Appendix A – Guidance Documents Final 2015-2018 Bridge Program AC Schedule July 2014 Total Federal Participating Cost (including State Match) PROJ # Description FY14 and Prior Advertisements OAK BLUFFS- TISBURY- BRIDGE REPLACEMENT, O-01-001=T-04-001, BEACH ROAD OVER 604029 LAGOON POND DRAWBRIDGE LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95 600703 (ROUTE 128) 605223 607338 607114 604796 FALL RIVER- INTERCHANGE IMPROVEMENTS AT ROUTE I-195/ROUTE 79/ROUTE 138 GLOUCESTER- BRIDGE PRESERVATION, G-05-017, ROUTE 128 OVER ANNISQUAM RIVER (PHASE II) LANCASTER - FULL BRIDGE REPLACEMENT, L-02-018, JACKSON ROAD OVER ROUTE 2. (OFF-SYSTEM) DEDHAM- BRIDGE REPLACEMENT, D-05-033, PROVIDENCE HIGHWAY OVER MOTHER BROOK 606553 604173 $7,000,000 $15,447,468 $14,886,555 $6,600,000 2018 $1,632,532 $24,080,000 $44,770,081 $5,108,000 $19,994,555 $36,794,555 $1,598,263 $8,198,263 $88,273,263 $5,506,585 $5,506,585 $13,956,585 $3,432,000 $3,432,000 $7,546,608 $1,192,805 $7,051,805 $62,404,208 $198,392,897 $9,364,839 $12,075,000 $9,364,839 $0 $0 $9,364,839 $12,075,000 BOSTON- BRIDGE REHABILITATION, B-16-237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE HANOVER- NORWELL- SUPERSTRUCTURE REPLACEMENT, H-06-010, ST 3 OVER ST 123 (WEBSTER STREET) & N-24-003, ST 3 OVER ST 123 (HIGH STREET) $3,135,181 $5,964,839 $5,964,839 $9,100,020 $8,554,209 $2,879,981 $2,879,981 $11,434,190 BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE CHARLES RIVER $5,000,000 Scheduled AC Conversions ATTLEBORO- SUPERSTRUCTURE REPLACEMENT, A-16-053, I-95 (NB & SB) OVER NORTH AVENUE FY17 Advertisements 604952 LYNN-SAUGUS: ROUTE 107 OVER SAUGUS RIVER $1,192,805 $38,617,945 $22,153,731 $2,710,161 $9,364,839 Scheduled AC Conversions Scheduled AC Conversions Scheduled AC Conversions $0 FY18 Advertisements HAVERHILL- SUBSTRUCTURE REPLACEMENT, H-12-039, I-495 (NB & SB) OVER 605306 MERRIMACK RIVER Scheduled AC Conversions FISCAL YEAR FEDERAL AID TOTALS: 12 2017 $0 FY16 Advertisements 600867 2016 Total Federal Participating Cost (Bridge Cost only) $1,632,532 FY15 Advertisements 606525 2015 Total Future/Remaining AC Conversions NON - FEDERAL AID ( TO BE CONVERTED TO FED. AID BY A/C CONVERSIONS AS SHOWN ABOVE ) $18,035,161 $30,000,000 $80,535,161 $85,535,161 $26,879,981 $30,000,000 $89,379,981 $106,069,371 $4,150,000 $16,250,000 $0 $16,250,000 $46,557,280 $0 $46,557,280 $50,707,280 $0 $50,707,280 $35,008,185 $21,419,815 $56,428,000 $0 $0 $0 $41,328,106 $48,207,960 $32,662,513 $81,258,185 $38,617,945 $31,518,570 $28,512,513 $46,250,000 $0 $21,419,815 $0 $56,428,000 $423,672,548 $229,126,123 Appendix F - 1 Federal Aid and Programming Office Final 2015-2018 State Category Programs AC Schedule July 2014 Total Federal Participating Cost (including State Match) Description PROJ # 2015 FY14 and Prior Advertisements 606432 607422 605181 607731 607424 605833 LEXINGTON- BURLINGTON- WOBURN- STONEHAMREADING- WAKEFIELD- LYNNFIELD- EXPANSION OF FIBER & CCTV ON I-95 DISTRICT 1- DISTRICT 2- DISTRICT 3- DISTRICT 4- DISTRICT 5- DISTRICT 6- REAL TIME TRAVEL MONITORING SYSTEM (RTTM) METHUEN- INTERCHANGE RECONSTRUCTION ON I-93 AT ROUTE 110/113 ROTARY, INCLUDING REMOVAL OF M-17017 & M-17-018, REHAB OF M-17-007 & NEW BRIDGE CONSTRUCTION OF M-17-040 (MAJOR INFRA CMAQ, STATEWIDE STP-TE AND TAP) SPRINGFIELD- VIADUCT DECK REPLACEMENT OF S-24-061 ON I-91 (EARLY ACTION) STATEWIDE- ITS ADVANCED TRANSPORTATION MANAGEMENT SYSTEM (ATMS) SOFTWARE WEST SPRINGFIELD TO BERNARDSTON – TRAFFIC SIGN REPLACEMENT ON INTERSTATE 91 Scheduled AC Conversions 2016 2017 Total Future/Remaining AC Conversions 2018 Total Federal Participating Cost $500,000 $500,000 $500,000 $3,500,000 $11,500,000 $29,557,024 $76,936,716 $230,000,000 $231,000,000 $3,000,000 $6,407,070 $4,064,580 $7,175,580 $270,621,604 $333,519,366 $3,000,000 $5,500,000 $6,000,000 $6,500,000 $800,000 $1,028,800 $350,000 $578,800 $2,762,128 $8,288,345 $2,000,000 $6,000,000 $700,000 $1,313,600 $500,000 $2,228,800 $16,112,128 $31,438,345 $3,500,000 $24,724,668 $4,832,356 $149,006,250 $71,993,750 $2,000,000 $1,000,000 $9,000,000 $4,064,580 $183,795,498 $77,826,106 $2,500,000 $3,000,000 $500,000 $6,000,000 $9,000,000 $0 FY15 Advertisements 607484 607483 606931 606930 82865 608024 606916 606927 DISTRICT 3- INSTALLATION OF CCTV CAMERAS AND VMS ON I-290 BETWEEN I-495 AND I-90 DISTRICT 5- ITS CAMERA & VMS CONSTRUCTION ON ROUTE 24, FROM RANDOLPH TO FALL RIVER (39 MILES) HOV LANE BTV OPERATOR CONTRACT, 2 YEAR CONTRACT HOV LANE TOW TRUCK SERVICES FOR 2 YEARS (YEAR 1) MASSRIDES - TRAVEL OPTIONS PROGRAM STATEWIDE - CONVERSION OF INTERSTATE AND FREEWAY EXIT NUMBERS TO MILEPOST-BASED STATEWIDE- HOC OPERATIONS AND MAINTENANCE SUPPORT ITS CONTRACT STATEWIDE- REPLACEMENT OF VARIABLE MESSAGE SIGNS (VMS) Scheduled AC Conversions $228,800 $800,000 $228,800 $350,000 $2,689,512 $4,000,000 $2,762,128 $2,000,000 $613,600 $700,000 $1,728,800 $500,000 $16,112,128 $2,836,705 $2,836,705 $2,836,705 $2,836,705 Appendix F - 2 Federal Aid and Programming Office Description PROJ # 2015 FY16 Advertisements 607960 607482 605733 603917 ASHBURNHAM- INTERSECTION IMPROVEMENTS AT ROUTE 101 & WILLIAMS & COREY HILL ROAD DISTRICT 4- ITS CONSTRUCTION ON I-93, FROM WOBURN TO NEW HAMPSHIRE BORDER (21 MILES) DISTRICT 6- HIGHWAY LIGHTING SYSTEM REPLACEMENT ON I-93, FROM SOUTHAMPTON STREET TO NEPONSET AVENUE IN BOSTON MEDFORD- STONEHAM- WOBURN- READING- HIGHWAY LIGHTING REHABILITATION ON I-93 (PHASE II) 2016 $624,000 $750,000 $8,325,000 $2,500,000 $4,500,000 $15,000,000 Scheduled AC Conversions HOC HOV HOV HOV $624,000 $1,248,000 $8,325,000 $9,075,000 $5,750,000 $8,250,000 $2,500,000 $17,500,000 $17,199,000 $36,073,000 $0 $1,080,000 $1,250,000 $1,250,000 TISBURY- BIKE & PEDESTRIAN IMPROVEMENTS ALONG BEACH ROAD, FROM THE TERMINATION OF THE EXISTING SHARED USE PATH WESTERLY TO THE FIVE CORNERS INTERSECTION (SEE MPO AC SCHEDULE ALSO) $1,080,000 HOC OPERATING AND MAINTENANCE EXPENSES HOV LANE BTV OPERATOR CONTRACT, 2 YEAR CONTRACT HOV LANE TOW TRUCK SERVICES FOR 2 YEARS HOV OPERATING EXPENSES FOR TWO YEARS $1,425,000 $800,000 $1,100,000 $800,000 $1,100,000 $2,525,000 $800,000 $2,000,000 $350,000 $600,000 $350,000 $400,000 $350,000 $1,100,000 $400,000 $1,400,000 $0 $2,650,000 $2,650,000 $8,105,000 $4,460,400 $12,489,120 FY18 Advertisements WEBSTER - OXFORD -INTERSTATE MAINTENANCE, RESURFACING AND RELATED WORK ON I-391 $8,028,720 Scheduled AC Conversions 24 Total Federal Participating Cost $2,500,000 $15,949,000 Scheduled AC Conversions 607562 Total Future/Remaining AC Conversions 2018 $624,000 FY17 Advertisements 607411 2017 $0 $8,028,720 $4,460,400 $12,489,120 $421,624,831 FISCAL YEAR FEDERAL AID TOTALS: $183,795,498 $93,938,234 $27,785,705 $6,736,705 $311,043,132 NON - FEDERAL AID ( TO BE CONVERTED TO FED. AID BY A/C CONVERSIONS AS SHOWN ABOVE ) $93,938,234 $93,938,234 $27,785,705 $6,736,705 $311,043,132 Appendix F - 3 Federal Aid and Programming Office Final 2015-2018 MPO Projects AC Schedule July 2014 PROJ # Total Federal Participating Cost (including State Match) REGION 2015 2016 2017 2018 Total Future/Remaining AC Conversions FUTURE Total Federal Participating Cost FY14 and Previous Advertisements 601320 603711 601657 605181 None LEE- RECONSTRUCTION OF TYRINGHAM ROAD, FROM THE TYRINGHAM T.L. TO ROUTE 102 (2.0 MILES) . STP NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04BOS 020, N-04-021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADD-A-LANE - CONTRACT V). NHPP MONTAGUE- RECONSTRUCTION ON GREENFIELD ROAD, FROM 195' SOUTH OF FRCOG SHERMAN DRIVE TO HATCHERY RD (2.0 MILES) METHUEN- INTERCHANGE RECONSTRUCTION ON I-93 AT ROUTE 110/113 ROTARY, MVPC INCLUDING REMOVAL OF M-17-017 & M-17-018, REHAB OF M-17-007 & NEW BRIDGE CONSTRUCTION OF M-17-040 (Regional HSIP, STP) PVPC SPRINGFIELD - UNION STATION (CMAQ) Scheduled AC Conversions BERK FY15 Advertisements 602280 604960 607586 605114 606433 601426 604957 DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8. CMAQ, STP CLINTON- RESURFACING & RELATED WORK ON WATER STREET AND BOLTON ROAD (1.2 MRPC MILES) STP, TAP EDGARTOWN-OAK BLUFFS-TISBURY RESURFACING & RELATED WORK ON MVC EDGARTOWN/VINEYARD HAVEN ROAD GROVELAND -REHABILITATION OF ROUTE 97 (SCHOOL STREET & SALEM STREET). STP MVPC BERK NANTUCKET- MULTI-USE PATH CONSTRUCTION, FROM WASHINGTON STREET TO ORANGE STREET BILLERICA - RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK NMCOG ROAD (5,400 FEET). CMAQ, STP, TAP PEMBROKE- RECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON OCPC STREET (ROUTE 53) CMAQ, STP, TAP Scheduled AC Conversions NAN FY16 Advertisements 29492 BOS 601630 BOS 1569 BOS FY17 Advertisements 606233 BERK 607411 NAN BEDFORD- BILLERICA- BURLINGTON- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III). STP + $1M of NMCOG funding WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA). HSIP, STP, HPP GREEN LINE EXTENSION PROJECT (PHASE II), MEDFORD HILLSIDE (COLLEGE AVENUE) TO MYSTIC VALLEY PARKWAY/ROUTE 16 Scheduled AC Conversions PITTSFIELD- INTERSECTION & SIGNAL IMPROVEMENTS AT FIRST STREET & NORTH STREET (NEAR BERKSHIRE MEDICAL CENTER). CMAQ, HSIP, STP TISBURY-BIKE AND PED IMPROVEMENTS ALONG BEACH ROAD FROM THE TERMINATION OF THE EXISTING SHARED USE PATH WESTERLY TO THE FIVE CORNERS INTERSECTION (CMAQ, HSIP - See Statewide AC Schedule also) Scheduled AC Conversions $1,139,304 $13,768,183 $5,900,000 $87,768,183 $142,640,372 $30,000,000 $30,000,000 $2,780,175 $2,549,715 $5,329,890 $5,329,890 $492,173 $315,970 $34,727,622 $266,046 $750,873 $33,566,634 $14,000,000 $758,219 $1,066,843 $96,062,439 $758,219 $1,066,843 $155,695,324 $3,042,576 $5,658,284 $980,281 $6,638,565 $9,681,141 $2,835,219 $2,715,781 $2,715,781 $5,551,000 $492,158 $541,128 $541,128 $1,033,286 $4,159,898 $2,181,863 $2,181,863 $6,341,761 $324,832 $362,029 $362,029 $686,861 $3,712,139 $3,312,639 $3,312,639 $7,024,778 $6,732,869 $1,895,651 $16,667,375 $980,281 $1,895,651 $17,647,656 $8,628,520 $38,947,347 $21,691,442 $7,604,906 $13,400,000 $19,021,760 $21,031,758 $8,100,000 $0 $29,900,000 $56,526,666 $40,000,000 $61,031,758 $3,899,100 $2,417,444 $541,128 $541,128 $2,958,572 $0 $14,000,000 $1,139,304 $13,768,183 $0 $0 $0 $112,100,000 $112,100,000 $7,604,906 $29,296,348 $40,053,518 $53,453,518 $182,000,000 $229,658,424 $190,100,000 $272,849,866 $2,417,444 $0 $0 $541,128 $2,958,572 $6,316,544 $1,082,256 $7,398,800 Appendix F - 4 Federal Aid and Programming Office PROJ # REGION 2015 2016 2017 2018 FUTURE Total Future/Remaining AC Conversions Total Federal Participating Cost FY18 Advertisements 601431 602418 WASHINGTON- RECONSTRUCTION OF WASHINGTON MOUNTAIN ROAD, FROM BECKET T.L. TO THE DALTON T.L.. STP MVPC AMESBURY - RECONSTRUCTION OF ELM STREET. STP Scheduled AC Conversions BERK FISCAL YEAR FEDERAL AID TOTALS: 19 NON - FEDERAL AID ( TO BE CONVERTED TO FED. AID BY A/C CONVERSIONS AS SHOWN ABOVE ) $0 $0 $0 $3,234,372 $1,801,944 $6,962,520 $7,235,952 $14,198,472 $56,027,313 $93,425,451 $75,947,175 $82,794,829 $126,298,472 $34,727,622 $50,234,009 $71,506,947 $77,758,513 $126,298,472 $6,962,520 $7,235,952 $14,198,472 $10,196,892 $9,037,896 $19,234,788 $494,126,125 $360,525,563 Appendix F - 5 Federal Aid and Programming Office 2015 - 2018 Statewide Transportation Improvement Plan Advance Construction Charts METHUEN - I-93 ROTARY 9/11/2014 Total Federal Participating Cost (including State Match) FILE NO. FUNDING CATEGORY FFY 13 FFY 14 FFY 15 FFY 16 FFY 17 TOTAL 605181 STP-FLEX $ 260,795 HSIP - REGION $ 442,956 CMAQ - REGION $266,046 $ 609,064 $ 2,582,785 $ $526,841 492,173 $1,544,193 $2,582,785 CMAQ - REGIONAL MAJOR INFRASTRUCTURE $ 17,700,000 $ 23,808,000 $ 23,808,000 TE - REGIONAL MAJOR INFRASTRUCTURE $ $ $ 458,334 $1,105,168 $ 458,334 $458,334 188,500 458,334 TE -STATEWIDE $4,832,356 $0 $70,148,356 HPP #2434 $ 329,258 $329,258 IM - DISCRETIONARY (2010) $ 1,000,000 $1,000,000 FISCAL YEAR FEDERAL AID TOTALS: NON - FEDERAL AID ( TO BE CONVERTED TO FED. AID BY $ 19,921,509 $ 27,458,183 $ 25,216,841 $ 27,458,183 $ 25,216,841 $ 5,098,402 $5,098,402 $ 77,694,935 $57,773,426 A/C CONVERSIONS AS SHOWN ABOVE ) Appendix F - 6 Federal Aid and Programming Office Final 2015-2018 Bridge Program AC Schedule July 2014 Total Federal Participating Cost (including State Match) PROJ # Description FY14 and Prior Advertisements OAK BLUFFS- TISBURY- BRIDGE REPLACEMENT, O-01-001=T-04-001, BEACH ROAD OVER 604029 LAGOON POND DRAWBRIDGE LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95 600703 (ROUTE 128) 605223 607338 607114 604796 FALL RIVER- INTERCHANGE IMPROVEMENTS AT ROUTE I-195/ROUTE 79/ROUTE 138 GLOUCESTER- BRIDGE PRESERVATION, G-05-017, ROUTE 128 OVER ANNISQUAM RIVER (PHASE II) LANCASTER - FULL BRIDGE REPLACEMENT, L-02-018, JACKSON ROAD OVER ROUTE 2. (OFF-SYSTEM) DEDHAM- BRIDGE REPLACEMENT, D-05-033, PROVIDENCE HIGHWAY OVER MOTHER BROOK 606553 604173 $7,000,000 $15,447,468 $14,886,555 $6,600,000 2018 $1,632,532 $24,080,000 $44,770,081 $5,108,000 $19,994,555 $36,794,555 $1,598,263 $8,198,263 $88,273,263 $5,506,585 $5,506,585 $13,956,585 $3,432,000 $3,432,000 $7,546,608 $1,192,805 $7,051,805 $62,404,208 $198,392,897 $9,364,839 $12,075,000 $9,364,839 $0 $0 $9,364,839 $12,075,000 BOSTON- BRIDGE REHABILITATION, B-16-237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE HANOVER- NORWELL- SUPERSTRUCTURE REPLACEMENT, H-06-010, ST 3 OVER ST 123 (WEBSTER STREET) & N-24-003, ST 3 OVER ST 123 (HIGH STREET) $3,135,181 $5,964,839 $5,964,839 $9,100,020 $8,554,209 $2,879,981 $2,879,981 $11,434,190 BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE CHARLES RIVER $5,000,000 Scheduled AC Conversions ATTLEBORO- SUPERSTRUCTURE REPLACEMENT, A-16-053, I-95 (NB & SB) OVER NORTH AVENUE FY17 Advertisements 604952 LYNN-SAUGUS: ROUTE 107 OVER SAUGUS RIVER $1,192,805 $38,617,945 $22,153,731 $2,710,161 $9,364,839 Scheduled AC Conversions Scheduled AC Conversions Scheduled AC Conversions $0 FY18 Advertisements HAVERHILL- SUBSTRUCTURE REPLACEMENT, H-12-039, I-495 (NB & SB) OVER 605306 MERRIMACK RIVER Scheduled AC Conversions FISCAL YEAR FEDERAL AID TOTALS: 12 2017 $0 FY16 Advertisements 600867 2016 Total Federal Participating Cost (Bridge Cost only) $1,632,532 FY15 Advertisements 606525 2015 Total Future/Remaining AC Conversions NON - FEDERAL AID ( TO BE CONVERTED TO FED. AID BY A/C CONVERSIONS AS SHOWN ABOVE ) $18,035,161 $30,000,000 $80,535,161 $85,535,161 $26,879,981 $30,000,000 $89,379,981 $106,069,371 $4,150,000 $16,250,000 $0 $16,250,000 $46,557,280 $0 $46,557,280 $50,707,280 $0 $50,707,280 $35,008,185 $21,419,815 $56,428,000 $0 $0 $0 $41,328,106 $48,207,960 $32,662,513 $81,258,185 $38,617,945 $31,518,570 $28,512,513 $46,250,000 $0 $21,419,815 $0 $56,428,000 $423,672,548 $229,126,123 Appendix F - 1 Federal Aid and Programming Office Final 2015-2018 State Category Programs AC Schedule July 2014 Total Federal Participating Cost (including State Match) Description PROJ # 2015 FY14 and Prior Advertisements 606432 607422 605181 607731 607424 605833 LEXINGTON- BURLINGTON- WOBURN- STONEHAMREADING- WAKEFIELD- LYNNFIELD- EXPANSION OF FIBER & CCTV ON I-95 DISTRICT 1- DISTRICT 2- DISTRICT 3- DISTRICT 4- DISTRICT 5- DISTRICT 6- REAL TIME TRAVEL MONITORING SYSTEM (RTTM) METHUEN- INTERCHANGE RECONSTRUCTION ON I-93 AT ROUTE 110/113 ROTARY, INCLUDING REMOVAL OF M-17017 & M-17-018, REHAB OF M-17-007 & NEW BRIDGE CONSTRUCTION OF M-17-040 (MAJOR INFRA CMAQ, STATEWIDE STP-TE AND TAP) SPRINGFIELD- VIADUCT DECK REPLACEMENT OF S-24-061 ON I-91 (EARLY ACTION) STATEWIDE- ITS ADVANCED TRANSPORTATION MANAGEMENT SYSTEM (ATMS) SOFTWARE WEST SPRINGFIELD TO BERNARDSTON – TRAFFIC SIGN REPLACEMENT ON INTERSTATE 91 Scheduled AC Conversions 2016 2017 Total Future/Remaining AC Conversions 2018 Total Federal Participating Cost $500,000 $500,000 $500,000 $3,500,000 $11,500,000 $29,557,024 $76,936,716 $230,000,000 $231,000,000 $3,000,000 $6,407,070 $4,064,580 $7,175,580 $270,621,604 $333,519,366 $3,000,000 $5,500,000 $6,000,000 $6,500,000 $800,000 $1,028,800 $350,000 $578,800 $2,762,128 $8,288,345 $2,000,000 $6,000,000 $700,000 $1,313,600 $500,000 $2,228,800 $16,112,128 $31,438,345 $3,500,000 $24,724,668 $4,832,356 $149,006,250 $71,993,750 $2,000,000 $1,000,000 $9,000,000 $4,064,580 $183,795,498 $77,826,106 $2,500,000 $3,000,000 $500,000 $6,000,000 $9,000,000 $0 FY15 Advertisements 607484 607483 606931 606930 82865 608024 606916 606927 DISTRICT 3- INSTALLATION OF CCTV CAMERAS AND VMS ON I-290 BETWEEN I-495 AND I-90 DISTRICT 5- ITS CAMERA & VMS CONSTRUCTION ON ROUTE 24, FROM RANDOLPH TO FALL RIVER (39 MILES) HOV LANE BTV OPERATOR CONTRACT, 2 YEAR CONTRACT HOV LANE TOW TRUCK SERVICES FOR 2 YEARS (YEAR 1) MASSRIDES - TRAVEL OPTIONS PROGRAM STATEWIDE - CONVERSION OF INTERSTATE AND FREEWAY EXIT NUMBERS TO MILEPOST-BASED STATEWIDE- HOC OPERATIONS AND MAINTENANCE SUPPORT ITS CONTRACT STATEWIDE- REPLACEMENT OF VARIABLE MESSAGE SIGNS (VMS) Scheduled AC Conversions $228,800 $800,000 $228,800 $350,000 $2,689,512 $4,000,000 $2,762,128 $2,000,000 $613,600 $700,000 $1,728,800 $500,000 $16,112,128 $2,836,705 $2,836,705 $2,836,705 $2,836,705 Appendix F - 2 Federal Aid and Programming Office Description PROJ # 2015 FY16 Advertisements 607960 607482 605733 603917 ASHBURNHAM- INTERSECTION IMPROVEMENTS AT ROUTE 101 & WILLIAMS & COREY HILL ROAD DISTRICT 4- ITS CONSTRUCTION ON I-93, FROM WOBURN TO NEW HAMPSHIRE BORDER (21 MILES) DISTRICT 6- HIGHWAY LIGHTING SYSTEM REPLACEMENT ON I-93, FROM SOUTHAMPTON STREET TO NEPONSET AVENUE IN BOSTON MEDFORD- STONEHAM- WOBURN- READING- HIGHWAY LIGHTING REHABILITATION ON I-93 (PHASE II) 2016 $624,000 $750,000 $8,325,000 $2,500,000 $4,500,000 $15,000,000 Scheduled AC Conversions HOC HOV HOV HOV $624,000 $1,248,000 $8,325,000 $9,075,000 $5,750,000 $8,250,000 $2,500,000 $17,500,000 $17,199,000 $36,073,000 $0 $1,080,000 $1,250,000 $1,250,000 TISBURY- BIKE & PEDESTRIAN IMPROVEMENTS ALONG BEACH ROAD, FROM THE TERMINATION OF THE EXISTING SHARED USE PATH WESTERLY TO THE FIVE CORNERS INTERSECTION (SEE MPO AC SCHEDULE ALSO) $1,080,000 HOC OPERATING AND MAINTENANCE EXPENSES HOV LANE BTV OPERATOR CONTRACT, 2 YEAR CONTRACT HOV LANE TOW TRUCK SERVICES FOR 2 YEARS HOV OPERATING EXPENSES FOR TWO YEARS $1,425,000 $800,000 $1,100,000 $800,000 $1,100,000 $2,525,000 $800,000 $2,000,000 $350,000 $600,000 $350,000 $400,000 $350,000 $1,100,000 $400,000 $1,400,000 $0 $2,650,000 $2,650,000 $8,105,000 $4,460,400 $12,489,120 FY18 Advertisements WEBSTER - OXFORD -INTERSTATE MAINTENANCE, RESURFACING AND RELATED WORK ON I-391 $8,028,720 Scheduled AC Conversions 24 Total Federal Participating Cost $2,500,000 $15,949,000 Scheduled AC Conversions 607562 Total Future/Remaining AC Conversions 2018 $624,000 FY17 Advertisements 607411 2017 $0 $8,028,720 $4,460,400 $12,489,120 $421,624,831 FISCAL YEAR FEDERAL AID TOTALS: $183,795,498 $93,938,234 $27,785,705 $6,736,705 $311,043,132 NON - FEDERAL AID ( TO BE CONVERTED TO FED. AID BY A/C CONVERSIONS AS SHOWN ABOVE ) $93,938,234 $93,938,234 $27,785,705 $6,736,705 $311,043,132 Appendix F - 3 Federal Aid and Programming Office Final 2015-2018 MPO Projects AC Schedule July 2014 PROJ # Total Federal Participating Cost (including State Match) REGION 2015 2016 2017 2018 Total Future/Remaining AC Conversions FUTURE Total Federal Participating Cost FY14 and Previous Advertisements 601320 603711 601657 605181 None LEE- RECONSTRUCTION OF TYRINGHAM ROAD, FROM THE TYRINGHAM T.L. TO ROUTE 102 (2.0 MILES) . STP NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04BOS 020, N-04-021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADD-A-LANE - CONTRACT V). NHPP MONTAGUE- RECONSTRUCTION ON GREENFIELD ROAD, FROM 195' SOUTH OF FRCOG SHERMAN DRIVE TO HATCHERY RD (2.0 MILES) METHUEN- INTERCHANGE RECONSTRUCTION ON I-93 AT ROUTE 110/113 ROTARY, MVPC INCLUDING REMOVAL OF M-17-017 & M-17-018, REHAB OF M-17-007 & NEW BRIDGE CONSTRUCTION OF M-17-040 (Regional HSIP, STP) PVPC SPRINGFIELD - UNION STATION (CMAQ) Scheduled AC Conversions BERK FY15 Advertisements 602280 604960 607586 605114 606433 601426 604957 DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8. CMAQ, STP CLINTON- RESURFACING & RELATED WORK ON WATER STREET AND BOLTON ROAD (1.2 MRPC MILES) STP, TAP EDGARTOWN-OAK BLUFFS-TISBURY RESURFACING & RELATED WORK ON MVC EDGARTOWN/VINEYARD HAVEN ROAD GROVELAND -REHABILITATION OF ROUTE 97 (SCHOOL STREET & SALEM STREET). STP MVPC BERK NANTUCKET- MULTI-USE PATH CONSTRUCTION, FROM WASHINGTON STREET TO ORANGE STREET BILLERICA - RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK NMCOG ROAD (5,400 FEET). CMAQ, STP, TAP PEMBROKE- RECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON OCPC STREET (ROUTE 53) CMAQ, STP, TAP Scheduled AC Conversions NAN FY16 Advertisements 29492 BOS 601630 BOS 1569 BOS FY17 Advertisements 606233 BERK 607411 NAN BEDFORD- BILLERICA- BURLINGTON- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III). STP + $1M of NMCOG funding WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA). HSIP, STP, HPP GREEN LINE EXTENSION PROJECT (PHASE II), MEDFORD HILLSIDE (COLLEGE AVENUE) TO MYSTIC VALLEY PARKWAY/ROUTE 16 Scheduled AC Conversions PITTSFIELD- INTERSECTION & SIGNAL IMPROVEMENTS AT FIRST STREET & NORTH STREET (NEAR BERKSHIRE MEDICAL CENTER). CMAQ, HSIP, STP TISBURY-BIKE AND PED IMPROVEMENTS ALONG BEACH ROAD FROM THE TERMINATION OF THE EXISTING SHARED USE PATH WESTERLY TO THE FIVE CORNERS INTERSECTION (CMAQ, HSIP - See Statewide AC Schedule also) Scheduled AC Conversions $1,139,304 $13,768,183 $5,900,000 $87,768,183 $142,640,372 $30,000,000 $30,000,000 $2,780,175 $2,549,715 $5,329,890 $5,329,890 $492,173 $315,970 $34,727,622 $266,046 $750,873 $33,566,634 $14,000,000 $758,219 $1,066,843 $96,062,439 $758,219 $1,066,843 $155,695,324 $3,042,576 $5,658,284 $980,281 $6,638,565 $9,681,141 $2,835,219 $2,715,781 $2,715,781 $5,551,000 $492,158 $541,128 $541,128 $1,033,286 $4,159,898 $2,181,863 $2,181,863 $6,341,761 $324,832 $362,029 $362,029 $686,861 $3,712,139 $3,312,639 $3,312,639 $7,024,778 $6,732,869 $1,895,651 $16,667,375 $980,281 $1,895,651 $17,647,656 $8,628,520 $38,947,347 $21,691,442 $7,604,906 $13,400,000 $19,021,760 $21,031,758 $8,100,000 $0 $29,900,000 $56,526,666 $40,000,000 $61,031,758 $3,899,100 $2,417,444 $541,128 $541,128 $2,958,572 $0 $14,000,000 $1,139,304 $13,768,183 $0 $0 $0 $112,100,000 $112,100,000 $7,604,906 $29,296,348 $40,053,518 $53,453,518 $182,000,000 $229,658,424 $190,100,000 $272,849,866 $2,417,444 $0 $0 $541,128 $2,958,572 $6,316,544 $1,082,256 $7,398,800 Appendix F - 4 Federal Aid and Programming Office PROJ # REGION 2015 2016 2017 2018 FUTURE Total Future/Remaining AC Conversions Total Federal Participating Cost FY18 Advertisements 601431 602418 WASHINGTON- RECONSTRUCTION OF WASHINGTON MOUNTAIN ROAD, FROM BECKET T.L. TO THE DALTON T.L.. STP MVPC AMESBURY - RECONSTRUCTION OF ELM STREET. STP Scheduled AC Conversions BERK FISCAL YEAR FEDERAL AID TOTALS: 19 NON - FEDERAL AID ( TO BE CONVERTED TO FED. AID BY A/C CONVERSIONS AS SHOWN ABOVE ) $0 $0 $0 $3,234,372 $1,801,944 $6,962,520 $7,235,952 $14,198,472 $56,027,313 $93,425,451 $75,947,175 $82,794,829 $126,298,472 $34,727,622 $50,234,009 $71,506,947 $77,758,513 $126,298,472 $6,962,520 $7,235,952 $14,198,472 $10,196,892 $9,037,896 $19,234,788 $494,126,125 $360,525,563 Appendix F - 5 Federal Aid and Programming Office 2015 - 2018 Statewide Transportation Improvement Plan Advance Construction Charts METHUEN - I-93 ROTARY 9/11/2014 Total Federal Participating Cost (including State Match) FILE NO. FUNDING CATEGORY FFY 13 FFY 14 FFY 15 FFY 16 FFY 17 TOTAL 605181 STP-FLEX $ 260,795 HSIP - REGION $ 442,956 CMAQ - REGION $266,046 $ 609,064 $ 2,582,785 $ $526,841 492,173 $1,544,193 $2,582,785 CMAQ - REGIONAL MAJOR INFRASTRUCTURE $ 17,700,000 $ 23,808,000 $ 23,808,000 TE - REGIONAL MAJOR INFRASTRUCTURE $ $ $ 458,334 $1,105,168 $ 458,334 $458,334 188,500 458,334 TE -STATEWIDE $4,832,356 $0 $70,148,356 HPP #2434 $ 329,258 $329,258 IM - DISCRETIONARY (2010) $ 1,000,000 $1,000,000 FISCAL YEAR FEDERAL AID TOTALS: NON - FEDERAL AID ( TO BE CONVERTED TO FED. AID BY $ 19,921,509 $ 27,458,183 $ 25,216,841 $ 27,458,183 $ 25,216,841 $ 5,098,402 $5,098,402 $ 77,694,935 $57,773,426 A/C CONVERSIONS AS SHOWN ABOVE ) Appendix F - 6 Federal Aid and Programming Office