The Total Cost of Ownership (TCO) is the total of all costs generated over the useful lifespan of the facility (30-50 years). The goal of TCO is to determine a value that will reflect the true cost of the facility, including: • planning and constructing • equipping the facility (infrastructure, technology, security) • operating cost over the useful life Construction 11% Financing 14% Alterations 25% Operations 50% The initial cost to construct a building typically represents only a small portion of the actual cost to own the facility over its lifetime. HVAC Applications (1999) American society of Heating, Refrigeration, and Air Conditioning, Atlanta, GA. 2004 Bond History (additional facilities dollars history) Facilities equipment comparison – Building Age comparison Present Day Needs & Costs Future Day Needs & Costs Measure D Bond 2004 - 2015 • Parking Lot A/B & Road Re-alignment • Student Services Building SAC • 21 KV Project • VAPA Complex $41,436,039 • Horticulture Refinanced Bond • Watsonville Building A Land acquisition and renovation • Athletic Fields / Stadium Turf • Health & Wellness • Green Technology Center • Well Replacement • Smart Classrooms/Security • Many small projects $118.5M State and Federal Matching Funds to augment Measure D Bond funds 15,100 Students • • • • • • Major Projects Re-Cap Allied Health Expansion SAC Construction VAPA 2 and 3 D classrooms Crocker Theater Samper Music Recital Hall Green Technology Center in Watsonville 199,679 G.S.F. 806,333 G.S.F. Equipment 1998 450,000 S.F. (estimated) Equipment 2015 800,000 S.F. 8,400 Interior Light Fixtures 15,000 Int. Light Fixtures 1,680 Exterior Light Fixtures 3,000 Ext. Light Fixtures 950 doors 1,741 doors 5 Boilers 18 Boilers 84 Furnaces 150 Furnaces 1120 Filters 2,000 Filters 11 Elevators 18 Elevators 220 Exhaust/Supply Fans 400 Exhaust/Supply Fans 213 Restroom Fixtures 552 Restroom Fixtures BUILDING SQ. FOOTAGE YR. BUILT 100 ENROLLMENT SERVICES 15,892 1962 200 THEATER MUSIC 34,870 1962 400 SOCIAL SCIENCE 23,784 1967 450 FORUM 11,416 1967 500 BUS SOC SCIENCE 19,287 1962 700 MATH ENGIN TECH 20,707 1962 900 COLLEGE CENTER 30,300 1962 1100 GYMNASIUM 43,857 1962 1300 BUILDING TRADES 11,748 1976 9,900 1976 17,840 1976 1550 HUMAN RESOURCES 2,510 1976 1600 PUBLIC SERVICES 8,120 1979 11,719 1974 2020 GROUNDS SHOP 1,400 1974 2050 VEHICLE/CUSTODIAL 1,920 1974 2100A/B/C TRAILERS 2,880 1400 COMPUTER LAB 1500 EARLY CHILD NURSING 2000 MAINT & OPS 268,150 Broken Tile 500 Bldg. Restroom Antiquated 400 Bldg. Classroom Refer to 10 Year Facilities Plan: pages 1-7 highlight the next two years. $11.3 M in identified projects. Bond Dollars: None Estimated General Fund, On-going: $350k Estimated Parking Fund (no more than): $200k Prop 39, (a decrease in Governors’ budget) est.*: $150k 1 Time Sch. Maint. & Inst. Equip. 2015/16*: $480k Total Estimated 2015/16 is $1,180,000 Applied to estimated project cost: Funding Difference: [$11,300,000] $10,133,000 *Note: Estimates for one year – We do not know if we will get ongoing Prop 39 & Scheduled Maintenance Funds. Photo credit: Redriverhistorian.wordpress.com Refer to 10 Year Facilities Plan: pages 8-17 highlight 2017-2025. Photo credit: BBC Estimated total cost: $42.2M in identified and anticipated projects, 2017-2025. Top Four Categories – Through 2025 Heating Ventilation Air Conditioning (HVAC) $11,179,556 Access / Security $2,156,500 Restroom Renovation $3,050,000 Classroom Technology $11,750,000 Total: $28,136,056 Average $5M Scheduled Maintenance needed per year • • • • • • Educational Master Plan Facilities Master Plan Technology Plan Facilities Planning & Plant Operations Program Plan Energy Plan College Strategic Plan • • • • • Effects of and solutions to drought mandates (and other green/sustainable initiatives) Technology infrastructure and equipment (DE one of the focus areas for growth and opportunity) Student demand and enrollment supports (self service modules and portal communication tool) Student safety and quality learning environments Continued planning for Scheduled Maintenance based on all buildings and their length of service • • • • • • Provide a quality learning environment for students Provide a Safe Learning Environment Good Stewardship of Bond Funds/Refinancing Leveraging of Private & Grant Donations Leveraging of Naming Opportunities Leveraged rebates for energy & Prop 39 projects • How do we pay for both existing and long-term costs in light of maintaining a quality learning environment? • • How do we make Cabrillo a Destination? Community Perceptions 1.What are the challenges? 2.What are the opportunities?