89 AGENDA ITEM BACKGROUND TO: GOVERNING BOARD DATE FROM: PRESIDENT August 6, 2012 SUBJECT: Award of Bid: AEC VAPA Bldg. 2000/3000 HVAC Acoustic REASON FOR BOARD CONSIDERATION ACTION ITEM NUMBER ENCLOSURE(S) Page 1 of 1 C.5 BACKGROUND: Beginning in the fall of 2011, a study was conducted in order to identify corrective measures related to the acoustics and functionality of the heating and ventilation systems in various classrooms in VAPA buildings 2000 – 3000. This study and subsequent design was performed by Jim Young Engineering, Inc. which provided plans and specifications that were used to bid the work. The advertised Engineer’s estimate for this project was $650,000 with a planning budget of 700,000. Bid proposals were received by the Purchasing Department on July 10, 2012 and only two of the five general contractors that participated in the process provided bids to the District. Of the two bidders, one of the bidders, Environmental Services Inc. (ESI), was disqualified as non-responsive. Bid Results: Contractor Environmental Services Inc. of Northern California Cen Con Construction Inc. Address 3353 De La Cruz Blvd. Santa Clara, CA 95054 Base Bid $624,000 335 Swift Street Santa Cruz, California, 95060 $694,400 The lowest responsive bid proposal received by the District is from Cen Con Construction, Inc. FISCAL IMPACT: Measure C funds will be used to execute this work. RECOMMENDATION: It is recommended that the Governing Board award the bid for the AEC VAPA Bldgs. 2000/3000 HVAC Acoustic Project to Cen Con Construction, Inc, the lowest qualified bidder, in the amount of $694,400. Administrator Initiating Item: Michael Robins Victoria Lewis Academic and Professional Matter If yes, Faculty Senate Agreement Senate President Signature Yes No Yes No Final Disposition Approved