46 AGENDA ITEM BACKGROUND TO: GOVERNING BOARD DATE FROM: PRESIDENT April 8, 2013 SUBJECT: Ratification: Construction Change Orders REASON FOR BOARD CONSIDERATION CONSENT-ACTION ENCLOSURE(S) ITEM NUMBER Page 1 of 2 A.4 BACKGROUND: In accordance with Board Policy 4155, the attached change orders over $25,000 or more than 10% of the original contract value are submitted for Governing Board ratification. See attached spreadsheet for change order detail. FISCAL IMPACT: $29,578 funded from Bond Fund 47 $32,537 funded from Bond Fund 48 RECOMMENDATION: It is recommended that the Governing Board ratify the construction change orders. Administrator Initiating Item: Joe Nugent Victoria Lewis Academic and Professional Matter If yes, Faculty Senate Agreement Senate President Signature Yes No Yes No Final Disposition 47 Change Orders to be reported with April FMP 800 Building Renovation Coastwide Environmental #1 $ 14,258 Actual Acoustic Ceiling texture removed (13,703 SF) exceeded amount estimated (8,000 SF) in original scope Coastwide Environmental #2 $ 15,320 Actual Pipe fitting and pipe insulation materials removed (533 LF) exceeded amount estimated (150 LF) in original scope 800 Building Renovation Total $ 29,578 VAPA 2000 & 3000 Acoustics Cen-Con #1 $ 517 door hardware change Cen-Con #2 $ 9,492 scope change per engineer drawings Cen-Con #3 $ 3,251 installation of new fire/smoke damper Cen-Con #4 $ 17,008 subcontractor Geo Wilson work change Cen-Con #5 $ 2,263 relocate outdoor sink Cen-Con #6 $ 1,437 change to sub Geo Wilson work Cen-Con #7 $ (1,432) did not need all of CO#3 VAPA 2000 & 3000 Acoustics Total $ 32,536