November 7, 2014 Pamela Stephenson Division Administrator Federal Highway Administration 55 Broadway – 10th floor Cambridge, Massachusetts 02142 Dear Ms. Stephenson: On behalf of Acting Secretary Frank DePaola, I am writing to request your approval of the attached highway actions pertaining to the Federal Fiscal Years 20152018 State Transportation Improvement Program, as endorsed by the Southeastern Massachusetts Metropolitan Planning Organization and the Boston Metropolitan Planning Organization: Adjustment 1.01-1.11 Southeastern Mass. Boston Region October 21, 2014 November 6, 2014 These actions do not require an air quality conformity determination. If you have any questions, please call me at (857)368-8865. Sincerely, David J. Mohler Executive Director Office of Transportation Planning cc: Clinton Bench, Deputy Executive Director Steve Woelfel, Director of Strategic Planning Trey Wadsworth, Manager of MPO Activities Bryan K. Pounds, MPO Activities William Betts, FAPO Federal Transit Administration Federal Highway Administration Leading the Nation in Transportation Excellence Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 www.mass.gov/massdot Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO .00 SE MASS Project Location ID 607314 REHOBOTH Description CURRENT Source Total Federal REVISED Non Federal REHOBOTH- EMERGENCY REPAIR OF CULVERT R-04-002 ON WHEELER STREET Year Source Total Federal FINANCIAL CONSTRAINT Non- Year Federal Amendment Description Date 2014 ER $1,536,119 $1,228,895 $307,224 2015 ADJUSTMENT:Move Project 11/07/14 2015 NHPP $3,918,939 $3,135,151 $783,788 2015 AMENDMENT:Increase Cost 11/07/14 2015 HPP $1,012,389 $202,478 2015 AMENDMENT:Add Project 11/07/14 2015 TI $2,505,854 $2,004,683 $501,171 2015 AMENDMENT:Add Project 11/07/14 2015 HPP $2,587,214 $2,069,771 $517,443 2015 AMENDMENT:Add Project 11/07/14 2015 SEC 125 Project Moved from FY14 to FY15 1.01 BOSTON 605883 DEDHAM DEDHAM- BRIDGE REPLACEMENT, D-05-003 (33K), NEEDHAM STREET OVER GREAT DITCH NHPP $3,029,032 $2,423,226 $605,806 cost increase of $889,907; initial programming amount of $3,029,032 1.02 BOSTON 606889 BOSTON BOSTON- IMPROVEMENTS ALONG GAINSBOROUGH AND ST. BOTOLPH STREETS $809,911 Construction; HPP 2012 (MA153); SAFETEA-LU Earmark + HPP TI 180 Earmark Total Cost = $3,518,243 1.03 BOSTON 606889 BOSTON BOSTON- IMPROVEMENTS ALONG GAINSBOROUGH AND ST. BOTOLPH STREETS Construction; TI 180 (MA216); SAFETEA-LU Earmark + HPP TI Earmark Total Cost = $3,518,243 1.04 BOSTON 607209 SOMERVILLE SOMERVILLE- RECONSTRUCTION OF BEACON STREET, FROM OXFORD STREET TO CAMBRIDGE C.L. Construction; HPP 431 (MA118); SAFETEA-LU Earmark+NFA Total Cost = $8,940,346. 1.05 BOSTON 607839 BOSTON MEDFORD CLIPPERSHIP LINEAR PARK AND BIKEWAY $475,000 $475,000 $0 2015 AMENDMENT:Add Project 11/07/14 Construction; Section 125 (MA250) of $475,000 + local funding sources of $502,487 Total Cost = $977,487 1.06 BOSTON 1570 BOSTON GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR NFA $244,427,508 $244,427,508 2015 HPP $2,429,730 $1,943,784 HPP $5,007,375 $4,005,900 AMENDMENT:Remove Project 11/07/14 Project moved from FFY 2015 Highway Table to FFY 2015 Transit Table (5309 funds). Project cash flow for FFY 2015 has increased by $80,774,492; was $244,427,508. 1.07 BOSTON 605789 BOSTON BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284) $485,946 2015 HPP $2,429,730 $1,943,784 $485,946 2016 AMENDMENT:Move Project 11/07/14 $1,001,475 2015 HPP $5,007,375 $4,005,900 $1,001,475 2016 AMENDMENT:Move Project 11/07/14 Project moved from FFY 2015. Construction; HPP 756 (MA126); SAFETEA-LU Earmark (HPP 756)+ SAFETEA-LU Earmark (HPP 4284) =Total Cost $7,437,105 1.08 BOSTON 605789 BOSTON BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284) Project moved from FFY 2015. Construction; HPP 4284 (MA203); SAFETEA-LU Earmark (HPP 756)+ SAFETEA-LU Earmark (HPP 4284) =Total Cost $7,437,105 Date: 11/7/2014 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO 1.09 BOSTON Project Location ID 1570 BOSTON CURRENT Federal REVISED Non Federal Year Source Total Federal FINANCIAL CONSTRAINT Non- Year Federal Amendment Description Description Source Total Date GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR NFA $428,900,255 $428,900,255 2016 AMENDMENT:Remove Project 11/07/14 NFA $338,011,653 $338,011,653 2017 AMENDMENT:Remove Project 11/07/14 NFA $214,270,798 $214,270,798 2018 AMENDMENT:Remove Project 11/07/14 Project moved from FFY 2016 Highway Table to FFY 2016 Transit Table (5309 funds). Project cash flow for FFY 2016 has decreased by $56,274,255; was $428,900,255. 1.10 BOSTON 1570 BOSTON GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR Project moved from 2017 Highway Table to 2017 Transit Table (5309 funds). Project cash flow for FFY 2017 increased by $37,442,347; was $338,011,653. 1.11 BOSTON 1570 BOSTON GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR Project moved from FFY 2018 Highway Table to FFY 2018 Transit Table (5309 funds). Project cash flow for FFY 2018 has increased by $131,830,202; was $214,270,798. Date: 11/7/2014 05/13/2014 Draft Released 2015 SRPEDD Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ 06/17/2014 Endorsed Municipality Name ▼ MassDOT Project Description▼ MassDOT District ▼ Funding Source ▼ Total Programmed Funds ▼ Federal Funds ▼ 07/03/2014 Adjustment #1 Non-Federal Funds ▼ 10/21/2014 Adjustment #2 Additional Information ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 606729 Southeastern Mass Taunton TAUNTON - COUNTY ST (RTE 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA 5 HSIP HSIP ($1,560,000) / Statewide TE ($843,066) Total Cost = $2,403,066; Construction; EC Score 26 Of 93; Status Pre 25% - Plans Received 01-23-14, Comments to DE 03-04-14 $ 1,560,000 $ 1,404,000 $ 156,000 HSIP Subtotal ► $ 1,560,000 $ 1,404,000 $ 156,000 ◄ 90% Federal + 10% Non-Federal ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 605848 Southeastern Mass Dartmouth DARTMOUTH - IMPROVEMENTS ON GRAND ARMY OF THE REPUBLIC HIGHWAY (U.S. ROUTE 6) AND FAUNCE CORNER ROAD (PHASE 1) 5 CMAQ $ 2,308,045 $ 1,846,436 $ CMAQ ($2,308,045) / TAP ($428,067) Total Cost = $2,736,112; Construction; EC Score 59 Of 93; Status 461,609 Pre 25% - Plans Received 05-18-12, Comments to DE 04-12-13 Eligible for CMAQ Funding 605368 Southeastern Mass North Attleborough NORTH ATTLEBOROUGH - TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT EAST WASHINGTON STREET (ROUTE 1), SOUTH WASHINGTON STREET AND HOPPIN HILL ROAD (ROUTE 120) 5 CMAQ $ 1,843,146 $ 1,474,517 $ Total Cost = $1,843,146; Construction; EC Score 43 368,629 Of 93; Status 25% - Design Public Hearing 11-07-13 Eligible for HSIP & CMAQ Funding 4,151,191 $ 3,320,953 $ 830,238 ◄ 80% Federal + 20% Non-Federal CMAQ Subtotal ► $ ►TAP - Transportation Alternatives Program 605848 Southeastern Mass Dartmouth DARTMOUTH - IMPROVEMENTS ON GRAND ARMY OF THE REPUBLIC HIGHWAY (U.S. ROUTE 6) AND FAUNCE CORNER ROAD (PHASE 1) 5 TAP CMAQ ($2,308,045) / TAP ($428,067) Total Cost = $2,736,112; Construction; EC Score 59 Of 93; Status 85,613 Pre 25% - Plans Received 05-18-12, Comments to DE 04-12-13 Eligible for CMAQ Funding 85,613 ◄ 80% Federal + 20% Non-Federal $ 428,067 $ 342,454 $ TAP Subtotal ► $ 428,067 $ 342,454 $ $ 5,851,116 $ 4,680,893 $ 1,170,223 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 5,851,116 $ 4,680,893 $ 1,170,223 ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 603893 Southeastern Mass Dartmouth DARTMOUTH - PADANARAM BRIDGE CAUSEWAY PROJECT, D-04-002, BRIDGE STREET OVER APPONAGANSETT RIVER 5 STP STP ($5,851,116) / § 330 (2003) ($342,125) / FY2002 SAA - BDP ($1,308,114) Total Cost = $7,501,355; Construction; EC Score 12 Of 93; Status Pre 25% Plans Received 04-05-11, Comments to DE 10-19-12 ►Section 1A / Fiscal Constraint Analysis Total Federal Aid Target Funds Programmed ► $ 11,990,374 $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 5,851,116 $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 1,560,000 $ 4,151,191 $ 428,067 $ 14,226,542 ◄Total Target $ ◄ Max. Non9,442,869 CMAQ/HSIP/TA $ P 995,567 ◄ Min. HSIP $ 3,360,039 ◄ Min. CMAQ $ 428,067 ◄ Min. TAP $ 2,236,168 Target Funds Available 2,236,168 Non-CMAQ/HSIP/TAP (Other) Available (564,433) HSIP Minimum Met (791,152) CMAQ Minimum Met - TAP Minimum Met HSIP, CMAQ, TAP Overprogrammed $ (1,355,585) Page 1 of 4 05/13/2014 Draft Released 2015 SRPEDD Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ 06/17/2014 Endorsed Municipality Name ▼ MassDOT Project Description▼ MassDOT District ▼ Funding Source ▼ Total Programmed Funds ▼ Federal Funds ▼ 07/03/2014 Adjustment #1 10/21/2014 Adjustment #2 Additional Information ▼ Non-Federal Funds ▼ ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ $ - $ $ - Statewide Bridge Maintenance Program Subtotal ► $ ◄ 80% Federal + 20% Non-Federal ►On System Adjustment #1 - Redistribution in funding split between FY15 & FY16, FY15 From $7,110,161 to $2,710,161, FY16 From $4,964,839 to $9,364,839 605223 Southeastern Mass Fall River FALL RIVER - INTERCHANGE IMPROVEMENTS AT ROUTE I-195/ROUTE 79/ROUTE 138 5 NHPP $ 6,600,000 $ 5,280,000 $ 606525 Southeastern Mass Attleboro ATTLEBORO - BRIDGE REPLACEMENT, A-16-053, I-95 (NB & SB) OVER NORTH AVENUE 5 NHPP $ 2,710,161 $ 2,168,129 $ On System Subtotal ► $ 9,310,161 $ 7,448,129 $ This project was combined with 606354 for a total construction cost of $270,626,756. - $171,911,637 is for the I-195/Route 79/Route 138 Interchange Improvements (Spaghetti Ramps) of which $167,600,637 is identified as GANS funding (federal & state match), $3,317,500 is additional state 1,320,000 funding, and $993,500 is Section 330 federal funding designated for Route 79. - $98,715,119 is for Structural Repairs, Cleaning and Painting to the Braga Bridge. This portion of the project is being advance constructed with federal Bridge funds over FY 2013-2016 (Year 3 of 4) 542,032 AC Year 1 of 2; Total Cost $12,075,000 1,862,032 ◄ 80% Federal + 20% Non-Federal ►Off-System 604589 Southeastern Mass Norton 606372 Southeastern Mass Wareham NORTON - BRIDGE REPLACEMENT, N-23-017, PLAIN STREET OVER THE CANOE RIVER 5 STP-BR-OFF $ 2,005,055 $ 1,604,044 $ 401,011 Status Pre 25% - Plans Received 01-22-14 WAREHAM - BRIDGE REPLACEMENT, W-06-002, PAPER MILL ROAD OVER WEWEANTIC RIVER 5 STP-BR-OFF $ 2,039,319 $ 1,631,455 $ 407,864 Status Pre 25% Off-System Subtotal ► $ 4,044,374 $ 3,235,499 $ 808,875 ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - No Projects Programmed $ Statewide Bridge Inspection Program Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid Adjustment #2 - Project moved from FY14 to FY15 603893 Southeastern Mass Dartmouth DARTMOUTH - PADANARAM BRIDGE CAUSEWAY PROJECT, D-04-002, BRIDGE STREET OVER APPONAGANSETT RIVER 5 Other FA $ 342,125 $ - $ 342,125 STP ($5,851,116) / § 330 (2003) ($342,125) / FY2002 SAA - BDP ($1,308,114) Total Cost = $7,501,355; Construction; EC Score 12 Of 93; Status Pre 25% Plans Received 04-05-11, Comments to DE 10-19-12 603893 Southeastern Mass Dartmouth DARTMOUTH - PADANARAM BRIDGE CAUSEWAY PROJECT, D-04-002, BRIDGE STREET OVER APPONAGANSETT RIVER 5 Other FA $ 1,308,114 $ - $ 1,308,114 STP ($5,851,116) / § 330 (2003) ($342,125) / FY2002 SAA - BDP ($1,308,114) Total Cost = $7,501,355; Construction; EC Score 12 Of 93; Status Pre 25% Plans Received 04-05-11, Comments to DE 10-19-12 607314 Southeastern Mass Rehoboth REHOBOTH- EMERGENCY REPAIR OF CULVERT R-04-002 ON WHEELER STREET 5 ER $ 1,536,119 $ 1,228,895 $ 307,224 $ 3,186,358 $ 1,228,895 $ 1,957,463 Other Federal Aid Subtotal ► ◄ Funding Split Varies by Funding Source Page 2 of 4 05/13/2014 Draft Released 2015 SRPEDD Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ 06/17/2014 Endorsed Municipality Name ▼ MassDOT Project Description▼ MassDOT District ▼ Funding Source ▼ Total Programmed Funds ▼ Federal Funds ▼ 07/03/2014 Adjustment #1 10/21/2014 Adjustment #2 Additional Information ▼ Non-Federal Funds ▼ ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed No Projects Programmed $ $ Statewide Infrastructure Program Subtotal ► $ - - $ $ $ - - $ $ $ ◄ 80% Federal + 20% Non-Federal - ► Statewide HSIP Program No Projects Programmed No Projects Programmed $ $ Statewide HSIP Program Subtotal ► $ - - $ $ $ - - $ $ $ ◄ 90% Federal + 10% Non-Federal - ► Statewide Safe Routes to Schools Program 607716 Southeastern Mass Mansfield MANSFIELD - SIDEWALK CONSTRUCTION & RELATED WORK ON EAST STREET AT THE JORDAN-JACKSON ELEMENTARY SCHOOL (SRTS) 5 TAP $ Statewide Safe Routes to Schools Program Subtotal ► $ 900,000 $ 720,000 $ 180,000 80% Federal + 20% Non-Federal 900,000 $ 720,000 $ 180,000 ◄ Funding Split Varies by Funding Source ► Statewide CMAQ No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - Statewide CMAQ ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Statewide Transportation Enhancements 606729 Southeastern Mass Taunton TAUNTON - COUNTY ST (RTE 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA 5 STP-TE HSIP ($1,560,000) / Statewide TE ($843,066) Total Cost = $2,403,066; Construction; EC Score 26 Of 93; Status Pre 25% - Plans Received 01-23-14, Comments to DE 03-04-14 $ 843,066 $ 674,453 $ 168,613 Statewide Transportation Enhancements Subtotal ► $ 843,066 $ 674,453 $ 168,613 ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects Programmed $ - No Projects Programmed $ - Statewide ITS Subtotal ► $ - $ No Projects Programmed $ - - No Projects Programmed $ - - Statewide Interstate Maintenance Program Subtotal ► $ - $ No Projects Programmed $ - No Projects Programmed $ - Statewide NHS Preservation Program Subtotal ► $ - $ $ - - ►Statewide Interstate Maintenance Program $ - ◄ 80% Federal + 20% Non-Federal - ◄ 90% Federal + 10% Non-Federal - $ - ►Statewide NHS Preservation Program+ - - - $ - ►Statewide RR Grade Crossings No Projects Programmed No Projects Programmed Statewide RR Grade Crossings Subtotal ► $ $ - ◄ 80% Federal + 20% Non-Federal $ - $ - ◄ 80% Federal + 20% Non-Federal - ◄ 80% Federal + 20% Non-Federal ►Statewide Stormwater Retrofits No Projects Programmed No Projects Programmed $ $ Statewide Stormwater Retrofits Subtotal ► $ - $ - - $ - Page 3 of 4 05/13/2014 Draft Released 2015 SRPEDD Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ 06/17/2014 Endorsed Municipality Name ▼ MassDOT Project Description▼ MassDOT District ▼ Funding Source ▼ Total Programmed Funds ▼ Federal Funds ▼ 07/03/2014 Adjustment #1 10/21/2014 Adjustment #2 Additional Information ▼ Non-Federal Funds ▼ ►Statewide ADA Implementation Plan No Projects Programmed No Projects Programmed $ $ Statewide ADA Implementation Plan Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal - ◄ Funding Split Varies by Funding Source ◄100% Non-Federal ►Other Statewide Items ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning $ $ - - - - $ - $ - Statewide Design and Right of Way $ - - Statewide Recreational Trails $ - - Other Statewide Items Subtotal ► $ - $ - - - - - ►Section 2A / Non-Federal Projects $ - - ►Non Federal Aid No Projects Programmed No Projects Programmed NFA $ NFA $ Non-Federal Aid Subtotal► $ - $ $ $ - NFA $ NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ $ - - $ - ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed No Projects Programmed 2015 SRPEDD TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ ◄100% Non-Federal Total of All Projects ▼ TIP Section 2: ▼ 30,274,333 $ 23,055,275 - 7,219,058 $ - $ 30,274,333 ◄ Total Spending in Region $ 23,055,275 ◄ Total Federal Spending in Region $ 7,219,058 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public W orks Projects / 701 CMR 7.00 (the Regulation) was prom ulgated and becam e law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is perform ed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Com m onwealth is the Awarding Authority. Therefore, all projects m ust be considered and im plem ented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional inform ation relative to guidance and im plem entation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.m assdot.state.m a.us/Highway/flaggers/m ain.aspx Page 4 of 4 T he f ile you have accessed is ent it led “Draf t Amendment O ne t o t he F F Ys 2015 – 18 T ransport at ion I mprovement Program. ” Cont ained in t he f ile are t he Massachuset t s Depart ment of T ransport at ion’s project ident if icat ion number, project descript ion, dist rict number, f unding source, programmed f unds, and t he split bet ween f ederal and non-f ederal f unds f or each of t he years of t he highway sect ion. Similar inf ormat ion is cont ained f or t he t ransit sect ion. T his f ile is not current ly available in an accessible f ormat . T he Massachuset t s Depart ment of T ransport at ion is working collaborat ively wit h each of t he st at e’s regional planning agencies t o address t his issue. W hile t his work is ongoing, alt ernat ive f ormat s are available by calling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates a project moved out to another TIP element (cost not reflected in total) Indicates a new addition to the TIP (action taken as denoted) Indicates a new funding category ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 605146 SALEM- RECONSTRUCTION ON CANAL STREET, FROM W ASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE 4 HSIP $ 2,000,000 $ 1,800,000 $ 200,000 STP+HSIP+CMAQ Total Cost = $7,867,762 605657 MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 3 HSIP $ 3,000,000 $ 2,700,000 $ 300,000 STP+HSIP+CMAQ+TAP Total Cost = $12,062,567; HSIP pending Road Safety Audit HSIP Subtotal ► $ 5,000,000 $ 4,500,000 $ 500,000 ◄ 90% Federal + 10% Non-Federal 4 CMAQ $ 2,000,000 $ 1,600,000 $ 400,000 N/A CMAQ $ 400,000 $ 320,000 $ 80,000 4 CMAQ $ 5,429,110 $ 4,343,288 $ 1,085,822 6 CMAQ $ 5,000,000 $ 4,000,000 $ 1,000,000 STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP, TCSP) Total Cost = $16,866,250 3 CMAQ $ 5,000,000 $ 4,000,000 $ 1,000,000 STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 CMAQ Subtotal ► $ 17,829,110 $ 14,263,288 $ ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 605146 1559 604652 606284 605657 SALEM- RECONSTRUCTION ON CANAL STREET, FROM W ASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE INTERSECTION IMPROVEMENT PROGRAM STONEHAM- W INCHESTER- W OBURN- TRICOMMUNITY BIKEWAY BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 1 of 33 STP+HSIP+CMAQ Total Cost = $7,867,762 3,565,822 ◄ 80% Federal + 20% Non-Federal Boston Region MPO Staff - 11/6/2014 T he f ile you have accessed is ent it led “Draf t Amendment O ne t o t he F F Ys 2015 – 18 T ransport at ion I mprovement Program. ” Cont ained in t he f ile are t he Massachuset t s Depart ment of T ransport at ion’s project ident if icat ion number, project descript ion, dist rict number, f unding source, programmed f unds, and t he split bet ween f ederal and non-f ederal f unds f or each of t he years of t he highway sect ion. Similar inf ormat ion is cont ained f or t he t ransit sect ion. T his f ile is not current ly available in an accessible f ormat . T he Massachuset t s Depart ment of T ransport at ion is working collaborat ively wit h each of t he st at e’s regional planning agencies t o address t his issue. W hile t his work is ongoing, alt ernat ive f ormat s are available by calling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►TAP - Transportation Alternatives Program 605657 MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 3 TAP STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 $ 2,548,719 $ 2,038,975 $ 509,744 TAP Subtotal ► $ 2,548,719 $ 2,038,975 $ 509,744 ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 605146 SALEM- RECONSTRUCTION ON CANAL STREET, FROM W ASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE 4 STP $ 3,867,762 $ 3,094,210 $ 773,552 606284 BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 STP $ 7,446,852 $ 5,957,482 $ 1,489,370 605657 MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 3 STP $ 1,513,848 $ 1,211,078 $ 302,770 603711 NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04021, N-04-022, N-04-026, N-04-027 & W -13-023 (ADDA-LANE - CONTRACT V) 6 NHPP $ 30,000,000 $ 24,000,000 $ 6,000,000 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 42,828,462 $ 34,262,770 $ 8,565,692 ◄ 80% Federal + 20% Non-Federal Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 68,206,291 $ 42,828,462 $ 68,221,673 ◄Total Target 44,786,168 ◄ Max. NonCMAQ/HSIP/TAP $ $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 5,000,000 $ 17,829,110 $ 2,548,719 $ 4,774,123 ◄ Min. HSIP 16,112,664 ◄ Min. CMAQ 2,548,719 ◄ Min. TAP $ $ $ STP+HSIP+CMAQ Total Cost = $7,867,762 STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP, TCSP) Total Cost = $16,866,250 STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 AC Yr 2 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 2015-18 TIP) ►Section 1A / Fiscal Constraint Analysis 15,382 Target Funds Available 15,383 Non-CMAQ/HSIP/TAP (Other) Available (225,877) HSIP Minimum Met (1,716,446) CMAQ Minimum Met TAP Minimum Met HSIP, CMAQ, TAP Overprogrammed $ (1,942,323) - Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 2 of 33 Boston Region MPO Staff - 11/6/2014 T he f ile you have accessed is ent it led “Draf t Amendment O ne t o t he F F Ys 2015 – 18 T ransport at ion I mprovement Program. ” Cont ained in t he f ile are t he Massachuset t s Depart ment of T ransport at ion’s project ident if icat ion number, project descript ion, dist rict number, f unding source, programmed f unds, and t he split bet ween f ederal and non-f ederal f unds f or each of t he years of t he highway sect ion. Similar inf ormat ion is cont ained f or t he t ransit sect ion. T his f ile is not current ly available in an accessible f ormat . T he Massachuset t s Depart ment of T ransport at ion is working collaborat ively wit h each of t he st at e’s regional planning agencies t o address t his issue. W hile t his work is ongoing, alt ernat ive f ormat s are available by calling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects Programmed $ $ $ Statewide Bridge Maintenance Program Subtotal ► $ $ $ ◄ 80% Federal + 20% Non-Federal ►On System 600703 LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95 (ROUTE 128) 4 NHPP $ - 14,886,555 $ - 11,909,244 $ - 2,977,311 AC Yr 3 of 4; Total Cost = $35,108,000 607338 GLOUCESTER- BRIDGE PRESERVATION, G-05-017, ROUTE 128 OVER ANNISQUAM RIVER (PHASE II) 4 NHPP $ 5,506,585 $ 4,405,268 $ 1,101,317 AC Yr 2 of 2; Total Cost = $13,956,585 604796 DEDHAM- BRIDGE REPLACEMENT, D-05-033, PROVIDENCE HIGHWAY OVER MOTHER BROOK 6 NHPP $ 1,192,805 $ 954,244 $ 238,561 AC Yr 2 of 2; Total Cost = $7,051,805 3 NHPP $ 1,780,272 $ 1,424,218 $ 356,054 6 NHPP $ 3,918,939 $ 3,135,151 $ 783,788 607273 AMENDMENT:Incr ease Cost 605883 FRANKLIN- BRIDGE DEMOLITION, F-08-005, OLD STATE ROUTE 140 OVER MBTA/CSX & NEW PEDESTRIAN BRIDGE CONSTRUCTION DEDHAM- BRIDGE REPLACEMENT, D-05-003 (33K), NEEDHAM STREET OVER GREAT DITCH 603008 WOBURN- BRIDGE REPLACEMENT, W-43-003, SALEM STREET OVER MBTA 4 NHPP $ 5,018,477 $ 4,014,782 $ 1,003,695 608019 BOSTON- ADVANCED UTILITY RELOCATIONS FOR BRIDGE B-16-237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE 6 NHPP $ 6,000,000 $ 4,800,000 $ 1,200,000 On System Subtotal ► $ 38,303,633 $ 30,642,906 $ $ $ $ Off-System Subtotal ► $ $ $ $ $ $ - cost increase of $708,975 $889,907; was $3,029,032 7,660,727 ◄ 80% Federal + 20% Non-Federal ►Off-System No Projects Programmed ► Statewide Bridge Inspection Program No Projects Programmed $ Statewide Bridge Inspection Program Subtotal ► $ - - - - - ◄ 80% Federal + 20% Non-Federal $ - ◄ 80% Federal + 20% Non-Federal - Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 3 of 33 Boston Region MPO Staff - 11/6/2014 T he f ile you have accessed is ent it led “Draf t Amendment O ne t o t he F F Ys 2015 – 18 T ransport at ion I mprovement Program. ” Cont ained in t he f ile are t he Massachuset t s Depart ment of T ransport at ion’s project ident if icat ion number, project descript ion, dist rict number, f unding source, programmed f unds, and t he split bet ween f ederal and non-f ederal f unds f or each of t he years of t he highway sect ion. Similar inf ormat ion is cont ained f or t he t ransit sect ion. T his f ile is not current ly available in an accessible f ormat . T he Massachuset t s Depart ment of T ransport at ion is working collaborat ively wit h each of t he st at e’s regional planning agencies t o address t his issue. W hile t his work is ongoing, alt ernat ive f ormat s are available by calling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid AMENDMENT:Mov e Project - (FROM 2015) 605789 BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284) 6 HPP $ $ $ 605789 BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284) 6 HPP $ $ $ 606134 BOSTON- TRAFFIC SIGNAL IMPROVEMENTS ON BLUE HILL AVENUE AND W ARREN STREET AMENDMENT:Add Project 606889 BOSTON- IMPROVEMENTS ALONG GAINSBOROUGH AND ST. BOTOLPH STREETS 6 HPP $ 1,012,389 $ 809,911 $ AMENDMENT:Add Project 606889 BOSTON- IMPROVEMENTS ALONG GAINSBOROUGH AND ST. BOTOLPH STREETS 6 TI $ 2,505,854 $ 2,004,683 $ AMENDMENT:Add Project 607209 4 HPP $ 2,587,214 $ 2,069,771 $ AMENDMENT:Mov e Project - (FROM 2015) AMENDMENT:Add Project - - Project moved out to FFY 2016. Was $7,437,105. - 6 HPP $ - 2,377,900 $ - 1,902,320 $ 606284 SOMERVILLE- RECONSTRUCTION OF BEACON STREET, FROM OXFORD STREET TO CAMBRIDGE C.L. BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 606284 BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 606284 BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 606284 BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 606284 BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 TCSP $ 1,250,000 $ 1,000,000 $ 607839 MEDFORD CLIPPERSHIP LINEAR PARK AND BIKEWAY 4 Sec 125 $ 475,000 $ 475,000 $ Other Federal Aid Subtotal ► $ 13,377,755 $ Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Project moved out to FFY 2016. Was $7,437,105. 6 6 6 6 HPP Sec 129 Sec 125 STPP Page 4 of 33 $ $ $ $ 1,114,501 $ 980,000 $ 475,000 $ 599,897 $ 891,601 $ 980,000 $ 475,000 $ 599,897 $ 11,208,183 $ 475,580 - Construction; HPP 2129 (MA155) Construction; HPP 2012 (MA153); SAFETEA-LU Earmark + HPP TI 180 Earmark Total Cost = $3,518,243 Construction; TI 180 (MA216); SAFETEA-LU Earmark + HPP TI Earmark Total Cost = 501,171 $3,518,243 202,478 517,443 Construction; HPP 431 (MA118); SAFETEA-LU Earmark+NFA Total Cost = $8,940,346. Construction; HPP 682; STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, 222,900 TCSP) Total Cost = $16,866,250 - Construction; Section 129 (MA246); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 - Construction; Section 125 (MA252); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 - Construction; STPP (MA267); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Construction; TCSP (11MA008); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 250,000 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Construction; Section 125 (MA250) of $475,000 + local funding sources of $502,487 Total Cost = $977,487 2,169,572 ◄ Funding Split Varies by Funding Source - Boston Region MPO Staff - 11/6/2014 T he f ile you have accessed is ent it led “Draf t Amendment O ne t o t he F F Ys 2015 – 18 T ransport at ion I mprovement Program. ” Cont ained in t he f ile are t he Massachuset t s Depart ment of T ransport at ion’s project ident if icat ion number, project descript ion, dist rict number, f unding source, programmed f unds, and t he split bet ween f ederal and non-f ederal f unds f or each of t he years of t he highway sect ion. Similar inf ormat ion is cont ained f or t he t ransit sect ion. T his f ile is not current ly available in an accessible f ormat . T he Massachuset t s Depart ment of T ransport at ion is working collaborat ively wit h each of t he st at e’s regional planning agencies t o address t his issue. W hile t his work is ongoing, alt ernat ive f ormat s are available by calling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program DISTRICT 4- HIGHWAY LIGHTING BRANCH CIRCUIT RE-CABLING FROM SIX (6) LIGHTING LOAD 607700 4 STP $ CENTERS ALONG ROUTE I-95 (128) LEXINGTONW OBURN Statewide Infrastructure Program Subtotal ► $ 2,500,000 $ 2,000,000 $ 500,000 2,500,000 $ 2,000,000 $ 500,000 ◄ 80% Federal + 20% Non-Federal $ $ ◄ 90% Federal + 10% Non-Federal ► Statewide HSIP Program No Projects Programmed $ Statewide HSIP Program Subtotal ► $ $ $ ► Statewide Safe Routes to Schools Program 607920 607892 MILTON- SAFE ROUTES TO SCHOOL (GLOVER 6 TAP $ 725,000 $ 580,000 $ ELEMENTARY SCHOOL) SOMERVILLE- SAFE ROUTES TO SCHOOL (HEALEY 4 TAP $ 700,000 $ 560,000 $ SCHOOL) Statewide Safe Routes to Schools Program Subtotal ► $ 1,425,000 $ 1,140,000 $ 145,000 80% Federal + 20% Non-Federal 140,000 80% Federal + 20% Non-Federal 285,000 ◄ Funding Split Varies by Funding Source ► Statewide CMAQ 604531 ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL ►Statewide Transportation Enhancements ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL 604531 3 3 CMAQ $ Statewide TE+Statewide CMAQ Total Cost = $4,575,977 808,575 ◄ 80% Federal + 20% Non-Federal $ Statewide TE+Statewide CMAQ Total Cost = $4,575,977 106,621 ◄ 80% Federal + 20% Non-Federal $ 4,042,873 $ 3,234,298 $ Statewide CMAQ ► $ 4,042,873 $ 3,234,298 STP-TE $ 808,575 533,104 426,483 106,621 Statewide Transportation Enhancements Subtotal ► $ 533,104 $ 426,483 $ Statewide ITS Subtotal ► $ $ $ ◄ 80% Federal + 20% Non-Federal $ - - $ - - ◄ 90% Federal + 10% Non-Federal ►Statewide ITS No Projects Programmed ►Statewide Interstate Maintenance Program No Projects Programmed Statewide Interstate Maintenance Program Subtotal ► $ - ►Statewide NHS Preservation Program+ CHELSEA- REVERE- RESURFACING & RELATED 607174 4 NHPP $ - 8,663,824 - - 6,931,059 W ORK ON ROUTE 1 - AMENDMENT:Incr BEVERLY - RESURFACING & RELATED W ORK ON 607891 4 NHPP $ 5,805,600 4,644,480 ease Cost ROUTE 128 Statewide NHS Preservation Program Subtotal ► $ 14,469,424 $ 11,575,539 $ AMENDMENT:Incr ease Cost 1,732,765 1,161,120 cost increase of $963,449; was $8,663,824 cost increase of $1,946,780; was $5,805,600 2,893,885 ◄ 80% Federal + 20% Non-Federal ►Statewide RR Grade Crossings No Projects Programmed Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP $ Statewide RR Grade Crossings Subtotal ► $ Page 5 of 33 $ - - - $ ◄ 80% Federal + 20% Non-Federal Boston Region MPO Staff - 11/6/2014 - - T he f ile you have accessed is ent it led “Draf t Amendment O ne t o t he F F Ys 2015 – 18 T ransport at ion I mprovement Program. ” Cont ained in t he f ile are t he Massachuset t s Depart ment of T ransport at ion’s project ident if icat ion number, project descript ion, dist rict number, f unding source, programmed f unds, and t he split bet ween f ederal and non-f ederal f unds f or each of t he years of t he highway sect ion. Similar inf ormat ion is cont ained f or t he t ransit sect ion. T his f ile is not current ly available in an accessible f ormat . T he Massachuset t s Depart ment of T ransport at ion is working collaborat ively wit h each of t he st at e’s regional planning agencies t o address t his issue. W hile t his work is ongoing, alt ernat ive f ormat s are available by calling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ $ $ ◄ 80% Federal + 20% Non-Federal $Statewide ADA Implementation Plan Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal Other Statewide Items Subtotal ► $ - -$ - $ - - ◄ Funding Split Varies by Funding Source - - ►Statewide Stormwater Retrofits No Projects Programmed $ Statewide Stormwater Retrofits Subtotal ► $ ►Statewide ADA Implementation Plan No Projects Programmed ►Other Statewide Items No Projects Programmed ►Section 2A / Non-Federal Projects - ►Non Federal Aid 606146 AMENDMENT:Incr ease Cost,AMENDMENT :Change Funding Source 1570 1568 CANTON- NORW OOD- W ESTW OOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON CANTON STREET/DEDHAM STREET, INCLUDES REPLACEMENT OF C-02-034, REHAB OF C-02-024, C02-002=N-25-016=W-31-002 & 5 SIGNALIZED INTERSECTIONS GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE W ITH THE UNION SQUARE SPUR FAIRMOUNT IMPROVEMENTS Non-federal aid 5/6 NFA $ N/A NFA $ N/A NFA $ 38,000,000 Project moved from FFY 2015 Highway Table to FFY 2015 Transit Table (5309 funds). Project cash flow for FFY 2015 has increased by $80,774,492; was $244,427,508. $ - 4,863,082 $ 4,863,082 Lists cash flows (based on state fiscal year) for Fairmount Improvements MassDOT made a formal request on Aug. 1, 2011, to remove this project from the State Implementation Plan regulation. The MPO is continuing to reference this project in the document until the process is complete. - RED LINE-BLUE LINE CONNECTOR DESIGN N/A 1572 38,000,000 $ NFA $ 10,000,000 $ 10,000,000 Non-Federal Aid Subtotal► $ 52,863,082 $ 52,863,082 ◄100% Non-Federal $ $ ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 6 of 33 - Boston Region MPO Staff - 11/6/2014 T he f ile you have accessed is ent it led “Draf t Amendment O ne t o t he F F Ys 2015 – 18 T ransport at ion I mprovement Program. ” Cont ained in t he f ile are t he Massachuset t s Depart ment of T ransport at ion’s project ident if icat ion number, project descript ion, dist rict number, f unding source, programmed f unds, and t he split bet ween f ederal and non-f ederal f unds f or each of t he years of t he highway sect ion. Similar inf ormat ion is cont ained f or t he t ransit sect ion. T his f ile is not current ly available in an accessible f ormat . T he Massachuset t s Depart ment of T ransport at ion is working collaborat ively wit h each of t he st at e’s regional planning agencies t o address t his issue. W hile t his work is ongoing, alt ernat ive f ormat s are available by calling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ 2015 Boston Region MPO TIP Summary Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ TIP Section 1: ▼ TIP Section 2: ▼ Total of All Projects ▼ Total ► $ 142,858,080 $ Federal Funds ► $ 115,292,443 Non-Federal Funds ► $ 27,565,637 $ 52,863,082 $ $ 52,863,082 $ Additional Information ▼ 195,721,162 ◄ Total Spending in Region 115,292,443 ◄ Total Federal Spending in Region 80,428,719 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 7 of 33 Boston Region MPO Staff - 11/6/2014 2015 Boston Region MPO Transportation Improvement Program Regional Transit Project Description ▼ Authority ▼ 5307 MBTA PREVENTIVE MAINTENANCE MBTA HEAVY RAIL CARS Red/Orange Lines $ 5307 5307 MBTA MBTA Government Center (Blue Line Modernization) Elevators/Escalators 5307 CATA 5307 5307 5307 5307 - $ - $ - $ RTA Funds ▼ SCA ▼ - $ - $ Total Cost ▼ 3,000,000 $ 15,000,000 $ - $ - $ - $ - $ $ 32,761,068 $ 25,924,448 $ $ - $ $ - $ $ - $ $ - $ $ - $ $ BUY REPLACEMENT 30FT BUS (1) $ 320,000 $ 80,000 $ - $ - $ - $ - $ - $ 400,000 CATA PREVENTIVE MAINTENANCE $ 193,391 $ - $ - $ - $ - $ - $ 48,347 $ 241,738 CATA ACQUIRE - MISC SUPPORT EQUIPMENT $ 16,700 $ 4,176 $ - $ - $ - $ - $ - $ 20,876 MWRTA TERMINAL, INTERMODAL (TRANSIT) $ 20,000 $ 5,000 $ - $ - $ - $ - $ - $ 25,000 $ 471,356 $ 117,840 $ - $ - $ - $ - $ - $ 589,196 $ $ 25,000 20,000 $ $ 6,250 5,000 $ $ - $ $ - $ $ - $ $ - $ $ - $ $ 31,250 25,000 $ 50,000 $ 12,500 $ - $ - $ - $ - $ - $ 62,500 $ 80,000 $ 20,000 $ - $ - $ - $ - $ - $ 100,000 $ 1,000,000 $ - $ - $ - $ - $ 250,000 $ - $ 1,250,000 $ 10,000 $ 260,766 $ $ - $ $ - $ $ - $ $ 250,000 $ $ 17,719,726 $ 50,000 $ 91,152,455 $ 60,000,000 $ 40,000,000 $ 21,190,546 5337 Subtotal ► $ 121,190,546 $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ - $ 15,000,000 $ 10,000,000 $ 5,297,637 $ 30,297,637 $ 75,000,000 $ 50,000,000 $ 26,488,183 $151,488,183 $ 5339 Subtotal ► $ $ $ - $ $ - $ $ - $ $ - $ $ - $ $ $ $ $ $ - $ $ - $ $ - $ $ - $ $ - $ $ 5307 5307 MWRTA MWRTA 5307 MWRTA 5307 MWRTA ACQUIRE - MOBILE SURV/SECURITY EQUIP ACQUISITION OF BUS SUPPORT EQUIP/FACILITIES MWRTA NON FIXED ROUTE ADA PARA SERV 5307 MWRTA ACQUIRE - SUPPORT VEHICLES (2) 5337 5337 5337 MBTA MBTA MBTA Bridge & Tunnel Program Stations - T-GAPS Systems Upgrades 5339 MBTA Systems Upgrades $ 40,000 5307 Subtotal ► $ 72,921,963 No Projects Programmed N/A $ 5310 Subtotal ► $ Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP 5,287,027 5,287,027 - Page 8 of 33 - Additional Information▼ - TERMINAL, INTERMODAL (TRANSIT) ACQUISITION OF BUS SUPPORT EQUIP/FACILITIES PURCHASE SIGNAGE - $ ITCCAP ▼ TDC ▼ $ MWRTA 5310 RTACAP ▼ MAP ▼ $ 12,000,000 5307 5307 State Match Sources Carryover or Earmark Federal Details▼ Funds ▼ FTA Program ▼ 8,190,267 6,481,112 1,321,757 1,321,757 - $ - Project is now funded with state funds; was $80,000,000. $ 40,951,335 $ 32,405,560 $ $ 6,608,784 6,608,784 - Boston Region MPO Staff - 11/6/2014 2015 Boston Region MPO Transportation Improvement Program FTA Program ▼ 5309 MBTA Other Other RTACAP ▼ MAP ▼ GREEN LINE EXTENSION PROJECTEXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR N/A $ 100,000,000 5309 Subtotal ► $ 100,000,000 No Projects Programmed No Projects Programmed No Projects Programmed SoGR Livability TIGER State Match Sources Carryover or Earmark Federal Details▼ Funds ▼ Regional Transit Project Authority ▼ Description ▼ N/A N/A N/A Grants Subtotal ► MBTA HEAVY RAIL CARS Red/Orange Lines CATA BUS REPLACEMENT <30 FT BUS (1) N/A N/A $ $ $ $ - ITCCAP ▼ TDC ▼ RTA Funds ▼ SCA ▼ Total Cost ▼ Additional Information▼ Project moved from FFY 2015 TIP Highway Table to FFY 2015 TIP Transit Table. Cash flow increase of $80,774,492; was $244,427,508. The Green Line Extension project is currently in the New Starts pipeline and the Commonwealth anticipates a decision in a Full Funding Grant Agreement in FFY 2015. The cash flows for the project begin programming New Starts funding in FFY 2015 and assume $100 million in New Starts funding in FFY 2015. The Commonwealth is committed to fully funding this project with bond funds if New Starts is not awarded. $1,419,383,000 of the $1,992,243,000 project cost is programmed in the FFYs 2015-18 TIP. $ $ - $ $ - $ $ - $ $ - $ $ - $225,202,000 $225,202,000 $325,202,000 $325,202,000 $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ $ $ $ $ $ - $ $ Other Subtotal ► $ - - - - $ - $ - $ - $ - $ 82,130,340 $ 82,130,340 $ 121,824 $ 121,824 $ $ - $ $ - $ $ - $ $ - $ $ 82,130,340 121,824 $ $ 82,252,164 $ 382,590 $ - $ - $ - $ $356,671,460 $656,703,586 Project is now funded 100% with state funds. Project cash flow increase of $2,130,340. Was $80,000,000. New FFY 2015 Project. Total► $ 299,399,536 Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 9 of 33 250,000 Boston Region MPO Staff - 11/6/2014 2015 Boston Region MPO Transportation Improvement Program FTA Program ▼ Regional Transit Project Authority ▼ Description ▼ Carryover or Earmark Federal Details▼ Funds ▼ Fiscal Constraint Analysis Federal Funding Source ▼ Programmed ▼ Available ▼ FFY 15 / 5307 $ FFY 15 / 5337 $ FFY 15 / 5339 $ FFY 15 / 5310 $ FFY 15 / 5309 $ 72,921,963 121,190,546 5,287,027 100,000,000 $ $ $ $ (+/-) ▼ 136,921,963 121,190,546 5,287,027 $100,000,000 $64,000,000 $ $ $ $ Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP State Match Sources RTACAP ▼ MAP ▼ ITCCAP ▼ TDC ▼ SCA ▼ State Funding Source ▼ Available ▼ Available Available Available Available Available RTACAP MAP ITCCAP SCA TDC Page 10 of 33 Programmed ▼ $ $ $ $ $ 382,590 $ 672,010 - $ - $ 250,000 $ 3,234,526 - RTA Funds ▼ Total Cost ▼ Additional Information▼ (+/-) ▼ 289,420 Available Available Available 2,984,526 Available $ $ $ $ - Boston Region MPO Staff - 11/6/2014 The file y ou hav e ac c es s ed is entitled “Draft Amendment One to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2016 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates a project moved out to another TIP element (cost not reflected in total) Indicates a new addition to the TIP (action taken as denoted) Indicates a new funding category ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM 601630 HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) MARLBOROUGH- RECONSTRUCTION OF ROUTE 85 604810 (MAPLE STREET) 6 HSIP $ 1,000,000 $ 900,000 $ 100,000 3 HSIP $ 3,397,727 $ 3,057,954 $ 339,773 HSIP Subtotal ► $ 4,397,727 $ 3,957,954 $ AC Yr 1 of 4; STP+HSIP+TEA-21 Earmark Total Cost = $60,053,518 ($53,453,518 programmed in FFYs 2015-18 TIP) HSIP+CMAQ Total Cost = $5,397,727; HSIP pending Road Safety Audit 439,773 ◄ 90% Federal + 10% Non-Federal ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 1559 1569 604810 605110 CLEAN AIR AND MOBILITY GREEN LINE EXTENSION PROJECT (PHASE II), MEDFORD HILLSIDE (COLLEGE AVENUE) TO MYSTIC VALLEY PARKWAY/ROUTE 16 MARLBOROUGH- RECONSTRUCTION OF ROUTE 85 (MAPLE STREET) BROOKLINE- INTERSECTION & SIGNAL IMPROVEMENTS @ ROUTE 9 & VILLAGE SQUARE (GATEWAY EAST) ►TAP - Transportation Alternatives Program BROOKLINE- INTERSECTION & SIGNAL 605110 IMPROVEMENTS @ ROUTE 9 & VILLAGE SQUARE (GATEWAY EAST) N/A CMAQ $ 374,850 $ 299,880 $ 74,970 N/A CMAQ $ 8,100,000 $ 6,480,000 $ 1,620,000 3 CMAQ $ 2,000,000 $ 1,600,000 $ 400,000 HSIP+CMAQ Total Cost = $5,397,727 6 CMAQ $ 244,171 $ 195,337 $ 48,834 TAP+CMAQ+Private Sector Contribution ($1,000,000) Total Cost = $5,591,009 CMAQ Subtotal ► $ 10,719,021 $ 8,575,217 $ $ 4,346,838 $ 3,477,470 $ 869,368 TAP Subtotal ► $ 4,346,838 $ 3,477,470 $ 869,368 ◄ 80% Federal + 20% Non-Federal 6 TAP Yr 1 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 2,143,804 ◄ 80% Federal + 20% Non-Federal TAP+CMAQ+Private Sector Contribution ($1,000,000) Total Cost = $5,591,009 ►Non-CMAQ/HSIP/TAP (Other) 29492 BEDFORD- BILLERICA- BURLINGTON- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III) 4 STP $ 21,691,442 $ 17,353,154 $ 4,338,288 AC Yr 1 of 2; STP+Northern Middlesex Council of Governments contribution ($1,000,000) Total Cost = $29,296,348 603711 NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADDA-LANE - CONTRACT V) 6 NHPP $ 30,000,000 $ 24,000,000 $ 6,000,000 AC Yr 3 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 2015-18 TIP) 3,800,000 $ 3,040,000 $ 760,000 AC Yr 1 of 4; STP+HSIP+TEA-21 Earmark Total Cost = $60,053,518 ($53,453,518 programmed in FFYs 2015-18 TIP) 55,491,442 $ 44,393,154 $ 601630 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM 6 STP $ HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 11 of 33 11,098,288 ◄ 80% Federal + 20% Non-Federal Boston Region MPO Staff - 11/6/2014 The file y ou hav e ac c es s ed is entitled “Draft Amendment One to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2016 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1A / Fiscal Constraint Analysis Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 74,955,028 $ 55,491,442 $ 75,009,821 ◄Total Target 52,939,052 ◄ Max. NonCMAQ/HSIP/TAP $ $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 4,397,727 $ 10,719,021 $ 4,346,838 $ 4,296,710 ◄ Min. HSIP 13,427,220 ◄ Min. CMAQ 4,346,838 ◄ Min. TAP $ $ $ 54,793 Target Funds Available (2,552,390) Non-CMAQ/HSIP/TAP (Other) Exceeds Maximum (101,017) HSIP Minimum Met 2,708,199 CMAQ Minimum Not Met - TAP Minimum Met Remaining HSIP, CMAQ, and TAP Funds $ 2,607,182 ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects Programmed $ - $ - $ - Statewide Bridge Maintenance Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►On System 600703 600867 604173 607685 606553 LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95 (ROUTE 128) BOSTON- BRIDGE REPLACEMENT, B-16-237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE CHARLES RIVER BRAINTREE- BRIDGE REHABILITATION, B-21-060 AND B-21-061, ST 3 (SB) AND ST 3 (NB) OVER RAMP C (QUINCY ADAMS) HANOVER- NORWELL- SUPERSTRUCTURE REPLACEMENT, H-06-010, ST 3 OVER ST 123 (WEBSTER STREET) & N-24-003, ST 3 OVER ST 123 (HIGH STREET) 4 NHPP $ 5,108,000 $ 4,086,400 $ 1,021,600 AC Yr 4 of 4; Total Cost = $35,108,000 6 NHPP $ 3,135,181 $ 2,508,145 $ 627,036 AC Yr 1 of 2; Total Cost = $9,100,020 6 NHPP $ 5,000,000 $ 4,000,000 $ 1,000,000 6 NHPP $ 6,668,480 $ 5,334,784 $ 1,333,696 6 NHPP $ 8,554,209 $ 6,843,367 $ 1,710,842 On System Subtotal ► $ 28,465,870 $ 22,772,696 $ $ 6,416,550 $ 5,133,240 $ 1,283,310 Off-System Subtotal ► $ 6,416,550 $ 5,133,240 $ 1,283,310 ◄ 80% Federal + 20% Non-Federal AC Yr 1 of 5; Total Cost = $85,000,000 ($53,035,161 programmed within FFYs 2015-18 TIP) AC Yr 1 of 2; Total Cost = $11,434,190 5,693,174 ◄ 80% Federal + 20% Non-Federal ►Off-System 607345 COHASSET- SUPERSTRUCTURE REPLACEMENT & SUBSTRUCTURE REHABILITATION, C-17-002, ATLANTIC AVENUE OVER LITTLE HARBOR INLET 5 STP-BR-OFF ► Statewide Bridge Inspection Program No Projects Programmed Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - Page 12 of 33 ◄ 80% Federal + 20% Non-Federal Boston Region MPO Staff - 11/6/2014 The file y ou hav e ac c es s ed is entitled “Draft Amendment One to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2016 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid 601630 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) 6 HPP $ 8,600,000 $ 6,880,000 $ 605789 BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284) 6 HPP $ 2,429,730 $ 1,943,784 $ 605789 BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284) 6 HPP $ 5,007,375 $ 4,005,900 $ Other Federal Aid Subtotal ► $ 16,037,105 $ AMENDMENT:Move Project - (FROM 2015) AMENDMENT:Move Project - (FROM 2015) 12,829,684 $ 1,720,000 AC Yr 1 of 4; STP+HSIP+TEA-21 Earmark Total Cost = $60,053,518 ($53,453,518 programmed in FFYs 2015-18 TIP) Project moved from FFY 2015. Construction; HPP 756 (MA126); SAFETEA-LU Earmark (HPP 485,946 756)+ SAFETEA-LU Earmark (HPP 4284) =Total Cost $7,437,105 1,001,475 Project moved from FFY 2015. Construction; HPP 4284 (MA203); SAFETEA-LU Earmark (HPP 756)+ SAFETEA-LU Earmark (HPP 4284) =Total Cost $7,437,105 3,207,421 ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program 603917 605733 MEDFORD- STONEHAM- WOBURN- READINGHIGHWAY LIGHTING REHABILITATION ON I-93 4 STP $ 15,000,000 $ (PHASE II) DISTRICT 6- HIGHWAY LIGHTING SYSTEM REPLACEMENT ON I-93, FROM SOUTHAMPTON 6 STP $ 2,500,000 $ STREET TO NEPONSET AVENUE IN BOSTON Statewide Infrastructure Program Subtotal ► $ 17,500,000 $ 12,000,000 $ 3,000,000 AC Yr 1 of 2; Total Cost = $17,500,000 2,000,000 $ 500,000 AC Yr 1 of 3; Total Cost = $8,250,000 14,000,000 $ - $ $ 3,500,000 ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - $ $ - - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program 607997 607998 607999 608000 SAUGUS- SAFE ROUTES TO SCHOOL (VETERANS 4 TAP MEMORIAL) EVERETT- SAFE ROUTES TO SCHOOL (MADELAINE 4 TAP ENGLISH) REVERE- SAFE ROUTES TO SCHOOL (GARFIELD 4 TAP ELEMENTARY & MIDDLE SCHOOL) BEDFORD- SAFE ROUTES TO SCHOOL (JOHN 4 TAP GLENN MIDDLE) Statewide Safe Routes to Schools Program Subtotal ► $ 676,000 $ 540,800 $ 135,200 80% Federal + 20% Non-Federal $ 624,000 $ 499,200 $ 124,800 80% Federal + 20% Non-Federal $ 936,000 $ 748,800 $ 187,200 80% Federal + 20% Non-Federal $ 780,000 $ $ 3,016,000 $ 624,000 $ 2,412,800 $ 156,000 80% Federal + 20% Non-Federal 603,200 ◄ Funding Split Varies by Funding Source ► Statewide CMAQ Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 13 of 33 Boston Region MPO Staff - 11/6/2014 The file y ou hav e ac c es s ed is entitled “Draft Amendment One to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2016 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ 601579 602165 605189 606316 07/10/2014 Endorsed 10/16/2014 Draft Amendment One MassDOT MassDOT Funding Project Description▼ District ▼ Source ▼ WAYLAND- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 27 (MAIN STREET) AND 3 CMAQ ROUTE 30 (COMMONWEALTH ROAD) STONEHAM- SIGNAL & INTERSECTION 4 CMAQ IMPROVEMENTS AT ROUTE 28/NORTH STREET CONCORD- BRUCE FREEMAN RAIL TRAIL CONSTRUCTION, FROM COMMONWEALTH 4 CMAQ AVENUE TO POWDER MILL ROAD, INCLUDES 2 RAILROAD BRIDGES & 1 CULVERT (PHASE II-C) BROOKLINE- PEDESTRIAN BRIDGE REHABILITATION, B-27-016, OVER MBTA OFF 6 CMAQ CARLTON STREET Statewide CMAQ ► ►Statewide Transportation Enhancements No Projects Programmed Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ $ 1,931,854 $ 1,545,483 $ 386,371 $ 3,268,366 $ 2,614,693 $ 653,673 $ 5,753,887 $ 4,603,110 $ 1,150,777 $ 1,847,452 $ 1,477,962 $ 369,490 $ 12,801,559 $ 10,241,247 $ 2,560,312 ◄ 80% Federal + 20% Non-Federal $ Statewide Transportation Enhancements Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide ITS Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects Programmed ►Statewide Interstate Maintenance Program FOXBOROUGH- PLAINVILLE- WRENTHAMINTERSTATE MAINTENANCE & RELATED WORK ON 606176 5 NHPP $ I-495 (NB & SB) Statewide Interstate Maintenance Program Subtotal ► $ ►Statewide NHS Preservation Program+ No Projects Programmed 14,692,038 13,222,834 14,692,038 $ 13,222,834 $ 1,469,204 ◄ 90% Federal + 10% Non-Federal 1,469,204 $ Statewide NHS Preservation Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide RR Grade Crossings Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal $ Statewide Stormwater Retrofits Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal $ Statewide ADA Implementation Plan Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal Other Statewide Items Subtotal ► $ - -$ - $ - - ◄ Funding Split Varies by Funding Source ►Statewide RR Grade Crossings No Projects Programmed ►Statewide Stormwater Retrofits No Projects Programmed ►Statewide ADA Implementation Plan No Projects Programmed ►Other Statewide Items No Projects Programmed Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 14 of 33 Boston Region MPO Staff - 11/6/2014 The file y ou hav e ac c es s ed is entitled “Draft Amendment One to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2016 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 2A / Non-Federal Projects ►Non Federal Aid 87790 AMENDMENT:Decrease Cost,AMENDMENT:Cha nge Funding Source 1570 CANTON- DEDHAM- NORWOOD- WESTWOODINTERCHANGE IMPROVEMENTS AT I-95/I-93/ UNIVERSITY AVENUE/I-95 WIDENING GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR Non-federal aid 5/6 NFA $ 190,000,000 N/A NFA $ $ - 190,000,000 - $ RED LINE-BLUE LINE CONNECTOR DESIGN 1572 N/A NFA $ 29,000,000 $ Non-Federal Aid Subtotal► $ 219,000,000 $ 29,000,000 Project moved from FFY 2016 Highway Table to FFY 2016 Transit Table (5309 funds). Project cash flow for FFY 2016 has decreased by $56,274,255; was $428,900,255. MassDOT made a formal request on Aug. 1, 2011, to remove this project from the State Implementation Plan regulation. The MPO is continuing to reference this project in the document until the process is complete. 219,000,000 ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - TIP Section 1: ▼ 2016 Boston Region MPO TIP Summary - $ $ TIP Section 2: ▼ ◄100% Non-Federal Total of All Projects ▼ Total ► $ 173,884,150 $ 219,000,000 $ Federal Funds ► $ 141,016,297 $ Non-Federal Funds ► $ 32,867,854 $ 219,000,000 $ 392,884,150 ◄ Total Spending in Region 141,016,297 ◄ Total Federal Spending in Region 251,867,854 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 15 of 33 Boston Region MPO Staff - 11/6/2014 2016 Boston Region MPO Transportation Improvement Program Carryover or Earmark Details▼ State Match Sources FTA Program ▼ Regional Transit Project Authority ▼ Description ▼ 5307 MBTA PREVENTIVE MAINTENANCE 5307 5307 MBTA MBTA HEAVY RAIL CARS Red/Orange Lines Systems Upgrades $ $ 58,685,516 $ $ - $ $ - $ $ - $ $ - $ $ - $ $ 14,671,379 $ $ 73,356,895 5307 CATA BUY REPLACEMENT 30FT BUS (1) $ 320,000 $ 80,000 $ - $ - $ - $ - $ - $ 400,000 CATA PREVENTIVE MAINTENANCE $ 193,391 $ - $ - $ - $ - $ - $ 48,347 $ 241,738 CATA ACQUIRE - MISC SUPPORT EQUIPMENT $ 22,001 $ 5,501 $ - $ - $ - $ - $ - $ 27,502 MWRTA TERMINAL, INTERMODAL (TRANSIT) 2015 $ 471,356 $ 117,840 $ - $ - $ - $ - $ - $ 589,196 MWRTA ACQUISITION OF BUS SUPPORT EQUIP/FACILITIES 2015 $ 80,000 $ 20,000 $ - $ - $ - $ - $ - $ 100,000 MWRTA ACQUIRE - MOBILE SURV/SECURITY EQUIP 2015 $ 50,000 $ 12,500 $ - $ - $ - $ - $ - $ 62,500 5307 5307 MWRTA MWRTA TERMINAL, INTERMODAL (TRANSIT) PURCHASE SIGNAGE 2015 $ 2015 $ 20,000 20,000 $ $ 5,000 5,000 $ $ - $ $ - $ $ - $ $ - $ $ - $ $ 25,000 25,000 5307 MWRTA NON FIXED ROUTE ADA PARA SERV 2015 $ 1,000,000 $ - $ - $ - $ - $ 250,000 $ - $ 1,250,000 5307 MWRTA ACQUISITION OF BUS SUPPORT EQUIP/FACILITIES 250,000 $ $ 17,719,726 $ 81,250 $ 91,159,081 5337 5337 5337 MBTA MBTA MBTA 5339 MBTA 5307 5307 5307 5307 5307 5310 Federal Funds ▼ RTACAP ▼ MAP ▼ $ 12,000,000 $ - $ ITCCAP ▼ - $ - TDC ▼ $ RTA Funds ▼ SCA ▼ - $ - $ Total Cost ▼ 3,000,000 Additional Information▼ $ 15,000,000 2015 $ 65,000 5307 Subtotal ► $ 72,927,264 $ 16,250 $ 262,091 $ $ - $ $ - $ $ - $ $ Bridge & Tunnel Program Stations - T-GAPS Systems Upgrades $ 85,000,000 $ 16,000,000 $ 20,190,546 5337 Subtotal ► $ 121,190,546 $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ - $ 21,250,000 $ 4,000,000 $ 5,047,637 $ 30,297,637 $106,250,000 $ 20,000,000 $ 25,238,183 $151,488,183 Systems Upgrades $ 5339 Subtotal ► $ $ $ - $ $ - $ $ - $ $ - $ $ - $ $ $ $ No Projects Programmed N/A $ 5310 Subtotal ► $ $ $ - $ $ - $ $ - $ $ - $ $ - $ $ Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP 5,287,027 5,287,027 - Page 16 of 33 1,321,757 1,321,757 - $ $ Project is now funded with state funds; was $80,000,000. 6,608,784 6,608,784 - Boston Region MPO Staff - 11/6/2014 2016 Boston Region MPO Transportation Improvement Program FTA Program ▼ 5309 Carryover or Earmark Details▼ Regional Transit Project Authority ▼ Description ▼ MBTA GREEN LINE EXTENSION PROJECTEXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR RTACAP ▼ MAP ▼ N/A $ 150,000,000 5309 Subtotal ► $ 150,000,000 No Projects Programmed No Projects Programmed No Projects Programmed SoGR Livability TIGER State Match Sources Federal Funds ▼ N/A N/A N/A Grants Subtotal ► Other MBTA HEAVY RAIL CARS Red/Orange Lines N/A Other CATA Purchase 1 29' Bus N/A $ $ $ $ $ - ITCCAP ▼ TDC ▼ RTA Funds ▼ SCA ▼ Total Cost ▼ Additional Information▼ Project moved from FFY 2016 TIP Highway Table to FFY 2016 TIP Transit Table. Cash flow decrease of $56,274,255; was $428,900,255. The Green Line Extension project is currently in the New Starts pipeline and the Commonwealth anticipates a decision in a Full Funding Grant Agreement in FFY 2015. The cash flows for the project begin programming New Starts funding in FFY 2015 and assume $150 million in New Starts funding in FFY 2016. The Commonwealth is committed to fully funding this project with bond funds if New Starts is not awarded. $1,419,383,000 of the $1,992,243,000 project cost is programmed in the FFYs 2015-18 TIP. $ $ - $ $ - $ $ - $ $ - $ $ - $ 222,626,000 $ 222,626,000 $372,626,000 $372,626,000 $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ $ $ $ $ - - $ - $ - $ - $ - $ 18,995,732 $ 18,995,732 $ 120,499 $ 120,499 $ $ - $ $ - $ $ - $ $ - $ $ 18,995,732 $ 120,499 $ 19,116,231 $ 382,590 $ - $ - $ - $ $ 290,960,852 $640,998,279 - $ - - Project is now funded 100% with state funds. Project FFY 2016 cash flow decrease of $61,004,268. Was $80,000,000. New FFY 2016 Project. Other Subtotal ► $ Total► $ 349,404,837 Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 17 of 33 250,000 Boston Region MPO Staff - 11/6/2014 2016 Boston Region MPO Transportation Improvement Program FTA Program ▼ Regional Transit Project Authority ▼ Description ▼ Carryover or Earmark Details▼ Fiscal Constraint Analysis Federal Funding Source ▼ Programmed ▼ Available ▼ FFY 16 / 5307 $ FFY 16 / 5337 $ FFY 16 / 5339 $ FFY 16 / 5310 $ FFY 16 / 5309 $ 72,927,264 121,190,546 5,287,027 150,000,000 $ $ $ $ $ State Match Sources Federal Funds ▼ RTACAP ▼ MAP ▼ (+/-) ▼ 136,927,264 121,190,546 5,287,027 150,000,000 $ $ $ $ $ 64,000,000 - Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Available Available Available Available Available ITCCAP ▼ TDC ▼ State Funding Source ▼ Programmed ▼ Available ▼ RTACAP MAP ITCCAP SCA TDC Page 18 of 33 $ $ $ $ $ 382,590 250,000 - SCA ▼ 950,970 $ $ $ $ -3,234,526 - RTA Funds ▼ Total Cost ▼ Additional Information▼ (+/-) ▼ 568,380 Available Available Available 2,984,526 Available $ $ $ $ - Boston Region MPO Staff - 11/6/2014 The file y ou hav e ac c es s ed is entitled “Draft Amendment One to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformat ion@ct ps.org. 2017 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates a project moved out to another TIP element (cost not reflected in total) Indicates a new addition to the TIP (action taken as denoted) Indicates a new funding category ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program WOBURN- RECONSTRUCTION OF MONTVALE 604935 AVENUE, FROM I-93 INTERCHANGE TO CENTRAL STREET (APPROX. 1,850 FT) 4,752,838 $ 4,277,554 $ 475,284 HSIP Subtotal ► $ 4,752,838 $ 4,277,554 $ 475,284 ◄ 90% Federal + 10% Non-Federal 3 CMAQ $ 4,038,370 $ 3,230,696 $ 807,674 N/A CMAQ $ 13,427,220 $ 10,741,776 $ CMAQ Subtotal ► $ 17,465,590 $ 13,972,472 $ $ 2,824,382 $ 2,259,506 $ 564,876 TAP Subtotal ► $ 2,824,382 $ 2,259,506 $ 564,876 ◄ 80% Federal + 20% Non-Federal 4 STP $ 6,604,906 $ 5,283,925 $ 1,320,981 AC Yr 2 of 2; STP+Northern Middlesex Council of Governments contribution ($1,000,000) Total Cost = $29,296,348 N/A STP $ 16,472,780 $ 13,178,224 $ 3,294,556 Yr 2 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 6 STP $ 12,850,000 $ 10,280,000 $ 2,570,000 AC Yr 2 of 4; STP+HSIP+TEA-21 Earmark Total Cost = $60,053,518 ($53,453,518 programmed in FFYs 2015-18 TIP) 6 NHPP $ 14,000,000 $ 11,200,000 $ 2,800,000 AC Yr 4 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 2015-18 TIP) Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 49,927,686 $ 39,942,149 $ 9,985,537 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program SOUTHBOROUGH- RECONSTRUCTION OF MAIN 604989 STREET (RTE 30), FROM SEARS ROAD TO PARK STREET 3 HSIP HSIP pending Road Safety Audit $ ►CMAQ - Congestion Mitigation and Air Quality Improvement Program SOUTHBOROUGH- RECONSTRUCTION OF MAIN 604989 STREET (RTE 30), FROM SEARS ROAD TO PARK STREET GREEN LINE EXTENSION PROJECT (PHASE II), 1569 MEDFORD HILLSIDE (COLLEGE AVENUE) TO MYSTIC VALLEY PARKWAY/ROUTE 16 4 TAP CMAQ+TAP Total Cost = $6,862,752 Yr 2 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 3,493,118 ◄ 80% Federal + 20% Non-Federal 2,685,444 CMAQ+TAP Total Cost = $6,862,752 ►Non-CMAQ/HSIP/TAP (Other) 29492 1569 601630 603711 BEDFORD- BILLERICA- BURLINGTON- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III) GREEN LINE EXTENSION PROJECT (PHASE II), MEDFORD HILLSIDE (COLLEGE AVENUE) TO MYSTIC VALLEY PARKWAY/ROUTE 16 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADDA-LANE - CONTRACT V) Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 19 of 33 Boston Region MPO Staff - 11/6/2014 The file y ou hav e ac c es s ed is entitled “Draft Amendment One to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformat ion@ct ps.org. 2017 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ 07/10/2014 Endorsed 10/16/2014 Draft Amendment One MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1A / Fiscal Constraint Analysis Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 74,970,496 $ 49,927,686 $ 75,009,821 ◄Total Target 54,461,509 ◄ Max. NonCMAQ/HSIP/TAP $ $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 4,752,838 $ 17,465,590 $ 2,824,382 $ 4,296,710 ◄ Min. HSIP 13,427,220 ◄ Min. CMAQ 2,824,382 ◄ Min. TAP $ $ $ 39,325 Target Funds Available 39,325 Non-CMAQ/HSIP/TAP (Other) Available (456,128) HSIP Minimum Met (4,038,370) CMAQ Minimum Met - TAP Minimum Met HSIP, CMAQ, TAP Overprogrammed $ (4,494,498) ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program 607507 WAKEFIELD- BRIDGE DECK REPLACEMENT, W-01021 (2MF), HOPKINS STREET OVER I-95/ST 128 4 NHPP $ 2,469,936 $ 1,975,949 $ 493,987 Statewide Bridge Maintenance Program Subtotal ► $ 2,469,936 $ 1,975,949 $ 493,987 ◄ 80% Federal + 20% Non-Federal ►On System 600867 604173 606553 604952 607954 BOSTON- BRIDGE REPLACEMENT, B-16-237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE CHARLES RIVER HANOVER- NORWELL- SUPERSTRUCTURE REPLACEMENT, H-06-010, ST 3 OVER ST 123 (WEBSTER STREET) & N-24-003, ST 3 OVER ST 123 (HIGH STREET) LYNN- SAUGUS- BRIDGE REPLACEMENT, L-18016=S-05-008, ROUTE 107 OVER THE SAUGUS RIVER (AKA - BELDEN G. BLY BRIDGE) DANVERS - BRIDGE REPLACEMENT, D-03-018, ROUTE 128 OVER WATERS RIVER 4 NHPP $ 5,964,839 $ 4,771,871 $ 1,192,968 AC Yr 2 of 2; Total Cost = $9,100,020 6 NHPP $ 18,035,161 $ 14,428,129 $ 3,607,032 AC Yr 2 of 5; Total Cost = $85,000,000 ($53,035,161 programmed within FFYs 2015-18 TIP) 6 NHPP $ 2,879,981 $ 2,303,985 $ 575,996 4 NHPP $ 4,150,000 $ 3,320,000 $ AC Yr 1 of 4; Total Cost = $45,000,000 830,000 ($20,400,000 programmed within the FFYs 201518 TIP) 4 NHPP $ 8,949,150 $ 7,159,320 $ On System Subtotal ► $ 39,979,131 $ 31,983,305 $ AC Yr 2 of 2; Total Cost = $11,434,190 1,789,830 7,995,826 ◄ 80% Federal + 20% Non-Federal ►Off-System No Projects Programmed $ - $ - $ - Off-System Subtotal ► $ - $ - $ - $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects Programmed Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 20 of 33 ◄ 80% Federal + 20% Non-Federal Boston Region MPO Staff - 11/6/2014 The file y ou hav e ac c es s ed is entitled “Draft Amendment One to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformat ion@ct ps.org. 2017 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid 601630 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) 6 HPP AC Yr 2 of 4; STP+HSIP+TEA-21 Earmark Total Cost = $60,053,518 ($53,453,518 programmed in FFYs 2015-18 TIP) $ 6,171,760 $ 4,937,408 $ 1,234,352 Other Federal Aid Subtotal ► $ 6,171,760 $ 4,937,408 1,234,352 ◄ Funding Split Varies by Funding Source 2,500,000 $ 2,000,000 $ 500,000 AC Yr 2 of 2; Total Cost = $17,500,000 4,500,000 $ 3,600,000 $ 900,000 AC Yr 2 of 3; Total Cost = $8,250,000 7,000,000 $ 5,600,000 $ - $ $ $ ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program 603917 605733 MEDFORD- STONEHAM- WOBURN- READINGHIGHWAY LIGHTING REHABILITATION ON I-93 4 STP $ (PHASE II) DISTRICT 6- HIGHWAY LIGHTING SYSTEM REPLACEMENT ON I-93, FROM SOUTHAMPTON 6 STP $ STREET TO NEPONSET AVENUE IN BOSTON Statewide Infrastructure Program Subtotal ► $ 1,400,000 ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - $ $ - - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program 608003 608004 WEYMOUTH- SAFE ROUTES TO SCHOOL (PINGREE 6 TAP $ ELEMENTARY) WATERTOWN- SAFE ROUTES TO SCHOOL 6 TAP $ (HOSMER ELEMENTARY) Statewide Safe Routes to Schools Program Subtotal ► $ 1,312,200 $ 1,049,760 ACTON- CONCORD- BRUCE FREEMAN RAIL TRAIL CONSTRUCTION (PHASE II-B) $ 6,220,800 $ 4,976,640 $ 1,244,160 Statewide CMAQ ► $ 6,220,800 $ 4,976,640 1,244,160 ◄ 80% Federal + 20% Non-Federal 648,000 $ 664,200 $ 518,400 $ 531,360 $ $ 129,600 80% Federal + 20% Non-Federal 132,840 80% Federal + 20% Non-Federal 262,440 ◄ Funding Split Varies by Funding Source ► Statewide CMAQ 606223 ►Statewide Transportation Enhancements No Projects Programmed 3 CMAQ $ $ Statewide Transportation Enhancements Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide ITS Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects Programmed - Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 21 of 33 Boston Region MPO Staff - 11/6/2014 The file y ou hav e ac c es s ed is entitled “Draft Amendment One to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformat ion@ct ps.org. 2017 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ 07/10/2014 Endorsed 10/16/2014 Draft Amendment One MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ ►Statewide Interstate Maintenance Program RANDOLPH- QUINCY- BRAINTREE - RESURFACING 607481 6 NHPP $ AND RELATED WORK ON I-93 Statewide Interstate Maintenance Program Subtotal ► $ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ 12,055,824 12,055,824 10,850,242 $ 10,850,242 $ 1,205,582 ◄ 90% Federal + 10% Non-Federal 1,205,582 ►Statewide NHS Preservation Program+ LYNNFIELD- PEABODY - RESURFACING AND 607477 4 NHPP $ RELATED WORK ON ROUTE 1 Statewide NHS Preservation Program Subtotal ► $ 6,490,417 6,490,417 $ 5,192,334 5,192,334 $ 1,298,083 ◄ 80% Federal + 20% Non-Federal 1,298,083 ►Statewide RR Grade Crossings No Projects Programmed $ Statewide RR Grade Crossings Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide Stormwater Retrofits Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal $ Statewide ADA Implementation Plan Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal Other Statewide Items Subtotal ► $ - -$ - $ - - ◄ Funding Split Varies by Funding Source $ - Project moved from 2017 Highway Table to 2017 Transit Table (5309 funds). Project cash flow for FFY 2017 increased by $37,442,347; was $338,011,653. ►Statewide Stormwater Retrofits No Projects Programmed ►Statewide ADA Implementation Plan No Projects Programmed ►Other Statewide Items No Projects Programmed ►Section 2A / Non-Federal Projects ►Non Federal Aid AMENDMENT:Decrease Cost,AMENDMENT:Cha nge Funding Source 1570 GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR NFA $ - RED LINE-BLUE LINE CONNECTOR DESIGN 1572 Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP NFA MassDOT made a formal request on Aug. 1, 2011, to remove this project from the State Implementation Plan regulation. The MPO is continuing to reference this project in the document until the process is complete. $ 10,000,000 $ 10,000,000 Non-Federal Aid Subtotal► $ 10,000,000 $ 10,000,000 ◄100% Non-Federal Page 22 of 33 Boston Region MPO Staff - 11/6/2014 The file y ou hav e ac c es s ed is entitled “Draft Amendment One to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformat ion@ct ps.org. 2017 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed N/A NFA Section 2B / Non-Federal Bridge Projects Subtotal► $ TIP Section 1: ▼ 2017 Boston Region MPO TIP Summary $ $ TIPSection 2: ▼ Total ► $ 156,670,564 $ Federal Funds ► $ 127,017,317 Non-Federal Funds ► $ 29,653,247 $ - ◄100% Non-Federal Total of All Projects ▼ 10,000,000 $ $ 10,000,000 $ 166,670,564 ◄ Total Spending in Region 127,017,317 ◄ Total Federal Spending in Region 39,653,247 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 23 of 33 Boston Region MPO Staff - 11/6/2014 2017 Boston Region MPO Transportation Improvement Program FTA Program ▼ 5307 Regional Transit Authority ▼ Project Description ▼ MBTA PREVENTIVE MAINTENANCE $ 5307 5307 MBTA MBTA 5307 CATA 5307 CATA 5307 CATA MWRTA MWRTA INTERMODAL (TRANSIT): Facil. Improvements PURCHASE SIGNAGE ITCCAP ▼ TDC ▼ RTA ▼ SCA ▼ Total Cost ▼ Additional Information▼ 12,000,000 $ - $ - $ - $ - $ - $ 3,000,000 $ 15,000,000 26,685,516 $ $ - $ $ - $ $ - $ $ - $ $ - $ $ 6,671,379 $ $ 33,356,895 $ 193,391 $ - $ - $ - $ - $ - $ 48,347 $ 241,738 $ 320,000 $ 80,000 $ - $ - $ - $ - $ - $ 400,000 $ 27,355 $ 6,840 $ - $ - $ - $ - $ - $ 34,195 2016 $ 2016 $ 471,356 20,000 $ $ 117,840 5,000 $ $ - $ $ - $ $ - $ $ - $ $ - $ $ 589,196 25,000 2016 $ 80,000 $ 20,000 $ - $ - $ - $ - $ - $ 100,000 2016 $ 50,000 $ 12,500 $ - $ - $ - $ - $ - $ 62,500 2016 $ 1,000,000 $ - $ - $ - $ - $ $ - $ 1,250,000 2016 $ 20,000 $ 5,000 $ - $ - $ - $ $ - $ 25,000 2016 $ 5307 Subtotal ► $ 65,000 40,932,618 $ $ 16,250 263,430 $ $ - $ $ - $ $ - $ $ $ $ 5337 Subtotal ► $ 100,000,000 21,190,546 121,190,546 $ $ $ - $ $ $ - $ $ $ - $ $ $ - $ $ $ $ 5339 Subtotal ► $ 5,287,027 5,287,027 $ $ - $ $ - $ $ - $ $ - $ $ - $ $ - $ $ - $ $ - 5307 MWRTA 5307 MWRTA 5307 MWRTA MWRTA INTERMODAL (TRANSIT): Facil. Improvements 5307 MWRTA ACQUISITION OF BUS SUPPORT EQUIP/FACILITIES 5337 5337 MBTA MBTA Bridge & Tunnel Program Systems Upgrades 5339 MBTA Systems Upgrades 5310 MAP ▼ $ $ ACQUISITION OF BUS SUPPORT EQUIP/FACILITIES ACQUIRE - MOBILE SURV/SECURITY EQUIP NON FIXED ROUTE ADA PARA SERV 5307 RTACAP ▼ Funds HEAVY RAIL CARS Red/Orange Lines Systems Upgrades PREVENTIVE MAINTENANCE BUY REPLACEMENT 30FT BUS (1) ACQUIRE - MISC SUPPORT EQUIPMENT 5307 5307 State Match Sources Carryover or Earmark Federal Details▼ Funds ▼ No Projects Programmed N/A $ 5310 Subtotal ► $ Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP - Page 24 of 33 250,000 - 250,000 $ $ 9,719,726 $ $ 81,250 51,165,774 - $ $ $ 25,000,000 5,297,637 30,297,637 $ $ $ 125,000,000 26,488,183 151,488,183 $ $ - $ $ 1,321,757 1,321,757 $ $ 6,608,784 6,608,784 $ $ - $ $ - $ $ Project is now funded with state funds; was $120,000,000. - Boston Region MPO Staff - 11/6/2014 2017 Boston Region MPO Transportation Improvement Program FTA Program ▼ Regional Transit Authority ▼ State Match Sources Carryover or Earmark Federal Details▼ Funds ▼ Project Description ▼ RTACAP ▼ MAP ▼ ITCCAP ▼ TDC ▼ RTA ▼ SCA ▼ Total Cost ▼ Additional Information▼ Funds 5309 MBTA Other N/A $ 5309 Subtotal ► $ No Projects Programmed N/A No Projects Programmed N/A No Projects Programmed N/A Grants Subtotal ► SoGR Livability TIGER Other GREEN LINE EXTENSION PROJECTEXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR MBTA HEAVY RAIL CARS Red/Orange Lines CATA BUY REPLACEMENT <30 FT BUS (1) N/A N/A $ $ $ $ $ 150,000,000 150,000,000 - - $ $ - $ $ - $ $ - $ $ - $ $ - $ $ $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ $ - $ - $ - $ - $ - $ Project moved from FFY 2017 TIP Highway Table to FFY 2017 TIP Transit Table. Cash flow increase of $37,442,347; was $338,011,653.The Green Line Extension project is currently in the New Starts pipeline and the Commonwealth anticipates a decision in a Full Funding Grant Agreement in FFY 2015. The cash flows for the project begin programming New Starts funding in FFY 2015 and assume $150 million in New Starts funding in FFY 2017. The Commonwealth is committed to fully funding this project with bond funds if New Starts is not awarded; $1,419,383,000 of the $1,992,243,000 project cost is programmed in the FFYs 2015-18 TIP. 225,454,000 225,454,000 - 148,559,943 $ $ $ $ $ $ $ 375,454,000 375,454,000 - 148,559,943 Project is now funded 100% with state funds. Project FFY 2017 cash flow increase of $28,559,943; was $120,000,000. New FFY 2017 Project. $ Other Subtotal ► $ Total► $ Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP 317,410,191 $ $ 119,160 119,160 $ $ - $ $ - $ $ - $ $ $ 382,590 $ - $ - $ - $ Page 25 of 33 250,000 $ $ 148,559,943 $ $ 119,160 148,679,103 $ 415,353,063 $ 733,395,844 Boston Region MPO Staff - 11/6/2014 2017 Boston Region MPO Transportation Improvement Program FTA Program ▼ Regional Transit Authority ▼ Project Description ▼ Carryover or Earmark Federal Details▼ Funds ▼ State Match Sources RTACAP ▼ MAP ▼ ITCCAP ▼ TDC ▼ SCA ▼ RTA ▼ Total Cost ▼ Additional Information▼ Funds Fiscal Constraint Analysis Federal Funding Source ▼ Programmed ▼ Available ▼ FFY 17 / 5307 $ FFY 17 / 5337 $ FFY 17 / 5339 $ FFY 17 / 5310 $ FFY 17 / 5309 $ 40,932,618 121,190,546 5,287,027 150,000,000 $ $ $ $ $ (+/-) ▼ 136,932,618 121,190,546 5,287,027 150,000,000 $96,000,000 $ $ $ $ State Funding Source ▼ Available Available Available Available Available Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP RTACAP MAP ITCCAP SCA TDC Page 26 of 33 Programmed ▼ Available ▼ $ $ $ $ $ 382,590 250,000 - 263,430 $ $ $ $ $ $ $ 3,234,526 $ (+/-) ▼ (119,160) 2,984,526 Over Programmed Available Available Available - Boston Region MPO Staff - 11/6/2014 The file y ou hav e ac c es s ed is entitled “Draft Amendment One to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2018 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates a project moved out to another TIP element (cost not reflected in total) Indicates a new addition to the TIP (action taken as denoted) Indicates a new funding category ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program No Projects Programmed $ HSIP Subtotal ► $ ►CMAQ - Congestion Mitigation and Air Quality Improvement Program GREEN LINE EXTENSION PROJECT (PHASE II), 1569 MEDFORD HILLSIDE (COLLEGE AVENUE) TO MYSTIC VALLEY PARKWAY/ROUTE 16 N/A CMAQ - $ $ - - $ $ $ 13,427,220 $ 10,741,776 $ CMAQ Subtotal ► $ 13,427,220 $ 10,741,776 $ ◄ 90% Federal + 10% Non-Federal Yr 3 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 2,685,444 ◄ 80% Federal + 20% Non-Federal 2,685,444 ►TAP - Transportation Alternatives Program No Projects Programmed $ - $ - $ - TAP Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 1569 601630 603711 N/A STP $ 26,572,780 $ 21,258,224 $ 5,314,556 Yr 3 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 6 STP $ 21,031,758 $ 16,825,406 $ 4,206,352 AC Yr 3 of 4; STP+HSIP+TEA-21 Earmark Total Cost = $60,053,518 ($53,453,518 programmed in FFYs 2015-18 TIP) 6 NHPP $ 13,768,183 $ 11,014,546 $ 2,753,637 AC Yr 5 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 2015-18 TIP) Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 61,372,721 $ 49,098,177 $ Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 74,799,941 $ 61,372,721 $ 75,009,821 ◄Total Target 54,461,509 ◄ Max. NonCMAQ/HSIP/TAP $ $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ - $ 13,427,220 $ - $ 4,296,710 ◄ Min. HSIP 13,427,220 ◄ Min. CMAQ 2,824,382 ◄ Min. TAP $ $ $ GREEN LINE EXTENSION PROJECT (PHASE II), MEDFORD HILLSIDE (COLLEGE AVENUE) TO MYSTIC VALLEY PARKWAY/ROUTE 16 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADDA-LANE - CONTRACT V) 12,274,544 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis 209,880 Target Funds Available (6,911,212) Non-CMAQ/HSIP/TAP (Other) Exceeds Maximum 4,296,710 HSIP Minimum Not Met - CMAQ Minimum Met 2,824,382 TAP Minimum Not Met Remaining HSIP, CMAQ, and TAP Funds $ 7,121,092 Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 27 of 33 Boston Region MPO Staff - 11/6/2014 The file y ou hav e ac c es s ed is entitled “Draft Amendment One to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the high way s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2018 Boston Region MPO Transportation Improvement Program MassDOT MassDOT Project ID ▼ Project Description▼ ►Section 1B / Federal Aid Bridge Projects 07/10/2014 Endorsed 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ Amendment/ Adjustment Type ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Statewide Bridge Maintenance Program 607915 NEWTON- WELLESLEY- WESTON- BRIDGE MAINTENANCE OF N-12-063, N-12-054, N-12-055 & N6 NHPP $ 12-056 ON I-95/ROUTE 128 Statewide Bridge Maintenance Program Subtotal ► $ 1,724,400 $ 1,379,520 $ 344,880 1,724,400 $ 1,379,520 $ 344,880 ◄ 80% Federal + 20% Non-Federal ►On System 604173 604952 BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE CHARLES RIVER LYNN- SAUGUS- BRIDGE REPLACEMENT, L-18016=S-05-008, ROUTE 107 OVER THE SAUGUS RIVER (AKA - BELDEN G. BLY BRIDGE) 6 NHPP $ 30,000,000 $ 24,000,000 $ 4 NHPP $ 16,250,000 $ 13,000,000 $ On System Subtotal ► $ 46,250,000 $ 37,000,000 $ AC Yr 3 of 5; Total Cost = $85,000,000 ($53,035,161 programmed within FFYs 2015-18 TIP) AC Yr 2 of 4; Total Cost = $45,000,000 3,250,000 ($20,400,000 programmed within the FFYs 201518 TIP) 9,250,000 ◄ 80% Federal + 20% Non-Federal 6,000,000 ►Off-System 606632 607133 604655 607533 HOPKINTON- WESTBOROUGH- BRIDGE REPLACEMENT, H-23-006=W-24-016, FRUIT STREET OVER CSX & SUDBURY RIVER QUINCY- BRIDGE REPLACEMENT, Q-01-039, ROBERTSON STREET OVER I-93/US 1/SR 3 MARSHFIELD- BRIDGE REPLACEMENT, M-07-007, BEACH STREET OVER THE CUT RIVER WALTHAM- WOERD AVENUE OVER THE CHARLES RIVER 3 STP-BR-OFF $ 12,727,339 $ 10,181,871 $ 2,545,468 6 STP-BR-OFF $ 6,435,763 $ 5,148,610 $ 1,287,153 5 STP-BR-OFF $ 4,822,854 $ 3,858,283 $ 964,571 4 STP-BR-OFF $ 3,873,360 $ 3,098,688 $ Off-System Subtotal ► $ 27,859,316 $ 22,287,453 $ 774,672 5,571,863 ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - $ - $ - $ - Other Federal Aid Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 28 of 33 ◄ Funding Split Varies by Funding Source Boston Region MPO Staff - 11/6/2014 The file y ou hav e ac c es s ed is entitled “Draft Amendment One to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2018 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MassDOT Project Description▼ 07/10/2014 Endorsed 10/16/2014 Draft Amendment One MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program 605733 606381 DISTRICT 6- HIGHWAY LIGHTING SYSTEM REPLACEMENT ON I-93, FROM SOUTHAMPTON 6 STP $ STREET TO NEPONSET AVENUE IN BOSTON ARLINGTON- BELMONT- HIGHWAY LIGHTING 4 STP $ REPAIR & MAINTENANCE ON ROUTE 2 Statewide Infrastructure Program Subtotal ► $ 1,250,000 $ 250,000 AC Yr 3 of 3; Total Cost = $8,250,000 1,000,000 $ 5,750,000 $ 4,600,000 $ 1,150,000 7,000,000 $ 5,600,000 $ 1,400,000 ◄ 80% Federal + 20% Non-Federal - $ $ - $ $ - ► Statewide HSIP Program No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - $ $ - $ - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program No Projects Programmed $ Statewide Safe Routes to Schools Program Subtotal ► $ - - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source ► Statewide CMAQ 607329 WAKEFIELD- LYNNFIELD- RAIL TRAIL EXTENSION, FROM THE GALVIN MIDDLE SCHOOL TO LYNNFIELD/PEABODY T.L. ►Statewide Transportation Enhancements No Projects Programmed 4 CMAQ $ 7,084,000 $ 5,667,200 $ 1,416,800 Statewide CMAQ ► $ 7,084,000 $ 5,667,200 1,416,800 ◄ 80% Federal + 20% Non-Federal $ $ Statewide Transportation Enhancements Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide ITS Subtotal ► $ - $ - $ - - ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects Programmed ►Statewide Interstate Maintenance Program FRANKLIN- INTERSTATE MAINTENANCE & 606546 3 NHPP $ RELATED WORK ON I-495 Statewide Interstate Maintenance Program Subtotal ► $ ►Statewide NHS Preservation Program+ SAUGUS - RESURFACING AND RELATED WORK ON 608008 4 NHPP ROUTE 1 MARSHFIELD - PLYMOUTH - RESURFACING & 607988 5 NHPP RELATED WORK ON ROUTE 3 MARSHFIELD - RESURFACING & RELATED WORK 607989 5 NHPP ON ROUTE 3 Statewide NHS Preservation Program Subtotal ► 6,280,243 6,280,243 $ 5,652,219 -$ 5,652,219 628,024 $ 10,620,378 $ 16,229,512 8,496,302 $ $ 4,398,285 2,124,076 12,983,610 31,248,175 $ 24,998,540 3,518,628 ►Statewide RR Grade Crossings No Projects Programmed 628,024 ◄ 90% Federal + 10% Non-Federal $ Statewide RR Grade Crossings Subtotal ► $ - 3,245,902 $ 6,249,635 ◄ 80% Federal + 20% Non-Federal 879,657 $ - $ - ◄ 80% Federal + 20% Non-Federal - Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 29 of 33 - Boston Region MPO Staff - 11/6/2014 The file y ou hav e ac c es s ed is entitled “Draft Amendment One to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 2018 Boston Region MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ 07/10/2014 Endorsed 10/16/2014 Draft Amendment One MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Statewide Stormwater Retrofits No Projects Programmed $ Statewide Stormwater Retrofits Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide ADA Implementation Plan Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal Other Statewide Items Subtotal ► $ - -$ - $ - - ◄ Funding Split Varies by Funding Source Project moved from FFY 2018 Highway Table to FFY 2018 Transit Table (5309 funds). Project cash flow for FFY 2018 has increased by $131,830,202; was $214,270,798. ►Statewide ADA Implementation Plan No Projects Programmed ►Other Statewide Items No Projects Programmed ►Section 2A / Non-Federal Projects ►Non Federal Aid AMENDMENT:Increase Cost,AMENDMENT:Cha nge Funding Source 1570 GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR N/A NFA $ - $ - Non-Federal Aid Subtotal► $ - $ - ◄100% Non-Federal NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ $ - ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed 2018 TIP Section 1: ▼ Boston Region MPO TIP Summary TIP Section 2: ▼ Total ► $ 202,246,075 $ Federal Funds ► $ 162,424,884 Non-Federal Funds ► $ 39,821,191 $ - Total of All Projects ▼ $ $ $ 202,246,075 ◄ Total Spending in Region 162,424,884 ◄ Total Federal Spending in Region 39,821,191 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP Page 30 of 33 Boston Region MPO Staff - 11/6/2014 2018 Boston Region MPO Transportation Improvement Program FTA Program ▼ Regional Transit Authority ▼ Project Description ▼ 5307 MBTA PREVENTIVE MAINTENANCE Carryover or Earmark Federal Details▼ Funds ▼ $ 5307 5307 MBTA MBTA 5307 CATA 5307 CATA 5307 CATA 5307 MWRTA 5307 MWRTA 5307 MWRTA HEAVY RAIL CARS Red/Orange Lines Systems Upgrades PREVENTIVE MAINTENANCE ACQUIRE - MISC SUPPORT EQUIPMENT BUY REPLACEMENT 30FT BUS (1) TERMINAL, INTERMODAL (TRANSIT) PURCHASE BUS SHELTERS ACQUIRE - MOBILE SURV/SECURITY EQUIP MWRTA ACQUISITION OF BUS SUPPORT EQUIP/FACILITIES MWRTA INTERMODAL (TRANSIT): Facil. Improvements 5307 5307 12,000,000 State Match Sources RTACAP ▼ $ - MAP ▼ $ ITCCAP ▼ - $ - TDC ▼ $ RTA Funds ▼ SCA ▼ - $ - $ Additional Information▼ Total Cost ▼ 3,000,000 $ 15,000,000 $ $ 26,685,516 $ $ - $ $ - $ $ - $ $ - $ $ - $ $ 6,671,379 $ $ 33,356,895 $ 193,391 $ - $ - $ - $ - $ - $ 48,347 $ 241,738 $ 32,763 $ 8,192 $ - $ - $ - $ - $ - $ 40,955 $ 320,000 $ 80,000 $ - $ - $ - $ - $ - $ 400,000 2017 $ 351,357 $ 87,840 $ - $ - $ - $ - $ - $ 439,197 2017 $ 20,000 $ 5,000 $ - $ - $ - $ - $ - $ 25,000 2017 $ 50,000 $ 12,500 $ - $ - $ - $ - $ - $ 62,500 2017 $ 200,000 $ 50,000 $ - $ - $ - $ - $ - $ 250,000 2017 $ 20,000 $ 5,000 $ - $ - $ - $ - $ - $ 25,000 2017 $ 65,000 $ 16,250 $ - $ - $ - $ - $ - $ 81,250 2017 $ 5307 Subtotal ► $ 1,000,000 40,938,027 $ $ 264,782 $ $ - $ $ - $ $ - $ $ $ 60,000,000 $ 61,190,546 5337 Subtotal ► $ 121,190,546 $ $ $ - $ $ $ - $ $ $ - $ $ $ - $ $ $ $ 5339 Subtotal ► $ $ $ - $ $ - $ $ - $ $ - $ $ 5307 MWRTA 5307 MWRTA ACQUISITION OF BUS SUPPORT EQUIP/FACILITIES NON FIXED ROUTE ADA PARA SERV 5337 5337 MBTA MBTA Bridge & Tunnel Program Systems Upgrades 5339 MBTA Systems Upgrades Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP 5,287,027 5,287,027 Page 31 of 33 250,000 250,000 $ $ 9,719,726 $ $ 1,250,000 51,172,535 - $ $ $ 15,000,000 15,297,637 30,297,637 $ $ $ 75,000,000 76,488,183 151,488,183 - $ $ 1,321,757 1,321,757 $ $ 6,608,784 6,608,784 Project is now funded with state funds; was $120,000,000. Boston Region MPO Staff - 11/6/2014 2018 Boston Region MPO Transportation Improvement Program FTA Program ▼ Regional Transit Authority ▼ No Projects Programmed N/A $ 5310 Subtotal ► $ 5310 5309 SoGR Livability TIGER MBTA State Match Sources Carryover or Earmark Federal Details▼ Funds ▼ Project Description ▼ RTACAP ▼ - N/A $ 150,000,000 5309 Subtotal ► $ 150,000,000 Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP - $ $ ITCCAP ▼ - $ $ - TDC ▼ $ $ RTA Funds ▼ SCA ▼ - $ $ - $ $ Additional Information▼ Total Cost ▼ - $ $ Project moved from FFY 2018 Highway Table to FFY 2018 Transit Table. Cash flow increase of $131,830,202; ; was $214,270,798. The Green Line Extension project is currently in the New Starts pipeline and the Commonwealth anticipates a decision in a Full Funding Grant Agreement in FFY 2015. The cash flows for the project begin programming New Starts funding in FFY 2015 and assume $150 million in New Starts funding in FFY 2018. The Commonwealth is committed to fully funding this project with bond funds if New Starts is not awarded. $1,419,383,000 of the $1,992,243,000 project cost is programmed in the FFYs 2015-18 TIP. GREEN LINE EXTENSION PROJECTEXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR No Projects Programmed N/A No Projects Programmed N/A No Projects Programmed N/A Grants Subtotal ► $ $ MAP ▼ $ $ $ $ - $ $ - $ $ - $ $ - $ $ - $ $ - $ $ $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ Page 32 of 33 196,101,000 196,101,000 - $ $ $ $ $ $ 346,101,000 346,101,000 - Boston Region MPO Staff - 11/6/2014 2018 Boston Region MPO Transportation Improvement Program FTA Program ▼ Regional Transit Authority ▼ Project Description ▼ Carryover or Earmark Federal Details▼ Funds ▼ Other MBTA HEAVY RAIL CARS Red/Orange Lines N/A CATA BUY REPLACEMENT <30 FT BUS (1) N/A $ State Match Sources RTACAP ▼ - $ - MAP ▼ $ ITCCAP ▼ - $ - TDC ▼ $ RTA Funds ▼ SCA ▼ - $ - $ Total Cost ▼ 52,682,528 $ 52,682,528 Additional Information▼ Project is now funded 100% with state funds. Project FFY 2018 cash flow decrease of $67,317,472; was $120,000,000. New FFY 2018 Project. Other $ - $ 117,808 $ - $ - $ - $ - $ $ 117,808 Other Subtotal ► $ - $ 117,808 $ - $ - $ - $ - $ 52,682,528 $ 52,800,336 $ 382,590 $ - $ - $ - $ $ 290,122,648 $ 608,170,838 Total► $ 317,415,600 Fiscal Constraint Analysis Federal Funding Source ▼ Programmed ▼ Available ▼ FFY 17 / 5307 FFY 17 / 5337 FFY 17 / 5339 FFY 17 / 5310 FFY 17 / 5309 $ 40,938,027 $ $ 121,190,546 $ $ 5,287,027 $ $ - $ $ 150,000,000 (+/-) ▼ 136,938,027 $ 96,000,000 121,190,546 $ 5,287,027 $ $ - 150,000,000 $ State Funding Source ▼ Available Available Available Available Available RTACAP MAP ITCCAP SCA TDC 250,000 Programmed ▼ Available ▼ $ $ $ $ $ 382,590 250,000 $ $ $ $ Proposed Update to Draft Amendment One to the FFYs 2015-18 TIP (+/-) ▼ (117,808) Over Programmed Available Available 2,984,526 Available 264,782 $ $ $ 3,234,526 $ - - - - - Page 33 of 33 Boston Region MPO Staff - 11/6/2014 Transportation Improvement Program (TIP) Project List (FY2015) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 5307 Cape Ann Transportation Authority 5307 Cape Ann Transportation Authority 5307 Cape Ann Transportation Authority 5307 MetroWest Regional Transit Authority 5307 MetroWest Regional Transit Authority 117A00 5307 MetroWest Regional Transit Authority 5307 MetroWest Regional Transit Authority 5307 MetroWest Regional Transit Authority 5307 MetroWest Regional Transit Authority 5307 MetroWest Regional Transit Authority 5307 MetroWest Regional Transit Authority Massachusetts Bay Transportation 5307 Authority (MBTA) Massachusetts Bay Transportation 5307 Authority (MBTA) Massachusetts Bay Transportation 5307 Authority (MBTA) 117C00 117A00 PREVENTIVE MAINTENANCE 111203 BUY REPLACEMENT 30‐FT BUS (1) 114220 ACQUIRE ‐ MISC SUPPORT EQUIPMENT 113303 TERMINAL, INTERMODAL (TRANSIT) 113403 TERMINAL, INTERMODAL (TRANSIT) ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES 119208 PURCHASE SIGNAGE $193,391 $0 $320,000 $80,000 $16,700 $4,176 $20,000 $5,000 $471,356 $117,840 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $48,347 $0 $0 $0 $0 $241,738 $400,000 $20,876 $25,000 $589,196 $6,250 $5,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $31,250 $25,000 $50,000 $12,500 $0 $0 $0 $0 $0 $62,500 $80,000 $20,000 $1,000,000 $0 $40,000 $10,000 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $0 $0 $0 $0 $0 $0 $100,000 $1,250,000 $50,000 $25,000 $20,000 114209 ACQUIRE ‐ MOBILE SURV/SECURITY EQUIP ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES NON FIXED ROUTE ADA PARA SERV 114211 ACQUIRE ‐ SUPPORT VEHICLES (2) Government Center (Blue Line 123402 Modernization) $32,761,068 $0 $0 $0 $0 $0 $8,190,267 $40,951,335 123302 Elevators/Escalators $25,924,448 $0 $0 $0 $0 $0 $6,481,112 $32,405,560 $12,000,000 $0 $72,921,963 $260,766 $0 $0 $0 $0 $0 $0 $0 $250,000 $3,000,000 $17,719,726 $15,000,000 $91,152,455 PREVENTIVE MAINTENANCE Subtotal 5309 Massachusetts Bay Transportation 5309 Authority (MBTA) GREEN LINE EXTENSION: COLLEGE 132303 AVE/UNION SQ SPUR Subtotal $100,000,000 $100,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $225,202,000 $325,202,000 $0 $225,202,000 $325,202,000 Subtotal $0 $0 $0 $0 $0 $0 122404 Bridge & Tunnel Program $60,000,000 $0 $0 $0 $0 $0 $15,000,000 $75,000,000 123402 Stations ‐ T‐GAPS $40,000,000 $0 $0 $0 $0 $0 $10,000,000 $50,000,000 119400 Systems Upgrades $21,190,546 $121,190,546 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,297,637 $26,488,183 $30,297,637 $151,488,183 $5,287,027 $0 $0 $0 $0 $0 $1,321,757 $6,608,784 Subtotal $0 $5,287,027 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,811 $1,321,757 $22,864 $6,608,784 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 $0 $121,824 $0 $0 $0 $0 $0 $121,824 $0 $0 $0 $121,824 $299,399,536 $382,590 $0 $0 $0 $0 $0 $0 $82,130,340 $82,130,340 $0 $0 $0 $82,130,340 $82,252,164 $0 $0 $250,000 $356,671,460 $656,703,586 5311 $0 $0 5337 Massachusetts Bay Transportation 5337 Authority (MBTA) Massachusetts Bay Transportation 5337 Authority (MBTA) Massachusetts Bay Transportation 5337 Authority (MBTA) Subtotal 5339 Massachusetts Bay Transportation 5339 Authority (MBTA) 5339 Cape Ann Transportation Authority (CATA) 119400 Systems Upgrades REHAB/RENOVATE BUS SUPPORT 114400 FACIL/EQUIP Other Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Cape Ann Transportation Authority Massachusetts Bay Transportation Authority (MBTA) 111204 BUY REPLACEMENT <30 FT BUS (1) 121221 HEAVY RAIL CARS ‐ Red/Orange Lines Subtotal Total Transportation Improvement Program (TIP) Project List (FY2016) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 5307 MetroWest Regional Transit Authority 5307 Cape Ann Transportation Authority 117A00 5307 MetroWest Regional Transit Authority 5307 MetroWest Regional Transit Authority Massachusetts Bay Transportation 5307 Authority (MBTA) 5307 Cape Ann Transportation Authority 5307 MetroWest Regional Transit Authority 5307 MetroWest Regional Transit Authority 5307 MetroWest Regional Transit Authority Massachusetts Bay Transportation 5307 Authority (MBTA) 5307 MetroWest Regional Transit Authority 5307 Cape Ann Transportation Authority 117A00 117C00 113403 TERMINAL, INTERMODAL (TRANSIT) PREVENTIVE MAINTENANCE ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES 2015 $471,356 $117,840 $193,391 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $48,347 $589,196 $241,738 2015 $80,000 $20,000 $0 $0 $0 $0 $0 $100,000 114209 ACQUIRE ‐ MOBILE SURV/SECURITY EQUIP 2015 $50,000 $12,500 $0 $0 $0 $0 $0 $62,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $3,000,000 $0 $0 $0 $0 $15,000,000 $27,502 $25,000 $25,000 $1,250,000 PREVENTIVE MAINTENANCE 114220 ACQUIRE ‐ MISC SUPPORT EQUIPMENT 113303 TERMINAL, INTERMODAL (TRANSIT) 119208 PURCHASE SIGNAGE NON FIXED ROUTE ADA PARA SERV 119400 Systems Upgrades ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES 111203 BUY REPLACEMENT 30‐FT BUS (1) 2015 2015 2015 2015 Subtotal $12,000,000 $22,001 $20,000 $20,000 $1,000,000 $0 $5,501 $5,000 $5,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $58,685,516 $0 $0 $0 $0 $0 $14,671,379 $73,356,895 $65,000 $16,250 $320,000 $80,000 $72,927,264 $262,091 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $0 $0 $17,719,726 $81,250 $400,000 $91,159,081 5309 Massachusetts Bay Transportation 5309 Authority (MBTA) GREEN LINE EXTENSION: COLLEGE 132303 AVE/UNION SQ SPUR Subtotal $150,000,000 $150,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $222,626,000 $372,626,000 $0 $222,626,000 $372,626,000 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 122404 Bridge & Tunnel Program $85,000,000 $0 $0 $0 $0 $0 123402 Stations ‐ T‐GAPS $16,000,000 $0 $0 $0 $0 $0 $20,190,546 $121,190,546 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,287,027 $0 $0 $0 $0 $0 $1,321,757 $6,608,784 Subtotal $0 $5,287,027 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,849 $1,321,757 $23,093 $6,608,784 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 $0 $120,499 $0 $0 $0 $0 $0 $120,499 $0 $0 $0 $120,499 $349,404,837 $382,590 $0 $0 $0 $0 $0 $0 $18,995,732 $18,995,732 $0 $0 $0 $18,995,732 $19,116,231 $0 $0 $250,000 $290,960,852 $640,998,279 5310 5311 5337 Massachusetts Bay Transportation 5337 Authority (MBTA) Massachusetts Bay Transportation 5337 Authority (MBTA) Massachusetts Bay Transportation 5337 Authority (MBTA) 119400 Systems Upgrades Subtotal $21,250,000 $106,250,000 $4,000,000 $20,000,000 $5,047,637 $25,238,183 $30,297,637 $151,488,183 5339 Massachusetts Bay Transportation 5339 Authority (MBTA) 5339 Cape Ann Transportation Authority (CATA) 119400 Systems Upgrades REHAB/RENOVATE BUS SUPPORT 114400 FACIL/EQUIP Other Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Cape Ann Transportation Authority Massachusetts Bay Transportation Authority (MBTA) 1 29' bus 121221 HEAVY RAIL CARS ‐ Red/Orange Lines Subtotal Total Transportation Improvement Program (TIP) Project List (FY2017) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 5307 MetroWest Regional Transit Authority 5307 Cape Ann Transportation Authority 5307 MetroWest Regional Transit Authority 117A00 5307 MetroWest Regional Transit Authority 5307 MetroWest Regional Transit Authority 5307 MetroWest Regional Transit Authority Massachusetts Bay Transportation 5307 Authority (MBTA) Massachusetts Bay Transportation 5307 Authority (MBTA) 5307 Cape Ann Transportation Authority 117C00 117A00 TERMINAL, INTERMODAL (TRANSIT): Facil. 113403 Improvements PREVENTIVE MAINTENANCE 119208 PURCHASE SIGNAGE ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES 2016 $471,356 $117,840 $193,391 $0 $20,000 $5,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $48,347 $0 $589,196 $241,738 $25,000 2016 $80,000 $20,000 $0 $0 $0 $0 $0 $100,000 114209 ACQUIRE ‐ MOBILE SURV/SECURITY EQUIP NON FIXED ROUTE ADA PARA SERV 2016 2016 $50,000 $12,500 $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $0 $0 $62,500 $1,250,000 $0 $0 $0 $0 $0 $3,000,000 $15,000,000 $26,685,516 $0 $320,000 $80,000 $0 $0 $0 $0 $0 $0 $0 $0 $6,671,379 $0 $33,356,895 $400,000 $5,000 $6,840 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $25,000 $34,195 $65,000 $16,250 $40,932,618 $263,430 $0 $0 $0 $0 $0 $0 $0 $250,000 $0 $9,719,726 $81,250 $51,165,774 PREVENTIVE MAINTENANCE 5307 MetroWest Regional Transit Authority 119400 Systems Upgrades 111203 BUY REPLACEMENT 30‐FT BUS (1) TERMINAL, INTERMODAL (TRANSIT): Facil. 113303 Improvements 114220 ACQUIRE ‐ MISC SUPPORT EQUIPMENT ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES Massachusetts Bay Transportation 5309 Authority (MBTA) GREEN LINE EXTENSION: COLLEGE 132303 AVE/UNION SQ SPUR 5307 MetroWest Regional Transit Authority 5307 Cape Ann Transportation Authority 2016 $12,000,000 2016 2016 Subtotal $20,000 $27,355 5309 Subtotal $150,000,000 $150,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $225,454,000 $375,454,000 $0 $225,454,000 $375,454,000 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 $21,190,546 $0 $0 $0 $0 $0 $5,297,637 $26,488,183 $100,000,000 $121,190,546 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,287,027 $0 $0 $0 $0 $0 $1,321,757 $6,608,784 Subtotal $0 $5,287,027 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,321,757 $19,436 $6,608,784 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal Total $0 $0 $0 $119,160 $0 $119,160 $317,410,191 $382,590 $0 $0 $0 $0 $0 $0 $0 $0 5310 5311 5337 Massachusetts Bay Transportation 5337 Authority (MBTA) Massachusetts Bay Transportation 5337 Authority (MBTA) 119400 Systems Upgrades 122404 Bridge & Tunnel Program Subtotal $25,000,000 $125,000,000 $30,297,637 $151,488,183 5339 Massachusetts Bay Transportation 5339 Authority (MBTA) 5339 Cape Ann Transportation Authority (CATA) 119400 Systems Upgrades REHAB/RENOVATE BUS SUPPORT 114400 FACIL/EQUIP Other Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Massachusetts Bay Transportation Authority (MBTA) Cape Ann Transportation Authority 111221 HEAVY RAIL CARS ‐ Red/Orange Lines 111204 BUY REPLACEMENT <30 FT BUS (1) $0 $0 $148,559,943 $148,559,943 $0 $0 $0 $119,160 $0 $0 $148,559,943 $148,679,103 $0 $250,000 $415,353,063 $733,395,844 Transportation Improvement Program (TIP) Project List (FY2018) FTA Program Transit Agency FTA Activity Line Item Project Description Carryover or Earmark Detail Federal Funds RTACAP MAP ITCCAP TDC SCA LocalFunds Total Cost 5307 5307 MetroWest Regional Transit Authority 5307 Cape Ann Transportation Authority 5307 MetroWest Regional Transit Authority 117A00 5307 MetroWest Regional Transit Authority 5307 MetroWest Regional Transit Authority Massachusetts Bay Transportation 5307 Authority (MBTA) Massachusetts Bay Transportation 5307 Authority (MBTA) 5307 Cape Ann Transportation Authority 114209 ACQUIRE ‐ MOBILE SURV/SECURITY EQUIP ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES 117A00 5307 MetroWest Regional Transit Authority 5307 MetroWest Regional Transit Authority 5307 Cape Ann Transportation Authority 5307 MetroWest Regional Transit Authority 113403 TERMINAL, INTERMODAL (TRANSIT) PREVENTIVE MAINTENANCE 119202 PURCHASE BUS SHELTERS 117C00 2017 2017 $351,357 $87,840 $193,391 $0 $20,000 $5,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $48,347 $0 $439,197 $241,738 $25,000 2017 $50,000 $12,500 $0 $0 $0 $0 $0 $62,500 2017 $200,000 $50,000 $0 $0 $0 $0 $0 $250,000 PREVENTIVE MAINTENANCE 119400 Systems Upgrades 114220 ACQUIRE ‐ MISC SUPPORT EQUIPMENT TERMINAL, INTERMODAL (TRANSIT): Facil. 113303 Improvements ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES 111203 BUY REPLACEMENT 30‐FT BUS (1) NON FIXED ROUTE ADA PARA SERV 2017 2017 2017 Subtotal $12,000,000 $0 $0 $0 $0 $0 $3,000,000 $15,000,000 $26,685,516 $32,763 $0 $8,192 $0 $0 $0 $0 $0 $0 $0 $0 $6,671,379 $0 $33,356,895 $40,955 $20,000 $5,000 $0 $0 $0 $0 $0 $25,000 $65,000 $16,250 $320,000 $80,000 $1,000,000 $0 $40,938,027 $264,782 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $0 $250,000 $0 $0 $0 $9,719,726 $81,250 $400,000 $1,250,000 $51,172,535 5309 Massachusetts Bay Transportation 5309 Authority (MBTA) GREEN LINE EXTENSION: COLLEGE 132303 AVE/UNION SQ SPUR Subtotal $150,000,000 $150,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $196,101,000 $346,101,000 $0 $196,101,000 $346,101,000 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 Subtotal $0 $0 $0 $0 $0 $0 $0 $0 $60,000,000 $0 $0 $0 $0 $0 $15,000,000 $75,000,000 $61,190,546 $121,190,546 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $15,297,637 $76,488,183 $30,297,637 $151,488,183 $5,287,027 $0 $0 $0 $0 $0 $1,321,757 $6,608,784 $0 $0 $0 $0 $0 $0 $0 $19,631 $5,287,027 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,321,757 $0 $6,608,784 $0 $0 $0 $0 $117,808 $0 $117,808 $317,415,600 $382,590 $0 $0 $0 $0 $0 $0 $0 $0 5310 5311 5337 Massachusetts Bay Transportation 5337 Authority (MBTA) Massachusetts Bay Transportation 5337 Authority (MBTA) 122404 Bridge & Tunnel Program 119400 Systems Upgrades Subtotal 5339 Massachusetts Bay Transportation 5339 Authority (MBTA) 5339 Cape Ann Transportation Authority (CATA) 119400 Systems Upgrades REHAB/RENOVATE BUS SUPPORT 114400 FACIL/EQUIP Subtotal Subtotal Other Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Massachusetts Bay Transportation Authority (MBTA) Cape Ann Transportation Authority 121221 HEAVY RAIL CARS ‐ Red/Orange Lines 111204 BUY REPLACEMENT <30 FT BUS (1) Subtotal Total $0 $0 $52,682,528 $52,682,528 $0 $0 $0 $117,808 $0 $0 $52,682,528 $52,800,336 $0 $250,000 $290,122,648 $608,170,838