University Project Status Report INCEPTION: this phase consists of general ideas, thoughts, suggestions, studies and proposals for new projects. PLANNING: this phase identifies participants, determines justification for the project, as well as identifies the project's scope, site, and identifying the financial sources. PROGRAMMING CONCEPT DESIGN: this identifies the project's background and justification; identifies the needed spaces, space use, types and quality. It also identifies the infrastructure needs, site amenities, special equipment, estimated budget and project delivery time line. Included is the identification of resources for maintenance and operation. If any existing space is being vacated due to this project, this phase includes the repurposing of existing spaces. SELECTION OF CONSULTANTS: This phase involves selecting the professional consultants, the "on call" consultants or the in house professional staff needed to prepare the design, bid documents and administer project delivery. DESIGN CONSTRUCTION DOCUMENTS: This phase begins with schematic and design documents that result in the creation of the construction documents that are used to bid and build the project. BIDDING: This phase selects from interested contractors or in house shops to provide the construction price to build the project via the state, university, foundation or in house shop processes of bidding. This is dependent on the scope of the project CONSTRUCTION: This phase involves building, installing, repairing or replacing items as required by the bid documents. COMMISSIONING: This phase requires all systems be tested and balanced to check performance based on design criteria. COMPLETION: Substantial completion - some items are left to be finished (such as punch list items), but the project can be occupied and all warranties are started. Completion - the project is 100% complete with all close out document and all submittals received. WARRANTY: This phase runs generally one year after substantial completion to correct any deficienies for all work, materials equipment. Project Name Project Type State R&R Project Name Project Type State R&R Project Name Project Type State R&R 12.5kv/4.2kv Campus Creek Complex - Burt Hall Total % Complete Construction Start Date Construction Completion Date Current Phase Programming Concept Design 50% 15% Jan 2015 Aug 2015 Manager J. Carlson 12.5kv/4.2kv Conversion for Anderson Hall Current Phase Construction 70% Total % Complete Construction Start Date Construction Completion Date 75% May 2014 Aug 3, 2014 Manager J. Carlson 12.5kv/4.2kv Conversion for Eisenhower-Holton-Holtz Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 25% **Aug '14 Dec '14 Monday, August 04, 2014 Manager J. Carlson Page 1 of 20 Project Name 12.5kv/4.2kv Conversion for Willard Hall Project Type State R&R Current Phase Construction 10% Project Name 150 Year Time Capsule Plaza Project Type State Current Phase Construction Project Name Ackert Boiler - Animal Quarters Project Type State R&R Current Phase Construction 98% Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Total % Complete Construction Start Date Construction Completion Date 25% June 2014 July 2014 Total % Complete Construction Start Date Construction Completion Date 15% 06/2014 09/14 Total % Complete Construction Start Date Construction Completion Date 97% After Jan '14 Warranty began Manager J. Carlson Manager S. Hao Manager J. Carlson Agronomy Farm shop bldg #516 roof repairs and paint/coating Current Phase Bidding Total % Complete Construction Start Date Construction Completion Date 10% Summer 2014 Aug 2014 Manager K. Minihan Ahearn Complex - Life Safety Improvements Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 50% May 2013 Aug 2014 Manager J. Sharp AiM/AssetWorks Implemntatin Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 80% n/a 5-2014 Manager V. L'Ecuyer Anderson 104A Hardwood floor re-finsih Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 7/14/14 Manager K. Minihan Anderson Hall 06 Current Phase Planning Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date 0% 7-20-2014 7-27-2014 Manager R. Holle Page 2 of 20 Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type City/University Project Name Project Type State Project Name Project Type State Project Name Project Type State Anderson Hall 201 Current Phase Planning Total % Complete Construction Start Date Construction Completion Date 0% NA NA Manager R. Holle Anderson Hall 201 Kitchenette renovations Current Phase Planning Total % Complete Construction Start Date Construction Completion Date 0% NA NA Manager R. Holle Animal Science Sheep and Meat Goat Center Current Phase Total % Complete Construction Start Date Construction Completion Date Manager M. Loberg Annual Space Inventory Update Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 20% 2-2014 November 2014 Manager V. L'Ecuyer Bike Parking on campus Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 15% 7/2014 8/2014 Manager S. Hao Bluemont 121 Remodel Current Phase Bidding Total % Complete Construction Start Date Construction Completion Date Fall 2014 Manager K. Minihan Bluemont 16 wall around column and outlets Current Phase Bidding Total % Complete Construction Start Date Construction Completion Date Manager K. Minihan Total % Complete Construction Start Date Construction Completion Date Manager M. Loberg Bluemont 241 Fume Hood Adjustments Current Phase Monday, August 04, 2014 Page 3 of 20 Project Name Bluemont 5102 epoxy floor Project Type State Current Phase Construction Project Name Bluemont 5119 epoxy floor Project Type State Current Phase Construction Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type City/University 8-01-14 8-08-14 Total % Complete Construction Start Date Construction Completion Date 7-24-14 8-1-14 Manager K. Minihan Manager K. Minihan Boyd Hall Domestic Water Replacement Current Phase Construction (95%) Total % Complete Construction Start Date Construction Completion Date 95% May 2014 August 2014 Manager E. Chamberlin BOYD HALL RE-ROOFING Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 70% July 9th, 2014 construct August 1, 2014 Manager D. McMullen Bushnell Hall - Life Safety Improvements Current Phase Bidding (0%) Total % Complete Construction Start Date Construction Completion Date 50% May 2013 Aug 2014 Manager J. Sharp Call Rm 160 Fume Hood Attachment Project Type Current Phase State / ASI Departmen Construction Project Name Total % Complete Construction Start Date Construction Completion Date Total % Complete Construction Start Date Construction Completion Date 100% TBD 6/20/2014 Warranty began Manager J. Carlson Calvin 112 Doorbell Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 0 Manager M. Loberg Campus Addressing Current Phase Construction Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date 20% n/a 1-2015 Manager V. L'Ecuyer Page 4 of 20 Project Name Project Type State Project Name Project Type State Project Name Project Type State (Bond) Project Name Project Type City/University Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type City/University Cardwell Hall - Room 101 Renovation Current Phase Construction (75%) Total % Complete Construction Start Date Construction Completion Date 90% Sept.2014 Sep 2014 Manager D. McMullen Chem Bio-Chem 4th floor autoclave Current Phase Bidding Total % Complete Construction Start Date Construction Completion Date Manager K. Minihan Chiller Water - Plant/Distrib/CBA Steam 2013 Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 15% May 2014 Aug 2015 Manager J. Carlson City Signal Tower on Campus Current Phase Total % Complete Construction Start Date Construction Completion Date Manager M. Taussig Colby Water Main Service Replacement Total % Complete Construction Start Date Construction Completion Date Current Phase Programming Concept Design 10% 10% tbd tbd Manager J. Carlson Coles Hall HVAC Improvements Current Phase Completion Total % Complete Construction Start Date Construction Completion Date 75 09/01/13 06/15/14 Manager M. George Cut out and replace 10X 6' piece of concrete slab at base of entry steps Current Phase Inception Total % Complete Construction Start Date Construction Completion Date 1% JULY 2014 asap Manager D. McMullen Denison Ave. Cooridor Improvements by Goodnow Hall Total % Complete Construction Start Date Construction Completion Date Current Phase Programming Concept Design (75 5% 5/15/15 TBD Monday, August 04, 2014 Manager S. Hao Page 5 of 20 Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type Foundation Project Name Project Type State Project Name Project Type State Project Name Project Type State Dicken Hall South Steps Current Phase Planning Total % Complete Construction Start Date Construction Completion Date 0% 5-19-2014 5-26-2014 Manager R. Holle Dickens 307/308 Current Phase Planning Total % Complete Construction Start Date Construction Completion Date 10% 5/19/2014 6/13/2014 Manager R. Holle Durland 2012-2015 Current Phase Planning Total % Complete Construction Start Date Construction Completion Date 0% NA NA Manager R. Holle Durland Hall 1033 Current Phase Planning Total % Complete Construction Start Date Construction Completion Date 0% NA NA Manager R. Holle EAST MEMORIAL STADIUM WELCOME CENTER Current Phase Programming Concept Design Total % Complete Construction Start Date Construction Completion Date 5% summer or Fall 2014 de summer or Fall 2016 Manager D. McMullen Edwards Hall D. wing Stair rreplacement Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 35% July 1 2014 Aug 15, 2014 Manager T. Bartlett Eisenhower 011 space remodel convert unassigned space to offices Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 40% spring 2014 summer 2014 Manager D. McMullen ELP - Space Request Current Phase Planning Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date 50 n/a August 8 Manager V. L'Ecuyer Page 6 of 20 Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type Foundation Project Name Project Type Foundation Project Name Project Type State Project Name Project Type State Project Name Project Type State Engineering Complex Expansion- Phase IV Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 10% April 2014 Sept 2015 Manager M. George Equine Performance Testing Center Current Phase Selection of Consultants (20%) Total % Complete Construction Start Date Construction Completion Date 5% June 2015 March 2016 Manager E. Chamberlin Esienhower 01 remodel Current Phase Planning Total % Complete Construction Start Date Construction Completion Date 10% 5-19-2014 7-19-2014 Manager R. Holle Feed Mill - New metal building warehouse for feed tech Current Phase Inception Total % Complete Construction Start Date Construction Completion Date Manager D. McMullen Feed Mill new office location - fourth floor Current Phase Inception Total % Complete Construction Start Date Construction Completion Date 90% LAYOU TBD TBD Manager D. McMullen Global Campus Building Sign Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 08/2014 08/2014 Manager S. Hao Hale 118 Remodel Current Phase Inception Total % Complete Construction Start Date Construction Completion Date 0% December 2014 January 2015 Manager E. Chamberlin Hale 407/408 Remodel Current Phase Construction Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date 95% 1 June 2014 August 2014 Manager E. Chamberlin Page 7 of 20 Project Name Project Type N/A Project Name Project Type State Project Name Project Type State Hale East Upper Roof Warranty Issues Current Phase Warranty Current Phase Construction Current Phase Construction Project Type State Project Name Project Type State Project Name Project Type State 50% May 21, 2014 August, 21,2014 Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 10% May 2014 May 2016 Project Type State Project Name Total % Complete Construction Start Date Construction Completion Date Manager T. Bartlett Hale Library Sprinkler Replacement Hale NW 12.5 line relocate Project Type State 5% Manager M. Loberg Hale Library Foundation Waterproofing Project Name Project Name Total % Complete Construction Start Date Construction Completion Date Total % Complete Construction Start Date Construction Completion Date 100% May 19, 2014 June 13, 2014 Manager J. Sharp Manager M. Loberg Hazardous Waste Transfer Facility Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 15% TBD TBD Manager E. Chamberlin Holton 202 Renovations Current Phase Planning Total % Complete Construction Start Date Construction Completion Date 0% NA NA Manager R. Holle Holton Hall Landscape Current Phase Inception Total % Complete Construction Start Date Construction Completion Date 0% 8/2014 9/2014 Manager S. Hao Holton Hall Re-Roof Current Phase Construction Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date 40% 7-14-14 8-15-14 Manager K. Minihan Page 8 of 20 Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type City/University Project Name Horticulture Olathe Research ext. service road Current Phase Bidding Total % Complete Construction Start Date Construction Completion Date 90-95% Aug 1 2014 Sept 1 Manager T. Bartlett Housing and Dining Storage Building Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 0% Aug 2013 Jan 2015 Manager J. Sharp Improve electrical lines within the swine unit. Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 75% June 15, 2014 July 20, 2014 Manager T. Bartlett Jardine Building M Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 25% 01/2014 12/2014 Manager M. Taussig Jardine M Site Work Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 0% 10/2014 Dec. 2014 Manager S. Hao Justin 119 new office partitioned off in the break room Current Phase Inception Total % Complete Construction Start Date Construction Completion Date short form O as soon as practical N/A Manager D. McMullen Kimball Ave. Sidewalk Current Phase Programming Concept Design Total % Complete Construction Start Date Construction Completion Date June 2015 Manager M. Taussig K-State Gardens - Conservatory Garden Master Plan Project Type Current Phase City/University/Found Construction Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date 5% 7/2014 9/2014 Manager S. Hao Page 9 of 20 Project Name Project Type Foundation Project Name Project Type Foundation Project Name Project Type State Project Name Project Type City/University Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type Foundation K-State Directional Signs Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 90% July 2014 August 2014 Manager M. Taussig K-State Gardens Conservatory Current Phase Programming Concept Design Total % Complete Construction Start Date Construction Completion Date 75 NA NA Manager M. Taussig K-State Student Union renovation Current Phase Programming Concept Design Total % Complete Construction Start Date Construction Completion Date 10% January 2015 fall 2015 Manager D. McMullen K-STATE UNION - FORUM HALL STAGE LIGHTING Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 10% SUMMER 2014 SUMMER 2014 Manager D. McMullen KSU-S APARTMENTS Current Phase Programming Concept Design Total % Complete Construction Start Date Construction Completion Date CONSULTAN TBD TBD Manager D. McMullen Lafene Space Audit Current Phase Planning Total % Complete Construction Start Date Construction Completion Date 25% July 25, 2014 September 1 Manager V. L'Ecuyer Leasure 103-4 Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 40% spring 2014 summer 2014 Manager D. McMullen Library Annex Current Phase Construction(75%) Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date 85% Roberta Johnson Nov. 2014 Manager D. McMullen Page 10 of 20 Project Name Project Type State Project Name Project Type State (Bond) Project Name Project Type Foundation Project Name Project Type State R&R Project Name Project Type City/University Project Name Project Type Foundation Project Name Project Type Foundation Project Name Project Type State Library Landscape Current Phase Inception Total % Complete Construction Start Date Construction Completion Date 0% 8/2014 10/2014 Manager S. Hao Lovers Lane Street Replacement Current Phase Planning 15% Total % Complete Construction Start Date Construction Completion Date 05% Manager J. Carlson Mark A. Chapman - Nichols Theatre Lighting & Sound Upgrade Current Phase Construction 95% Total % Complete Construction Start Date Construction Completion Date 95% May 15, 2014 July 1, 2014 warranty begins Manager J. Carlson McCain 112 Costume Shoppe HVAC Current Phase Bidding 05% Total % Complete Construction Start Date Construction Completion Date 15% Sep 2014 Late Mar 2015 Manager J. Carlson McCain Auditorium Stage Lighting Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 15% June 9th August 2014 Manager M. George McCain Hall - Room 204 remodel - Phase 2 Current Phase Construction (0%) Total % Complete Construction Start Date Construction Completion Date 20% Aug. 15 2014 August 2014 Manager M. George McCain Lobby Addition Visioning Current Phase Programming Concept Design Total % Complete Construction Start Date Construction Completion Date 90% December 2013 July 2014 Manager E. Chamberlin McCain Lobby Office Current Phase Planing Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date 0% NA NA Manager R. Holle Page 11 of 20 Project Name Project Type Foundation Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type Foundation Project Name Project Type City/University McCain Theatre repair moveable ceiling Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 5% 6-1-2014 1-1-2014 Manager M. Loberg Mosier Hall - Alterations for Equine CT Table Current Phase Bidding Total % Complete Construction Start Date Construction Completion Date 20% May 2014 Dec 2014 Manager M. George Mosier Hall - Room F117 Remodel Current Phase Bidding Total % Complete Construction Start Date Construction Completion Date 20% July 2014 Dec 2014 Manager M. George Mosier Hall - SA Lobby Remodel Current Phase Programming Concept Design Total % Complete Construction Start Date Construction Completion Date 5% May 2015 August 2015 Manager E. Chamberlin Mosier Hall Live-In Lab Renovation Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 25% July 2014 October 2014 Manager E. Chamberlin Mosier Hall Room E107 Remodel Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 10% TBD TBD Manager E. Chamberlin Multicultural Student Center Current Phase Programming Concept Design Total % Complete Construction Start Date Construction Completion Date 10% SEPT 2014 TBD Manager D. McMullen NBAF Sanitary Sewer Current Phase Construction Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date 90% 03/2014 07/2014 Manager M. Taussig Page 12 of 20 Project Name New Bldg for College of Business Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 10% Aug 2014 July 2016 Project Type State Project Name Nichols 26 Dance floor Project Type State Project Name Current Phase Planning Current Phase Construction Project Name Parking Lot D1 Elect Feeder Project Type State R&R Current Phase Construction 100% Project Type State Project Name Project Type State Project Name Project Type State 0% NA NA Manager R. Holle Total % Complete Construction Start Date Construction Completion Date 40% 5-19-2014 9-1-2014 Total % Complete Construction Start Date Construction Completion Date 100% May 12, 14 Warranty began 6/13/14 Manager M. Loberg Manager J. Carlson Parking Lots A11 & A12 Reconstuction Project Type State- ParkingFees Project Name Total % Complete Construction Start Date Construction Completion Date Nichols Stone replace Ph 3 South side Project Type State Project Name Manager M. George Current Phase Construction 95% Total % Complete Construction Start Date Construction Completion Date 95% Summer 2014 tbd Manager J. Carlson Parsons Machinery Building (SEARC) Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 95% 03/2014 July 2014 Manager M. George Peter's Rec Center exterior caulking Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 7-28-14 10-01-14 Manager K. Minihan Peter's Rec Center front entrance concrete apron mudjacking Current Phase Construction Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date 8-11-14 8-18-14 Manager K. Minihan Page 13 of 20 Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Pres Office Current Phase Planning Current Phase Construction Current Phase Construction Current Phase Planning Total % Complete Construction Start Date Construction Completion Date 85% 4-7-2014 NA Manager R. Holle Total % Complete Construction Start Date Construction Completion Date 90% 4-21-2014 NA Manager R. Holle Total % Complete Construction Start Date Construction Completion Date 0% NA NA Manager R. Holle Presidents Office Lighting Project Pure Bred Beef Relocation Project Type State Current Phase Inception Project Type State NA President Office and conference room Project Name Project Name 5-19-2014 Pres Res Current Phase Planning Project Type unknown 5% Manager R. Holle Pres Res Project Type State Project Name Total % Complete Construction Start Date Construction Completion Date Total % Complete Construction Start Date Construction Completion Date 0% 3500 NA Total % Complete Construction Start Date Construction Completion Date 0% 07/2015 06/2016 Manager R. Holle Manager M. Taussig Putnam Hall Domestic Water Replacement Current Phase Construction (75%) Total % Complete Construction Start Date Construction Completion Date 80% May 2014 August 2014 Manager E. Chamberlin PUTNAM HALL RE-ROOFING Current Phase Construction Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date 99% MAY 19th, 2014 August 1, 2014 Manager D. McMullen Page 14 of 20 Project Name Project Type State Project Name Rathbone Hall - Room 1073 remodel Current Phase Planning (%) Current Phase Planning Project Name Recreation Center Pavilion Project Type Foundation Current Phase Inception Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State 1% Summer 2014 Manager K. Minihan Rathbone Hall 0047 Project Type State Project Name Total % Complete Construction Start Date Construction Completion Date Total % Complete Construction Start Date Construction Completion Date 0% NA NA Total % Complete Construction Start Date Construction Completion Date 0% N/A N/A Manager R. Holle Manager M. Taussig Recycling Center Equipment Building Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 0% 08/2013 12/2013 Manager M. Taussig Relpace west fence and repair cross fence ( Stocker Unit) Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 80% May 20, 2014 Aug 1, 2014 Manager T. Bartlett Repair-Replace entry doors at the Flour mill - it appears that the closed needs to be adjusted to allow the door to fully close - - may be other Current Phase Inception Total % Complete Construction Start Date Construction Completion Date 1% JULY 2014 asap Manager D. McMullen Replace Furrowing House roof Current Phase Bidding Total % Complete Construction Start Date Construction Completion Date 20% Manager T. Bartlett Rocky Ford Irrigation Pump Replacement Current Phase Planning 25% Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date 10% Nov 2013 May 2015 Manager J. Carlson Page 15 of 20 Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type Foundation Project Name Project Type State Project Name Scholarship House Code Improvements and Mechanical CD's Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 95% 07/2014 08/2014 Manager M. Taussig SE Kansas Research/Extension Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 15% Aug 2014 August 2015 Manager M. George SEARC replace metal siding on Mound valley #963 Current Phase Planning Total % Complete Construction Start Date Construction Completion Date 20% Manager T. Bartlett Seaton 213 Wood Floor Refinish Current Phase Total % Complete Construction Start Date Construction Completion Date Manager M. Loberg Total % Complete Construction Start Date Construction Completion Date Manager D. McMullen SEATON HALL ROOM 142 REMODEL Current Phase Planning & estimating 5% concept TBD Seaton Hall/Seaton Court Renovation and Expansion, Phase I and II Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 5% May 2015 May 2016 Manager E. Chamberlin Shellenberger Hall - Life Safety Improvements Project Type State Current Phase Bidding (0%) Project Name Solar Car Charging Station Project Type State Current Phase Inception 15% Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date 40% May 2013 Aug 2014 Total % Complete Construction Start Date Construction Completion Date 20% Sep 2013 Jan 2014 Manager J. Sharp Manager J. Carlson Page 16 of 20 Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type Foundation Project Name Project Type State Project Name Project Type State Stone House bathroom cabinets and countertops. Current Phase Planning Total % Complete Construction Start Date Construction Completion Date 0% NA NA Manager R. Holle Stone House North Door replacement Current Phase Planning Total % Complete Construction Start Date Construction Completion Date 0% 5-19-2014 5-23-2014 Manager R. Holle Strong Complex Electrical Study Current Phase Planning Total % Complete Construction Start Date Construction Completion Date 0% NA 12/12/14 Manager M. Taussig Strong Complex Electrical Study Current Phase Inception Total % Complete Construction Start Date Construction Completion Date 0% NA NA Manager M. Taussig SW Kansas Equipment Shed Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 07/2014 09/2014 Manager M. Taussig Swine Nursery Barn Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 0% 7/2014 10/2014 Manager M. Taussig Throckmorton 4308 lab renovate to office space Current Phase Bidding Total % Complete Construction Start Date Construction Completion Date Fall 2014 Manager K. Minihan Throckmorton Hall Room 4411 Current Phase Construction Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date 100% 4-7-2014 5-9-2014 Manager R. Holle Page 17 of 20 Project Name Throckmorton Stone repair Project Type State Current Phase Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type State Project Name Project Type Private Project Name Project Type State Total % Complete Construction Start Date Construction Completion Date Manager T. Bartlett Throckmorton telecom room planning - 8 NEW TELECOM ROOMS Current Phase Planning 80% Total % Complete Construction Start Date Construction Completion Date 20% June 2014 - working wit pending completion of FCP and Manager D. McMullen Trotter Library Remodel Current Phase Construction (10%) Total % Complete Construction Start Date Construction Completion Date 35% July 2014 September 2014 Manager E. Chamberlin Trotter Mara Center Renovations Current Phase Inception Total % Complete Construction Start Date Construction Completion Date 0% November 2014 December 2014 Manager E. Chamberlin Trotter Quiet Room Renovations Current Phase Total % Complete Construction Start Date Construction Completion Date September 2014 October 2014 Manager E. Chamberlin Van Zile West Stairs Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 95% May 26, 2014 June 13, 2014 Manager M. Loberg Vanier Football Complex Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 30% December 2014 August 2015 Manager E. Chamberlin Wall and roof repair Forestry Seedling shed Current Phase Construction Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date 95-100% July 1, 2014 Manager T. Bartlett Page 18 of 20 Project Name Project Type State Project Name Project Type City/University Project Name Project Type State Project Name Project Type State Project Name Project Type H&D funds Project Name Project Type State Project Name Project Type State Project Name Project Type State R&R Waters 38, 38A, 38B Lab Remodel Current Phase Programming Concept Design Total % Complete Construction Start Date Construction Completion Date 10% Oct. 15, 2014 Manager M. Loberg Waters Hall Landscape & Irrigation Current Phase Construction Total % Complete Construction Start Date Construction Completion Date 75% May 2014 Fall 2014 Manager S. Hao Waters Hall Rm 231 General Classroom Renovation Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 5-18-15 8-24-15 Manager K. Minihan Waters Hall Signs Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 95% 07/2014 08/2014 Manager M. Taussig Wefald Hall new dormitory and food service complex Total % Complete Construction Start Date Construction Completion Date Current Phase Design & Construction Documents 75% 06/2014 May 2016 Manager M. Taussig West Memorial Stadium - Purple Masque Theatre Current Phase Construction (15%) Total % Complete Construction Start Date Construction Completion Date 24% Nov 15, 2013 Jan 2015 Manager J. Sharp Western Kansas AG Research Center Water supply replacement Current Phase Planning Total % Complete Construction Start Date Construction Completion Date 50% Manager T. Bartlett Willard Art Studio Ventilation Rm 320 Current Phase Construction 95% Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date 95% Sept 15, 2013 (NTP) Jul 14, 2014 (NTP) Manager J. Carlson Page 19 of 20 Project Name Willard Art Studio Ventilation Rms 319, 203-206, 321,322 Project Type Current Phase State - R&R'13 & FY'10 Construction 10% Project Name Project Type State Total % Complete Construction Start Date Construction Completion Date 15% Jun '14 Jan '15 Manager J. Carlson WKARC Replace Rollup doors on Mechanical shed Current Phase Planning Monday, August 04, 2014 Total % Complete Construction Start Date Construction Completion Date Manager T. Bartlett Page 20 of 20