DIVISION OF RIGHT OF WAY AND ACCESS MANAGEMENT

advertisement
DIVISION OF RIGHT OF WAY
AND
ACCESS MANAGEMENT
Presented by: Robert Cunningham / Polina Knaster, P.E., PMP
RIGHT OF WAY LINES DO NOT HAVE TO BE
STRAIGHT
ROW LINES INCLUDE EASEMENT LINES
A SET DISTANCE FROM THE CURB LINE OR
OTHER ARBITRARY JUSTIFICATION FOR
DRAWING THE LINES
BOTH TEMPORARY AND PERMANENT
THERE IS NO LAW OR REQUIREMENT TO
ONLY ACQUIRE THE MINIMUM AMOUNT OF
LAND
ENTIRE TAKINGS
INSTEAD OF LEAVING UNECONOMIC
REMAINDERS
ALL MINOR TAKINGS OR MINOR
IMPACTS NEED BE REVIEWED
TO SEE IF IT CAN BE ELIMINATED OR
FURTHER REDUCED
3 ft setback
from new
ROW line
TEMP CONSTRUCTION
LINE GOES THROUGH
PORCH & 2 FT IN TO MAIN
BUILDING
ROW LINE GOES
AROUND MAJOR SIGN
STRUCTURE
KICK-OFF MEETINGS INCLUDING
DISTRICT AND FIELD STAFF EARLY
DISCUSS PROJECT WITH FIELD ROW
STAFF THROUGHOUT DESIGN
NEW ROW GUIDELINES DUE OUT
SOON
BALANCE NEEDS OF THE PROJECT
WITH NEEDS OF THE INDIVIDUAL
OWNER
NEVER COMPROMISE ON SAFETY
REMEMBER
ALL ROW LINES CAN
BEND