTRUCTION OF BEACON STREET, FROM OXFORD STREET TO CAMBRIDGE C.L. BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 606284 BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 606284 BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 606284 BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 606284 BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 TCSP $ 1,250,000 $ 1,000,000 $ 607839 MEDFORD CLIPPERSHIP LINEAR PARK AND BIKEWAY 4 Sec 125 $ 475,000 $ 475,000 $ N/A MEDFORD WATER TAXI, Phase 1 - Feasibility Analysis 4 FBD $ 155,000 $ 124,000 $ Other Federal Aid Subtotal ► $ 13,532,755 $ 607209 AMENDMENT:Add Project 6 HPP $ 1,114,501 $ 891,601 $ 6 Sec 129 $ 980,000 $ 980,000 $ 6 6 Sec 125 STPP $ $ 475,000 $ 599,897 $ 475,000 $ 599,897 $ 11,332,183 $ Construction; HPP 2129 (MA155) Construction; HPP 2012 (MA153); SAFETEA-LU Earmark + HPP TI 180 Earmark Total Cost = $3,518,243 Construction; TI 180 (MA216); SAFETEA-LU Earmark + HPP TI Earmark Total Cost = 501,171 $3,518,243 517,443 222,900 - - - Construction; HPP 431 (MA118); SAFETEA-LU Earmark+NFA Total Cost = $8,940,346. Construction; HPP 682; STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Construction; Section 129 (MA246); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Construction; Section 125 (MA252); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Construction; STPP (MA267); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Construction; TCSP (11MA008); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 250,000 125 and 129, STPP, TCSP) Total Cost = $16,866,250 - Construction; Section 125 (MA250) of $475,000 + local funding sources of $502,487 Total Cost = $977,487 Feasibility Study Analysis and Preliminary Engineering; Ferry Boat Discretionary (FBD) Program; City of Medford match 2,200,572 ◄ Funding Split Varies by Funding Source 31,000 The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program 607700 DISTRICT 4- HIGHWAY LIGHTING BRANCH CIRCUIT RE-CABLING FROM SIX (6) LIGHTING LOAD 4 STP $ CENTERS ALONG ROUTE I-95 (128) LEXINGTONWOBURN Statewide Infrastructure Program Subtotal ► $ 2,500,000 $ 2,000,000 $ 500,000 2,500,000 $ 2,000,000 $ 500,000 ◄ 80% Federal + 20% Non-Federal - $ $ ► Statewide HSIP Program No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - $ $ - - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program 607920 607892 MILTON- SAFE ROUTES TO SCHOOL (GLOVER 6 TAP $ ELEMENTARY SCHOOL) SOMERVILLE- SAFE ROUTES TO SCHOOL (HEALEY 4 TAP $ SCHOOL) Statewide Safe Routes to Schools Program Subtotal ► $ 725,000 $ 700,000 $ 580,000 $ 560,000 $ $ 145,000 80% Federal + 20% Non-Federal 140,000 80% Federal + 20% Non-Federal 1,425,000 $ 1,140,000 285,000 ◄ Funding Split Varies by Funding Source $ 5,976,941 $ 4,781,553 $ 1,195,388 Statewide CMAQ ► $ 5,976,941 $ 4,781,553 1,195,388 ◄ 80% Federal + 20% Non-Federal ► Statewide CMAQ ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL AMENDMENT:Increase Cost 3 604531 ►Statewide Transportation Enhancements ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL 604531 3 CMAQ STP-TE $ Statewide Transportation Enhancements Subtotal ► $ ►Statewide ITS No Projects Programmed $ 533,104 533,104 $ 426,483 426,483 $ Statewide ITS Subtotal ► $ - Statewide Interstate Maintenance Program Subtotal ► $ - $ cost increase of $1,934,068; Statewide TE+Statewide CMAQ Total Cost = $6,510,045; Statewide CMAQ was $4,042,873 Statewide TE+Statewide CMAQ Total Cost = $5,773,540 106,621 ◄ 80% Federal + 20% Non-Federal 106,621 $ - $ - ◄ 80% Federal + 20% Non-Federal -$ - $ - - ◄ 90% Federal + 10% Non-Federal ►Statewide Interstate Maintenance Program No Projects Programmed ►Statewide NHS Preservation Program+ AMENDMENT:Increase Cost AMENDMENT:Increase Cost 607174 607891 CHELSEA- REVERE- RESURFACING & RELATED 4 NHPP $ WORK ON ROUTE 1 BEVERLY - RESURFACING & RELATED WORK ON 4 NHPP $ ROUTE 128 Statewide NHS Preservation Program Subtotal ► $ - cost increase of $2,151,562; NHPP+TAP Total Cost = $10,815,386; NHPP was $8,663,824 cost increase of $132,811; NHPP+TAP Total 5,718,991 8,392,762 Cost = $5,938,411; NHPP was $5,805,600 2,098,190 16,209,943 $ 12,967,954 $ 3,241,989 ◄ 80% Federal + 20% Non-Federal 4,575,193 1,143,798 10,490,952 - The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program MassDOT Project ID ▼ ►Statewide RR Grade Crossings Amendment/Adjustment Type ▼ 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Project Description▼ No Projects Programmed MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ $ Statewide RR Grade Crossings Subtotal ► $ - Federal Funds ▼ $ - Non-Federal Funds ▼ $ Additional Information ▼ - ◄ 80% Federal + 20% Non-Federal ►Statewide Stormwater Retrofits AMENDMENT:Add Funding Source AMENDMENT:Add Funding Source AMENDMENT:Add Project 607174 CHELSEA- REVERE- RESURFACING & RELATED WORK ON ROUTE 1 607891 BEVERLY - RESURFACING & RELATED WORK ON ROUTE 128 608131 4 TAP $ 324,434 - $ 219,420 259,547 4 TAP DANVERS- MEDFORD- STORMWATER 4 TAP $ IMPROVEMENTS ALONG ROUTE 1/I-95/I-93 Statewide Stormwater Retrofits Subtotal ► $ 64,887 2,950,000 175,536 2,950,000 $ 2,360,000 43,884 $ 2,360,000 ►Statewide ADA Implementation Plan No Projects Programmed Stormwater retrofits components of 607174 now funded under TAP; NHPP+TAP Total Cost = $10,815,386 Stormwater retrofits components of 607891 now funded under TAP; NHPP+TAP Total Cost = $5,938,411 new addition 590,000 ◄ 80% Federal + 20% Non-Federal 590,000 $ Statewide ADA Implementation Plan Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal Other Statewide Items Subtotal ► $ - -$ - $ - - ◄ Funding Split Varies by Funding Source ►Other Statewide Items No Projects Programmed ►Section 2A / Non-Federal Projects ►Non Federal Aid 606146 1568 CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON CANTON STREET/DEDHAM STREET, INCLUDES REPLACEMENT OF C-02-034, REHAB OF C-02-024, C-02-002=N-25-016=W-31-002 & 5 SIGNALIZED INTERSECTIONS FAIRMOUNT IMPROVEMENTS Non-federal aid 5/6 NFA $ 38,000,000 $ 38,000,000 N/A NFA $ 4,863,082 $ 4,863,082 Lists cash flows (based on state fiscal year) for Fairmount Improvements MassDOT made a formal request on Aug. 1, 2011, to remove this project from the State Implementation Plan regulation. The MPO is continuing to reference this project in the document until the process is complete. RED LINE-BLUE LINE CONNECTOR DESIGN 1572 N/A NFA $ 10,000,000 $ 10,000,000 Non-Federal Aid Subtotal► $ 52,863,082 $ 52,863,082 ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ $ - ◄100% Non-Federal The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 2015 Boston Region MPO TIP Summary 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ TIP Section 1: ▼ TIP Section 2: ▼ Total of All Projects ▼ Total ► $ 149,637,667 $ Federal Funds ► $ 120,716,113 Non-Federal Funds ► $ 28,921,554 $ 52,863,082 $ $ 52,863,082 $ Additional Information ▼ 202,500,749 ◄ Total Spending in Region 120,716,113 ◄ Total Federal Spending in Region 81,784,636 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Div ision website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2016 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates a project moved out to another TIP element (cost not reflected in total) Indicates a new addition to the TIP (action taken as denoted) Indicates a new funding category ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM 601630 HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) MARLBOROUGH- RECONSTRUCTION OF ROUTE 85 604810 (MAPLE STREET) 6 HSIP $ 1,000,000 $ 900,000 $ 3 HSIP $ 3,397,727 $ 3,057,954 $ HSIP Subtotal ► $ 4,397,727 $ 3,957,954 $ 100,000 AC Yr 1 of 4; STP+HSIP+TEA-21 Earmark Total Cost = $60,053,518 ($53,453,518 programmed in FFYs 2015-18 TIP) HSIP+CMAQ Total Cost = $5,397,727; HSIP pending Road Safety Audit 439,773 ◄ 90% Federal + 10% Non-Federal 339,773 ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 1559 AMENDMENT:Change Project Description 1569 604810 605110 CLEAN AIR AND MOBILITY GREEN LINE EXTENSION PROJECT (PHASE II), COLLEGE AVENUE TO MYSTIC VALLEY PARKWAY/ROUTE 16 MARLBOROUGH- RECONSTRUCTION OF ROUTE 85 (MAPLE STREET) BROOKLINE- INTERSECTION & SIGNAL IMPROVEMENTS @ ROUTE 9 & VILLAGE SQUARE (GATEWAY EAST) ►TAP - Transportation Alternatives Program BROOKLINE- INTERSECTION & SIGNAL 605110 IMPROVEMENTS @ ROUTE 9 & VILLAGE SQUARE (GATEWAY EAST) N/A CMAQ $ 374,850 $ 299,880 $ 74,970 N/A CMAQ $ 8,100,000 $ 6,480,000 $ 1,620,000 3 CMAQ $ 2,000,000 $ 1,600,000 $ 400,000 HSIP+CMAQ Total Cost = $5,397,727 6 CMAQ $ 244,171 $ 195,337 $ 48,834 TAP+CMAQ+Private Sector Contribution ($1,000,000) Total Cost = $5,591,009 CMAQ Subtotal ► $ 10,719,021 $ 8,575,217 $ $ 4,346,838 $ 3,477,470 $ 869,368 TAP Subtotal ► $ 4,346,838 $ 3,477,470 $ 869,368 ◄ 80% Federal + 20% Non-Federal 6 TAP Yr 1 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 2,143,804 ◄ 80% Federal + 20% Non-Federal TAP+CMAQ+Private Sector Contribution ($1,000,000) Total Cost = $5,591,009 ►Non-CMAQ/HSIP/TAP (Other) 29492 BEDFORD- BILLERICA- BURLINGTON- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III) 4 STP $ 21,691,442 $ 17,353,154 $ 4,338,288 AC Yr 1 of 2; STP+Northern Middlesex Council of Governments contribution ($1,000,000) Total Cost = $29,296,348 603711 NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADDA-LANE - CONTRACT V) 6 NHPP $ 30,000,000 $ 24,000,000 $ 6,000,000 AC Yr 3 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 2015-18 TIP) 3,800,000 $ 3,040,000 $ 760,000 AC Yr 1 of 4; STP+HSIP+TEA-21 Earmark Total Cost = $60,053,518 ($53,453,518 programmed in FFYs 2015-18 TIP) 55,491,442 $ 44,393,154 $ 601630 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM 6 STP $ HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 11,098,288 ◄ 80% Federal + 20% Non-Federal The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2016 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1A / Fiscal Constraint Analysis Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 74,955,028 $ 55,491,442 $ 75,009,821 ◄Total Target 52,939,052 ◄ Max. NonCMAQ/HSIP/TAP $ $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 4,397,727 $ 10,719,021 $ 4,346,838 $ 4,296,710 ◄ Min. HSIP 13,427,220 ◄ Min. CMAQ 4,346,838 ◄ Min. TAP $ $ $ 54,793 Target Funds Available (2,552,390) Non-CMAQ/HSIP/TAP (Other) Exceeds Maximum (101,017) HSIP Minimum Met 2,708,199 CMAQ Minimum Not Met TAP Minimum Met Remaining HSIP, CMAQ, and TAP Funds $ 2,607,182 ►Section 1B / Federal Aid Bridge Projects - ►Statewide Bridge Maintenance Program No Projects Programmed $ - $ - $ - Statewide Bridge Maintenance Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►On System 600703 600867 604173 607685 606553 LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95 (ROUTE 128) BOSTON- BRIDGE REPLACEMENT, B-16-237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE CHARLES RIVER BRAINTREE- BRIDGE REHABILITATION, B-21-060 AND B-21-061, ST 3 (SB) AND ST 3 (NB) OVER RAMP C (QUINCY ADAMS) HANOVER- NORWELL- SUPERSTRUCTURE REPLACEMENT, H-06-010, ST 3 OVER ST 123 (WEBSTER STREET) & N-24-003, ST 3 OVER ST 123 (HIGH STREET) 4 NHPP $ 5,108,000 $ 4,086,400 $ 1,021,600 AC Yr 4 of 4; Total Cost = $35,108,000 6 NHPP $ 3,135,181 $ 2,508,145 $ 627,036 AC Yr 1 of 2; Total Cost = $9,100,020 6 NHPP $ 5,000,000 $ 4,000,000 $ 1,000,000 6 NHPP $ 6,668,480 $ 5,334,784 $ 1,333,696 6 NHPP $ 8,554,209 $ 6,843,367 $ 1,710,842 On System Subtotal ► $ 28,465,870 $ 22,772,696 $ $ 6,416,550 $ 5,133,240 $ 1,283,310 Off-System Subtotal ► $ 6,416,550 $ 5,133,240 $ 1,283,310 ◄ 80% Federal + 20% Non-Federal AC Yr 1 of 5; Total Cost = $85,000,000 ($53,035,161 programmed within FFYs 2015-18 TIP) AC Yr 1 of 2; Total Cost = $11,434,190 5,693,174 ◄ 80% Federal + 20% Non-Federal ►Off-System 607345 COHASSET- SUPERSTRUCTURE REPLACEMENT & SUBSTRUCTURE REHABILITATION, C-17-002, ATLANTIC AVENUE OVER LITTLE HARBOR INLET 5 STP-BR-OFF ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2016 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid 601630 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) 6 HPP $ 8,600,000 $ 6,880,000 $ 1,720,000 605789 BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284) 6 HPP $ 2,429,730 $ 1,943,784 $ 485,946 Construction; HPP 756 (MA126); SAFETEA-LU Earmark (HPP 756)+ SAFETEA-LU Earmark (HPP 4284) =Total Cost $7,437,105 605789 BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284) 6 HPP $ 5,007,375 $ 4,005,900 $ 1,001,475 Construction; HPP 4284 (MA203); SAFETEA-LU Earmark (HPP 756)+ SAFETEA-LU Earmark (HPP 4284) =Total Cost $7,437,105 Other Federal Aid Subtotal ► $ 16,037,105 $ 12,829,684 $ AC Yr 1 of 4; STP+HSIP+TEA-21 Earmark Total Cost = $60,053,518 ($53,453,518 programmed in FFYs 2015-18 TIP) 3,207,421 ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program 603917 605733 MEDFORD- STONEHAM- WOBURN- READING4 STP $ 15,000,000 $ HIGHWAY LIGHTING REHABILITATION ON I-93 (PHASE II) DISTRICT 6- HIGHWAY LIGHTING SYSTEM REPLACEMENT ON I-93, FROM SOUTHAMPTON 6 STP $ 2,500,000 $ STREET TO NEPONSET AVENUE IN BOSTON Statewide Infrastructure Program Subtotal ► $ 17,500,000 $ 12,000,000 $ 3,000,000 AC Yr 1 of 2; Total Cost = $17,500,000 2,000,000 $ 500,000 AC Yr 1 of 3; Total Cost = $8,250,000 14,000,000 $ - $ $ 3,500,000 ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - $ $ - - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program 607997 607998 607999 608000 SAUGUS- SAFE ROUTES TO SCHOOL (VETERANS 4 TAP MEMORIAL) EVERETT- SAFE ROUTES TO SCHOOL (MADELAINE 4 TAP ENGLISH) REVERE- SAFE ROUTES TO SCHOOL (GARFIELD 4 TAP ELEMENTARY & MIDDLE SCHOOL) BEDFORD- SAFE ROUTES TO SCHOOL (JOHN 4 TAP GLENN MIDDLE) Statewide Safe Routes to Schools Program Subtotal ► $ 676,000 $ 540,800 $ 135,200 80% Federal + 20% Non-Federal $ 624,000 $ 499,200 $ 124,800 80% Federal + 20% Non-Federal $ 936,000 $ 748,800 $ 187,200 80% Federal + 20% Non-Federal $ 780,000 $ $ 3,016,000 $ 624,000 $ 2,412,800 $ 156,000 80% Federal + 20% Non-Federal 603,200 ◄ Funding Split Varies by Funding Source The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2016 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ 07/10/2014 Endorsed 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ► Statewide CMAQ 601579 602165 605189 606316 WAYLAND- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 27 (MAIN STREET) AND ROUTE 30 (COMMONWEALTH ROAD) STONEHAM- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 28/NORTH STREET CONCORD- BRUCE FREEMAN RAIL TRAIL CONSTRUCTION, FROM COMMONWEALTH AVENUE TO POWDER MILL ROAD, INCLUDES 2 RAILROAD BRIDGES & 1 CULVERT (PHASE II-C) BROOKLINE- PEDESTRIAN BRIDGE REHABILITATION, B-27-016, OVER MBTA OFF CARLTON STREET ►Statewide Transportation Enhancements No Projects Programmed 3 CMAQ $ 1,931,854 $ 1,545,483 $ 386,371 4 CMAQ $ 3,268,366 $ 2,614,693 $ 653,673 4 CMAQ $ 5,753,887 $ 4,603,110 $ 1,150,777 6 CMAQ $ 1,847,452 $ 1,477,962 $ 369,490 Statewide CMAQ ► $ 12,801,559 $ 10,241,247 $ 2,560,312 ◄ 80% Federal + 20% Non-Federal $ Statewide Transportation Enhancements Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide ITS Subtotal ► $ - $ - $ - - ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects Programmed ►Statewide Interstate Maintenance Program FOXBOROUGH- PLAINVILLE- WRENTHAMINTERSTATE MAINTENANCE & RELATED WORK ON 606176 5 NHPP $ I-495 (NB & SB) Statewide Interstate Maintenance Program Subtotal ► $ ►Statewide NHS Preservation Program+ No Projects Programmed 14,692,038 13,222,834 14,692,038 $ 13,222,834 $ 1,469,204 ◄ 90% Federal + 10% Non-Federal 1,469,204 $ Statewide NHS Preservation Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide RR Grade Crossings Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal $ Statewide Stormwater Retrofits Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal $ Statewide ADA Implementation Plan Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal Other Statewide Items Subtotal ► $ - -$ - $ - - ◄ Funding Split Varies by Funding Source ►Statewide RR Grade Crossings No Projects Programmed ►Statewide Stormwater Retrofits No Projects Programmed ►Statewide ADA Implementation Plan No Projects Programmed ►Other Statewide Items No Projects Programmed The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2016 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 2A / Non-Federal Projects ►Non Federal Aid 87790 CANTON- DEDHAM- NORWOOD- WESTWOODINTERCHANGE IMPROVEMENTS AT I-95/I-93/ UNIVERSITY AVENUE/I-95 WIDENING RED LINE-BLUE LINE CONNECTOR DESIGN 1572 Non-federal aid 5/6 N/A NFA NFA $ 190,000,000 $ $ 29,000,000 $ Non-Federal Aid Subtotal► $ 219,000,000 $ 190,000,000 29,000,000 MassDOT made a formal request on Aug. 1, 2011, to remove this project from the State Implementation Plan regulation. The MPO is continuing to reference this project in the document until the process is complete. 219,000,000 ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed 2016 Boston Region MPO TIP Summary NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - TIP Section 1: ▼ - $ $ TIP Section 2: ▼ ◄100% Non-Federal Total of All Projects ▼ Total ► $ 173,884,150 $ 219,000,000 $ Federal Funds ► $ 141,016,297 $ Non-Federal Funds ► $ 32,867,854 $ 219,000,000 $ 392,884,150 ◄ Total Spending in Region 141,016,297 ◄ Total Federal Spending in Region 251,867,854 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Div ision website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 2017 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates a project moved out to another TIP element (cost not reflected in total) Indicates a new addition to the TIP (action taken as denoted) Indicates a new funding category ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program WOBURN- RECONSTRUCTION OF MONTVALE 604935 AVENUE, FROM I-93 INTERCHANGE TO CENTRAL STREET (APPROX. 1,850 FT) 4,752,838 $ 4,277,554 $ 475,284 HSIP Subtotal ► $ 4,752,838 $ 4,277,554 $ 475,284 ◄ 90% Federal + 10% Non-Federal 3 CMAQ $ 4,038,370 $ 3,230,696 $ 807,674 N/A CMAQ $ 13,427,220 $ 10,741,776 $ 2,685,444 CMAQ Subtotal ► $ 17,465,590 $ 13,972,472 $ $ 2,824,382 $ 2,259,506 $ 564,876 TAP Subtotal ► $ 2,824,382 $ 2,259,506 $ 564,876 ◄ 80% Federal + 20% Non-Federal 4 STP $ 6,604,906 $ 5,283,925 $ 1,320,981 AC Yr 2 of 2; STP+Northern Middlesex Council of Governments contribution ($1,000,000) Total Cost = $29,296,348 N/A STP $ 16,472,780 $ 13,178,224 $ 3,294,556 Yr 2 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 6 STP $ 12,850,000 $ 10,280,000 $ 2,570,000 AC Yr 2 of 4; STP+HSIP+TEA-21 Earmark Total Cost = $60,053,518 ($53,453,518 programmed in FFYs 2015-18 TIP) 6 NHPP $ 14,000,000 $ 11,200,000 $ 2,800,000 AC Yr 4 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 2015-18 TIP) Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 49,927,686 $ 39,942,149 $ 9,985,537 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program SOUTHBOROUGH- RECONSTRUCTION OF MAIN 604989 STREET (RTE 30), FROM SEARS ROAD TO PARK STREET 3 HSIP HSIP pending Road Safety Audit $ ►CMAQ - Congestion Mitigation and Air Quality Improvement Program SOUTHBOROUGH- RECONSTRUCTION OF MAIN 604989 STREET (RTE 30), FROM SEARS ROAD TO PARK STREET GREEN LINE EXTENSION PROJECT (PHASE II), AMENDMENT:Change 1569 COLLEGE AVENUE TO MYSTIC VALLEY Project Description PARKWAY/ROUTE 16 4 TAP CMAQ+TAP Total Cost = $6,862,752 Yr 2 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 3,493,118 ◄ 80% Federal + 20% Non-Federal CMAQ+TAP Total Cost = $6,862,752 ►Non-CMAQ/HSIP/TAP (Other) 29492 AMENDMENT:Change Project Description 1569 601630 603711 BEDFORD- BILLERICA- BURLINGTON- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III) GREEN LINE EXTENSION PROJECT (PHASE II), COLLEGE AVENUE TO MYSTIC VALLEY PARKWAY/ROUTE 16 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADDA-LANE - CONTRACT V) The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 2017 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ 07/10/2014 Endorsed 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1A / Fiscal Constraint Analysis Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 74,970,496 $ 49,927,686 $ 75,009,821 ◄Total Target 54,461,509 ◄ Max. NonCMAQ/HSIP/TAP $ $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 4,752,838 $ 17,465,590 $ 2,824,382 $ 4,296,710 ◄ Min. HSIP 13,427,220 ◄ Min. CMAQ 2,824,382 ◄ Min. TAP $ $ $ 39,325 Target Funds Available 39,325 Non-CMAQ/HSIP/TAP (Other) Available (456,128) HSIP Minimum Met (4,038,370) CMAQ Minimum Met TAP Minimum Met HSIP, CMAQ, TAP Overprogrammed $ (4,494,498) ►Section 1B / Federal Aid Bridge Projects - ►Statewide Bridge Maintenance Program 607507 WAKEFIELD- BRIDGE DECK REPLACEMENT, W-01021 (2MF), HOPKINS STREET OVER I-95/ST 128 4 NHPP $ 2,469,936 $ 1,975,949 $ 493,987 Statewide Bridge Maintenance Program Subtotal ► $ 2,469,936 $ 1,975,949 $ 493,987 ◄ 80% Federal + 20% Non-Federal ►On System 600867 604173 606553 604952 607954 BOSTON- BRIDGE REPLACEMENT, B-16-237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE CHARLES RIVER HANOVER- NORWELL- SUPERSTRUCTURE REPLACEMENT, H-06-010, ST 3 OVER ST 123 (WEBSTER STREET) & N-24-003, ST 3 OVER ST 123 (HIGH STREET) LYNN- SAUGUS- BRIDGE REPLACEMENT, L-18016=S-05-008, ROUTE 107 OVER THE SAUGUS RIVER (AKA - BELDEN G. BLY BRIDGE) DANVERS - BRIDGE REPLACEMENT, D-03-018, ROUTE 128 OVER WATERS RIVER 4 NHPP $ 5,964,839 $ 4,771,871 $ 1,192,968 AC Yr 2 of 2; Total Cost = $9,100,020 6 NHPP $ 18,035,161 $ 14,428,129 $ 3,607,032 AC Yr 2 of 5; Total Cost = $85,000,000 ($53,035,161 programmed within FFYs 2015-18 TIP) 6 NHPP $ 2,879,981 $ 2,303,985 $ 575,996 4 NHPP $ 4,150,000 $ 3,320,000 $ AC Yr 1 of 4; Total Cost = $45,000,000 830,000 ($20,400,000 programmed within the FFYs 201518 TIP) 4 NHPP $ 8,949,150 $ 7,159,320 $ On System Subtotal ► $ 39,979,131 $ 31,983,305 $ AC Yr 2 of 2; Total Cost = $11,434,190 1,789,830 7,995,826 ◄ 80% Federal + 20% Non-Federal ►Off-System No Projects Programmed $ - $ - $ - Off-System Subtotal ► $ - $ - $ - $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects Programmed ◄ 80% Federal + 20% Non-Federal The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 2017 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid 601630 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) 6 HPP AC Yr 2 of 4; STP+HSIP+TEA-21 Earmark Total Cost = $60,053,518 ($53,453,518 programmed in FFYs 2015-18 TIP) $ 6,171,760 $ 4,937,408 $ 1,234,352 Other Federal Aid Subtotal ► $ 6,171,760 $ 4,937,408 1,234,352 ◄ Funding Split Varies by Funding Source 2,500,000 $ 2,000,000 $ 500,000 AC Yr 2 of 2; Total Cost = $17,500,000 4,500,000 $ 3,600,000 $ 900,000 AC Yr 2 of 3; Total Cost = $8,250,000 7,000,000 $ 5,600,000 $ - $ $ $ ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program 603917 605733 MEDFORD- STONEHAM- WOBURN- READINGHIGHWAY LIGHTING REHABILITATION ON I-93 4 STP $ (PHASE II) DISTRICT 6- HIGHWAY LIGHTING SYSTEM REPLACEMENT ON I-93, FROM SOUTHAMPTON 6 STP $ STREET TO NEPONSET AVENUE IN BOSTON Statewide Infrastructure Program Subtotal ► $ 1,400,000 ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - $ $ - - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program 608003 608004 WEYMOUTH- SAFE ROUTES TO SCHOOL (PINGREE 6 TAP $ ELEMENTARY) WATERTOWN- SAFE ROUTES TO SCHOOL 6 TAP $ (HOSMER ELEMENTARY) Statewide Safe Routes to Schools Program Subtotal ► $ 1,312,200 $ 1,049,760 ACTON- CONCORD- BRUCE FREEMAN RAIL TRAIL CONSTRUCTION (PHASE II-B) $ 6,220,800 $ 4,976,640 $ 1,244,160 Statewide CMAQ ► $ 6,220,800 $ 4,976,640 1,244,160 ◄ 80% Federal + 20% Non-Federal 648,000 $ 664,200 $ 518,400 $ 531,360 $ $ 129,600 80% Federal + 20% Non-Federal 132,840 80% Federal + 20% Non-Federal 262,440 ◄ Funding Split Varies by Funding Source ► Statewide CMAQ 606223 ►Statewide Transportation Enhancements No Projects Programmed 3 CMAQ $ $ Statewide Transportation Enhancements Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide ITS Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects Programmed - The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 2017 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ ►Statewide Interstate Maintenance Program RANDOLPH- QUINCY- BRAINTREE - RESURFACING 607481 6 NHPP $ AND RELATED WORK ON I-93 Statewide Interstate Maintenance Program Subtotal ► $ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ 12,055,824 12,055,824 10,850,242 $ 10,850,242 $ 1,205,582 ◄ 90% Federal + 10% Non-Federal 1,205,582 ►Statewide NHS Preservation Program+ LYNNFIELD- PEABODY - RESURFACING AND 607477 4 NHPP $ RELATED WORK ON ROUTE 1 Statewide NHS Preservation Program Subtotal ► $ 6,490,417 6,490,417 $ 5,192,334 5,192,334 $ 1,298,083 ◄ 80% Federal + 20% Non-Federal 1,298,083 ►Statewide RR Grade Crossings No Projects Programmed $ Statewide RR Grade Crossings Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide Stormwater Retrofits Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal $ Statewide ADA Implementation Plan Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal Other Statewide Items Subtotal ► $ - -$ - $ - - ◄ Funding Split Varies by Funding Source ►Statewide Stormwater Retrofits No Projects Programmed ►Statewide ADA Implementation Plan No Projects Programmed ►Other Statewide Items No Projects Programmed ►Section 2A / Non-Federal Projects ►Non Federal Aid RED LINE-BLUE LINE CONNECTOR DESIGN 1572 NFA MassDOT made a formal request on Aug. 1, 2011, to remove this project from the State Implementation Plan regulation. The MPO is continuing to reference this project in the document until the process is complete. $ 10,000,000 $ 10,000,000 Non-Federal Aid Subtotal► $ 10,000,000 $ 10,000,000 ◄100% Non-Federal The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 2017 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed 2017 Boston Region MPO TIP Summary N/A NFA Section 2B / Non-Federal Bridge Projects Subtotal► $ $ $ - TIP Section 1: ▼ TIPSection 2: ▼ Total ► $ 156,670,564 $ Federal Funds ► $ 127,017,317 Non-Federal Funds ► $ 29,653,247 $ - ◄100% Non-Federal Total of All Projects ▼ 10,000,000 $ $ 10,000,000 $ 166,670,564 ◄ Total Spending in Region 127,017,317 ◄ Total Federal Spending in Region 39,653,247 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Div ision website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2018 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates a project moved out to another TIP element (cost not reflected in total) Indicates a new addition to the TIP (action taken as denoted) Indicates a new funding category ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program No Projects Programmed $ HSIP Subtotal ► $ ►CMAQ - Congestion Mitigation and Air Quality Improvement Program GREEN LINE EXTENSION PROJECT (PHASE II), 1569 COLLEGE AVENUE TO MYSTIC VALLEY PARKWAY/ROUTE 16 AMENDMENT:Change Project Description N/A CMAQ - $ $ - - $ $ $ 13,427,220 $ 10,741,776 $ CMAQ Subtotal ► $ 13,427,220 $ 10,741,776 $ ◄ 90% Federal + 10% Non-Federal Yr 3 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 2,685,444 ◄ 80% Federal + 20% Non-Federal 2,685,444 ►TAP - Transportation Alternatives Program No Projects Programmed $ - $ - $ - TAP Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) AMENDMENT:Change Project Description 1569 601630 603711 N/A STP $ 26,572,780 $ 21,258,224 $ 5,314,556 Yr 3 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 6 STP $ 21,031,758 $ 16,825,406 $ 4,206,352 AC Yr 3 of 4; STP+HSIP+TEA-21 Earmark Total Cost = $60,053,518 ($53,453,518 programmed in FFYs 2015-18 TIP) 6 NHPP $ 13,768,183 $ 11,014,546 $ 2,753,637 AC Yr 5 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 2015-18 TIP) Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 61,372,721 $ 49,098,177 $ Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 74,799,941 $ 61,372,721 $ 75,009,821 ◄Total Target 54,461,509 ◄ Max. NonCMAQ/HSIP/TAP $ $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ - $ 13,427,220 $ - $ 4,296,710 ◄ Min. HSIP 13,427,220 ◄ Min. CMAQ 2,824,382 ◄ Min. TAP $ $ $ GREEN LINE EXTENSION PROJECT (PHASE II), COLLEGE AVENUE TO MYSTIC VALLEY PARKWAY/ROUTE 16 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADDA-LANE - CONTRACT V) 12,274,544 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis Remaining HSIP, CMAQ, and TAP Funds $ 7,121,092 209,880 Target Funds Available (6,911,212) Non-CMAQ/HSIP/TAP (Other) Exceeds Maximum 4,296,710 HSIP Minimum Not Met - CMAQ Minimum Met TAP Minimum Not Met 2,824,382 The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2018 Boston Region MPO Transportation Improvement Program 07/10/2014 Endorsed 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Funding District ▼ Source ▼ Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ ►Section 1B / Federal Aid Bridge Projects Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Statewide Bridge Maintenance Program 607915 NEWTON- WELLESLEY- WESTON- BRIDGE MAINTENANCE OF N-12-063, N-12-054, N-12-055 & N6 NHPP $ 12-056 ON I-95/ROUTE 128 Statewide Bridge Maintenance Program Subtotal ► $ 1,724,400 $ 1,379,520 $ 344,880 1,724,400 $ 1,379,520 $ 344,880 ◄ 80% Federal + 20% Non-Federal ►On System 604173 604952 BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE CHARLES RIVER LYNN- SAUGUS- BRIDGE REPLACEMENT, L-18016=S-05-008, ROUTE 107 OVER THE SAUGUS RIVER (AKA - BELDEN G. BLY BRIDGE) 6 NHPP $ 30,000,000 $ 24,000,000 $ 4 NHPP $ 16,250,000 $ 13,000,000 $ On System Subtotal ► $ 46,250,000 $ 37,000,000 $ AC Yr 3 of 5; Total Cost = $85,000,000 ($53,035,161 programmed within FFYs 2015-18 TIP) AC Yr 2 of 4; Total Cost = $45,000,000 3,250,000 ($20,400,000 programmed within the FFYs 201518 TIP) 9,250,000 ◄ 80% Federal + 20% Non-Federal 6,000,000 ►Off-System 606632 607133 604655 607533 HOPKINTON- WESTBOROUGH- BRIDGE REPLACEMENT, H-23-006=W-24-016, FRUIT STREET OVER CSX & SUDBURY RIVER QUINCY- BRIDGE REPLACEMENT, Q-01-039, ROBERTSON STREET OVER I-93/US 1/SR 3 MARSHFIELD- BRIDGE REPLACEMENT, M-07-007, BEACH STREET OVER THE CUT RIVER WALTHAM- WOERD AVENUE OVER THE CHARLES RIVER 3 STP-BR-OFF $ 12,727,339 $ 10,181,871 $ 2,545,468 6 STP-BR-OFF $ 6,435,763 $ 5,148,610 $ 1,287,153 5 STP-BR-OFF $ 4,822,854 $ 3,858,283 $ 964,571 4 STP-BR-OFF $ 3,873,360 $ 3,098,688 $ Off-System Subtotal ► $ 27,859,316 $ 22,287,453 $ 774,672 5,571,863 ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - $ - $ - $ - Other Federal Aid Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed ◄ Funding Split Varies by Funding Source The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2018 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program 605733 606381 DISTRICT 6- HIGHWAY LIGHTING SYSTEM REPLACEMENT ON I-93, FROM SOUTHAMPTON 6 STP $ STREET TO NEPONSET AVENUE IN BOSTON ARLINGTON- BELMONT- HIGHWAY LIGHTING 4 STP $ REPAIR & MAINTENANCE ON ROUTE 2 Statewide Infrastructure Program Subtotal ► $ 1,250,000 $ 250,000 AC Yr 3 of 3; Total Cost = $8,250,000 1,000,000 $ 5,750,000 $ 4,600,000 $ 1,150,000 7,000,000 $ 5,600,000 $ 1,400,000 ◄ 80% Federal + 20% Non-Federal - $ $ - $ $ - ► Statewide HSIP Program No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - $ $ - $ - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program No Projects Programmed $ Statewide Safe Routes to Schools Program Subtotal ► $ - - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source ► Statewide CMAQ 607329 WAKEFIELD- LYNNFIELD- RAIL TRAIL EXTENSION, FROM THE GALVIN MIDDLE SCHOOL TO LYNNFIELD/PEABODY T.L. ►Statewide Transportation Enhancements No Projects Programmed 4 CMAQ $ 7,084,000 $ 5,667,200 $ 1,416,800 Statewide CMAQ ► $ 7,084,000 $ 5,667,200 1,416,800 ◄ 80% Federal + 20% Non-Federal $ $ Statewide Transportation Enhancements Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide ITS Subtotal ► $ - $ - $ - - ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects Programmed ►Statewide Interstate Maintenance Program FRANKLIN- INTERSTATE MAINTENANCE & 606546 3 NHPP $ RELATED WORK ON I-495 Statewide Interstate Maintenance Program Subtotal ► $ ►Statewide NHS Preservation Program+ SAUGUS - RESURFACING AND RELATED WORK ON 608008 4 NHPP ROUTE 1 MARSHFIELD - PLYMOUTH - RESURFACING & 607988 5 NHPP RELATED WORK ON ROUTE 3 MARSHFIELD - RESURFACING & RELATED WORK 607989 5 NHPP ON ROUTE 3 Statewide NHS Preservation Program Subtotal ► 6,280,243 6,280,243 $ 5,652,219 -$ 5,652,219 628,024 $ 10,620,378 $ 16,229,512 8,496,302 $ $ 4,398,285 2,124,076 12,983,610 31,248,175 $ 24,998,540 3,518,628 ►Statewide RR Grade Crossings No Projects Programmed 628,024 ◄ 90% Federal + 10% Non-Federal $ Statewide RR Grade Crossings Subtotal ► $ - 3,245,902 $ 6,249,635 ◄ 80% Federal + 20% Non-Federal 879,657 $ - $ - - ◄ 80% Federal + 20% Non-Federal The file y ou hav e ac c es s ed is entitled “Draft Amendment Two to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2018 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 2/5/2015 Proposed Update to Draft Amendment Two MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Statewide Stormwater Retrofits No Projects Programmed $ Statewide Stormwater Retrofits Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide ADA Implementation Plan Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal Other Statewide Items Subtotal ► $ - -$ - $ - - ◄ Funding Split Varies by Funding Source $ Non-Federal Aid Subtotal► $ - $ $ - ◄100% Non-Federal NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ $ - ◄100% Non-Federal ►Statewide ADA Implementation Plan No Projects Programmed ►Other Statewide Items No Projects Programmed ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects Programmed ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed 2018 Boston Region MPO TIP Summary TIP Section 1: ▼ TIP Section 2: ▼ Total ► $ 202,246,075 $ Federal Funds ► $ 162,424,884 Non-Federal Funds ► $ 39,821,191 $ - Total of All Projects ▼ $ $ $ 202,246,075 ◄ Total Spending in Region 162,424,884 ◄ Total Federal Spending in Region 39,821,191 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Div ision website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx 05/20/2014 Draft Released 06/24/2014 Endorsed 2015 Northern Middlesex MPO Transportation Improvement Program Amendment/Adju MassDOT stment Type ▼ Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program No Projects Programmed ►CMAQ - Congestion Mitigation and Air Quality Improvement Program BILLERICA RECONSTRUCTION OF ALLEN ROAD, 601426 Northern Middlesex Billerica FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) 4 $ - $ - $ - HSIP Subtotal ► $ - $ - $ - CMAQ ◄ 90% Federal + 10% Non- AC Year 1 of 2. Total project cost at 100% design $7,024,778 (Funding Sources - STP, CMAQ, TAP) TEC = 5.52 $ 1,789,585 $ 1,431,668 $ 357,917 CMAQ Subtotal ► $ 1,789,585 $ 1,431,668 $ 357,917 ◄ 80% Federal + 20% Non- ►TAP - Transportation Alternatives Program 601426 Northern Middlesex Billerica BILLERICA RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) 4 TAP AC Year 1 of 2. Total project cost at 100% design $7,024,778 (Funding Sources - STP, CMAQ, TAP) TEC = 5.52 $ 245,303 $ 196,242 $ 49,061 TAP Subtotal ► $ 245,303 $ 196,242 $ 49,061 ◄ 80% Federal + 20% Non- ►Non-CMAQ/HSIP/TAP (Other) 601426 Northern Middlesex Billerica 606238 Northern Middlesex Tewksbury BILLERICA RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) 4 STP $ 1,677,251 $ 1,341,801 $ 335,450 AC Year 1 of 2. Total project cost at 100% design $7,024,778 (Funding Sources - STP, CMAQ, TAP) TEC = 5.52 Total Estimated Cost at 75% Design is $2,061,000. TEC = 4.77. TEWKSBURY RESURFACING & 4 STP $ RELATED WORK ON ROUTE 38 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 2,061,000 $ 1,648,800 $ 412,200 3,738,251 $ 2,990,601 $ 747,650 ◄ 80% Federal + 20% Non- Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 5,773,139 $ 3,738,251 $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ - $ 1,789,585 $ 245,303 $ 6,207,540 ◄Total Target $ $ 4,061,733 ◄ Max. NonCMAQ/HSIP/TA P 434,401 ◄ Min. HSIP $ 1,466,103 ◄ Min. CMAQ $ 245,303 ◄ Min. TAP $ ►Section 1A / Fiscal Constraint Analysis 434,401 Target Funds 323,482 Non-CMAQ/HSIP/ 434,401 HSIP Minimum (323,482) CMAQ Minimum TAP Minimum - Remaining HSIP, CMAQ, and TAP Funds $ 110,919 ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program $ No Projects $ Programmed Statewide Bridge Maintenance Program Subtotal ► $ $ - $ - - - $ - $ - - $ - $ - ◄ 80% Federal + 20% NonFederal ►On System 602932 604537 Northern Middlesex Lowell LOWELL-BRIDGE REPLACEMENT, L-15058, VFW HIGHWAY OVER BEAVER BROOK (BR-ON) 4 NHPP $ 14,017,076 $ 11,213,661 $ 2,803,415 Northern Middlesex Lowell LOWELL-BRIDGE REPLACEMENT, L-15045, MARKET STREET OVER THE WESTERN CANAL (BR-ON) 4 NHPP $ 3,792,941 $ 3,034,353 $ 758,588 17,810,017 $ 14,248,014 $ $ 10,404,940 $ 8,323,952 $ $ - $ 10,404,940 $ - $ 8,323,952 $ On System Subtotal ► $ Revised Cost Estimate 3/26/14 Total project cost estimate for FY 2015 $3,792,941 3,562,003 ◄ 80% Federal + 20% NonFederal ►Off-System 607123 Northern Middlesex Chelmsford ► Statewide Bridge Inspection Program CHELMSFORD - HUNT RD OVER I-495 (BROFF) No Projects Programmed 4 STP-BR-OFF Off-System Subtotal ► $ No Projects $ Programmed No Projects $ Programmed Statewide Bridge Inspection Program Subtotal ► $ - 2,080,988 - 2,080,988 ◄ 80% Federal + 20% NonFederal $ - - $ - $ - - $ - $ - $ Year of Estimate 2014. ◄ 80% Federal + 20% NonFederal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid AMENDMENT:Add Project Northern Middlesex Lowell Merrimack Riverwalk Other FA $ 4 Phase II - FLAP Project $ No Projects Programmed Other Federal Aid Subtotal ► $ 293,311 $ - $ 293,311 $ 235,000 $ - $ 235,000 $ 58,311 58,311 ◄ Funding Split Varies by Funding ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed No Projects $ - $ - $ $ Programmed Statewide Infrastructure Program Subtotal ► $ - $ $ - $ $ - - - ◄ 80% Federal + 20% Non- ► Statewide HSIP Program No Projects Programmed No Projects $ - $ - $ Programmed $ Statewide HSIP Program Subtotal ► $ - $ $ - $ $ No Projects Programmed No Projects $ - - ◄ 90% Federal + 10% Non- - ► Statewide Safe Routes to Schools Program $ Programmed Statewide Safe Routes to Schools Program Subtotal ► $ - $ - $ $ - - $ - $ $ - - Funding Split Varies by Funding Source Split Varies by Funding Funding Source ◄ Funding Split Varies by Funding ► Statewide CMAQ No Projects Programmed No Projects $ - $ Statewide CMAQ ► $ - $ - $ - $ $ - $ $ - ◄ 80% Federal + 20% Non- No Projects $ No Projects $ Statewide Transportation Enhancements Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non- No Projects No Projects $ $ Statewide ITS Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non- No Projects $ No Projects $ Statewide Interstate Maintenance Program Subtotal ► $ - $ - $ - ◄ 90% Federal + 10% Non- No Projects $ No Projects $ Statewide NHS Preservation Program Subtotal ► $ - No Projects $ No Projects $ Statewide RR Grade Crossings Subtotal ► $ - $ No Projects $ No Projects $ Statewide Stormwater Retrofits Subtotal ► $ - $ No Projects $ No Projects $ Statewide ADA Implementation Plan Subtotal ► $ - $ Programmed - ►Statewide Transportation Enhancements ►Statewide ITS ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ - $ - $ - ◄ 80% Federal + 20% Non- - $ - ◄ 80% Federal + 20% Non- - $ - ◄ 80% Federal + 20% Non- - $ - ◄ 80% Federal + 20% Non- ►Statewide RR Grade Crossings ►Statewide Stormwater Retrofits ►Statewide ADA Implementation Plan - - ►Other Statewide Items ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails Other Statewide Items Subtotal ► $ $ - $ - $ $ - $ - $ - - - - - -$ - - - ◄ Funding Split Varies by Funding - - ►Section 2A / Non-Federal Projects -$ - ►Non Federal Aid No Projects No Projects NFA $ NFA $ Non-Federal Aid Subtotal► $ - $ $ $ - ◄100% Non-Federal No Projects NFA $ No Projects NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ $ $ - ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2015 Northern Middlesex MPO TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ TIP Section2: ▼ 34,281,407 $ 27,425,477 6,855,930 $ Total of All Projects ▼ - $ $ $ 34,281,407 ◄ Total Spending in Region 27,425,477 ◄ Total Federal Spending in 6,855,930 ◄ Total Non-Federal Spending in 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx 2015Old Colony Transportation Improvement Program MassDOT Project ID ▼ MPO ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program Amendment/Adjustment Type ▼ AMENDMENT:Add Project 608087 Old Colony 05/20/2014 Draft Released 06/24/2014 Endorsed Municipality Name ▼ Brockton MassDOT Project Description▼ BROCKTONPEDESTRIAN IMPROVEMENTS AT VARIOUS LOCATIONS MassDOT District ▼ 5 ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 604957 Old Colony Pembroke PEMBROKERECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 53) AC PHASE 1 OF 2 5 604957 Old Colony Pembroke PEMBROKERECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 53) AC PHASE 1 OF 2 Funding Source ▼ Total Programmed Funds ▼ Federal Funds ▼ HSIP $ 506,616 $ 455,954 $ 50,662 HSIP, YOE IS $506,616 HSIP Subtotal ► $ 506,616 $ 455,954 $ 50,662 ◄ 90% Federal + 10% Non-Federal $ 1,709,829 $ 1,367,863 $ 341,966 CMAQ Subtotal ► $ 1,709,829 $ $ 300,009 $ 240,007 $ 60,002 TAP Subtotal ► $ 300,009 $ 240,007 $ 60,002 CMAQ ►TAP - Transportation Alternatives Program 5 12/16/2014 TIP Amendment Released 01/XX/2015 TIP Amendment Endorsed TAP Non-Federal Funds Additional ▼ Information ▼ - - $ CMAQ/ TAP/ STP; YOE is $6,732,869; 100 Percent Design; TEC Score is 7 ◄ 80% Federal + 20% Non-Federal CMAQ/ TAP/ STP; YOE is $6,732,869; 100 Percent Design; TEC Score is 7 ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 604957 Old Colony ►Section 1A / Fiscal Constraint Analysis Pembroke PEMBROKERECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO 5 STP $ WASHINGTON STREET (ROUTE 53) AC PHASE 1 OF 2 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 4,723,031 $ 3,778,425 $ 944,606 4,723,031 $ 3,778,425 $ 944,606 Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 7,239,485 4,723,031 $ $ 7,239,485 4,723,031 ◄Total Target ◄ Max. NonCMAQ/HSIP/TAP $ $ - Target Funds Available Non-CMAQ/HSIP/TAP (Other) A $ 506,616 $ 1,709,829 $ 300,009 $ ‐ $ $ $ 506,616 1,709,829 300,009 ◄ Min. HSIP ◄ Min. CMAQ ◄ Min. TAP $ $ $ - HSIP Minimum Met CMAQ Minimum Met TAP Minimum Met Total HSIP Programmed ► Total CMAQ Programmed ► Total TAP Programmed ► Remaining HSIP, CMAQ, and TAP Funds CMAQ/ TAP/ STP; YOE is $6,732,869; 100 Percent Design; TEC Score is 7 ◄ 80% Federal + 20% Non-Federal ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects $ Programmed Statewide Bridge Maintenance Program Subtotal ► $ ►On System ►Off-System ► Statewide Bridge Inspection Program No Projects Programmed No Projects Programmed - $ - $ - - $ - $ - $ - $ - $ - On System Subtotal ► $ - $ - $ - $ - $ - $ - Off-System Subtotal ► $ - $ - $ - - $ - $ - - $ - $ - $ - $ - $ - Other Federal Aid Subtotal ► $ - $ - $ - $ $ - $ $ - No Projects $ Programmed Statewide Bridge Inspection Program Subtotal ► $ ◄ 80% Federal + 20% Non-Federal ◄ 80% Federal + 20% Non-Federal ◄ 80% Federal + 20% Non-Federal ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ 25 - - ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program No Projects Programmed ► Statewide Safe Routes to Schools Program ► Statewide CMAQ $ Statewide HSIP Program Subtotal ► $ - - No Projects $ Programmed Statewide Safe Routes to Schools Program Subtotal ► $ - - $ $ - $ $ - - $ $ No Projects $ Statewide Transportation Enhancements Subtotal ► $ - No Projects $ Statewide ITS Subtotal ► $ - No Projects $ Statewide Interstate Maintenance Program Subtotal ► $ - $ $ - $ $ - - $ $ - ◄ 80% Federal + 20% Non-Federal $ - $ - ◄ 80% Federal + 20% Non-Federal $ - $ - ◄ 80% Federal + 20% Non-Federal - -$ - -$ - ◄ 90% Federal + 10% Non-Federal No Projects $ Statewide NHS Preservation Program Subtotal ► $ - -$ - -$ - ◄ 80% Federal + 20% Non-Federal No Projects - - ◄ 80% Federal + 20% Non-Federal - ◄ 80% Federal + 20% Non-Federal - ◄ 80% Federal + 20% Non-Federal - ◄ Funding Split Varies by Funding Source - ◄100% Non-Federal No Projects Programmed - $ Statewide CMAQ ► $ - - - ◄ 90% Federal + 10% Non-Federal - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source - ►Statewide Transportation Enhancements ►Statewide ITS ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ ►Statewide RR Grade Crossings $ Statewide RR Grade Crossings Subtotal ► $ $ - - ►Statewide Stormwater Retrofits No Projects $ Statewide Stormwater Retrofits Subtotal ► $ - No Projects $ Statewide ADA Implementation Plan Subtotal ► $ - ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails $ $ - $ - $ $ - $ - Other Statewide Items Subtotal ► $ - ►Statewide ADA Implementation Plan $ - $ $ $ - - $ ►Other Statewide Items ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects NFA $ Non-Federal Aid Subtotal► $ - No Projects NFA $ Section 2B / Non-Federal Bridge Projects Subtotal ► $ - ►Section 2B / Non-Federal Bridge Projects - - - - - - $ - - $ - $ $ - TIP Section 2: ▼ $ $ ◄100% Non-Federal Total of All Projects ▼ ►Section 2B / Non-Federal Bridge Projects 2015 Old Colony TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ 5,529,656 4,474,386 1,055,270 $ - $ - $ $ $ 5,529,656 4,474,386 1,055,270 ◄ Total Spending in Region ◄ Total Federal Spending in Region ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx 2015 Statewide Categories Transportation Improvement Program MassDOT Project ID Amendment/Adjustment Type ▼ MPO ▼ ▼ AMENDMENT:Add Project 607468 Statewide AMENDMENT:Add Project 608110 STATEWIDE AMENDMENT:Add Project AMENDMENT:Add Project AMENDMENT:Add Project ADJUSTMENT:Increase Cost 608111 608112 608113 607072 STATEWIDE STATEWIDE STATEWIDE Statewide Municipality Name ▼ xx/xx/xxxx Draft Released MassD MassDOT OT Funding Source Project District ▼ Description▼ NHPP DISTRICT 2SYSTEMATIC BRIDGE 2 MAINTENANCE AT VARIOUS LOCATIONS 2 DISTRICT 2HSIP SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) DISTRICT 3SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) 3 DISTRICT 4SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) 4 DISTRICT 5DISTRICT 6SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) 5/6 STATEWIDEStatewide IMPLEMENTATI ON (PHASE III) OF THE FLASHING YELLOW ARROW AT SIGNALIZED INTERSECTIONS-ONE OF THE "FHWA NINE PROVEN COUNTERMEAS Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional ▼ Information $ 2,771,540 $ 2,217,232 $ 554,308 Re-advertisement $ 575,317 $ 517,785 $ 57,532 Project 607071 STATEWIDE- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) was withdrawn and replaced by 4 separate projects. $ 536,556 $ 482,901 $ 53,656 Project 607071 STATEWIDE- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) was withdrawn and replaced by 4 separate projects. $ 1,125,258 $ 1,012,733 $ 112,526 Project 607071 STATEWIDE- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) was withdrawn and replaced by 4 separate projects. $ 726,663 $ 653,996 $ 72,666 Project 607071 STATEWIDE- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) was withdrawn and replaced by 4 separate projects. $ 2,000,000 $ 1,800,000 $ 200,000 Increase project by $500,000. HSIP HSIP HSIP HSIP AMENDMENT:Remove Project ADJUSTMENT:Decrease Cost ADJUSTMENT:Increase Cost 606432 607422 607424 AMENDMENT:Increase Cost,AMENDMENT:Change Funding Source 606927 AMENDMENT:Remove Project 606916 AMENDMENT:Remove Project AMENDMENT:Remove Project ADJUSTMENT:Increase Cost ADJUSTMENT:Increase Cost 606930 606931 RRC RRC STATEWIDE STATEWIDE Statewide BURLINGTON BURLINGTON- Statewid e WOBURNREADINGEXPANSION OF FIBER, CCTV, VMS & TRAFFIC SENSOR NETWORK ON I- CMAQ Statewid DISTRICT 1e DISTRICT 2DISTRICT 3DISTRICT 4DISTRICT 5DISTRICT 6REAL TIME TRAVEL MONITORING ( STATEWIDEITS) Statewid e ADVANCED TRANSPORTATI ON MANAGEMENT SYSTEM (ATMS) CMAQ STATEWIDE Statewide Statewid STATEWIDEe REPLACEMENT OF VARIABLE MESSAGE SIGNS (VMS) Statewid STATEWIDEe HOC OPERATIONS AND MAINTENANCE SUPPORT ITS STATEWIDE STATEWIDE STATEWIDE STATEWIDE STATEWIDE STATEWIDE BRAINTREE BRAINTREE BRAINTREEQUINCYBOSTON- HOV LANE TOW TRUCK SERVICES & Statewid e BRAINTREEQUINCYBOSTON- HOV LANE TOW TRUCK SERVICES & Statewid e STATEWIDE RAILROAD CROSSING HAZARD ELIMINATION CONTRACTS 0 STATEWIDE RAILROAD CROSSING PROTECTIVE DEVICES CONTRACTS 0 $ 500,000 $ 400,000 $ 100,000 Remove project. $ 1,246,623 $ 997,298 $ 249,325 Decrease funding by $2,253,377 due to award adjustment $ 4,324,577 $ 3,459,662 $ 864,915 Increase by $2,324,577. AC Year 1 of 2. Total Project Cost $5,324,577. $ 3,228,800 $ 2,583,040 $ 645,760 Increase by $1,500,000. Change funding from STP to CMAQ. Approved via consultation in January 2014. AC Year 1 of 2 Total Project Cost $3,728,800. $ 613,600 $ 490,880 $ 122,720 Remove project. $ 228,800 $ 183,040 $ 45,760 Remove project. $ 228,800 $ 183,040 $ 45,760 Remove project. $ 4,875,000 $ 3,900,000 $ 975,000 Increase cost from $500,000. $ 4,875,000 $ 3,900,000 $ 975,000 Increase cost from $500,000. CMAQ CMAQ STP STP STP RRHE RRPD ADJUSTMENT:Decrease Cost,ADJUSTMENT:Change Project Description AMENDMENT:Remove Project 606997 606999 Statewide STATEWIDE STATEWIDE BRAINTREEMILTONBOSTONSTATEWIDESTORMWATER RETROFITS AT VARIOUS 5&6 STP-TE $ 2,152,030 $ 1,721,624 $ $ 3,300,000 $ 2,640,000 $ 430,406 MANSFIELD LOCATION MOVED FROM 606997 to 608132. Project description updated. STP-TE 0 660,000 Remove 606999 as Stormwater funding for IM/NHS projects is now called out specifically by project. massDOT Charlie Baker, Governor J<aryn Polito, Lt. Governor Stephanie Pollack, MassDOT Secretary & CEO Massachusetts Department of Transportation February 6, 20 I 5 Mary Beth Mello Regional Administrator Federal Transit Administration 55 Broadway- 9th floor Cambridge, Massachusetts 02142 Dear Ms. Mello: On behalf of Secretary Stephanie Pollacl<, I am writing to request your approval of the attached transit actions pertaining to the Federal Fiscal Years 20 15-2018 State Transportation Improvement Program, as endorsed by the Boston Metropolitan Planning Organization, Franklin Regional Council of Governments, Northern Middlesex Metropolitan Planning Organization, and Old Colony Metropolitan Planning Organization. These transit actions, which include project additions, deletions and changes, are highlighted in green, pinl< and yellow, r espectively. These actions do not require an air quality conformity determination. If you have any questions, please call me at (857)368-8865. Sincerely, irector Executi Office of Transportati n Planning cc: Clinton Bench, Deputy Executive Director Steve Woelfel, Director of Strategic Planning Trey Wadsworth; Manager of MPO Activities Bryan 1<. Pounds, MPO Activities Tom Schiavone, Manager of Transit Programs Federal Transit Administration Federal Highway Administration Leading the Nation in Transportation Excellence Ten Park Plaza, Suite 4 I 60, Boston, MA 02 I I 6 Tel: 857-368-4636, TTY: 857-368-06 55 . www.mass.govj massdot Charlie Baker, Governor Karyn Polito, Lt. Governor Stephanie Pollack, MassDOT Secretary & CEO February 6, 2015 Mary Beth Mello Regional Administrator Federal Transit Administration 55 Broadway – 9th floor Cambridge, Massachusetts 02142 Dear Ms. Mello: On behalf of Secretary Stephanie Pollack, I am writing to request your approval of the attached transit actions pertaining to the Federal Fiscal Years 2015-2018 State Transportation Improvement Program, as endorsed by the Boston Metropolitan Planning Organization, Franklin Regional Council of Governments, Northern Middlesex Metropolitan Planning Organization, and Old Colony Metropolitan Planning Organization. These transit actions, which include project additions, deletions and changes, are highlighted in green, pink and yellow, respectively. These actions do not require an air quality conformity determination. If you have any questions, please call me at (857)368-8865. Sincerely, David J. Mohler Executive Director Office of Transportation Planning cc: Clinton Bench, Deputy Executive Director Steve Woelfel, Director of Strategic Planning Trey Wadsworth, Manager of MPO Activities Bryan K. Pounds, MPO Activities Tom Schiavone, Manager of Transit Programs Federal Transit Administration Federal Highway Administration Leading the Nation in Transportation Excellence Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 www.mass.gov/massdot Fiscal Constraint Analysis - 2015 Current Year Available Federal Funding Source Carryover Programmed Funds Unprogrammed Funds State Funding Current Year Source Available Change Programmed Funds Unprogrammed Funds 5307 $372,364,357 $199,553,260 $135,246,931 $436,670,686 $1,731,113 RTACAP $18,153,021 $18,153,021 $0 5309 $3,670,154 $100,000,000 $100,000,000 $3,670,154 $0 SCA $23,428,222 $21,686,697 $0 n/a 5310 $908,805 $0 $908,805 $0 $807,943 TDC n/a $952,552 5311 $2,734,326 $2,761,670 $2,734,326 $2,761,670 $0 MAP $93,491 $93,491 $0 5337 $240,253,324 $121,965,273 $124,213,575 $238,005,022 $0 ITCCAP $0 $0 $0 5339 $14,318,379 $7,703,009 $8,983,071 $13,038,317 $441,747 Local $362,666,387 $362,666,387 n/a $0 $55,615,132 $55,615,132 $0 $0 $634,249,345 $431,983,212 $372,086,708 $694,145,849 $372,086,708 Total NonFederal Aid $404,341,121 $402,599,596 $0 Discr. Federal Funds Change ‐$2,257,826 $0 $92,160 $0 $0 $1,019,572 Fiscal Constraint Analysis - 2016 Current Year Available Federal Funding Source Carryover 5307 5309 5310 5311 5337 5339 Programmed Funds Unprogrammed Funds State Funding Current Year Source Available Change $436,670,686 $201,548,794 $133,297,659 $504,921,821 -$1,949,272 $3,670,154 $150,000,000 $150,000,000 $3,670,154 $0 $0 $0 $0 $0 $0 $2,761,670 $2,789,286 $2,498,397 $3,052,559 $0 $238,005,022 $123,184,924 $124,226,215 $236,963,731 $0 $13,038,317 $7,780,038 $8,983,071 $11,835,284 $0 $0 $1,042,292 $1,042,292 $0 $1,042,292 $694,145,849 $485,303,042 $419,005,342 $760,443,549 -$1,949,272 Discr. Federal Funds RTACAP SCA TDC MAP ITCCAP Local Total NonFederal Aid Programmed Funds Unprogrammed Funds Change $16,015,665 $0 $48,661 $21,569,237 $21,569,237 $0 $0 n/a $467,522 n/a $0 $0 $0 $0 $0 $16,015,665 $0 $0 $0 $0 Total Cost Total Cost n/a $0 $37,584,902 $37,584,902 $0 $0 Fiscal Constraint Analysis - 2017 Current Year Available Federal Funding Source Carryover 5307 5309 5310 5311 5337 5339 Programmed Funds Unprogrammed Funds State Funding Current Year Source Available Change $504,921,821 $203,564,284 $98,066,616 $610,419,489 $0 $3,670,154 $150,000,000 $150,000,000 $3,670,154 $0 $0 $0 $0 $0 $0 $3,052,559 $2,817,180 $2,523,223 $3,346,516 $0 $236,963,731 $124,416,773 $123,587,796 $237,792,708 $0 $11,835,284 $7,857,836 $6,253,054 $13,440,066 $0 $760,443,549 $488,656,073 $380,430,689 $868,668,933 $0 RTACAP SCA TDC MAP ITCCAP Local Total NonFederal Aid Programmed Funds Unprogrammed Funds $56,550,513 $56,550,513 $0 $21,554,775 $21,554,775 n/a n/a $378,000 n/a $0 $0 $0 $0 $0 $0 $397,270,070 $397,270,070 n/a $475,375,358 $475,375,358 $0 Change Fiscal Constraint Analysis - 2018 Federal Funding Source 5307 5309 5310 5311 5337 5339 Current Year Available Carryover Programmed Funds Unprogrammed Funds State Funding Current Year Source Available Change $610,419,489 $205,599,926 $95,642,959 $720,376,456 $0 $3,670,154 $150,000,000 $150,000,000 $3,670,154 $0 $0 $0 0 $0 $0 $3,346,516 $2,845,350 $2,548,297 $3,643,569 $0 $237,792,708 $125,660,941 $124,311,768 $239,141,881 $0 $13,440,066 $7,936,418 $6,262,715 $15,113,769 $0 $868,668,933 $492,042,635 $378,765,739 $981,945,829 $0 RTACAP SCA TDC MAP ITCCAP Local Total NonFederal Aid Programmed Funds Unprogrammed Funds Change $0 $13,118,605 $13,118,605 $0 $19,206,508 $19,206,508 $0 $0 n/a $0 n/a $0 $0 $0 $0 $0 $0 $0 $0 $0 $386,905,906 $386,905,906 n/a $0 $419,231,019 $419,231,019 $0 $0 Transportation Improvement Program (TIP) Project List (FY2015) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 5307 5307 5307 5307 Cape Ann Transportation Authority Cape Ann Transportation Authority Cape Ann Transportation Authority MetroWest Regional Transit Authority 117A00 5307 MetroWest Regional Transit Authority 5307 MetroWest Regional Transit Authority 5307 MetroWest Regional Transit Authority 5307 5307 5307 5307 MetroWest Regional Transit Authority MetroWest Regional Transit Authority 117C00 MetroWest Regional Transit Authority MetroWest Regional Transit Authority Massachusetts Bay Transportation Authority 5307 (MBTA) Massachusetts Bay Transportation Authority 5307 (MBTA) Massachusetts Bay Transportation Authority 5307 (MBTA) 117A00 PREVENTIVE MAINTENANCE 111203 BUY REPLACEMENT 30-FT BUS (1) 114220 ACQUIRE - MISC SUPPORT EQUIPMENT 113403 TERMINAL, INTERMODAL (TRANSIT) ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES 119208 PURCHASE SIGNAGE $193,391 $0 $320,000 $80,000 $16,700 $4,176 $262,791 $156,180 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $48,347 $0 $0 $0 $241,738 $400,000 $20,876 $418,971 $20,000 $15,176 $5,000 $3,794 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $25,000 $18,970 $22,940 114209 ACQUIRE - MOBILE SURV/SECURITY EQUIP ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES NON FIXED ROUTE ADA PARA SERV 113303 TERMINAL, INTERMODAL (TRANSIT) 114211 ACQUIRE - SUPPORT VEHICLES Government Center (Blue Line 123402 Modernization) $5,735 $0 $0 $0 $0 $0 $28,675 $3,524 $1,378,983 $20,000 $40,000 $881 $0 $5,000 $10,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $344,746 $0 $0 $0 $0 $0 $0 $0 $0 $4,405 $1,723,729 $25,000 $50,000 $32,761,068 $0 $0 $0 $0 $0 $8,190,267 $40,951,335 123302 Elevators/Escalators $25,924,448 $0 $0 $0 $0 $0 $6,481,112 $32,405,560 $12,000,000 $0 $72,939,021 $260,766 $0 $0 $0 $0 $0 $0 $0 $344,746 $3,000,000 $17,719,726 $15,000,000 $91,264,259 PREVENTIVE MAINTENANCE Subtotal 5309 Massachusetts Bay Transportation Authority 5309 (MBTA) GREEN LINE EXTENSION: COLLEGE 132303 AVE/UNION SQ SPUR Subtotal $100,000,000 $100,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $225,202,000 $325,202,000 $0 $225,202,000 $325,202,000 $91,784 $0 $0 $0 $0 $0 5310 5310 City of Salem (NSCC) Mobility Management - Employment 442700 Express Mobility Management - Employment 442700 Express (Grant 2) 5310 City of Salem (NSCC) 300900 Employment Express - Operating Assistance 5310 City of Salem (NSCC) $22,946 $114,730 $53,559 $0 $0 $0 $0 $0 $13,390 $66,949 Subtotal $662,600 $807,943 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $662,600 $698,936 $1,325,200 $1,506,879 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 122404 Bridge & Tunnel Program $60,000,000 $0 $0 $0 $0 $0 $15,000,000 $75,000,000 123402 Stations - T-GAPS $40,000,000 $0 $0 $0 $0 $0 $10,000,000 $50,000,000 Subtotal $21,190,546 $121,190,546 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,297,637 $26,488,183 $30,297,637 $151,488,183 $460,800 $0 $0 $0 $92,160 $0 $0 $460,800 Subtotal $5,287,027 $5,747,827 $0 $0 $0 $0 $0 $0 $0 $92,160 $0 $0 $1,321,757 $1,321,757 $6,608,784 $7,069,584 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 113303 Ruggles Station Modernization $20,000,000 $0 $0 $0 $0 $0 $10,000,000 $30,000,000 122400 Charlestown Seawall Replacement $13,391,443 $0 $0 $0 $0 $0 $4,463,815 $17,855,258 112303 Green Line Fenway Portal Flood Proofing $21,673,689 $0 $0 $0 $0 $0 $7,224,564 $28,898,253 5311 5337 Massachusetts Bay Transportation Authority 5337 (MBTA) Massachusetts Bay Transportation Authority 5337 (MBTA) Massachusetts Bay Transportation Authority 5337 (MBTA) 119400 Systems Upgrades 5339 Massachusetts Bay Transportation Authority 5339 (MBTA) Massachusetts Bay Transportation Authority 5339 (MBTA) 111440 REHAB/REBUILD SPARE PARTS 119400 Systems Upgrades 5320 Other Federal Other Federal Other Federal Other Federal Massachusetts Bay Transportation Authority (MBTA) Massachusetts Bay Transportation Authority (MBTA) Massachusetts Bay Transportation Authority (MBTA) Subtotal Other Non-Federal Other Non-Federal Other Non-Federal Cape Ann Transportation Authority Massachusetts Bay Transportation Authority (MBTA) 111204 BUY REPLACEMENT <30 FT BUS (1) 121221 HEAVY RAIL CARS - Red/Orange Lines Subtotal Total $55,065,132 $0 $0 $0 $0 $0 $21,688,379 $76,753,511 $0 $121,824 $0 $0 $0 $0 $0 $121,824 $0 $0 $0 $121,824 $355,750,469 $382,590 $0 $0 $0 $0 $0 $0 $82,130,340 $82,130,340 $0 $0 $0 $82,130,340 $82,252,164 $0 $92,160 $344,746 $379,058,775 $735,536,580 Transportation Improvement Program (TIP) Project List (FY2015) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $1,095,869 $1,095,869 $0 $0 $0 $0 $0 $0 $775,233 $0 $0 $775,233 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 5309 5310 5311 5311 Franklin Regional Transit Authority 300900 OPERATING ASSISTANCE $320,636 $2,191,738 $320,636 $2,191,738 5337 5339 5320 Other Federal Other Non‐Federal Other Non‐Federal Franklin Regional Transit Authority 114243 ACQUIRE ‐ ADA VEHICLE EQUIPMENT $0 $15,000 $0 $0 $0 $0 $0 $15,000 Other Non‐Federal Other Non‐Federal Other Non‐Federal Franklin Regional Transit Authority Franklin Regional Transit Authority Franklin Regional Transit Authority 116402 REHAB/RENOV COMMUNICATIONS SYSTEM 119402 Transit Enhancements: Bus Shelters 114220 ACQUIRE ‐ MISC SUPPORT EQUIPMENT $0 $0 $0 $4,500 $20,000 $12,900 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,500 $20,000 $12,900 Other Non‐Federal Franklin Regional Transit Authority $0 $149,970 $0 $0 $0 $0 $0 $149,970 Other Non‐Federal Franklin Regional Transit Authority $0 $236,139 $0 $0 $0 $0 $0 $236,139 Other Non‐Federal Franklin Regional Transit Authority 116302 CONSTRUCT COMMUNICATIONS SYSTEM BUY REPLACEMENT <30 FT BUS (3 111204 Minibuses) REAL ESTATE ACQUISITION ‐ MAINTENANCE 117691 FACILITY $0 $1,200,000 $0 $0 $0 $0 $0 $1,200,000 Other Non‐Federal Franklin Regional Transit Authority 113403 Rehab/Renovation: Terminal, Intermodal $0 $10,000 $0 $0 $0 $0 $0 $10,000 $0 $15,000 $0 $0 $0 $0 $0 $15,000 $0 $10,000 $0 $1,638,509 $1,095,869 $1,638,509 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $775,233 Other Non‐Federal Franklin Regional Transit Authority Other Non‐Federal Franklin Regional Transit Authority REHAB/RENOVATE ‐ MOBILE 114409 SURVEILL/SECURITY EQUIP 114406 Rehab/Renovation: Shop Equipment Subtotal Total $0 $10,000 $0 $1,638,509 $320,636 $3,830,247 Transportation Improvement Program (TIP) Project List (FY2015) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 5307 Lowell Regional Transit Authority ENGINEERING/DESIGN FOR GALLAGHER 119100 INTERMODAL LOBBY 5307 Lowell Regional Transit Authority 113304 Construction: Gallagher 1 Parking Garage 5307 Lowell Regional Transit Authority 442400 SHORT RANGE TRANSIT PLANNING (RTP) BUY (6) REPLACEMENT 30‐FT BUS (st match 111203 in 2016) Purchase ‐ Replacement: Fixed Route Vans 111215 (4) 114211 ACQUIRE ‐ Supervisory Vehicle 442400 SHORT RANGE TRANSIT PLANNING 2015 111240 Purchase ‐ Capital Spare Parts PREVENTIVE MAINTENANCE 2015 300901 Operating Assistance 2015 5307 Lowell Regional Transit Authority 5307 5307 5307 5307 5307 5307 Lowell Regional Transit Authority Lowell Regional Transit Authority Lowell Regional Transit Authority Lowell Regional Transit Authority Lowell Regional Transit Authority Lowell Regional Transit Authority 117A00 $240,000 Subtotal $60,000 $0 $0 $0 $0 $0 $300,000 $2,058,854 $2,058,854 $0 $0 $0 $0 $0 $4,117,708 $25,000 $0 $0 $0 $0 $0 $6,250 $31,250 $2,000,000 $0 $0 $0 $0 $0 $0 $2,000,000 $320,000 $80,000 $30,400 $7,600 $80,000 $0 $104,000 $26,000 $1,074,404 $0 $1,663,686 $0 $7,596,344 $2,232,454 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $400,000 $0 $0 $0 $38,000 $0 $0 $20,000 $100,000 $0 $0 $0 $130,000 $0 $269,601 $0 $1,344,005 $0 $3,310,590 $2,476,697 $7,450,973 $0 $3,580,191 $2,502,947 $15,911,936 5309 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $57,189 $0 $57,189 $0 $0 $0 $0 $285,945 $285,945 Subtotal $550,000 $550,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $550,000 $550,000 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 $0 $105,000 $0 $105,000 $8,146,344 $2,337,454 $0 $0 $0 $0 $0 $0 $0 $105,000 $0 $0 $0 $0 $105,000 $0 $57,189 $3,580,191 $2,502,947 $16,852,881 5310 5311 5337 5339 5339 Lowell Regional Transit Authority ENGINEERING/DESIGN FOR GALLAGHER 113103 INTERMODAL LOBBY 5320 5320 Lowell Regional Transit Authority Alternatives Analysis for Lowell Trolley 119107 Expansion Other Federal Other Non‐Federal Other Non‐Federal Lowell Regional Transit Authority 111403 Mid‐Life Overhaul 2008 Gilligs Subtotal Total Transportation Improvement Program (TIP) Project List (FY2016) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 5307 5307 5307 5307 Lowell Regional Transit Authority Lowell Regional Transit Authority Lowell Regional Transit Authority Lowell Regional Transit Authority 5307 Lowell Regional Transit Authority 5307 Lowell Regional Transit Authority 117A00 442400 SHORT RANGE TRANSIT PLANNING 2016 111240 Purchase ‐ Capital Spare Parts PREVENTIVE MAINTENANCE 2016 300901 Operating Assistance 2016 111203 BUY REPLACEMENT 30‐FT DIESEL BUSES (8) 111215 BUY REPLACEMENT VAN 2015 2015 2015 $80,000 $104,000 $1,078,440 $1,663,686 $0 $26,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 2014 2012 Subtotal $561,030 $5,342 $3,487,156 $626,240 $1,336 $652,240 $0 $0 $0 $0 $0 $0 $0 $1,187,270 $0 $0 $0 $0 $6,678 $0 $0 $3,674,810 $2,558,614 $10,372,820 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 2014, 2015 $0 $0 $20,000 $0 $0 $0 $0 $269,610 $0 $0 $3,405,200 $2,538,614 $100,000 $130,000 $1,348,050 $7,607,500 5309 5310 5311 5337 5339 Purchase ‐ Replacement: Fixed Route Vans (2) 5339 Lowell Regional Transit Authority 111215 5320 City of Lowell 119107 Eng/Design for the Lowell Trolley Expansion Subtotal $0 $0 $0 $0 $0 $0 $0 $0 2014 $142,965 $49,997 $0 $0 $0 $0 $0 $192,962 Subtotal $1,042,292 $1,042,292 $0 $0 $1 $1 $0 $0 $0 $0 $0 $0 $0 $0 $1,042,293 $1,042,293 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $0 $500,000 $4,529,448 $1,152,240 $0 $0 $1 $0 $0 $0 $0 $500,000 $0 $0 $0 $0 $500,000 $0 $0 $3,674,810 $2,558,614 $11,915,113 5320 Other Federal Other Non‐Federal Other Non‐Federal Lowell Regional Transit Authority 111203 Replace (6) CNG Fixed Route Buses Subtotal Total Transportation Improvement Program (TIP) Project List (FY2016) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 5307 Brockton Area Transit Authority 5307 Brockton Area Transit Authority 5307 Brockton Area Transit Authority 5307 Brockton Area Transit Authority 111304 BUY <30‐FT BUS FOR EXPANSION (1) REHAB/RENOVATE ‐ MAINTENANCE 114402 FACILITY 116400 REHAB/RENOV‐COMMUNICATIONS EQ 114220 ACQUIRE ‐ MISC SUPPORT EQUIPMENT 5307 5307 5307 5307 5307 111700 VEH OVERHAUL (UP TO 20% VEH MAINT) 114211 ACQUIRE ‐ SUPPORT VEHICLES (2) 111240 BUY ASSOC CAP MAINT ITEMS 300900 Operating/PM/ADA 111201 BUY REPLACEMENT 40‐FT BUS (1) Brockton Area Transit Authority Brockton Area Transit Authority Brockton Area Transit Authority Brockton Area Transit Authority Brockton Area Transit Authority 2013 $52,000 $13,000 $0 $0 $0 $0 $0 $65,000 2013 2015 2015 $103,200 $25,800 $20,000 $5,000 $120,000 $30,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $129,000 $25,000 $150,000 2015 2014 Subtotal $448,000 $52,000 $140,000 $2,500,000 $244,771 $3,679,971 $112,000 $13,000 $35,000 $0 $61,193 $294,993 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,679,971 $294,993 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 2014, 2015 $0 $0 $0 $0 $0 $0 $0 $2,500,000 $0 $0 $0 $2,500,000 $0 $560,000 $0 $65,000 $0 $175,000 $0 $5,000,000 $114,036 $420,000 $114,036 $6,589,000 5309 5310 5311 5337 5339 5320 Other Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Brockton Area Transit Authority Brockton Area Transit Authority Brockton Area Transit Authority Brockton Area Transit Authority Brockton Area Transit Authority 300900 Operating: Easton 111204 BUY REPLACEMENT <30 FT BUS (7) 111215 BUY REPLACEMENT VAN COA (3) 300900 Operating: Sunday Service 300900 Operating: Rockland Subtotal Total $0 $15,000 $15,000 $30,000 $0 $0 $470,000 $470,000 $0 $0 $185,000 $185,000 $0 $400,000 $400,000 $800,000 $0 $110,000 $110,000 $220,000 $0 $525,000 $1,180,000 $1,705,000 $0 $3,025,000 $1,294,036 $8,294,000 Transportation Improvement Program (TIP) Project List (FY2017) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 5307 Brockton Area Transit Authority 5307 Brockton Area Transit Authority 5307 5307 5307 5307 Brockton Area Transit Authority Brockton Area Transit Authority Brockton Area Transit Authority Brockton Area Transit Authority 5307 5307 5307 5307 Brockton Area Transit Authority Brockton Area Transit Authority Brockton Area Transit Authority Brockton Area Transit Authority REHAB/RENOVATE ‐ MISC BUS STATION 113420 EQUIPMENT 114406 REHAB/RENOVATE ‐ SHOP EQUIPMENT REHAB/RENOVATE ‐ MOBILE 114409 SURVEILL/SECURITY EQUIP 111304 BUY <30‐FT BUS FOR EXPANSION (1) 111240 BUY ASSOC CAP MAINT ITEMS 114220 ACQUIRE ‐ MISC SUPPORT EQUIPMENT REHAB/RENOVATE ‐ MOBILE FARE COLL 114410 EQUIP 300900 Operating/PM/ADA 119202 PURCHASE BUS SHELTERS 114211 ACQUIRE ‐ SUPPORT VEHICLES (1) 2016 2015 $107,200 $144,000 $26,800 $36,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $134,000 $180,000 2016 2016 2016 2016 $80,000 $52,000 $140,000 $60,000 $20,000 $13,000 $35,000 $15,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $100,000 $65,000 $175,000 $75,000 2016 2016 2016 Subtotal $400,000 $2,550,000 $32,000 $60,000 $3,625,200 $100,000 $0 $8,000 $15,000 $268,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,550,000 $0 $0 $0 $0 $0 $2,550,000 $0 $0 $0 $0 $0 $500,000 $5,100,000 $40,000 $75,000 $6,444,000 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $75,000 $42,000 $75,000 $42,000 $150,000 $84,000 $0 $120,000 $0 $0 $0 $0 $0 $0 $0 $800,000 $0 $920,000 $3,625,200 $1,188,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 2015, 2016 5309 5310 5311 5337 5339 5320 Other Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Brockton Area Transit Authority Brockton Area Transit Authority Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Brockton Area Transit Authority Brockton Area Transit Authority Brockton Area Transit Authority Brockton Area Transit Authority Brockton Area Transit Authority 300900 Operating: Saturday Evening Service 300900 Operating: Avon/Stoughton CONSTRUCT ‐ MISC BUS STATION 113320 EQUIPMENT 111207 BUY REPLACEMENT COMMUTER BUS (3) 111204 BUY REPLACEMENT <30 FT BUS (7) 111215 BUY REPLACEMENT VAN COA (3) 111202 BUY REPLACEMENT 35‐FT BUS (9‐11) Subtotal Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $117,000 $0 $2,667,000 $480,000 $600,000 $1,800,000 $1,800,000 $485,000 $485,000 $190,000 $190,000 $3,200,000 $4,000,000 $6,272,000 $7,309,000 $6,272,000 $13,753,000