Kansas State University

advertisement
Kansas State University
New Residence Hall and Dining Center
Program Comparison
6-Jan-14
COMMUNITY SIZE
Function
Type
Occ.
Prog
NSF
Quan
Units
Total
Beds
KSU ORIGINAL PROGRAM
Total SF
Occ.
New Res Hall: Res. Community
Prog.NSF
Quan
Units
Total
Beds
Area Subtotal
46.0
10
# students/comm.
# communities
2
5
Traditional
1 Traditional Single (RA Unit)
Residential Bathrooms
Total SF
Occ.
5 fl above Ground level common
Residential Spaces
2 Traditional Double
SCHEMATIC DESIGN PROGRAM
Single
1|1
400|148
1|2
1|2
400|296
1
Double
2|2
230|242
22.5|14
23.5|16
45|28
46|30
5175|3388
5575|3684
2
subtotal
Shared Bathroom
ADA
ADA Roll-in
Community Spaces
Breakout Area
Study Area
Floor Lounge
Kitchen
Unisex Toilet
400
230
260|55
62
75
4|3
1
1
1040|165
62
75
5|5
80|175
13|13 200|200
2|1
1|1
160|175
200|200
5
13
80
200
0.5
500
67
1,000
67
1,000
260
Community Support Spaces
Janitorial / Custodial Closets
Trash/ Recycling Room
Utility Room for Residents
IT / Data Closet
Power Closet / Electrical
Elevator Lobby
3
1
Staff Residences
Faculty-in-Residence
Residence Life Coordinator
Assistant Residence Life Coordinator
2 - Bedroom Apartment
2 - Bedroom Apartment
1 - Bedroom Apartment
10
225
235
30.0
15
4,000
51,750
Area Subtotal
10,400
40
1
148
242
2
10,400
20
10
8,600
5
55
62
75
1,600
2,000
12
13
175
200
5,000
50
24
750
360
50
1
1
1
1
120
130
85
60
3
170
Area Subtotal
0
Total NSF:
74,750
Area Total
1,000
1,000
600
1
1
1
Main Lounge
67
1,000
Recreation Room
20
300
1
Study Room
5
100
6
2
2
1
Area Total
1
Total SF
# students/comm.
# communities
3
5
10
450
460
Area Subtotal
Total
Beds
Area Subtotal
# comm./floor
# floors
5
5
3
Building Commons
55,750
ELEV EQUIP
Ground Level below beds.
New Residence Hall: Building Common Spaces
Quan
Units
5 fl above Ground level common
3
Residential Community Spaces
Prog.NSF
# comm./floor
# floors
30
210
240
30
420
450
4,440
50,820
Area Subtotal
4,530
45
15
15
Area Subtotal
15
15
5
5
5
2475
930
1125
11,425
2,625
3,000
3,750
1,800
250
Area Subtotal
2,870
Total NSF:
74,085
5
5
5
5
15
5
600
650
425
300
45
850
Ground Level below beds.
182 ft²
2,600
1,000
1,000
600
Area Total
3,150
Area Total
4,305
12
12
8
1,200
1,200
750
1,000
110
1,650
300
57
850
1
850
600
10
150
3
450
4,400
MECH
717 ft²
55,260
Restrooms: Unisex
50
1
1
1
2
2
1
1
1,200
1,200
750
1,650
2
100
1
1,255
1
200
Storage Space
4
1,200
1
1,200
Laundry
7
1,300
1
1,300
42
1,255
Front Desk
2
135
135
2
200
Front Desk Storage
1
80
1
80
1
80
1
80
Office
2
110
2
220
4
140
3
420
Central Mailroom
30
600
1
600
Resident Life Program Storage
1
100
Maintenance Shop/Office
Housekeeping Break Room
2
8
560
120
Housekeeping Storage
1
240
Administration
Support Spaces
Area Total
1
1
Area Total
1
1
1
1,135
(moves to old Kramer)
1
Area Total
560
120
5
3
475
345
240
12
1,170
1
2
150
1
Trash / Recycling
700
(moves to old Kramer)
100
920
Area Total
1
1
Mech/Electrical / Plumbing
9,691
475
345
1,170
150
7,089
Main Electrical Room
1,680
Electrical Switches
AHU Units in penthouse
Steam - Equipment & heat Exchangers w/ pumps
220
717
3,750
Fire Pump Room
Penthouse(s) / Energy Recovery>
IT Head End Room / Data MDF room
Penthouse Elevator Equipment Room
Building Commons
3
260
0
280
1
2
182
1
280
182
Total NSF:
9,055
Total NSF:
17,846
NSF:
GRF:
GSF:
# Beds:
GSF / Bed:
Net to Gross
Efficiency %:
83,805
1.50
125,708
460
273
NSF:
GRF:
GSF:
# Beds:
GSF / Bed:
Net to Gross
Efficiency %:
91,931
1.24
113,537
450
252
New Residence Hall SUMMARY
Delivery Drive / Service
Outdoor Gathering Area
Staff Apt Patio / Exterior Entrance
Bicycle parking - # bikes
Exterior Equipment
New Parking - # stalls
Trash / Compactor Recycling
1500
500
315
?
0
?
70% of Student beds.
KANSAS STATE - NEW RES HALL & DINING CENTER
PROGRAM
PENTHOUSE
FLOOR PLAN
66.67%
80.97%
01/07/14
1/16" = 1'-0"
EB
1087
E
10
87
C
R
109
1
108
6
108
109
0
8
10
85
1090
1089
10
84
10
89
88
10
1084
84
10
10
83
82
10
1083
1
108
7
108
STUDY
1088
1089
EXISTING TUNNEL
STUDY
STUDY
DINING TERRACE
ON
NNECTI
NNEL CO
NEW TU
79
10
UP
CONTROL
GRAB N GO
ABOVE
78
W.
181 ft²
CLASSROOM
10
88
10
86
M.
1525 ft²
UP
10
87
161 ft²
RA WORKROOM
CENTRAL MAILRM.
619 ft²
373 ft²
DEPT. INITIATIVES
144 ft²
MULTI-CULTURAL
RESOURCE
HOUSING & DINING
MKTG. AND
COMMUNICATIONS
HOUSING & DINING
MKTG. AND
COMMUNICAITONS
537 ft²
876 ft²
M
293 ft²
DINING OFFICE
594 ft²
688 ft²
CONTROL
FURNITURE STORAGE
352 ft²
W
323 ft²
DINING
SUPPORT
EXISTING MECHANICAL
535 ft²
EXISTING MECHANICAL
476 ft²
WAREWASH
1198 ft²
UNIFORMS
1523 ft²
TEST KITCHEN
117 ft²
759 ft²
ELEV. EQP.
DINING / SERVERY
DATA
27573 ft²
276 ft²
PROD.OFFICES
107 ft²
UP
511 ft²
UP
DENISON STREET
1077
1078
1079
UP
DINING SUPPORT
T/R
CONFERENCE ROOM
495 ft²
MECH.
TRASH
92 ft²
98 ft²
MECHANICAL
125 ft²
3749 ft²
RECIEVING
MAIN ELECTRICAL
HK STOR.
1680 ft²
1166 ft²
UP
DOCK
150 ft²
77
10
DRY STORAGE
REF. STAGING
COLD/HOT PRODUCTION
2147 ft²
1371 ft²
3265 ft²
AHU
ELEC SWITCHES
10
76
219 ft²
EMERGENCY GENERATOR
FIRE PUMP
HK BREAK
319 ft²
157 ft²
MAINTENANCE
458 ft²
263 ft²
R
M
XF
1077
1088
1088
87
10
86
10
84
10
83
10
82
10
GROUND FLOOR PLAN
81
10
80
10
79
10
KANSAS STATE - NEW RES HALL & DINING CENTER
10
85
01/07/14
1/16" = 1'-0"
EO
1088
EB
1087
E
10
87
109
1
108
6
108
109
0
8
10
85
1089
1090
10
89
88
10
1084
84
10
10
84
82
10
1
108
7
108
1088
1089
TERRACE
637 ft²
79
10
GRAB N GO
TERRACE
UP
NANO WALL
10
87
GRAB N GO
10
88
10
86
2694 ft²
BACK OF HOUSE
527 ft²
UP
DN
MEZZ.
339 ft²
FIRE SIDE CHAT
337 ft²
DENISON STREET
366 ft²
ELEV.
LOBBY
FRONT DESK
S
79 ft²
201 ft²
DATA
78 ft²
146 ft²
UP
BAKERY
OFFICE
2516 ft²
81 ft²
MAIN LOUNGE
OFFICE
1689 ft²
151 ft²
T/R
OFFICE
152 ft²
OFFICE
120 ft²
S
REC. ROOM
71 ft²
825 ft²
FIREPLACE
1077
1078
1079
OPEN TO
BELOW
FACULTY ROOM
LAUNDRY
1256 ft²
S
BAKERY STORAGE
1073 ft²
COOLER
196 ft²
FREEZERCOOLER COOLER
111 ft²
91 ft²
89 ft²
COOLER
COOLER
135 ft²
129 ft²
139 ft²
HOUSING STORAGE
917 ft²
ROOFTOP HERB
GARDEN
148 ft²
STUDY
TERRACE
117 ft²
77
10
10
76
STUDY
STUDY
DINING SUPPORT/
DECOR STORAGE
176 ft²
966 ft²
UP
572 ft²
1077
1088
1088
87
10
86
10
84
10
83
10
82
10
FIRST FLOOR PLAN
81
10
80
10
79
10
KANSAS STATE - NEW RES HALL & DINING CENTER
10
85
01/07/14
1/16" = 1'-0"
UP
LARGE CONF.
491 ft²
UP
LECTURE/BANQUET
CONF.
2479 ft²
TRAINING CONF.
MULTIMEDIA CONF.
801 ft²
532 ft²
FIRE SIDE CHAT
337 ft²
FACULTY ROOM
366 ft²
MED. CONF.
MED. CONF.
SMALL CONF.
225 ft²
225 ft²
191 ft²
LARGE CONF.
461 ft²
UP
OFFICE
OFFICE
BAKERY
170 ft²
81 ft²
2502 ft²
S
71 ft²
S
BAKERY STORAGE
1073 ft²
COOLER
186 ft²
FREEZER COOLER COOLER COOLER
111 ft²
91 ft²
89 ft²
135 ft²
COOLER
129 ft²
139 ft²
W
307 ft²
M
303 ft²
HOUSING STORAGE
ROOFTOP HERB
GARDEN
917 ft²
DINING SUPPORT/
DECOR STORAGE
966 ft²
UP
572 ft²
KANSAS STATE - NEW RES HALL & DINING CENTER
KRAMER 2ND FLOOR PLAN - FUTURE
01/07/14
1/16" = 1'-0"
SEATING\
STUDY
SEATING\
STUDY
SEATING\
STUDY
UP
BRIDGE MEZZANINE
LARGE CONF.
491 ft²
UP
LECTURE/BANQUET
CONF.
2479 ft²
TRAINING CONF.
MULTIMEDIA CONF.
801 ft²
532 ft²
FIRE SIDE CHAT
337 ft²
FACULTY ROOM
366 ft²
MED. CONF.
MED. CONF.
SMALL CONF.
225 ft²
225 ft²
191 ft²
LARGE CONF.
461 ft²
UP
OFFICE
OFFICE
BAKERY
170 ft²
81 ft²
2502 ft²
S
71 ft²
S
BAKERY STORAGE
1073 ft²
COOLER
186 ft²
FREEZER COOLER COOLER COOLER
111 ft²
91 ft²
89 ft²
135 ft²
COOLER
129 ft²
139 ft²
W
307 ft²
M
303 ft²
HOUSING STORAGE
ROOFTOP HERB
GARDEN
917 ft²
DINING SUPPORT/
DECOR STORAGE
966 ft²
UP
572 ft²
KANSAS STATE - NEW RES HALL & DINING CENTER
OPTIONAL2ND
BRIDGE
MEZZANINE
CONNECTOR WITH
KRAMER
FLOOR
PLAN - FUTURE
SEATING / STUDY SPACES
01/07/14
1/16" = 1'-0"
E
EB
Study
203 ft²
BREAKOUT
161 ft²
2ND FLOOR TERRACE
UTL
84 ft²
LOUNGE
760 ft²
AHU
J
T
123 ft²
50 ft²
SKYLIGHT
DATA
DENISON STREET
63 ft²
MECH
2780 ft²
LOBBY
171 ft²
ROOF TERRACE
OVER DINING
KITCHEN
364 ft²
AHU
T/R
129 ft²
ROOF BELOW
1ST FLOOR TERRACE
BREAKOUT
STUDY
185 ft²
204 ft²
BREAKOUT
163 ft²
STUDY
177 ft²
ROOF BELOW
ROOF BELOW
KANSAS STATE - NEW RES HALL & DINING CENTER
2ND FLOOR PLAN
01/07/14
1/16" = 1'-0"
ELEV EQUIP
182 ft²
MECH
717 ft²
KANSAS STATE - NEW RES HALL & DINING CENTER
ALTERNATEDIAGRAM
SUNLIGHT
LOBBY
- WIDER
PENTHOUSE
FLOOR
PLAN ELEV LOBBY
01/07/14
1/16" = 1'-0"
ELEV EQUIP
182 ft²
MECH
717 ft²
KANSAS STATE - NEW RES HALL & DINING CENTER
ALTERNATE UPPER
PLAN
AND ROOF TERRACE
PENTHOUSE
FLOOR
PLAN
01/07/14
1/16" = 1'-0"
ELEV EQUIP
182 ft²
MECH
717 ft²
KANSAS STATE - NEW RES HALL & DINING CENTER
ALTERNATE BATHROOM
– STAIR/STUDY ORIENTATION
PENTHOUSE
FLOOR PLAN
01/07/14
1/16" = 1'-0"
ELEV EQUIP
182 ft²
MECH
717 ft²
KANSAS STATE - NEW RES HALL & DINING CENTER
ALTERNATE BATHROOM
PENTHOUSE
FLOOR PLAN
01/07/14
1/16" = 1'-0"
ELEV EQUIP
182 ft²
MECH
717 ft²
OPTIONAL UNIT DOOR ARTICULATION
KANSAS STATE - NEW RES HALL & DINING CENTER
ALTERNATE LOBBY
- WIDER
PENTHOUSE
FLOOR
PLAN ELEV LOBBY
01/07/14
1/16" = 1'-0"
ELEV EQUIP
182 ft²
MECH
717 ft²
KANSAS STATE - NEW RES HALL & DINING CENTER
PENTHOUSE FLOOR PLAN
01/07/14
1/16" = 1'-0"
DINING
OFFICES
600 sqft
DINING
SUPPORT
200 sqft
EXISTING
MECH
DINING
SUPPORT
540 sqft
uniforms
ELEV
CONF
ROOM
510 sqft
TEST
KITCHEN
800 sqft
WAREWASH
1530 sqft
EXISTING
MECH
MECH
PROD
OFFICES
510 sqft
ELEV EQUIP
182 ft²
MECH
trash
717 ft²
vestibule
receiving
DOCK
HOT
PRODUCTION
DRY
STORAGE
2300 sqft
REF
STORAGE
1380 sqft
3300 sqft
01/07/2014
SCHEMATIC #2
COLD
PRODUCTION
KANSAS STATE - NEW RES HALL & DINING CENTER
DINING
PENTHOUSE
FLOOR PLAN
01/07/14
1/16" = 1'-0"
DINING
OFFICES
600 sqft
DINING
SUPPORT
200 sqft
EXISTING
MECH
DINING
SUPPORT
540 sqft
uniforms
ELEV
CONF
ROOM
510 sqft
TEST
KITCHEN
800 sqft
WAREWASH
1530 sqft
EXISTING
MECH
MECH
PROD
OFFICES
510 sqft
ELEV EQUIP
182 ft²
MECH
trash
717 ft²
vestibule
receiving
DOCK
HOT
PRODUCTION
DRY
STORAGE
2300 sqft
REF
STORAGE
1380 sqft
3300 sqft
01/07/2014
SCHEMATIC #3
COLD
PRODUCTION
KANSAS STATE - NEW RES HALL & DINING CENTER
DINING
PENTHOUSE
FLOOR PLAN
01/07/14
1/16" = 1'-0"
SITE PLAN
LEGEND
1
BIKE PARKING
2
GRAB-N-GO OUTDOOR SEATING
3
NORTH DINING TERRACE
4
SOUTH DINING TERRACE
5
CENTRAL PLAZA
6
BASKETBALL COURT
7
PEDESTRIAN PROMENADE TO MAIN ENTRY
GOODNOW
HALL
6
ELEV EQUIP
182 ft²
+1084
MECH
717 ft²
• Site Furnishings
D
RI
ID
5% SLOPE
B
GE
• Seat Walls
GE
5
BR
• Lighting
1
7
3
• Decorative Paving
1081
• Landscape
2
1081
KRAMER
FOOD CENTER
+1093
NEW STUDENT
HOUSING
1
1081
4
KANSAS STATE - NEW RES HALL & DINING CENTER
SITE
PENTHOUSE
FLOOR PLAN
01/07/14
1/16" = 1'-0"
BIKE PARKING
GOODNOW
HALL
208 BIKE
PARKING
64”
ELEV EQUIP
LANDSCAPE
LIMESTONE
SEAT WALL
MECH
717 ft²
36”
NEW STUDENT
HOUSING
182 ft²
240 BIKE
PARKING
BIKE PARKING ENLARGEMENT
MADRAX BIKES: SHARK UP BIKE RACK, 8 BIKES, DOUBLE SIDED PARKING
PRODUCT NUMBER : SHU-DBL-8
KANSAS STATE - NEW RES HALL & DINING CENTER
SITE
PENTHOUSE
FLOOR PLAN
01/07/14
1/16" = 1'-0"
NORTH DINING TERRACE
GOODNOW
HALL
ELEV EQUIP
182 ft²
E
DG
MECH
717 ft²
I
BR
PERIMETER FENCE / SCREENING
(CONTROLLED ACCESS)
DESIGNED TO COMPLIMENT
ARCHITECTURE
CANOPY INTEGRATED INTO ARCHITECTURE
NORTH DINING TERRACE ENLARGEMENT
DINING TERRACE CHARACTER IMAGES
KANSAS STATE - NEW RES HALL & DINING CENTER
SITE
PENTHOUSE
FLOOR PLAN
01/07/14
1/16" = 1'-0"
CENTRAL PLAZA
LIMESTONE
SEAT WALL
LANDSCAPE
BASKETBALL COURT
ELEV EQUIP
182 ft²
MECH
717 ft²
OUTDOOR SEATING
LIMESTONE
SEAT WALLS
GE
G
ID
BR
D
RI
E
B
KRAMER
FOOD CENTER
CENTRAL PLAZA ENLARGEMENT
CENTRAL PLAZA CHARACTER IMAGES
KANSAS STATE - NEW RES HALL & DINING CENTER
SITE
PENTHOUSE
FLOOR PLAN
01/07/14
1/16" = 1'-0"
SOUTH DINING TERRACE
ELEV EQUIP
182 ft²
MECH
717 ft²
PERIMETER FENCE / SCREENING
(CONTROLLED ACCESS)
DESIGNED TO COMPLIMENT ARCHITECTURE
PERIMETER FENCE / SCREENING TBD.
DESIGNED TO COMPLIMENT ARCHITECTURE
GATE ACCESS FOR EMERGENCY VEHICLES
MAINTAIN 12’-0” LANE FOR EMERGENCY
VEHICLES
SOUTH DINING TERRACE ENLARGEMENT - OPTION A
SOUTH DINING TERRACE ENLARGEMENT - OPTION B
KANSAS STATE - NEW RES HALL & DINING CENTER
SITE
PENTHOUSE
FLOOR PLAN
01/07/14
1/16" = 1'-0"
ELEV EQUIP
182 ft²
MECH
717 ft²
KANSAS STATE - NEW RES HALL & DINING CENTER
MASSING
PENTHOUSE
FLOOR PLAN
01/07/14
1/16" = 1'-0"
ELEV EQUIP
182 ft²
MECH
717 ft²
KANSAS STATE - NEW RES HALL & DINING CENTER
MASSING
PENTHOUSE
FLOOR PLAN
01/07/14
1/16" = 1'-0"
ELEV EQUIP
182 ft²
MECH
717 ft²
KANSAS STATE - NEW RES HALL & DINING CENTER
MASSING
PENTHOUSE
FLOOR PLAN
01/07/14
1/16" = 1'-0"
ELEV EQUIP
182 ft²
MECH
717 ft²
KANSAS STATE - NEW RES HALL & DINING CENTER
VIEW FROM DENISON
PENTHOUSE
FLOOR PLAN
01/07/14
1/16" = 1'-0"
ELEV EQUIP
182 ft²
MECH
717 ft²
KANSAS STATE - NEW RES HALL & DINING CENTER
VIEW FROM GOODNOW
PENTHOUSE
FLOOR PLAN
01/07/14
1/16" = 1'-0"
ELEV EQUIP
182 ft²
MECH
717 ft²
KANSAS STATE - NEW RES HALL & DINING CENTER
VIEW OF KRAMER
COMMONS
PENTHOUSE
FLOOR
PLAN
01/07/14
1/16" = 1'-0"
ELEV EQUIP
182 ft²
MECH
717 ft²
KANSAS STATE - NEW RES HALL & DINING CENTER
VIEW OF KRAMER
ENTRY
PENTHOUSE
FLOOR
PLAN
01/07/14
1/16" = 1'-0"
GOODNOW & MARLATT RENOVATION
ID
Task Name
1
Pre-Design and Program Verification
Tue 10/8/13
Thu 10/31/13
10
Schematic Design
Tue 11/5/13
Tue 12/17/13
22
Design Development
Thu 12/5/13
Tue 1/7/14
29
Pkg 1_Marlatt-Fan Coil Units & Pumps
Mon 11/18/13
Fri 8/15/14
Mon 11/18/13
Wed 1/8/14
Mon 5/19/14
Fri 8/15/14
Mon 12/2/13
Mon 5/18/15
30
Construction Document Production
31
Construction
32
Pkg 2_Marlatt-Fire Alarm System
Start
Kansas State University
Finish
33
Construction Document Production
Mon 12/2/13
Mon 1/20/14
34
Construction
Mon 8/18/14
Mon 5/18/15
Mon 6/2/14
Fri 8/7/15
35
Pkg 3_Marlatt-Bathroom Remodel
36
(includes FCU, Makeup, Exhaust, Ceiling & Lights)
Mon 6/2/14
Mon 6/2/14
37
Construction Document Production
Mon 6/2/14
Mon 7/28/14
38
Construction
Mon 5/18/15
Fri 8/7/15
Mon 8/4/14
Mon 8/8/16
39
Pkg 4_Marlatt- Fire Sprinklers, Ceilings & Lighting
40
(includes Emergency Power)
Mon 8/4/14
Mon 8/4/14
41
Construction Document Production
Mon 8/4/14
Mon 9/29/14
42
Construction
Mon 5/16/16
Mon 8/8/16
Mon 9/29/14
Fri 6/2/17
43
Pkg 5_Goodnow-Renovation
44
(includes Bathrooms, FCU, Piping, Pumps,
Mon 9/29/14
Mon 9/29/14
45
Fire Sprinklers, Alarm, Ceilings & Lights)
Mon 9/29/14
Mon 9/29/14
46
Construction Document Production
Mon 9/29/14
Fri 12/19/14
47
Construction - WING A
Mon 1/4/16
Fri 6/24/16
48
Construction - WING B
Mon 6/27/16
Fri 12/23/16
49
Construction - WING C
Mon 1/2/17
Fri 6/2/17
Pkg 6_Goodnow-Roof Replacement
Mon 1/6/14
Mon 8/4/14
51
Construction Document Production
Mon 1/6/14
Fri 3/14/14
52
Construction
Mon 5/19/14
Mon 8/4/14
50
Preliminary Project Schedule
13 Qtr 4, 2013 Qtr 1, 2014 Qtr 2, 2014 Qtr 3, 2014 Qtr 4, 2014 Qtr 1, 2015 Qtr 2, 2015 Qtr 3, 2015 Qtr 4, 2015 Qtr 1, 2016 Qtr 2, 2016 Qtr 3, 2016 Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr
Sep Oct NovDec Jan FebMar Apr MayJun Jul AugSep Oct NovDec Jan Fe Mar Apr MayJun Jul AugSep Oct NovDec Jan Feb Mar Apr MayJun Jul AugSep Oct NovDec Jan FebMar Apr MayJun Jul
1/8
8/15
1/20
5/18
7/28
8/7
9/29
8/8
12/19
6/24
12/23
6/2
3/14
8/4
Tue 12/31/13