December 17, 2014 Pamela Stephenson Division Administrator Federal Highway Administration 55 Broadway – 10 th floor Cambridge, Massachusetts 02142 Dear Ms. Stephenson: On behalf of Acting Secretary Frank DePaola, I am writing to request your approval of the attached highway actions pertaining to the Federal Fiscal Years 20152018 State Transportation Improvement Program, as endorsed by the Berkshire Metropolitan Planning Organization and the Central Massachusetts Metropolitan Planning Organization: 0.02-0.07 2.01 Central Mass. Berkshire November 12, 2014 December 9, 2014 These actions do not require an air quality conformity determination. If you have any questions, please call me at (857)368-8865. Sincerely, David J. Mohler Executive Director Office of Transportation Planning cc: Clinton Bench, Deputy Executive Director Steve Woelfel, Director of Strategic Planning Trey Wadsworth, Manager of MPO Activities Bryan K. Pounds, MPO Activities William Betts, FAPO Federal Transit Administration Federal Highway Administration Leading the Nation in Transportation Excellence Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 www.mass.gov/massdot Amendment # MPO ProjectID Location Additional Information 605588 Construction / Design Status = Pre 25% / Bridge WORCESTER, WEST BOYLSTON - INTERSTATE Maintenance (FY15&16) + Interstate Maintenance WORCESTER MAINTENANCE & RELATED WORK ON I-190, Total Project Cost = $17,952,096 / Project #607518 INCLUDING W-44-124, I-190 OVER ROUTE 12 & RAMP B & #607519 being combined into project #605588 605588 Construction / Design Status = Pre 25% / Bridge Maintenance (FY15&16) + Interstate Maintenance WORCESTER, WEST BOYLSTON - INTERSTATE Total Project Cost = $17,952,096 / This project was WORCESTER MAINTENANCE & RELATED WORK ON I-190, moved from On System" to "Bridge Maintenance" / INCLUDING W-44-124, I-190 OVER ROUTE 12 & RAMP B Project #607518 & #607519 being combined into project #605588" 607518 WORCESTER - FEDERAL AID SYSTEMATIC MAINTENANCE; BRIDGE JOINTS, DECK REPAIRS, Construction / Design Status = TBD / Total Project WORCESTER PRESSURE WASHING AND RELATED WORK; I-190 OVER Cost = $1,521,624 / Project #607518 & #607519 being combined into project #605588 RT 12 AND RAMP B; BRIDGE NO. W-44-124 (1XF) NORTHBOUND 605588 Construction / Design Status = Pre 25% / Bridge Maintenance (FY15&16) + Interstate Maintenance WORCESTER, WEST BOYLSTON - INTERSTATE Total Project Cost = $17,952,096 / This project was WORCESTER MAINTENANCE & RELATED WORK ON I-190, moved from On System" to "Bridge Maintenance" / INCLUDING W-44-124, I-190 OVER ROUTE 12 & RAMP B Project #607518 & #607519 being combined into project #605588" CENTRAL MA 607519 WORCESTER - FEDERAL AID SYSTEMATIC Construction / Design Status = TBD / Total Project MAINTENANCE; BRIDGE JOINTS; DECK REPAIRS; WORCESTER Cost = $1,519,992 / Project #507518 & #607519 PRESSURE WASHING AND RELATED WORK; I-190 OVER being combined into project #605588 RT 12 AND RAMP B; BRIDGE NO. W-44-124 (1XG) CENTRAL MA 606075 OXFORD BERKSHIRE 605930 ADAMS CENTRAL MA 0.02 CENTRAL MA 0.03 CENTRAL MA 0.04 CENTRAL MA 0.05 0.06 0.07 2.01 Description OXFORD - STRUCTURAL STEEL CLEANING AND PAINTING AND OTHER RELATED WORK; BRIDGE NO. O06-036 OVER DANA ROAD AND BRIDGE NO. O-06-037 I395 SB OVER FEDERAL HILL ROAD ADAMS - MOUNT GREYLOCK SCENIC BYWAYS IMPROVEMENTS AT BASCOM LODGE AND WAR MEMORIAL TOWER Construction / Design Status = TBD / Total Project Cost = $1,519,954 / This project was moved from On System to Bridge Maintenance Design & construction Current Funding Source NHPP Current Total $14,910,480 $0 Current Federal Funds $13,419,432 $0 Current Non-Federal Funds $1,491,048 $0 Current Year 2015 2015 Revised Funding Source NHPP NHPP Revised Total $14,910,480 $1,521,624 Revised Federal Funds $13,419,432 $1,217,299 Revised Non-Federal Funds $1,491,048 $304,325 Revised Year Amendment Description 2015 ADJUSTMENT:Change Funding Source,ADJUSTMENT:Change Project Description,ADJUSTMENT:Change Additional Information 2015 ADJUSTMENT:Add Funding Source,ADJUSTMENT:Change Project Description,ADJUSTMENT:Change Additional Information Amendment Date 12/12/2014 14:32 12/12/2014 14:32 NHPP $1,521,624 $1,217,299 $304,325 2015 $0 $0 $0 ADJUSTMENT:Change Project ID 12/12/2014 $0 $0 $0 2016 NHPP $1,519,992 $1,215,994 $303,998 2016 ADJUSTMENT:Add Funding Source,ADJUSTMENT:Change Project Description,ADJUSTMENT:Change Additional Information 12/12/2014 14:32 NHPP $1,519,992 $1,215,994 $303,998 2016 NHPP $1,519,954 $1,215,963 $303,991 2017 $0 $0 $0 2015 $0 $0 $0 NHPP $1,519,954 $1,215,963 $303,991 2017 ADJUSTMENT:Change Funding Source SBYWY $990,000 $792,000 $198,000 2015 AMENDMENT:Add Project ADJUSTMENT:Change Project ID 12/12/2014 12/12/2014 14:32 12/12/2014 8:43 2015 Central Mass MPO Transportation Improvement Program Amendment/Adjustment Type ▻ MassDOT Project ID ▻ MPO ▻ Municipality Name ▻ 05/14/2014 Draft Released 06/25/2014 Endorsed MassDOT Project Description▻ MassDOT District ▻ Funding Source ▻ Total Programmed Funds ▻ Federal Funds ▻ Non-Federal Funds Additional ▻ Information ▻ 3 HSIP $ 1,000,000 $ 900,000 $ 100,000 3 HSIP $ 1,000,000 $ 900,000 $ 100,000 HSIP Subtotal ► $ 2,000,000 $ 1,800,000 $ 200,000 ▼ 90% Federal + 10% Non-Federal $ 1,300,000 $ 1,040,000 $ 260,000 ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 606485 Central Mass 606347 Central Mass MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD STURBRIDGE - RESURFACING AND RELATED WORK ON ROUTE 20, FROM ROUTE 49 TO I-84 Construction / Design Status = 25% / TEC Score = 2.3 / STP + HSIP+ SW HSIP Total Project Cost = $5,350,000 Construction / Design Status = Book Job / TEC Score = 3.3 / STP + HSIP Total Project Cost = $2,700,000 ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 607484 605964 Central Mass Central Mass ►TAP - Transportation Alternatives Program DISTRICT 3 - INSTALLATION OF CCTV CAMERAS AND VMS ON I-290 BETWEEN I295 AND I-90 MILLBURY - BRIDGE REPLACEMENT, M-22020, ROUTE 146 (NB & SB) OVER WEST MAIN STREET AND IMPROVEMENTS ON ROUTE 146 @ ELM STREET, ELMWOOD STREET & WEST MAIN STREET (ROTARY) 3 3 CMAQ Construction / Design Status = TBD / Total Project Cost = $1,300,000 $ 2,317,000 $ 1,853,600 $ Construction / Design Status = 25% / TEC Score = 6.90 / Total Project Cost w/NFA Funding = $13,647,354 / See also NFA Bridge Project under 463,400 Section 2B CMAQ Subtotal ► $ 3,617,000 $ 2,893,600 $ 723,400 ▼ 80% Federal + 20% Non-Federal CMAQ TAP01 Central Mass CMRPC REGION - BIKE RACKS INTALLATION 3 TAP $ 100,000 $ 80,000 $ 20,000 Construction / TEC Score = 1.03 / Total Project Cost = $100,000 TAP02 Central Mass WORCESTER - INSTALLION OF INFORMATIONAL KIOSK AT UNION STATION 3 TAP $ 100,000 $ 80,000 $ 20,000 Construction / TEC Score = 1.23 / Design Status = Pre 25% / Total Project Cost = $100,000 606629 Central Mass 3 TAP $ 226,039 $ 180,831 $ 45,208 TAP Subtotal ► $ 426,039 $ 340,831 $ 85,208 ▼ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 606485 Central Mass 605559 Central Mass 606686 Central Mass 606347 Central Mass WORCESTER - BLACKSTONE VISITOR CENTER MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD 3 STP $ 3,100,000 $ 2,480,000 $ 620,000 2 STP $ 1,398,000 $ 1,118,400 $ 279,600 2 STP $ 1,530,000 $ 1,224,000 $ 306,000 3 STP $ 1,700,000 $ 1,360,000 $ 340,000 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 7,728,000 $ 6,182,400 $ Total Federal Aid Target Funds Programmed ► $ 13,771,039 $ WARREN - RESURFACING & INTERSECTION IMPROVEMENTS AT ROUTE 67 & ROUTE 19 (WARREN TOW N CENTER) WARREN - RESURFACING AND RELATED WORK ON ROUTE 67 @ WEST WARREN AND WARREN TOWN CENTERS STURBRIDGE - RESURFACING AND RELATED WORK ON ROUTE 20, FROM ROUTE 49 TO I-84 Construction / TEC Score = 2.43 / Design Status = Pre 25% / Total Project Cost = $226,039 Construction / Design Status = 25% / TEC Score = 2.3 / STP + HSIP+ SW HSIP Total Project Cost = $5,350,000 Construction / Design Status = 75% / TEC Score = 4.57 / Total Project Cost = $1,398,000 Construction / Design Status = 25% / TEC Score = 1.7 / Total Project Cost = $1,530,000 Construction / Design Status = Book Job / TEC Score = 3.3 / STP + HSIP Total Project Cost = $2,700,000 1,545,600 ▼ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis 13,797,888 ▼Total Target $ 26,849 Target Funds Available Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 7,728,000 $ 9,147,480 ▼ Max. NonCMAQ/HSIP/TAP $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 2,000,000 3,617,000 426,039 $ $ $ 965,570 ▼ Min. HSIP 3,258,799 ▼ Min. CMAQ 426,039 ▼ Min. TAP $ $ $ Construction / Design Status = Pre 25% / Bridge Maintenance (FY15&16) + Interstate Maintenance Total Project Cost = $17,952,096 / This project was moved from "On System" to "Bridge Maintenance" HSIP, CMAQ, TAP Overprogrammed $ 26,849 Non-CMAQ/HSIP/TAP (Other) Available (1,034,430) HSIP Minimum Met (358,201) CMAQ Minimum Met - TAP Minimum Met (1,392,631) ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program ADJUSTMENT:Move Project - (From 2015 On System),ADJUSTMENT:Change Project 605588 Description,ADJUSTMENT:Change Additional Information,ADJUSTMENT:Change Project ID Central Mass WORCESTER, WEST BOYLSTON INTERSTATE MAINTENANCE & RELATED WORK ON I-190, INCLUDING W-44-124, I190 OVER ROUTE 12 & RAMP B 3 $ 1,521,624 $ 1,217,299 $ 304,325 Statewide Bridge Maintenance Program Subtotal ► $ 1,521,624 $ 1,217,299 $ 304,325 ▼ 80% Federal + 20% Non-Federal $ 4,168,395 $ 3,334,716 $ 833,679 On System Subtotal ► $ 4,168,395 $ 3,334,716 $ 833,679 ▼ 80% Federal + 20% Non-Federal $ 4,806,620 $ 3,845,296 $ 961,324 Off-System Subtotal ► $ 4,806,620 $ 3,845,296 $ 961,324 ▼ 80% Federal + 20% Non-Federal NHPP ►On System 605972 Central Mass SOUTHBRIDGE - BRIDGE PRESERVATION, S-21-002, SR 131 (MAIN STREET) OVER QUINEBAUG RIVER 3 NHPP Construction / Design Status = TBD / Total Project Cost = $4,168,395 ►Off-System 604675 Central Mass HOLDEN - BRIDGE REHABILITATION, H-18020, RIVER STREET OVER QUINAPOXET STREET 3 STP-BR-OFF Construction / Design Status = 25% / Total Project Cost = $4,806,620 ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ▼ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid 604892 608018 Central Mass Central Mass WORCESTER - BIKE PATH CONSTRUCTION, FROM TAINTER STREET TO KILBY STREET AND ROAD RESURFACING OF GARDNER AND KILBY STREET. WORCESTER - BLACKSTONE VISITOR CENTER AND BIKEWAY EARLY ACTION SITE WORK HPP $ 2,918,510 $ 2,334,808 $ 583,702 Construction / HPP#918 - MA136 & HPP#4288 MA207 / Design Status = 75-100% / Total Project Cost = $2,918,510 HPP $ 1,500,000 $ 1,200,000 $ 300,000 Construction / HPP#2351 - MA158, HPP#4283 MA202, HPP#2218 - MA157, HPP#2509 - MA165 / Design Status = Pre 25% / Total Project Cost = $1,500,000 Other Federal Aid Subtotal ► $ 4,418,510 $ 3,534,808 $ 883,702 ▼ Funding Split Varies by Funding Source 3 3 ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ - $ $ - $ $ - ▼ 80% Federal + 20% Non-Federal ► Statewide HSIP Program 606485 Central Mass MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD 3 HSIP Construction / Design Status = 25% / TEC Score = 2.3 / STP + HSIP+ SW HSIP Total Project Cost = $5,350,000 $ 1,250,000 $ 1,125,000 $ 125,000 Statewide HSIP Program Subtotal ► $ 1,250,000 $ 1,125,000 $ 125,000 ▼ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program No Projects Programmed $ Statewide Safe Routes to Schools Program Subtotal ► $ - - $ Statewide CMAQ ► $ - $ $ - - $ $ - $ $ - $ $ - - Funding Split Varies by Funding Source ▼ Funding Split Varies by Funding Source ► Statewide CMAQ No Projects Programmed ►Statewide Transportation Enhancements 606434 Central Mass ►Statewide ITS $ 1,652,015 Statewide Transportation Enhancements Subtotal ► $ 1,652,015 WORCESTER - CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENT No Projects Programmed ►Statewide Interstate Maintenance Program ADJUSTMENT:Change Project 605588 Description,ADJUSTMENT:Change Additional Information 607181 ►Statewide NHS Preservation Program+ ►Statewide RR Grade Crossings ►Statewide Stormwater Retrofits ►Statewide ADA Implementation Plan ►Other Statewide Items STP-TE $ Statewide ITS Subtotal ► $ NHPP WORCESTER, WEST BOYLSTON INTERSTATE MAINTENANCE & RELATED WORK ON I-190, INCLUDING W-44-124, I190 OVER ROUTE 12 & RAMP B $ - 1,321,612.0 $ $ 14,910,480 1,321,612 - ▼ 80% Federal + 20% Non-Federal 330,403.0 Design & Construction / Design Status = Pre 25% / STP-TE+HPP Total Project Cost = $7,277,015 $ $ 13,419,432.0 330,403 ▼ 80% Federal + 20% Non-Federal - ▼ 80% Federal + 20% Non-Federal 1,491,048.0 Construction / Design Status = Pre 25% / Bridge Maintenance (FY15&16) + Interstate Maintenance Total Project Cost = $17,952,096 3 $ 8,365,728 Statewide Interstate Maintenance Program Subtotal ► $ 23,276,208 NORTHBOROUGH - MARLBOROUGH INTERSTATE MAINTENANCE & RELATED WORK ON I-290 - 3 Central Mass Central Mass - NHPP 7,529,155.2 836,572.8 3 $ 20,948,587 $ Construction / Design Status = TBD / Total Project Cost = $8,365,728 2,327,621 ▼ 90% Federal + 10% Non-Federal No Projects Programmed $ Statewide NHS Preservation Program Subtotal ► $ - $ - $ - ▼ 80% Federal + 20% Non-Federal No Projects Programmed $ Statewide RR Grade Crossings Subtotal ► $ - $ - $ - ▼ 80% Federal + 20% Non-Federal No Projects Programmed $ Statewide Stormwater Retrofits Subtotal ► $ - $ - $ - ▼ 80% Federal + 20% Non-Federal No Projects Programmed $ Statewide ADA Implementation Plan Subtotal ► $ - $ - $ - ▼ 80% Federal + 20% Non-Federal ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of W ay Statewide Recreational Trails $ $ - - - $ - - - $ $ $ Other Statewide Items Subtotal ► $ - - $ - ▼ Funding Split Varies by Funding Source NFA $ Non-Federal Aid Subtotal► $ - $ $ - ▼100% Non-Federal $ ►Section 2A / Non-Federal Projects ►Non Federal Aid ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed 605964 2015 Central Mass MPO TIP Summary Central Mass MILLBURY - BRIDGE REPLACEMENT, M-22020, ROUTE 146 (NB & SB) OVER WEST MAIN STREET NFA $ 11,330,354 $ 11,330,354 Section 2B / Non-Federal Bridge Projects Subtotal► $ 11,330,354 $ 11,330,354 ▼100% Non-Federal 3 TIP Section 1: ▻ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ 54,864,411 46,544,150 8,320,261 TIP Section 2: ▻ $ 11,330,354 $ 11,330,354 Construction / Design Status = 25% / TEC Score = 6.90 / Total Project Cost w/CMAQ Funding = $13,647,354 Total of All Projects ▻ $ $ $ 66,194,765 ▼ Total Spending in Region 46,544,150 ▼ Total Federal Spending in Region 19,650,615 ▼ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public W orks Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 7,728,000 $ 9,147,480 ◄ Max. NonCMAQ/HSIP/TAP $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 2,000,000 $ 3,617,000 $ 426,039 $ 965,570 ◄ Min. HSIP 3,258,799 ◄ Min. CMAQ 426,039 ◄ Min. TAP $ $ $ 26,849 Non-CMAQ/HSIP/TAP (Other) A (1,034,430) HSIP Minimum Met (358,201) CMAQ Minimum Met - TAP Minimum Met HSIP, CMAQ, TAP Overprogrammed $ (1,392,631) ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program ADJUSTMENT:Move Project - (From 2015 On System),ADJUSTMENT:Change Project 605588 Description,ADJUSTMENT:Change Additional Information,ADJUSTMENT:Change Project ID Central Mass $ 1,521,624 $ 1,217,299 $ Construction / Design Status = Pre 25% / Bridge Maintenance (FY15&16) + Interstate Maintenance Total Project Cost = $17,952,096 / 304,325 This project was moved from "On System" to "Bridge Maintenance" / Project #607518 & #607519 being combined into project #605588 Statewide Bridge Maintenance Program Subtotal ► $ 1,521,624 $ 1,217,299 $ 304,325 ◄ 80% Federal + 20% Non-Federal WORCESTER, WEST BOYLSTON INTERSTATE MAINTENANCE & RELATED WORK ON I-190, INCLUDING W-44-124, I190 OVER ROUTE 12 & RAMP B 3 NHPP ►On System ADJUSTMENT:Change Project ID 607518 Central Mass WORCESTER - FEDERAL AID SYSTEMATIC MAINTENANCE; BRIDGE JOINTS, DECK REPAIRS, PRESSURE WASHING AND RELATED WORK; I-190 OVER RT 12 AND RAMP B; BRIDGE NO. W-44-124 (1XF) NORTHBOUND 605972 Central Mass SOUTHBRIDGE - BRIDGE PRESERVATION, S-21-002, SR 131 (MAIN STREET) OVER QUINEBAUG RIVER 3 NHPP $ 1,521,624 $ 1,217,299 $ 304,325 Construction / Design Status = TBD / Total Project Cost = $1,521,624 / Project #607518 & #607519 being combined into project #605588 3 NHPP $ 4,168,395 $ 3,334,716 $ 833,679 Construction / Design Status = TBD / Total Project Cost = $4,168,395 On System Subtotal ► $ 5,690,019 $ 4,552,015 $ STP-BR-OFF $ 4,806,620 $ 3,845,296 $ 961,324 Off-System Subtotal ► $ 4,806,620 $ 3,845,296 $ 961,324 ◄ 80% Federal + 20% Non-Federal 1,138,004 ◄ 80% Federal + 20% Non-Federal ►Off-System 604675 Central Mass HOLDEN - BRIDGE REHABILITATION, H-18020, RIVER STREET OVER QUINAPOXET STREET 3 Construction / Design Status = 25% / Total Project Cost = $4,806,620 ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid 604892 608018 Central Mass Central Mass WORCESTER - BIKE PATH CONSTRUCTION, FROM TAINTER STREET TO KILBY STREET AND ROAD RESURFACING OF GARDNER AND KILBY STREET. WORCESTER - BLACKSTONE VISITOR CENTER AND BIKEWAY EARLY ACTION SITE WORK HPP $ 2,918,510 $ 2,334,808 $ 583,702 Construction / HPP#918 - MA136 & HPP#4288 MA207 / Design Status = 75-100% / Total Project Cost = $2,918,510 HPP $ 1,500,000 $ 1,200,000 $ 300,000 Construction / HPP#2351 - MA158, HPP#4283 MA202, HPP#2218 - MA157, HPP#2509 MA165 / Design Status = Pre 25% / Total Project Cost = $1,500,000 Other Federal Aid Subtotal ► $ 4,418,510 $ 3,534,808 $ 883,702 ◄ Funding Split Varies by Funding Source 3 3 ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ ► Statewide HSIP Program - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal 606485 Central Mass MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD 3 HSIP $ Statewide HSIP Program Subtotal ► $ Construction / Design Status = 25% / TEC Score = 2.3 / STP + HSIP+ SW HSIP Total Project Cost = $5,350,000 1,250,000 $ 1,125,000 $ 125,000 1,250,000 $ 1,125,000 $ 125,000 ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program No Projects Programmed $ Statewide Safe Routes to Schools Program Subtotal ► $ - - $ $ - $ $ - $ $ - $ $ - - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source ► Statewide CMAQ No Projects Programmed $ Statewide CMAQ ► $ ►Statewide Transportation Enhancements 606434 Central Mass WORCESTER - CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENT STP-TE $ - - - 1,652,015 Design & Construction / Design Status = Pre 25% / STP-TE+HPP Total Project Cost = $7,277,015 3 Statewide Transportation Enhancements Subtotal► $ ◄ 80% Federal + 20% Non-Federal 1,652,015 1,321,612.0 $ 1,321,612 $ 330,403.0 330,403 ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects Programmed ►Statewide Interstate Maintenance Program 605588 ADJUSTMENT:Change Project Description,ADJUSTMENT:Change Additional Information $ Statewide ITS Subtotal ► $ Central Mass NHPP WORCESTER, WEST BOYLSTON INTERSTATE MAINTENANCE & RELATED WORK ON I-190, INCLUDING W-44-124, I190 OVER ROUTE 12 & RAMP B 607181 Central Mass NORTHBOROUGH - MARLBOROUGH INTERSTATE MAINTENANCE & RELATED WORK ON I-290 $ - $ - - 3,419,432.0 1 $ - 14,910,480 3 NHPP $ Construction / Design Status = Pre 25% / Bridge Maintenance (FY15&16) + Interstate Maintenance Total Project Cost = $17,952,096 / Project #607518 & #607519 being combined into project #605588 1,491,048.0 8,365,728 Construction / Design Status = TBD / Total Project Cost = $8,365,728 3 Statewide Interstate Maintenance Program Subtotal► $ ◄ 80% Federal + 20% Non-Federal 7,529,155.2 23,276,208 $ 20,948,587 836,572.8 $ 2,327,621 ◄ 90% Federal + 10% Non-Federal ►Statewide NHS Preservation Program+ No Projects Programmed $ Statewide NHS Preservation Program Subtotal ► $ - $ Statewide RR Grade Crossings Subtotal ► $ - $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ - ◄ 80% Federal + 20% Non-Federal - ◄ 80% Federal + 20% Non-Federal - ◄ 80% Federal + 20% Non-Federal ►Statewide RR Grade Crossings No Projects Programmed - ►Statewide Stormwater Retrofits No Projects Programmed $ Statewide Stormwater Retrofits Subtotal ► $ - $ - - ►Statewide ADA Implementation Plan No Projects Programmed $ Statewide ADA Implementation Plan Subtotal ► $ - ►Other Statewide Items ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails $ $ - $ - $ $ - $ Other Statewide Items Subtotal ► $ ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects Programmed NFA $ Non-Federal Aid Subtotal► $ - $ $ - - $ - - - - $ - $ - - - - $ $ - - - ◄ Funding Split Varies by Funding Source ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 605964 2015 Central Mass MPO TIP Summary Central Mass MILLBURY - BRIDGE REPLACEMENT, M-22020, ROUTE 146 (NB & SB) OVER WEST MAIN STREET NFA $ 11,330,354 Section 2B / Non-Federal Bridge Projects Subtotal► $ 11,330,354 $ 11,330,354 Construction / Design Status = 25% / TEC Score = 6.90 / Total Project Cost w/CMAQ Funding = $13,647,354 $ 11,330,354 ◄100% Non-Federal 3 TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ TIP Section 2: ▼ 56,386,035 $ 47,761,449 8,624,586 $ Total of All Projects ▼ 11,330,354 $ $ 11,330,354 $ 67,716,389 ◄ Total Spending in Region 47,761,449 ◄ Total Federal Spending in Region 19,954,940 ◄ Total Non-Federal Spending in Region 2016Central Mass M PO Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ 05/14/2014 Draft Released 06/25/2014 Endorsed MassDOT Municipality Name ▼ Project Description▼ MassDOT District ▼ Funding Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds Additional ▼ Information ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 604864 Central Mass WESTBOROUGH - INTERSECTION & SIGNAL IMPROVEMENTS AT ROUTE 9 & LYMAN STREET 3 HSIP $ 2,473,120 $ 2,225,808 $ 247,312 Construction / TEC Score = 7.9 / Design Status = 25% / HSIP+CMAQ Total Project Cost = $6,529,120 606207 Central Mass SPENCER - REHABILITATION ON ROUTE 9 (MAIN STREET), FROM HIGH STREET TO GROVE STREET 3 HSIP $ 904,800 $ 814,320 $ 90,480 Construction / Design Status = 25% / TEC Score = 5.1 / HSIP + CMAQ + TAP Total Project Cost = $3,192,800 HSIP Subtotal ► $ 3,377,920 $ 3,040,128 $ 337,792 ◄ 90% Federal + 10% Non-Federal ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 603251 Central Mass 604864 Central Mass 606207 Central Mass WORCESTER - SIGNAL & INTERSECTION IMPROVEMENTS @ HOLDEN STREET, DRUMMOND AVENUE & SHORE DRIVE Construction / Design Stage = Pre 25% / CMAQ + Statewide CMAQ Total Project Cost = $2,642,434 / Additional funding is provided by the Statewide CMAQ Program 3 CMAQ $ 900,640 $ 720,512 $ 180,128 WESTBOROUGH - INTERSECTION & SIGNAL IMPROVEMENTS AT ROUTE 9 & LYMAN STREET 3 CMAQ $ 4,056,000 $ 3,244,800 $ 811,200 Construction / TEC Score = 7.9 / Design Status = 25% / HSIP+CMAQ Total Project Cost = $6,529,120 SPENCER - REHABILITATION ON ROUTE 9 (MAIN STREET), FROM HIGH STREET TO GROVE STREET 3 CMAQ $ 1,872,000 $ 1,497,600 $ 374,400 Construction / Design Status = 25% / TEC Score = 5.1 / HSIP + CMAQ + TAP Total Project Cost = $3,192,800 CMAQ Subtotal ► $ 6,828,640 $ 5,462,912 $ 1,365,728 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program 606207 Central Mass TAP03 Central Mass SPENCER - REHABILITATION ON ROUTE 9 (MAIN STREET), FROM HIGH STREET TO GROVE STREET WORCESTER - WRTA STORMWATER MITIGATION 3 TAP $ 416,000 $ 332,800 $ 83,200 3 TAP $ 156,000 $ 124,800 $ 31,200 PROJECT TO BE DETERMINED $ TAP Subtotal ► $ - $ - Construction / Design Status = 25% / TEC Score = 5.1 / HSIP + CMAQ + TAP Total Project Cost = $3,192,800 Construction / TEC Score = .70 / Design Status = TBD / Total Project Cost = $156,000 - $ 572,000 $ 457,600 $ 114,400 ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 603486 Central Mass 604739 Central Mass BROOKFIELD - RECONSTRUCTION OF ROUTE 148 (FISKDALE ROAD) FROM MOLASSES HILL ROAD TO STURBRIDGE T.L. INCL. WEBBER ROAD WEST BROOKFIELD - RECONSTRUCTION ON ROUTE 9, ROUTE 67 & INTERSECTIONS AT SCHOOL STREET 3 STP $ 2,548,000 $ 2,038,400 $ 509,600 2 STP $ 1,664,000 $ 1,331,200 $ 332,800 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 4,212,000 $ 3,369,600 $ 842,400 Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 14,990,560 4,212,000 $ $ 15,170,796 10,858,343 Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 3,377,920 6,828,640 572,000 $ $ $ 869,013 2,715,666 727,774 Construction / Design Status = Pre 25% / TEC Score = 2.8 / Total Project Cost = $2,548,000 Construction / Design Status = 25% / TEC Score = 6.5 / Total Project Cost = $1,664,000 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis HSIP, CMAQ, TAP Overprogrammed $ (6,466,107) ►Section 1B / Federal Aid Bridge Projects ◄Total Target ◄ Max. NonCMAQ/HSIP/TAP $ $ ◄ Min. HSIP ◄ Min. CMAQ ◄ Min. TAP $ $ $ 180,236 Target Funds Available 180,236 Non-CMAQ/HSIP/TAP (Other) A (2,508,907) HSIP Minimum Met (4,112,974) CMAQ Minimum Met 155,774 TAP Minimum Not Met ►Statewide Bridge Maintenance Program ADJUSTMENT:Move Project - (From 2016 On System),ADJUSTMENT:Change Project 605588 Description,ADJUSTMENT:Change Additional Information,ADJUSTMENT:Change Project ID Central Mass $ 1,519,992 $ 1,215,994 $ 303,998 Construction / Design Status = Pre 25% / Bridge Maintenance (FY15&16) + Interstate Maintenance Total Project Cost = $17,952,096 / This project was moved from "On System" to "Bridge Maintenance" / Project #607518 & #607519 being combined into project #605588 Statewide Bridge Maintenance Program Subtotal ► $ 1,519,992 $ 1,215,994 $ 303,998 ◄ 80% Federal + 20% Non-Federal $ 1,519,992 $ 1,215,994 $ 303,998 On System Subtotal ► $ 1,519,992 $ 1,215,994 $ 303,998 WORCESTER, WEST BOYLSTON INTERSTATE MAINTENANCE & RELATED WORK ON I-190, INCLUDING W-44-124, I-190 OVER ROUTE 12 & RAMP B 3 NHPP ►On System ADJUSTMENT:Change Project ID 607519 Central Mass WORCESTER - FEDERAL AID SYSTEMATIC MAINTENANCE; BRIDGE JOINTS, DECK REPAIRS; PRESSURE WASHING AND RELATED WORK; I-190 OVER RT 12 AND RAMP B; BRIDGE NO. W-44-124 (1XG) 3 NHPP Construction / Design Status = TBD / Total Project Cost = $1,519,992 / Project #507518 & #607519 being combined into project #605588 ◄ 80% Federal + 20% Non-Federal ►Off-System 607113 Central Mass DUDLEY - BRIDGE REPLACEMENT, D-12-009, CARPENTER ROAD OVER ABANDONED RR 3 STP-BR-OFF $ 2,305,800 $ 1,844,640 $ 461,160 Construction / Design Status = TBD / Total Project Cost = $2,305,800 606303 Central Mass RUTLAND - BRIDGE SUPERSTRUCTURE REPLACEMENT, R-14-004, INTERVALE ROAD OVER EAST BRANCH OF WARE RIVER 3 STP-BR-OFF $ 1,814,400 $ 1,451,520 $ 362,880 Construction / Design Status = TBD / Total Project Cost = $1,814,400 604468 Central Mass WEST BROOKFIELD - BRIDGE REPLACEMENT, W-19-008, WICKABOAG VALLEY ROAD OVER SUCKER BROOK 2 STP-BR-OFF $ 2,376,648 $ 1,901,318 $ 475,330 Construction / Design Status = Pre 25% / Total Project Cost = $2,376,648 Off-System Subtotal ► $ 6,496,848 $ 5,197,478 $ 1,299,370 ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid 604893 604893 605820 605820 606888 606434 Central Mass Central Mass Central Mass Central Mass Central Mass Central Mass WORCESTER - STREETSCAPE IMPROVEMENTS AT MAIN STREET & MAYWOOD STREET 3 WORCESTER - STREETSCAPE IMPROVEMENTS AT MAIN STREET & MAYWOOD STREET 3 WORCESTER - BLACKSTONE RIVER BIKEWAY (SEGMENT 7), INCLUDING BRIDGE REHAB, W-44-041, MCGRATH BOULEVARD OVER MADISON STREET WORCESTER - BLACKSTONE RIVER BIKEWAY (SEGMENT 7), INCLUDING BRIDGE REHAB, W-44-041, MCGRATH BOULEVARD OVER MADISON STREET WORCESTER - BLACKSTONE CANAL STREETSCAPE IMPROVEMENTS ON HARDING STREET WORCESTER - CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENTS TI $ 2,285,798 $ 1,828,638 $ 457,160 Construction / TI#177 - MA213 / Design Status = Pre 25% / Total Project Cost = $2,297,798 TI $ 120,000 $ 96,000 $ 24,000 Design / TI#177 - MA213 / Design Status = 25%PSE / Total Project Cost = $2,297,798 HPP $ 4,411,942 $ 3,529,554 $ 882,388 Construction / HPP#4283 - MA202, HPP#2218 MA157, HPP#2509 - MA165 & MA006 / Design Status = 25% / Total Project Cost = $4,508,442 HPP $ 96,500 $ 77,200 $ 19,300 Design (25%-PSE) / HPP#2509 - MA165 / Design Status = 25% / Total Project Cost = $4,508,442 Sec 129 $ 735,000 $ 588,000 $ 147,000 Construction / MA238 / Design Status = 25% / Total Project Cost = $735,000 HPP $ 5,625,000 $ 4,500,000 $ 1,125,000 Construction / HPP#4266 - MA185 / Design Status = 25% / Total Project Cost = $7,277,015 3 3 3 3 605674 Central Mass STURBRIDGE - GRAND TRUNK TRAIL 606629 Central Mass WORCESTER - BLACKSTONE VISITOR CENTER 606629 Central Mass WORCESTER - BLACKSTONE VISITOR CENTER, BIKEWAY & BRIDGE HPP $ 507,500 $ 406,000 $ 101,500 HPP $ 6,449,200 $ 5,159,360 $ 1,289,840 HPP $ 1,120,000 $ 896,000 $ 224,000 Other Federal Aid Subtotal ► $ 21,350,940 $ 17,080,752 $ 4,270,188 - $ $ - $ $ - $ $ - $ $ - $ $ - $ $ - 3 3 3 Construction / HPP#2439 - MA162 / Design Status = 25% / Total Project Cost = $507,500 Construction / HPP#2351 - MA158 / Design Status = Pre 25% / Total Project Cost = $7 569 200 Construction / HPP#4283 - MA202, HPP#2218 MA157, HPP#2509 - MA165 & MA006 / Design Status = Pre 25% / Total Project Cost = $7,569,200 ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ - ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program No Projects Programmed $ Statewide Safe Routes to Schools Program Subtotal ► $ - - - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source ► Statewide CMAQ 603251 Central Mass WORCESTER - SIGNAL & INTERSECTION IMPROVEMENTS @ HOLDEN STREET, DRUMMOND AVENUE & SHORE DRIVE 3 CMAQ $ Statewide CMAQ ► $ 1,741,794 1,741,794 $ 1,393,435 $ 1,393,435 $ 348,359 Construction / Design Stage = Pre 25% / CMAQ + Statewide CMAQ Total Project Cost = $2,642,434 / $ 348,359 ◄ 80% Federal + 20% Non-Federal ►Statewide Transportation Enhancements No Projects Programmed $ Statewide Transportation Enhancements Subtotal ► $ - $ Statewide ITS Subtotal ► $ - $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ - ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects Programmed ►Statewide Interstate Maintenance Program 605592 ►Statewide NHS Preservation Program+ 607176 607473 Central Mass Central Mass Central Mass STURBRIDGE - HOLLAND - INTERSTATE NHPP $ 3 MAINTENANCE & RELATED WORK ON I-84 Statewide Interstate Maintenance Program Subtotal ► $ 11,486,592 SHREWSBURY - WESTBOROUGH RESURFACING AND RELATED WORK ON ROUTE 9 WEST BROOKFIELD - BROOKFIELD RESURFACING & RELATED WORK ON ROUTE 9, FROM SOUTH MAIN STREET WEST BROOKFIELD TO OLD WEST MAIN STREET BROOKFIELD (3.3 MILES) 11,486,592 NHPP $ 11,859,906 NHPP $ 3,504,883 - $ 10,337,933 10,337,932.8 - $ 1,148,659 1,148,659.2 Construction / Design Status = TBD / Total Project Cost = $11,859,906 3 2/3 Statewide NHS Preservation Program Subtotal ► $ 9,487,924.8 2,371,981.2 2,803,906.4 15,364,789 Construction / Design Status = Pre 25% / Total Project Cost = $11,486,592 ◄ 90% Federal + 10% Non-Federal $ Construction / Design Status = TBD / Total Project Cost = $3,504,883 700,976.6 12,291,831 $ 3,072,958 ◄ 80% Federal + 20% Non-Federal ►Statewide RR Grade Crossings No Projects Programmed $ Statewide RR Grade Crossings Subtotal ► $ - $ Statewide Stormwater Retrofits Subtotal ► $ - $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ - ◄ 80% Federal + 20% Non-Federal ►Statewide Stormwater Retrofits No Projects Programmed ►Statewide ADA Implementation Plan - - - - No Projects Programmed $ Statewide ADA Implementation Plan Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Other Statewide Items ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails $ $ - $ - - $ $ - $ $ Other Statewide Items Subtotal ► $ ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects Programmed - - $ - - - - - ◄ Funding Split Varies by Funding Source - NFA $ Non-Federal Aid Subtotal► $ - $ $ - ◄100% Non-Federal NFA $ Section 2B / Non-Federal Bridge Projects Subtotal ► $ - $ $ - ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed 2016 Central Mass MPO TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ 74,471,507 61,063,656 13,407,851 Total of All Projects ▼ TIP Section 2: ▼ $ - $ - $ $ $ 74,471,507 61,063,656 13,407,851 ◄ Total Spending in Region ◄ Total Federal Spending in Region ◄ Total Non-Federal Spending in Region Project costs have increased by 4% a year to account for inflation. 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx 2017Central Mass M PO Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ 05/14/2014 Draft Released 06/25/2014 Endorsed MassDOT Project Description▼ MassDOT District ▼ Funding Source ▼ Total Programmed Funds ▼ HSIP $ 4,218,240 $ 3,796,416 $ 421,824 HSIP Subtotal ► $ 4,218,240 $ 3,796,416 $ 421,824 CMAQ $ 2,812,160 $ 2,249,728 $ 562,432 CMAQ Subtotal ► $ 2,812,160 $ 2,249,728 $ 562,432 Federal Funds ▼ Non-Federal Funds ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 601368 Central Mass WORCESTER - RESURFACING & RELATED WORK ON ROUTE 122 (GRAFTON STREET), FROM WASHINGTON SQUARE TO RICE SQUARE (1.4 MILES) 3 ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 601368 Central Mass WORCESTER - RESURFACING & RELATED WORK ON ROUTE 122 (GRAFTON STREET), FROM WASHINGTON SQUARE TO RICE SQUARE (1.4 MILES) 3 ►TAP - Transportation Alternatives Program PROJECT TO BE DETERMINED $ - $ - $ - TAP Subtotal ► $ - $ - $ - ►Non-CMAQ/HSIP/TAP (Other) 602740 Central Mass SHREWSBURY - RESURFACING AND RELATED WORK ON MAIN STREET, FROM I-290 RAMPS EASTERLY TO MAPLE AVENUE 3 STP $ 5,775,744 $ 4,620,595 $ 1,155,149 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 5,775,744 $ 4,620,595 $ 1,155,149 Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 12,806,144 $ 5,775,744 $ ►Section 1A / Fiscal Constraint Analysis Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 4,218,240 2,812,160 - $ $ $ 15,170,796 ◄Total Target 11,113,242 ◄ Max. NonCMAQ/HSIP/TAP 869,013 ◄ Min. HSIP 2,715,666 ◄ Min. CMAQ 472,875 ◄ Min. TAP HSIP, CMAQ, TAP Overprogrammed $ (2,972,846) ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program ADJUSTMENT:Move Project (FROM 2017 On System) 606075 Central Mass OXFORD - STRUCTURAL STEEL CLEANING AND PAINTING AND OTHER RELATED WORK; BRIDGE NO. O-06-036 OVER DANA ROAD AND BRIDGE NO. O-06-037 I-395 SB OVER FEDERAL HILL ROAD 3 NHPP $ 1,519,954 $ 1,215,963 $ 303,991 Statewide Bridge Maintenance Program Subtotal ► $ 1,519,954 $ 1,215,963 $ 303,991 ►On System No Projects Programmed $ - $ - $ - On System Subtotal ► $ - - $ $ - ►Off-System 607135 Central Mass WORCESTER - DECK REPLACEMENT AND PAINTING, W-44-083, HARRISON STREET OVER I-290 3 STP-BR-OFF $ 5,454,680 $ 4,363,744 $ 1,090,936 Off-System Subtotal ► $ 5,454,680 $ 4,363,744 $ 1,090,936 ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - $ - $ - $ - Other Federal Aid Subtotal ► $ - $ - $ - $ $ - $ $ - $ $ - $ $ - $ $ - $ $ - ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ - - - - $ Statewide HSIP Program Subtotal ► $ - $ Statewide Safe Routes to Schools Program Subtotal ► $ - $ Statewide CMAQ ► $ - $ $ - $ $ - $ Statewide Transportation Enhancements Subtotal ► $ - $ - $ - $ Statewide ITS Subtotal ► $ - $ - $ - ► Statewide HSIP Program No Projects Programmed - - - ► Statewide Safe Routes to Schools Program No Projects Programmed - - - ► Statewide CMAQ No Projects Programmed - - - ►Statewide Transportation Enhancements No Projects Programmed ►Statewide ITS No Projects Programmed ►Statewide Interstate Maintenance Program 607479 Central Mass SHREWSBURY - BOYLSTON - NORTHBORO INTERSTATE MAINTENANCE & RELATED WORK ON I-290 NHPP $ 13,906,253 Statewide Interstate Maintenance Program Subtotal ► $ 13,906,253 - 3 12,515,627.7 $ 12,515,628 1,390,625.3 $ 1,390,625 ►Statewide NHS Preservation Program+ No Projects Programmed $ Statewide NHS Preservation Program Subtotal ► $ - $ - $ ►Statewide RR Grade Crossings - - - No Projects Programmed $ Statewide RR Grade Crossings Subtotal ► $ - $ Statewide Stormwater Retrofits Subtotal ► $ - $ - $ - $ - $ - ►Statewide Stormwater Retrofits No Projects Programmed - ►Statewide ADA Implementation Plan No Projects Programmed $ Statewide ADA Implementation Plan Subtotal ► $ - ►Other Statewide Items ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails $ $ - $ - $ $ - $ Other Statewide Items Subtotal ► $ ►Section 2A / Non-Federal Projects ►Non Federal Aid $ - $ - - - - $ - $ - - - - - - - No Projects Programmed NFA $ Non-Federal Aid Subtotal ► $ - $ $ - No Projects Programmed NFA $ Section 2B / Non-Federal Bridge Projects Subtotal ► $ - $ $ - ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2017 Central Mass MPO TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ Total of All Projects ▼ TIP Section 2: ▼ 33,687,031 $ 28,762,074 4,924,957 $ - $ $ $ 33,687,031 28,762,074 4,924,957 Project costs have increased by 4% a year to account for inflation. 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at th http://www.massdot.state.ma.us/Highway/flaggers/main.aspx Lists Are in Hidden Cells 2015 Berkshire MPO Transportation Improvement Program Amendment/Adjust ment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ MassDOT Project Description▼ 05/20/2014 Draft Released 06/24/2014 Endorsed 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released Federal Funds ▼ Additional Information ▼ Non-Federal Funds ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 607900 Berkshire Pittsfield PITTSFIELD- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT CENTER STREET AND WEST HOUSATONIC STREET (ROUTE 20) 1 HSIP CMAQ + HSIP; Total Cost = 1,470,000; MPO evaluation score 6 of 7; Design Status: <25% $ 395,516 $ 355,964 $ 39,552 $ HSIP Subtotal ► $ - $ 395,516 $ - $ 355,964 $ 39,552 ◄ 90% Federal + 10% Non-Federal - ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 607900 Berkshire Pittsfield PITTSFIELD- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT CENTER STREET AND WEST HOUSATONIC STREET (ROUTE 20) 1 CMAQ $ 1,074,484 $ 859,587 $ 602280 Berkshire Dalton DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 1 CMAQ $ 260,383 $ 208,306 $ CMAQ Subtotal ► $ 1,334,867 $ 1,067,894 $ 214,897 CMAQ + HSIP; Total Cost = 1,470,000; MPO evaluation score 6 of 7; Design Status: <25% AC - Year 1 of 3; STP + CMAQ; Total Cost 52,077 = 9,681,141; MPO evaluation score 4 of 7; Design Status: 100% 266,973 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program No Projects Programmed $ - $ - $ - TAP Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 601320 Berkshire Lee LEE- RECONSTRUCTION OF TYRINGHAM ROAD, FROM THE TYRINGHAM T.L. TO ROUTE 102 (2.0 MILES) 1 STP $ 1,139,304 $ 911,443 $ 602280 Berkshire Dalton DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 1 STP $ 2,782,193 $ 2,225,754 $ AC - Year 1 of 3; STP + CMAQ; Total Cost 556,439 = 9,681,141; MPO evaluation score 4 of 7; Design Status: 100% Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 3,921,497 $ 3,137,198 $ 784,299 ◄ 80% Federal + 20% Non-Federal Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 5,651,880 $ 3,921,497 $ 5,651,880 ◄Total Target 3,921,497 ◄ Max. NonCMAQ/HSIP/TAP $ $ - Target Funds Available Non-CMAQ/HSIP/TAP (Other) Available Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 395,516 $ 1,334,867 $ - $ 395,516 ◄ Min. HSIP 1,334,867 ◄ Min. CMAQ - ◄ Min. TAP $ $ $ - HSIP Minimum Met CMAQ Minimum Met TAP Minimum Met AC - Year 3 of 3; Total Project Cost = 227,861 5,900,000; MPO evaluation score 3 of 7; Design Status: 100% ►Section 1A / Fiscal Constraint Analysis Remaining HSIP, CMAQ, and TAP Funds $ ‐ - Page 1 of 4 2015 Berkshire MPO Transportation Improvement Program MassDOT Project ID Municipality ▼ MPO ▼ Name ▼ ►Section 1B / Federal Aid Bridge Projects Amendment/Adjust ment Type ▼ Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ MassDOT Project Description▼ 05/20/2014 Draft Released 06/24/2014 Endorsed 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released Federal Funds ▼ Additional Information ▼ Non-Federal Funds ▼ ►Statewide Bridge Maintenance Program 607510 Berkshire Sandisfield SANDISFIELD- SYSTEMATIC BRIDGE MAINTENANCE, S-03-033, ROUTE 8 (S.MAIN ST.) OVER W. BRANCH FARMINGTON RIVER (PHASE II) 1 NHPP $ 309,920 $ 247,936 $ 61,984 $ Statewide Bridge Maintenance Program Subtotal ► $ - $ 309,920 $ - $ 247,936 $ 61,984 ◄ 80% Federal + 20% Non-Federal $ 5,904,802 $ 4,723,842 $ 1,180,960 $ On System Subtotal ► $ - $ 5,904,802 $ - $ 4,723,842 $ 1,180,960 ◄ 80% Federal + 20% Non-Federal $ 2,589,860 $ 2,071,888 $ 517,972 $ Off-System Subtotal ► $ - $ 2,589,860 $ - $ 2,071,888 $ 517,972 ◄ 80% Federal + 20% Non-Federal - ►On System 605299 Berkshire Great Barrington GREAT BARRINGTON- BRIDGE REPLACEMENT, G-11-005, SR 183 (PARK STREET) OVER HOUSATONIC RIVER 1 NHPP - ►Off-System 607121 Berkshire Savoy SAVOY- BRIDGE REPLACEMENT, S-06004, RIVER ROAD OVER THE WESTFIELD RIVER 1 STP-BROFF - ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid AMENDMENT:Add Project 605930 Berkshire Adams ADAMS - MOUNT GREYLOCK SCENIC BYWAYS IMPROVEMENTS AT BASCOM LODGE AND WAR 1 SBYWY $ 990,000 $ 792,000 $ AMENDMENT:Add Project 608071 Berkshire Adams ADAMS- ASHUWILLTICOOK RAIL TRAIL EXTENSION 1 HPP $ 3,360,000 $ 2,688,000 $ 672,000 Construction; SAFETEA-LU, HPP 2850 - MA Berkshire County Bike Paths, Design & Construction - $5,000,000 (Earmark Total) Other Federal Aid Subtotal ► $ 4,350,000 $ 3,480,000 870,000 ◄ Funding Split Varies by Funding Source $ 198,000 Design & construction Page 2 of 4 2015 Berkshire MPO Transportation Improvement Program Amendment/Adjust ment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ MassDOT Project Description▼ 05/20/2014 Draft Released 06/24/2014 Endorsed 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released Federal Funds ▼ Additional Information ▼ Non-Federal Funds ▼ ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed $ - $ - $ No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ - $ $ - $ $ - - - ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program No Projects Programmed $ - No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - $ - $ $ $ - $ $ - - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program $ - No Projects Programmed $ Statewide Safe Routes to Schools Program Subtotal ► $ No Projects Programmed - - Funding Split Varies by Funding Source $ - $ $ - $ $ $ - $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal No Projects Programmed $ No Projects Programmed $ Statewide Transportation Enhancements Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal No Projects Programmed No Projects Programmed $ $ Statewide ITS Subtotal ► $ - - -$ - ◄ 80% Federal + 20% Non-Federal No Projects Programmed $ No Projects Programmed $ Statewide Interstate Maintenance Program Subtotal ► $ - - -$ - ◄ 90% Federal + 10% Non-Federal - - $ - Funding Split Varies by Funding Source - ◄ Funding Split Varies by Funding Source ► Statewide CMAQ No Projects Programmed $ - No Projects Programmed $ Statewide CMAQ ► $ - - ►Statewide Transportation Enhancements ►Statewide ITS $ ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ Berkshire Multiple 605887 606544 Berkshire Multiple SHEFFIELD - GREAT BARRINGTON RESURFACING AND RELATED WORK ROUTE 7 LENOX- PITTSFIELD RESURFACING AND RELATED WORK ROUTE 7 $ NHPP $ 6,641,040 - NHPP $ 3,422,162 1 5,312,832 1,328,208 1 Statewide NHS Preservation Program Subtotal ► $ 2,737,730 10,063,202 $ 8,050,562 $ 2,012,640 ◄ 80% Federal + 20% Non-Federal 684,432 Page 3 of 4 2015 Berkshire MPO Transportation Improvement Program Amendment/Adjust ment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ 05/20/2014 Draft Released 06/24/2014 Endorsed 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released Federal Funds ▼ Additional Information ▼ Non-Federal Funds ▼ ►Statewide RR Grade Crossings No Projects Programmed $ No Projects Programmed $ Statewide RR Grade Crossings Subtotal ► $ - No Projects Programmed $ No Projects Programmed $ Statewide Stormwater Retrofits Subtotal ► $ - No Projects Programmed $ No Projects Programmed $ Statewide ADA Implementation Plan Subtotal ► $ - $ ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails Other Statewide Items Subtotal ► $ $ - - $ - $ $ $ $ - $ - $ - ◄ 80% Federal + 20% Non-Federal - -$ - ◄ 80% Federal + 20% Non-Federal - -$ - ◄ 80% Federal + 20% Non-Federal - ◄ Funding Split Varies by Funding Source ►Statewide Stormwater Retrofits $ ►Statewide ADA Implementation Plan - ►Other Statewide Items - $ - - ►Section 2A / Non-Federal Projects $ - ►Non Federal Aid No Projects Programmed No Projects Programmed NFA $ NFA $ Non-Federal Aid Subtotal► $ - $ $ $ - ◄100% Non-Federal No Projects Programmed NFA $ No Projects Programmed NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ $ $ - ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2015 Berkshire MPO TIP Summary TIPSection 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ TIP Section 2: ▼ 28,869,664 $ 23,135,283 5,734,381 $ - Total of All Projects ▼ $ $ $ 28,869,664 ◄ Total Spending in Region 23,135,283 ◄ Total Federal Spending in Region 5,734,381 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx Page 4 of 4 December 17, 2014 Mary Beth Mello Regional Administrator Federal Transit Administration 55 Broadway – 9th floor Cambridge, Massachusetts 02142 Dear Ms. Mello: On behalf of Acting Secretary Frank DePaola, I am writing to request your approval of the attached transit actions pertaining to the Federal Fiscal Years 2015-2018 State Transportation Improvement Program, as endorsed by the Central Massachusetts Metropolitan Planning Organization, Montachusett Metropolitan Planning Organization and Martha’s Vineyard Commission. These transit actions, which include project additions and changes, are highlighted in green and yellow, respectively. These actions do not require an air quality conformity determination. If you have any questions, please call me at (857)368-8865. Sincerely, David J. Mohler Executive Director Office of Transportation Planning cc: Clinton Bench, Deputy Executive Director Steve Woelfel, Director of Strategic Planning Trey Wadsworth, Manager of MPO Activities Bryan K. Pounds, MPO Activities Tom Schiavone, Manager of Transit Programs Federal Transit Administration Federal Highway Administration Leading the Nation in Transportation Excellence Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 www.mass.gov/massdot Transportation Improvement Program (TIP) Project List (FY2015) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $845,522 $845,522 $0 $0 $0 $0 $0 $0 $0 $845,522 $0 $845,522 $0 $1,691,044 $0 $1,691,044 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 111203 BUY REPLACEMENT 30-FT BUS (4) $0 $1,355,000 $0 $0 $0 $0 $0 $1,355,000 114211 ACQUIRE - SUPPORT VEHICLES (1) $0 $75,000 $0 $0 $0 $0 $0 $75,000 113220 ACQUIRE - MISC BUS STATION EQUIP $0 $50,000 $0 $0 $0 $0 $0 $50,000 113207 ACQUIRE - SURVEIL/SECURITY EQUIP $0 $30,000 $0 $0 $0 $0 $0 $30,000 114320 CONSTRUCT - MISC. EQUIPMENT $0 $20,000 $0 $0 $0 $0 $0 $20,000 111215 BUY REPLACEMENT VAN (2) $0 $28,000 $0 $0 $0 $0 $0 $28,000 113420 Rehab/Renovation: Maintenance Facility $0 $25,000 $0 $0 $0 $0 $0 $25,000 114206 ACQUIRE - SHOP EQUIPMENT $0 $75,000 $0 $0 $0 $0 $0 $75,000 $0 $225,000 $0 $1,883,000 $845,522 $1,883,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $845,522 5309 5310 5311 Martha's Vineyard Regional Transit 5311 Authority 300901 UP TO 50% FEDERAL SHARE 5337 5339 Other Federal Other Non-Federal Other Non-Federal Other Non-Federal Other Non-Federal Other Non-Federal Other Non-Federal Other Non-Federal Other Non-Federal Other Non-Federal Other Non-Federal Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority 111400 REHAB/REBUILD - CAPITOL BUS Subtotal Total $0 $225,000 $0 $1,883,000 $0 $3,574,044 Transportation Improvement Program (TIP) Project List (FY2015) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 5307 Montachusett Regional Transit Authority BUY REPLACEMENT 30-FT BUS (2) (Match in 111203 FY16) 5307 Montachusett Regional Transit Authority 300901 UP TO 50% FEDERAL SHARE $660,800 $0 $0 $0 $0 $0 $0 $660,800 Subtotal $2,344,000 $3,004,800 $0 $0 $0 $0 $0 $0 $0 $2,344,000 $0 $2,344,000 $0 $4,688,000 $0 $5,348,800 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 $0 $51,000 $0 $0 $0 $0 $0 $51,000 $0 $42,647 $0 $0 $0 $0 $0 $42,647 $0 $15,846 $0 $0 $0 $0 $0 $15,846 5309 5310 5311 5337 5339 Other Federal Other Non-Federal Other Non-Federal Montachusett Regional Transit Authority Other Non-Federal Montachusett Regional Transit Authority Other Non-Federal Montachusett Regional Transit Authority REHAB/RENOVATE - MAINTENANCE 114402 FACILITY REHAB/RENOVATE - ADMIN/MAINT 114403 FACILITY REHAB/RENOVATE - ADMIN/MAINT FAC 114403 (FY13 5307 Match) Other Non-Federal Montachusett Regional Transit Authority 111215 Purchase - Replacement: Vans (8) $0 $89,687 $0 $0 $0 $0 $0 $89,687 Other Non-Federal Montachusett Regional Transit Authority 114220 ACQUIRE - MISC SUPPORT EQUIPMENT $0 $60,000 $0 $0 $0 $0 $0 $60,000 Other Non-Federal Montachusett Regional Transit Authority 113207 ACQUIRE - SURVEIL/SECURITY EQUIP $0 $10,000 $0 $269,180 $3,004,800 $269,180 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,344,000 Subtotal Total $0 $10,000 $0 $269,180 $0 $5,617,980 Transportation Improvement Program (TIP) Project List (FY2016) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 5307 Montachusett Regional Transit Authority 113404 REHAB/RENOVATE - BUS PARK & RIDE LOT $200,000 $50,000 $0 $0 $0 $0 $0 $250,000 5307 Montachusett Regional Transit Authority 114220 ACQUIRE - MISC SUPPORT EQUIPMENT $120,000 $30,000 $0 $0 $0 $0 $0 $150,000 5307 Montachusett Regional Transit Authority 300901 UP TO 50% FEDERAL SHARE REHAB/RENOVATE BUS SUPPORT 114400 FACIL/EQUIP $1,455,500 $0 $0 $0 $0 $1,455,500 5307 Montachusett Regional Transit Authority 5307 Montachusett Regional Transit Authority 111204 BUY REPLACEMENT <30 FT BUS (2) REHAB/RENOVATE - ADMIN/MAINT 114403 FACILITY 5307 Montachusett Regional Transit Authority 5307 Montachusett Regional Transit Authority 117A00 PREVENTIVE MAINTENANCE Subtotal $0 $2,911,000 $80,000 $20,000 $0 $0 $0 $0 $0 $100,000 $160,000 $40,000 $0 $0 $0 $0 $0 $200,000 $108,000 $27,000 $0 $0 $0 $0 $0 $135,000 $800,000 $0 $2,923,500 $167,000 $0 $0 $0 $0 $0 $200,000 $0 $1,655,500 $0 $1,000,000 $0 $4,746,000 5309 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 $0 $165,200 $0 $165,200 $2,923,500 $332,200 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,655,500 5310 5311 5337 5339 Other Federal Other Non-Federal Other Non-Federal Montachusett Regional Transit Authority BUY REPLACEMENT 30-FT BUS (2) (Matching 111203 FY15 5307) Subtotal Total $0 $165,200 $0 $165,200 $0 $4,911,200 Transportation Improvement Program (TIP) Project List (FY2015) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 5307 5307 5307 5307 5307 5307 Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority 5307 5307 5307 5307 5307 5307 5307 5307 Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority 5307 Worcester Regional Transit Authority 117A00 117C00 114303 CONSTRUCT - ADMIN/MAINT FACILITY 113403 TERMINAL, INTERMODAL (TRANSIT) PREVENTIVE MAINTENANCE 117900 PROJECT ADMINISTRATION NON FIXED ROUTE ADA PARA SERV 442400 SHORT RANGE TRANSIT PLANNING Spare Parts / Associated Capital 114220 Maintenance 114306 Purchase Shop Equipment 114208 Computer Technologies - Software 114207 Computer Technologies - Hardware 119302 Enhancements - Shelters 119208 Enhancements - Signage 114220 ACQUIRE - MISC SUPPORT EQUIPMENT 114211 Purchase - Support Vehicle (3) Purchase - Miscellaneous Support 114220 Equipment $3,512,339 $40,000 $3,588,677 $52,475 $902,208 $294,824 $0 $10,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $702,468 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $297,876 $40,000 $152,000 $146,000 $30,000 $72,800 $89,600 $116,000 $74,469 $10,000 $38,000 $36,500 $7,500 $18,200 $22,400 $29,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $5,200 $9,339,999 $1,300 $247,369 $0 $0 $0 $0 $0 $0 $702,468 $1,209,546 $0 $6,500 $0 $10,796,914 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $2,350,015 $2,350,015 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $587,504 $587,504 $2,937,519 $2,937,519 Subtotal $462,608 $462,608 $0 $0 $0 $0 $0 $0 $92,522 $92,522 $0 $0 $0 $0 $462,608 $462,608 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,000,000 $0 $4,000,000 $12,152,622 $4,247,369 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $794,990 $1,209,546 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $897,169 $13,119 $225,552 $73,706 $0 $0 $0 $0 $0 $0 $3,512,339 $50,000 $4,485,846 $65,594 $1,127,760 $368,530 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $372,345 $50,000 $190,000 $182,500 $37,500 $91,000 $112,000 $145,000 5309 5310 5311 5337 5337 Worcester Regional Transit Authority 113403 TERMINAL, INTERMODAL (TRANSIT) 5339 5339 Worcester Regional Transit Authority 114303 CONSTRUCT - ADMIN/MAINT FACILITY Other Federal Other Non-Federal Other Non-Federal Worcester Regional Transit Authority 114303 CONSTRUCT - ADMIN/MAINT FACILITY Subtotal Total $0 $4,000,000 $0 $4,000,000 $587,504 $18,197,041 Transportation Improvement Program (TIP) Project List (FY2016) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 5307 5307 5307 5307 5307 5307 5307 Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority 5307 5307 5307 5307 5307 Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority 5307 Worcester Regional Transit Authority 5307 Worcester Regional Transit Authority 117C00 Purchase - Expansion: Buses (3) Miscellaneous Equipment NON FIXED ROUTE ADA PARA SERV Preventive Maintenance Project Administration Transportation Planning Purchase - Support Vehicle (3) Purchase - Miscellaneous Support Equipment Purchase Shop Equipment Computer Technologies - Software Enhancements - Shelters Enhancements - Signage Spare Parts / Associated Capital Maintenance Computer Technologies - Hardware 2015 2015 2015 Subtotal $1,875,000 $33,600 $920,252 $3,660,451 $53,525 $280,320 $146,000 $0 $8,400 $0 $0 $0 $0 $36,500 $0 $0 $0 $0 $0 $0 $0 $0 $375,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $230,063 $915,113 $13,381 $70,080 $0 $0 $0 $0 $0 $0 $0 $0 $1,875,000 $42,000 $1,150,315 $4,575,564 $66,906 $350,400 $182,500 $101,600 $128,000 $84,000 $30,000 $48,800 $25,400 $32,000 $21,000 $7,500 $12,200 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $127,000 $160,000 $105,000 $37,500 $61,000 $327,437 $81,859 $99,200 $24,800 $7,788,185 $249,659 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $375,000 $1,228,637 $0 $0 $0 $409,296 $124,000 $9,266,481 $0 $0 $0 $0 $0 5309 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $2,373,515 $2,373,515 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $593,379 $593,379 $2,966,894 $2,966,894 Subtotal $462,608 $462,608 $0 $0 $0 $0 $0 $0 $92,522 $92,522 $0 $0 $0 $0 $462,608 $462,608 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal Total $0 $0 $10,624,308 $249,659 $0 $0 $0 $0 $0 $0 $467,522 $1,228,637 5310 5311 5337 5337 Worcester Regional Transit Authority 113403 TERMINAL, INTERMODAL (TRANSIT) 5339 5339 Worcester Regional Transit Authority 114303 CONSTRUCT - ADMIN/MAINT FACILITY Other Federal Other Non-Federal $0 $0 $593,379 $12,695,983 Transportation Improvement Program (TIP) Project List (FY2017) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 5307 5307 5307 5307 Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority 5307 5307 5307 5307 5307 5307 5307 5307 5307 Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority 5307 Worcester Regional Transit Authority 5307 Worcester Regional Transit Authority 117C00 NON FIXED ROUTE ADA PARA SERV Preventive Maintenance Transportation Planning Purchase - Support Vehicle (1) Spare Parts / Associated Capital Maintenance Purchase Shop Equipment Computer Technologies - Software Computer Technologies - Hardware Enhancements - Shelters Enhancements - Signage 113403 TERMINAL, INTERMODAL (TRANSIT) Miscellaneous Equipment Project Administration Purchase - Miscellaneous Support Equipment Purchase - Expansion: Buses (3) 2016 2016 2016 Subtotal $938,657 $3,733,660 $285,927 $26,000 $0 $0 $0 $6,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $234,664 $933,415 $71,482 $0 $0 $0 $0 $0 $1,173,321 $4,667,075 $357,409 $32,500 $205,868 $8,000 $77,576 $381,344 $30,000 $48,800 $53,040 $39,200 $54,595 $51,467 $2,000 $19,394 $95,336 $7,500 $12,200 $13,260 $9,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $13,649 $0 $0 $0 $0 $0 $0 $0 $0 $0 $257,335 $10,000 $96,970 $476,680 $37,500 $61,000 $66,300 $49,000 $68,244 $20,000 $5,000 $1,890,000 $0 $7,792,667 $222,457 $0 $0 $0 $0 $0 $0 $0 $378,000 $0 $0 $378,000 $1,253,210 $0 $0 $0 $25,000 $1,890,000 $9,268,334 5309 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $2,397,250 $2,397,250 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $599,313 $599,313 $2,996,563 $2,996,563 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal Total $0 $0 $10,189,917 $222,457 $0 $0 $0 $0 $0 $0 $378,000 $1,253,210 5310 5311 5337 5337 Worcester Regional Transit Authority 113403 TERMINAL, INTERMODAL (TRANSIT) 5339 Other Federal Other Non-Federal $0 $0 $599,313 $12,264,897 Transportation Improvement Program (TIP) Project List (FY2018) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 5307 5307 5307 5307 5307 5307 Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority 5307 5307 5307 5307 Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority Worcester Regional Transit Authority 5307 Worcester Regional Transit Authority 117C00 Preventive Maintenance Project Administration Purchase - Support Vehicle (3) Computer Technologies - Software Enhancements - Shelters Enhancements - Signage TERMINAL, INTERMODAL (TRANSIT): FACIL. 113403 IMPROVEMENT Computer Technologies - Hardware NON FIXED ROUTE ADA PARA SERV Transportation Planning Spare Parts / Associated Capital Maintenance 2017 2017 2017 Subtotal $3,808,333 $55,687 $100,000 $82,412 $30,000 $42,160 $0 $0 $25,000 $20,603 $7,500 $10,540 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $952,083 $13,922 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,760,416 $69,609 $125,000 $103,015 $37,500 $52,700 $51,480 $377,928 $957,430 $291,645 $12,870 $94,482 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $239,358 $72,911 $0 $0 $0 $0 $64,350 $472,410 $1,196,788 $364,556 $181,972 $45,493 $5,979,047 $216,488 $0 $0 $0 $0 $0 $0 $0 $1,278,274 $0 $0 $227,465 $7,473,809 5309 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $2,421,222 $2,421,222 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $605,306 $605,306 $3,026,528 $3,026,528 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,400,269 $216,488 $0 $0 $0 $0 $0 $0 $0 $1,278,274 5310 5311 5337 5337 Worcester Regional Transit Authority 113403 TERMINAL, INTERMODAL (TRANSIT) 5339 Other Federal Other Non-Federal Subtotal Total $0 $0 $605,306 $10,500,337