Al Balluch Bureau of Construction Management PS&E Plans Specifications Estimate Schedule Other Required Documents Plans Key Sheet (See Sample Plans) 1 Correct Project name (same on all documents) 2 Construction Federal # on Key sheet (Federal Funding) 3 Correct Specification Year 4 Signed and Sealed (Consultants) 5 Utilities Listed (refer to Specifications) Plans Key Sheet (See Sample Plans) 6 Structures and Bridges numbered and Listed 7 Midpoint of Project 40+/- Latitude 74+/- Longitude 8 Correct Year for Details, Electrical and ITS 9 Correct Advertisement Month and Year 10 North Arrow ??? 11 Length of Federal Project Plans Follow the Sample Plans Sign all Plan Sheets (consultant) Sequence #s on E-DOQ and on Plan Sheets E-DOQ will continue to have Sequence #s E-DOQ quantities match Estimate in number and unit Use a Bridge EQ sheet (where appropriate) Plans Plan sheet numbering is correct Pollution Liability insurance on ALL 2007 Spec. projects Progress Schedule Updates on all 2007 Spec. Projects = ½ of construction duration Trainee hours (Federal) or Training Reimbursement LS (State) Request from Civil Rights at FDS Special Provisions Use the latest SI Total # of pages is shown and correct (don’t forget to number and include the attachments) Correct reference to attachments is used… Federal vs. State Correct attachments are used…..Federal vs .State Multi year funding language (if appropriate) Utility work matches Agreement and Key Sheet Include other Authority Specifications (NJTP, Parkway, Railroad etc by reference or attachment) Contract time (completion dates) matches schedule ROW restrictions shown Special Provisions Liquidated Damages Substantial Completion = Road User Cost + Construction Engineer Cost (SC=RU + CE) Completion= ½ Construction Engineering Cost (C= ½ CE) Interim Completion = Road User Cost (IC = RU) Special Provisions Clearing Site and Demolition payment limits equal Estimate amount Include # of Trainees and DBE or ESBE/SBE % in Attachments No Specification “Nonstandard” NS Items have specs (CAN 076 9/2/09) Request # from Transport Unit Estimate Estimate Item quantity equals E-DOQ Use 2006 Construction Estimating Guidelines Use 2008 revised Step by Step guide to process Estimate Estimate Category # on ALL projects(4 digit) as per Manual Cost backup for NS and LS Items No “NO ITEM” Fixed Price “Carry Items” check mark them in Estimate…Fuel Price Adjustment, Asphalt Price Adjustment, Telephone Service etc Estimate Update the Estimate as close to PS&E as possible to avoid funding issues Provide Price History for Milestone (major) Items and Cost Backup Schedule Follow Construction Scheduling Manual BDC 01T-S Electronic copy P6 .prx or .xer format (NO FLOPPY DISKS) Utility durations match Special Provisions Work shown on Schedule must be broken down by Stage or Substage (1 2 3 or 1A 1B 1C) Realistic Durations ie Bid –Award etc. Working Drawing time frames accounted for Long lead time Items accounted for Schedule No Negative float Negative lag Open Ends Mandatory constraint Hammock Activity Schedule Multi year funded projects must address funding limits in the schedule Work Breakdown Structure (WBS) Code Field must be filled in Use the latest Data Date Schedule Ensure schedule addresses the requirements of: Weather sensitive Items Railroad (allowable closure times) Utility(ies) (work schedule and seasonal outages) Staging (road and bridge work must not conflict between stages) Environmental restrictions Permit Conditions Other Required Documents Designer Certification Design and Quantity Calculations Soil Borings Geotechnical Report Utility Work Package Other Documents Requested by our Unit…..Thanks! Questions????????? Thank You