MEASURE D CITIZEN’S OVERSIGHT COMMITTEE January 14, 2009 Minutes The meeting of the Measure D Citizen’s Oversight Committee was held at, 6500 Soquel Drive, room 804A, Aptos, CA on Wednesday, January 14, 2009 at 10:00 am. Present: Michael Bethke, John Fry, Bob Petersen Staff: Paul Anderson, Pegi Ard, Doug Deaver, Brian King Absent: Diane Craddock, Gary Meyer, Helen Palmer, Bud Winslow. Guests: None. Lou called the meeting to order at 10:05 am. I. Introductions: The committee members introduced themselves. II. Agenda Modifications Add under project status update: sale of state bonds, cash flow, stadium seating and campus signage. III. Approval of Minutes of September 23, 2008: The minutes of September 23, 2008 were postponed to the next meeting due to a lack of quorum. IV. Comments from the Public: Bob asked if there were any comments from members of the public. There were none. V. Project Status update: Doug distributed the January Facilities Master Plan Update to the committee. He explained that this monthly Board report summarizes the projects that remain to be completed with Measure D funds. Twice a year, usually February and August, there is a semi-annual update that is submitted to the Board that has even more detail about the projects. Bob asked whether the major projects will be completed within the next two years. Yes, Arts Education Classrooms and Allied Health projects will be M:\Citizen Oversight Committee\COC 2008-09\COC Minutes 1_14_09dd.doc completed. The Watsonville Industrial Technology Education Center (ITEC) will be very close to completion within two years time. • Arts Education Classrooms. Three classroom buildings opened for classes in September, 2008. The Theater and Music recital hall are scheduled to be completed in June and open in fall 2009. The project is one year behind schedule. There will be issues with contractor delays. John asked about why the punch list is taking so long to complete. Brian replied that when taking partial possession of a project, it takes longer to get through the punch list. • Allied Health Classrooms. The steel is up on one building and more steel will be delivered on 1/19/09. John asked who set the schedule. A general contractor developed the schedule based on the contract timeline of 600 days. John suggested having an architect and scheduler do a peer review. Michael asked to clarify what programs will be housed in the Allied Health complex: the stroke center, radiology, nursing, dental hygiene, etc. • Watsonville Library Acquisition: The Library has been demolished and a new building will be built in a year. 99% of the materials will be recycled rather than the projected 95%. The flat roof with tar couldn’t be recycled so it will be chipped. All of the metal was recycled, the wood burned in cogeneration plant. Michael noted that will help future LEED certification. A Board information item will be presented in February; currently plans are for the platinum level with a breakdown of costs for achieving each level. John asked it the LEED coordinator is separate from the architect? Yes, Liz Cordero, the LEED coordinator, has done numerous projects in Massachusetts and five in California. John asked whether the additional LEED costs are within or outside of the bond. Pegi replied that the discussion that will take place when the analysis is ready in a few weeks. Key players will review whether it should be part of the bond funds or should additional funds be raised for LEED certification. • Space Reallocation: As space is vacated on campus, new space will become available. bfgc Architects, Inc. has worked with departments and divisions to prioritize their needs and desires for space, taking into consideration adjacencies and other factors. Building 300 has been awarded $3 million of state funds, bringing a total of $6 million available for this renovation project. Plans are currently at DSA with the goal of going to bid in April and start construction in June. This schedule could be impacted if the state is unable to provide timely funding for their portion. • Stadium seating: The Office of Civil Rights (OCR) cited Cabrillo for inadequate wheelchair seating in the stadium. Currently, the bottom row of seats is being removed to improve accessibility. The total project budget is $270,000; $350,000 with soft costs. The Department of the State Architect (DSA) approved a plan at the community college level that didn’t go through a structure review. A compromise was reached. The OCR audited Cabrillo and stadium seating and campus signage are the final two projects to be completed. It was noted that the campus is amazingly accessible given that the campus on a hillside. M:\Citizen Oversight Committee\COC 2008-09\COC Minutes 1_14_09dd.doc • Campus signage: This is a $130,000 project to improve signage across campus required by the OCR was awarded to Kate Keating out of San Francisco. This company also just completed an upgrade on signage for the Santa Cruz Medical Foundation. Way-finding signs will be professionally printed on a replaceable vinyl. Signs on buildings will include numbers and names. John asked if the signs will be Braille as well. Yes, some signs will be in Braille but not the way-finding signs. There was discussion of the history of the Measure D projects already completed and where bottlenecks in the process exist today. It was noted that while that mandatory DSA approval was eliminated in November of 2008, no process has been put into place to replace it. Suggestions from the committee members include maximizing the effectiveness of the annual report, using it to educate our elected representatives and other stakeholders, for example, and looking more closely at the risk management plan for current projects. Next meeting: Thursday, April 9, 2009 at 10:00 am in room 804A. A tour will be held prior to the meeting at 9:00 am; meet in 804A. The meeting adjourned at 11:30 am. M:\Citizen Oversight Committee\COC 2008-09\COC Minutes 1_14_09dd.doc