2015-16 Health Safety / Scheduled MaintenanceProjects Updated: February 2015 Generated By Preventative 1.A / SP4 Maintenance Priority/Strat egic Plan Fund Timeline Project Source Unfunded 2015-16 Horticulture - Transformer 1.B / SP4.4 Critical needs: health & safety issue. Unfunded 2015-16 College-wide fire sprinkler system repairs. 1.C / SP4.4 Health & Safety issue Unfunded 2015-16 Handrails for Gym Bleachers 1.D / SP4.4 Critical needs: health & safety issue. Unfunded Re-key - repair / replace 2015-16 door hardware on upper campus phase I 1.E/ SP4.4 1.F/ SP4.4 1.G / SP4.4 1.H / SP4.4 1.I / SP4.4 1.J / SP4.4 1.K / SP4.4 Critical needs: health & safety issue. Critical needs: health & safety issue. Instructional Need Critical needs: This project is a health & safety issue. Critical needs: Sited by the Office of Civil Rights. Instructional Need Instructional Need 1.L / SP Energy 4.4 Unfunded Unfunded 2015-16 Replace existing HVAC systems 2015-16 Replace existing HVAC systems Unfunded 2015-16 Unfunded Replace restroom 2015-16 Partitions in the Watsonville Center Unfunded 2015-16 Unfunded Unfunded Unfunded Fiber Drinking Fountains – College Wide 2015-16 Fiber 2015-16 Cat 6 Replace Upper Campus, HPS lights on Exterior 2014-18 pedestrian WalkwaysUpper Campus Status Testing of oil in system has revealed a potential end of life cycle in 2015. Funds Needed $ Numerous fire sprinkler repairs are needed to comply with State Fire Marshall $ requirements. To improve the safety of our spectators and $ follow state regulations. The replacement of door hardware is essential to the safe operation of the $ facilities as well as the equipment that is at risk if not adequately secure. 100,000 Type Utility Repair 30,000 Plumbing 20,000 Repair 400,000 Repair HVAC controls & equipment repair/replacement 1400 Bldg. CTC $ 486,813 Repair HVAC controls & equipment repair/replacement 1500 Bldg. Children's Center $ 792,743 Repair Upgrade fiber runs from building to the B1300 or B100 MPOE (B800 and B300 with surrounding buildings have been done) $ 500,000 Tech The restrooms located in the Watsonville Center have exceeded their life cycle due to heavy use and graffiti/vandalism and need to be replaced $ 50,000 Repair In Process: Rough estimate – scope will need to be developed $ 50,000 ADA Plumbing $ 300,000 Tech $ 500,000 Tech $ 200,000 Energy Extend fiber out to the parking lots and create IDF’s Upgrade to CAT 6 and relocate IDF’s such as B450 and B700 Part of Prop 39 (five year horizon): lighting, HVAC, and energy reduction projects O:\Administrative Services\TotalCostofOwnership\042415TenYearFacilitiesPlan.xlsx FPPO Districtwide 2015-16 1 of 15 2015-16 Health Safety / Scheduled MaintenanceProjects Updated: February 2015 Water 2.A / SP2 conservation Unfunded Water conservation Unfunded Critical needs: This 2.C / SP4 project is a health & safety issue. Unfunded 2.B / SP2 2.D / SP Van replacement 4.2 2.E / SP4.4 2.F / SP4.4 2.G / SP4.4 2.H / SP4.4 3.A / SP4.4 Critical needs: This project is a health & safety issue. Health & Safety issue Critical needs: This project is a health & safety issue. Critical needs: This project is a health & safety issue. Critical needs Unfunded Unfunded Unfunded Grounds staff travel three times a week to Watsonville artificial turf Watsonville Center. Replacement of the 2015-16 replacement lawn areas would reduce the frequency of travel and conserve water. Repair / Replace water Numerous water system valves and back distribution system i.e. 2015-16 flow preventers are in need of failing valves /pumps replacement/repair. /controls Phase I 2015-16 Bldg. 700 tree removal Two large eucalyptus trees behind Bldg. 700 show signs of failure and require removal for safety purposes. $ $ 250,000 Repair $ 10,000 Repair Premature van failure. Many vehicles were purchased in the 1990's; annual budget 2015-16 Improve Student Access allows for purchase of 1.25 vehicles. The $ van is used by Student Services, Instruction, etc. A leak in the gutter above the stairs to the Building 500 – Gutter 500 Building has created a slip and fall 2015-16 $ Repair. hazard and requires repair prior to the next rainfall. Broad cracking may contribute to unsafe 2015-16 Resurface Tennis Courts $ playing conditions Unfunded 2015-16 Cameras focused on elevators. Unfunded 2015-16 Parking lot repairs Unfunded 2015-16 Storm Drain Failure – FP&PO Bldg. 2000. 25,000 Renovation 30,000 Transportatio n 2,000 30,000 Cameras will assist in elevator surveillance needs so as to reduce vandalism and unauthorized access to facilities. $ Ongoing $ 400,000 The storm drain at the 2000 Building backs up and overflows the parking lot causing $ severe flooding. 60,000 O:\Administrative Services\TotalCostofOwnership\042415TenYearFacilitiesPlan.xlsx FPPO Districtwide 2015-16 Repair 6,500 Renovation Repair 2 of 15 2015-16 Health Safety / Scheduled MaintenanceProjects Updated: February 2015 3.B / SP4.4 3.C / SP4.4 3.D / SP4.4 3.E / SP4.4 Critical needs Critical needs: This project is a health & safety issue. Water conservation Critical needs Bldg. 1000 Re-roof – partial repair. Unfunded 2015-16 Unfunded Replace restroom 2015-16 Partitions on the Aptos Campus Phase I Unfunded Unfunded Replace Sprinkler heads North West campus H.W. 1000/2000 Roof 2015-16 Leak 2015-16 The flat top roof area of bldg. 1000 has reached the end of its useful life and requires replacement Numerous restrooms on the Aptos campus have been observed to have reached the end of their useful life 440, 500, 600, 700 and 1000 restrooms would need to be addressed immediately. $ 100,000 Roof $ 250,000 Repair $ 50,000 This project may spill over into 2015, but is $ on the 2014 project list. 75,000 Drip irrigation reduces water consumption Institutional 3.F / SP 5 Responsibiliti es Unfunded 2015-16 Smoke Free Environment For initial surveillance and signage $ 45,000 4.A / SP 2 Critical needs Unfunded 2015-16 Emergency Prep training Spring flex training and drill $ 20,000 4.B/SP4.4 Instructional Need Unfunded 1000 Bldg. MLC & ILC 2015-16 renovation/lighting improvements 2015-16 Some MLC space was lost to shared space with the relocation of ASC (formerly DSPS). Lighting has been partially installed outside to increase study space. In the ILC, nearby classrooms nd hallways are being used to increase space during peak hours. (Cost is estimate only provided by instruction and depends on the space available.) Subtotal $ 4,933,056 Genral Fund (Existing Ongoing Allocation) $ 350,000 Parking Fund Prop 39 Funds One Time Unrestricted GF & Scheduled Maintenance Funding Estimated Available Funds Funding needed: 200,000 200,000 O:\Administrative Services\TotalCostofOwnership\042415TenYearFacilitiesPlan.xlsx FPPO Districtwide 2015-16 Other Other 150,000 Renovation $ $ $ Roof ? $ $ 750,000 4,183,056 3 of 15 2016-17 Health Safety / Scheduled MaintenanceProjects Updated: February 2015 Priority/Strat egic Plan Generated By Preventative 1. A / SP4 Maintenance 1.B / SP4.4 1.C / SP4.4 1. D/ SP4.4 1. E/ SP4.4 1. F / SP4.4 1. G / SP4.4 Health & Safety Critical needs: health & safety issue. Critical needs: health & safety issue. Critical needs: health & safety issue. Critical needs: health & safety issue. Critical needs: health & safety issue. Fund Source Timeline Project Repair/replace ridge vent building 100, 200 , 300, 400 Phase I Unfunded 2016-17 RDA 2015-16 Building Renumbering Capital Re-coat and repair Un2016-17 flashing/adjoining steel funded overhang 2500/2600 Bldg. Repair / Replace water Un2016-17 distribution system Phase II funded Unfunded Unfunded Unfunded 1. H / SP4.4 Critical needs: Sited by the Office of Civil Rights. Unfunded 1. I / SP4.4 Health & Safety issue Unfunded 1. J / SP Energy 4.4 1. K / SP Technology 4.4 1.L / SP Technology 4.4 Unfunded Unfunded Unfunded $ 250,000 Roof Renumber/signage Aptos campus $ 600,000 Renovation The metal flashing and steel overhang on the 2500/2600 building is severely rusting and requires remediation $ 120,000 Roof $ 250,000 Utility $ 400,000 Plumbing $ 400,000 HVAC $ 280,000 Paint $ 275,000 Flooring $ 150,000 Repairs $ 250,000 Energy $ 250,000 Tech $ 500,000 Tech VOIP Replace VOIP gateways – End of life Paint Interior / Exterior 2016-17 Bldgs. 100, 350, 1000/Library Phase I Replace flooring Bldgs. 2016-17 1600, 1000 Phase II repair / Replace stairs bldg. 2016-17 1100 2016-17 Type Fire Supression 1400 Bldg. HVAC Controls 2016-17 & Equip. repair/replacement 2016-17 Status Roughly 50% of water distribution system has failing valves / pumps / controls Old cast iron pipes are failing and require saw cutting floor removal and replacement. Some sleaving may be accomplished in under slab and clay pipes recommend replacement of restroom fixtures and partitions The 1400 building HVAC system has reached the end of its life cycle and needs to be replaced painting is critical in order to preserve the building envelope from deterioration and will extend the life of the structure. The flooring in the 1600, 1000 bldgs. has reached the end of its useful life and requires removal and replacement Temporary wooden stairs were built to accommodate access from Cabrillo College Dr. to the 1100 building and need to be replaced with code compliant stairs. Continued from 2013/14 through 2018/19 fiscal years B100 and B1300 Fire suppression Repair/ Replace sewer line upper campus 700, 800, 900 2016-17 & 1000 Phase II 2016-17 Funds Needed Mechanical ridge vents throughout the college continue to deteriorate and require repair/replacement Parking Lot A/B Powerlink Purchase and Installation O:\Administrative Services\TotalCostofOwnership\042415TenYearFacilitiesPlan.xlsx FFPO Districtwide 2016-17 4 of 15 2016-17 Health Safety / Scheduled MaintenanceProjects Updated: February 2015 1. M / SP Technology 4.4 2.A / SP 2 Preventative Maintenance Unfunded 2016-17 Parking Lot Fund Phone System F/G Lot (10, 000 SQFT) 2014-15 2.B / SP 2 Preventative Maintenance Parking Lot Fund E Lot (8000 SQFT) 2014-15 2.C / SP 2 Preventative Maintenance Parking Lot Fund C/D Lot (7000 SQFT) 2014-15 Water conservation Unfunded Water 2.E / SP2 conservation Unfunded Critical needs: This project is 2.F / SP4 a health & safety issue. Unfunded 2.D / SP2 2.G / SP4.4 Water conservation Unfunded Replace practice field / track w artificial turf, and 2016-17 baseball infield Replace existing football 2016-17 "Field Turf" Replace emergency phones 20,000 S.F. of grind out/overlay; 200 L.F. concrete dike; 80,000 slurry seal; 3,400 L.F. of striping; and 10 S.F. of truncated domes are currently needed in order to prevent increase cost to future deterioration. 5,000 S.F. of grind out/overlay; 200 L.F. concrete dike; 26,000 slurry seal; 3,400 L.F. of striping; and 10 S.F. of truncated domes are currently needed in order to prevent increase cost to future deterioration. 2,000 S.F. of grind out/overlay; 200 L.F. concrete dike; 5,000 slurry seal; 3,400 L.F. of striping; and 10 S.F. of truncated domes are currently needed in order to prevent increase cost to future deterioration. In an effort to accommodate program needs as well as reduce water consumption it is recommended that the existing practice field be replaced with artificial turf The existing artificial field turf in the stadium has reached the end of life and is becoming unsafe. Replacement is required $ 500,000 Tech $ 200,000 Roads $ 60,755 Roads $ 45,000 Roads $ 1,000,000 Fields $ 500,000 Fields Repairs repair / Replace handrails 2016-17 bldg. 1100 The handrails surrounding the 1100 building are in poor condition and require replacement $ 150,000 Remove and replace 2016-17 plantings in North East Campus Planted / landscaped areas require replacement plants in order to maintain appearance and water management practices $ 200,000 Landscape 2016-17 Subtotal Genral Fund (Existing Ongoing Allocation) Parking Fund Prop 39 Funds One Time Unrestricted GF & Scheduled Maintenance Funding Estimated Available Funds Funding needed: O:\Administrative Services\TotalCostofOwnership\042415TenYearFacilitiesPlan.xlsx FFPO Districtwide 2016-17 $ 6,380,755 $ 350,000 $ $ 200,000 200,000 ? $ $ 750,000 5,630,755 5 of 15 2017-18 Health Safety / Scheduled MaintenanceProjects Updated: February 2015 Priority/Stra tegic Plan 2 / SP4 1.D / SP4.4 1.E/ SP4.4 1.F/ SP4.4 1.G / SP4.4 1.H / SP4.4 1.I / SP4.4 1.J / SP4.4 1.K / SP4.4 1.L / SP4.4 1.M / SP4.4 Generated By Preventative Maintenance Critical needs: health & safety issue. Critical needs: health & safety issue. Critical needs: health & safety issue. Critical needs: health & safety issue. Critical needs: health & safety issue. Critical needs: Sited by the Office of Civil Rights. Critical needs: Sited by the Office of Civil Rights. Critical needs: Sited by the Office of Civil Rights. Critical needs: Sited by the Office of Civil Rights. Critical needs: Sited by the Office of Civil Rights. Fund Source Timeline Unfunded 2017-18 building 450, 500 , 600, 700 Unfunded Unfunded Project Mechanical ridge vents throughout the college continue to deteriorate and require repair/replacement Phase II Paint is essential to preserving the integrity of the Paint Interior / Exterior building envelope and the existing paint has 2017-18 Bldgs. 900, 1100, 1500 reached the end of it’s useful life Phase II Replace flooring Bldgs. 900, The flooring in the 900, 1100 bldgs. has reached the end of its useful life and requires removal and 2017-18 1100 Phase III replacement Funds Needed Type Repair/replace ridge vent Unfunded Repair / replace handrails 2017-18 bldg. 1000 Unfunded Repair failing skylights, 2017-18 1000/Library Unfunded Water Storage Tank Re2017-18 lining Unfunded Status Wood handrails that surround the 1000 building are in need of repair and/or replacement Multiple skylights on the 1000 building have begun to fail and leak. Repairs are needed to prevent further damage The existing water tank was installed during original construction of the college and requires a re-lining Replace HVAC System The controls on the VAPA 4000 and VAPA 5000 Controls VAPA 4000 / 5000 buildings are no longer supported and require 2017-18 $ 250,000 Roof $ 360,000 Paint $ 250,000 Repairs $ 250,000 Repairs $ 175,000 Repairs $ 250,000 Repairs $ 800,000 Repairs replacement Unfunded Standardize Building 2017-18 Management Systems for HVAC Fragmented energy management system throughout the college prevent efficiencies for maintenance and energy consumption $ 400,000 Repairs Unfunded Repair / Replace Plumbing 2017-18 fixture valves interior buildings upper campus Valves throughout the interior restrooms and buildings require replacement in order to continue to operate properly $ 500,000 Repairs $ 500,000 Tech $ 250,000 Tech Wireless Access Unfunded 2017-18 Main Distribution Frame Unfunded Upgrade and extend wireless access Upgrade Watsonville MDF, core is end of life 2017-18 O:\Administrative Services\TotalCostofOwnership\042415TenYearFacilitiesPlan.xlsx FPPO Disctrictwide 2017-18 6 of 15 2017-18 Health Safety / Scheduled MaintenanceProjects Updated: February 2015 Critical needs: Sited by the Office of Civil Rights. Unfunded 2.A / SP2 Water conservation Unfunded 2.B / SP2 Water conservation Unfunded 2.C / SP 2 Preventative Maintenance Parking Lot Fund 1.N / SP4.4 VM Ware Replacement 2017-18 $ 100,000 Drip systems reduce water consumption $ 100,000 Grounds Planted / landscaped areas require replacement plants in order to maintain appearance and water management practices $ 125,000 Grounds A/B Lot (150,000 SQFT) 12,500 L.F. of striping; and 100 S.F. of truncated domes are currently needed in order to prevent increase cost to future deterioration. $ 85,000 Roads Watsonville Parking Lot Resurface 10,500 L.F. of striping; and 100 S.F. of truncated domes are currently needed in order to prevent increase cost to future deterioration. $ 150,000 Roads $ 353,750 Roads Replace sprinkler systems 2017-18 with drip systems on North East campus Remove and replace 2017-18 plantings in North East Campus 2014-15 2.D / SP 2 Preventative Maintenance Parking Lot Fund 2014-15 2.E / SP 2 Preventative Maintenance Refresh 12 VMWare blades 70,000 S.F. of grind out/overlay; 2000 L.F. concrete dike; 140,000 slurry seal; 14,000 L.F. of Parking In-Fill Service Roads Upper & striping; and 100 S.F. of truncated domes are Lower Campus (200,000 SQFT) Lot Fund currently needed in order to prevent increase cost 2014-15 to future deterioration. 2017-18 Subtotal Genral Fund (Existing Ongoing Allocation) Parking Fund Prop 39 Funds One Time Unrestricted GF & Scheduled Maintenance Funding Estimated Available Funds Funding needed: O:\Administrative Services\TotalCostofOwnership\042415TenYearFacilitiesPlan.xlsx FPPO Disctrictwide 2017-18 $ 4,898,750 $ $ $ 350,000 200,000 200,000 Tech ? $ $ 750,000 4,148,750 7 of 15 2018-19 Health Safety / Scheduled MaintenanceProjects Updated: February 2015 Priority/Stra tegic Plan 2 / SP4 1.D / SP4.4 1.E/ SP4.4 1.F/ SP4.4 1.G / SP4.4 1.H / SP4.4 1.J / SP4.4 Generated By Preventative Maintenance Critical needs: health & safety issue. Critical needs: health & safety issue. Critical needs: health & safety issue. Critical needs: health & safety issue. Critical needs: health & safety issue. Critical needs: This project is a health & safety issue. Fund Source Timeline Unfunded 2018-19 building 800 , 900, 1000, 1100 Unfunded Unfunded Unfunded Unfunded Unfunded Project Status Mechanical ridge vents throughout the college continue to deteriorate and require repair/replacement Phase III The flooring in the SAC & Watsonville bldgs. has 2018-19 Replace carpet Bldgs. SAC, reached the end of its useful life and requires Watsonville A Phase IV removal and replacement Paint interior/exterior Bldgs. Paint is essential to preserving the integrity of the building envelope and the existing paint has 2018-19 1200, 1300, 1400, 1500, reached the end of it’s useful life 1600 Phase III Paint interior/exterior Bldgs. Paint is essential to preserving the integrity of the building envelope and the existing paint has 2018-19 1800, 2000, 2030, maint. reached the end of it’s useful life Bldgs. Phase IV Funds Needed Repair/replace ridge vent Standardize and automate 2018-19 keying system throughout District Phase II Watsonville B exterior paint 2018-19 $ $ 400,000 Floor $ 300,000 Paint $ 250,000 Paint Security of facilities continues to become a high priority with the increase in technology used $ 600,000 Repairs Paint is essential to preserving the integrity of the building envelope and the existing paint has reached the end of it’s useful life $ 175,000 Replace or re-line failing Numerous gutter systems on roof tops have been gutters throughout the upper observed to have failed and require replacement/re- $ 2018-19 campus lining Replace carpet Bldgs. 400, 2018-19 500, 600, 700 Phase IV Health & Safety issue Unfunded 1.L / SP4.4 1.M / SP4.4 1.N / SP4.4 Health & Safety issue Health & Safety issue Health & Safety issue Unfunded Unfunded Unfunded 2.A / SP2 Water conservation Unfunded 2.B / SP2 Water conservation Unfunded 2018-19 2018-19 2018-19 250,000 Roof Unfunded 1.K / SP4.4 Type Paint 400,000 Repairs The flooring in the 1600, 1000 bldgs. has reached the end of its useful life and requires removal and replacement $ 350,000 Repairs Refresh UPS Repair / Replace UPS's upper campus $ 250,000 Tech. Update Firewalls Refresh ASA and 6500 FWSM firewalls $ 250,000 Tech. Refresh Routers Refresh routers throughout campus $ 350,000 Tech. Replace sprinkler systems 2018-19 with drip systems South West campus Replace plantings in 2018-19 landscape throughout South West campus Drip systems are more affective at reducing water consumption $ 75,000 Grounds Planted / landscaped areas require replacement plants in order to maintain appearance and water management practices $ 100,000 Grounds O:\Administrative Services\TotalCostofOwnership\042415TenYearFacilitiesPlan.xlsx FPPO Districtwide 2018-19 8 of 15 2018-19 Health Safety / Scheduled MaintenanceProjects Updated: February 2015 Preventative 2.C / SP 2 Maintenance Parking Lot Fund Preventative 2.D / SP 4 Maintenance Parking Additional Quoted items @ M, and 2014N, Hort, K, R, S, I/J, Connect Lot Fund 15 Critical needs: This project is a 2.E / SP4 health & safety issue. Critical needs: 2.F / This project is a SP4.4 health & safety issue. Critical needs: 2.G / This project is a SP4.4 health & safety issue. Cabrillo College Dr (60,000 2014-15 SQFT) 2013-14 Replace Gym floor Unfunded Unfunded 2018-19 Resurface upper campus 2018-19 walkways 10,000 S.F. of grind out/overlay; 200 L.F. concrete dike; 40,000 slurry seal; 7,100 L.F. of striping; and 100 S.F. of truncated domes $ 250,340 Roads 3,200 S.F. of gring out/overlay; 200 L.F. concrete dike; 75,000 slurry seal; 3 speed bumps; and 7,206 planter fill in and artificial turf $ 233,270 Roads The Gym floor has reached the end of it's useful life and cannot successfully be sanded down and refinished - Replacement is required $ 400,000 Repairs Walkways throughout the college require resurfacing in order to prevent trips, slips and falls. Approximately 40% of walkways have reached the end of their life cycle $ 350,000 Parking TBD $ 1,000,000 $ 5,983,610 $ $ $ 350,000 200,000 200,000 Technology Needs Unfunded 2018-19 2018-19 Subtotal Genral Fund (Existing Ongoing Allocation) Parking Fund Prop 39 Funds One Time Unrestricted GF & Scheduled Maintenance Funding Estimated Available Funds Funding needed: O:\Administrative Services\TotalCostofOwnership\042415TenYearFacilitiesPlan.xlsx FPPO Districtwide 2018-19 Tech. ? $ $ 750,000 5,233,610 9 of 15 2019-20 Health Safety / Scheduled MaintenanceProjects Updated: February 2015 2 / SP4 1.D / SP4.4 1.E/ SP4.4 Preventative Maintenance Preventative Maintenance Preventative Maintenance Fund Source Unfunded Unfunded Unfunded 1.F/ SP4.4 Preventative Maintenance Unfunded 2019-20 Unfunded 2019-20 Unfunded 2019-20 VAPA 1000, VAPA 2000, VAPA exceeded their useful life and require 2019-20 Replace HVAC systems SAC Priority/Stra tegic Plan 1.G / SP4.4 1.H / SP4.4 Generated By Preventative Maintenance Preventative Maintenance 1.J / SP4.4 Preventative Maintenance Unfunded 1.K / SP4.4 1.L / SP4.4 1.L / SP4.4 1.M / SP4.4 Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Unfunded Unfunded Unfunded Unfunded Timeline Project 2019-20 2019-20 2019-20 Smart Classrooms upgrade Buildings 300, 400, 450, 500 Technology upgrades are necessary to keep up with industry standards Smart Classrooms upgrade Technology upgrades are necessary to keep up with industry standards Buildings 600, 700, 800, 900 Smart Classrooms H.W. 1000, Technology upgrades are necessary to keep up with industry standards H.W. 2000, 1000 Smart Classrooms VAPA 1000, VAPA 2000, VAPA 3000, VAPA Technology upgrades are necessary to keep up with industry standards 4000, VAPA 5000 Flooring Replacement The Flooring in these buildings have exceeded their useful life and require Buildings H.W. 1000, H.W. replacement 2000 Flooring Replacement Buildings 3000, VAPA 4000, VAPA 5000 2019-20 Status Flooring Replacement Buildings Wat A, B, C, D 2019-20 Athletics 2019-20 IDF 2019-20 Technology Needs Funds Needed Type $ 250,000 $ 250,000 $ 250,000 $ 350,000 $ 300,000 Flooring $ 400,000 Flooring $ 800,000 HVAC $ 400,000 Flooring $ 400,000 Athletics $ 500,000 Tech $ 500,000 Tech $ 4,400,000 Genral Fund (Existing Ongoing Allocation) $ 350,000 Parking Fund Prop 39 Funds $ $ 200,000 200,000 Tech Tech Tech Tech The Flooring in these buildings have replacement It is anticipated that the boiler / heating systems in the SAC building will have reached the end of their life cycle The Flooring in these buildings have exceeded their useful life and require replacement TBD - this project is based upon average per year cost for system repairs. Refresh premise and IDF switches TBD Subtotal One Time Unrestricted GF & Scheduled Maintenance Funding Estimated Available Funds Funding needed: O:\Administrative Services\TotalCostofOwnership\042415TenYearFacilitiesPlan.xlsx FPPO Districtwide 2019-20 ? $ $ 750,000 3,650,000 10 of 15 2020-21 Health Safety / Scheduled MaintenanceProjects Updated: February 2015 Priority/Stra tegic Plan Generated By 1.A / SP4 1.B / SP4.4 1.C/ SP4.4 Preventative Maintenance Preventative Maintenance Preventative Maintenance 1.D/ SP4.4 1.E / SP4.4 1.F / SP4.4 1.G / SP4.4 1.H / SP4.4 1.I / SP4.4 1.J / SP4.4 Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Fund Source Unfunded Unfunded Unfunded Unfunded Unfunded Unfunded Unfunded Unfunded Unfunded Unfunded Timeline Project 2020-21 HVAC 2020-21 Plumbing 2020-21 Electrical 2020-21 Paint 2020-21 Flooring 2020-21 Parking lot resurfacing 2020-21 Security 2020-21 Water conservation 2020-21 Athletics 2020-21 Technology Status TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. TBD - Paint is needed on a rotation bases throughout the college and this project cost is based upon a per year average. TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. TBD - there will be an ongoing need for security systems in order to protect assets of the district TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. Subtotal O:\Administrative Services\TotalCostofOwnership\042415TenYearFacilitiesPlan.xlsx FPPO Districtwide 2020-21 Funds Needed Type $ 1,500,000 $ 500,000 $ 250,000 $ 350,000 $ 400,000 Flooring $ 400,000 Parking $ 250,000 Security $ 350,000 Flooring $ 400,000 Athletics $ 1,000,000 $ 5,400,000 HVAC Plumbing Electrical Paint Tech 11 of 15 2021-22 Health Safety / Scheduled MaintenanceProjects Updated: February 2015 Priority/Stra tegic Plan Generated By Preventative 1.A / SP4 Maintenance 1.B / SP4.4 1.C/ SP4.4 1.D/ SP4.4 1.E / SP4.4 1.F / SP4.4 1.G / SP4.4 1.H / SP4.4 1.I / SP4.4 1.J / SP4.4 Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Fund Source Timeline Project Status Unfunded 2021-22 HVAC TBD - this project is based upon average per year cost for system repairs. $ Unfunded 2021-22 Plumbing TBD - this project is based upon average per year cost for system repairs. $ Unfunded 2021-22 Electrical TBD - this project is based upon average per year cost for system repairs. $ Unfunded 2021-22 Paint Unfunded 2021-22 Flooring Unfunded 2021-22 Parking lot resurfacing Unfunded 2021-22 Security Unfunded TBD - Paint is needed on a rotation bases throughout the college and this project cost is based upon a per year average. Funds Needed Type 1,500,000 HVAC 500,000 Plumbing 250,000 Electrical $ 350,000 TBD - this project is based upon average per year cost for system repairs. $ 400,000 Flooring TBD - this project is based upon average per year cost for system repairs. TBD - there will be an ongoing need for security systems in order to protect assets of the district $ 400,000 Parking $ 250,000 Security 2021-22 Water conservation TBD - this project is based upon average per year cost for system repairs. $ 350,000 Flooring Unfunded 2021-22 Athletics TBD - this project is based upon average per year cost for system repairs. $ 400,000 Athletics Unfunded 2021-22 Technology TBD - this project is based upon average per year cost for system repairs. $ 1,000,000 $ 5,400,000 Subtotal O:\Administrative Services\TotalCostofOwnership\042415TenYearFacilitiesPlan.xlsx FPPO Districtwide 2021-22 Paint Tech 12 of 15 2022-23 Health Safety / Scheduled MaintenanceProjects Updated: February 2015 Priority/Stra tegic Plan Generated By 1.A / SP4 1.B / SP4.4 1.C/ SP4.4 Preventative Maintenance Preventative Maintenance Preventative Maintenance 1.D/ SP4.4 1.E / SP4.4 1.F / SP4.4 1.G / SP4.4 1.H / SP4.4 1.H / SP4.4 1.I / SP4.4 Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Fund Source Unfunded Unfunded Unfunded Unfunded Unfunded Unfunded Unfunded Unfunded Unfunded Unfunded Timeline Project 2022-23 HVAC 2022-23 Plumbing 2022-23 Electrical 2022-23 Paint 2022-23 Flooring 2022-23 Parking lot resurfacing 2022-23 Security 2022-23 Water conservation 2022-23 Athletics 2022-23 Technology Status TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. TBD - Paint is needed on a rotation bases throughout the college and this project cost is based upon a per year average. TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. TBD - there will be an ongoing need for security systems in order to protect assets of the district TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. Subtotal O:\Administrative Services\TotalCostofOwnership\042415TenYearFacilitiesPlan.xlsx FPPO Districtwide 2022-23 Funds Needed Type $ 1,500,000 $ 500,000 $ 250,000 $ 350,000 $ 400,000 Flooring $ 400,000 Parking $ 250,000 Security $ 350,000 Flooring $ 400,000 Athletics $ 1,000,000 $ 5,400,000 HVAC Plumbing Electrical Paint Tech 13 of 15 2023-24 Health Safety / Scheduled MaintenanceProjects Updated: February 2015 Priority/Stra tegic Plan Generated By 1.A / SP4 1.B / SP4.4 1.C/ SP4.4 Preventative Maintenance Preventative Maintenance Preventative Maintenance 1.D/ SP4.4 1.E / SP4.4 1.F / SP4.4 1.G / SP4.4 1.H / SP4.4 1.I / SP4.4 1.J / SP4.4 Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Preventative Maintenance Fund Source Unfunded Unfunded Unfunded Unfunded Unfunded Unfunded Unfunded Unfunded Unfunded Unfunded Timeline Project 2023-24 HVAC 2023-24 Plumbing 2023-24 Electrical 2023-24 Paint 2023-24 Flooring 2023-24 Parking lot resurfacing 2023-24 Security 2023-24 Water conservation 2023-24 Athletics 2023-24 Technology Status TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. TBD - Paint is needed on a rotation bases throughout the college and this project cost is based upon a per year average. TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. TBD - there will be an ongoing need for security systems in order to protect assets of the district TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. Subtotal O:\Administrative Services\TotalCostofOwnership\042415TenYearFacilitiesPlan.xlsx FPPO Districtwide 2023-24 Funds Needed Type $ 1,500,000 $ 500,000 $ 250,000 $ 350,000 $ 400,000 Flooring $ 400,000 Parking $ 250,000 Security $ 350,000 Flooring $ 350,000 Athletics $ 1,000,000 $ 5,350,000 HVAC Plumbing Electrical Paint Tech 14 of 15 2024-25 Health Safety / Scheduled MaintenanceProjects Updated: February 2015 Generated By Fund Source Timeline Project Preventative 1.A / SP4 Maintenance Unfunded 2024-25 HVAC Priority/Stra tegic Plan 1.B / SP4.4 Preventative Maintenance Unfunded 2024-25 Plumbing 1.C/ SP4.4 Preventative Maintenance Unfunded 2024-25 Electrical Unfunded 2024-25 Paint 1.D/ SP4.4 Preventative Maintenance 1.E / SP4.4 Preventative Maintenance Unfunded 2024-25 Flooring 1.F / SP4.4 Preventative Maintenance Unfunded 2024-25 Parking lot resurfacing 1.G / SP4.4 Preventative Maintenance Unfunded 2024-25 Security 1.H / SP4.4 Preventative Maintenance Unfunded 2024-25 Water conservation 1.I / SP4.4 Preventative Maintenance Unfunded 2024-25 Athletics 1.J / SP4.4 Preventative Maintenance Unfunded 2024-25 Technology Status Funds Needed TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. TBD - Paint is needed on a rotation bases throughout the college and this project cost is based upon a per year average. TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. TBD - there will be an ongoing need for security systems in order to protect assets of the district TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. TBD - this project is based upon average per year cost for system repairs. $ 1,500,000 HVAC $ 500,000 Plumbing $ 250,000 Electrical Subtotal Total Estimated Facilities Projects 2015-25 Type $ 350,000 $ 400,000 Flooring $ 400,000 Parking $ 250,000 Security $ 350,000 Flooring $ 400,000 Athletics $ 1,000,000 $ 5,400,000 $ O:\Administrative Services\TotalCostofOwnership\042415TenYearFacilitiesPlan.xlsx FPPO DIstrictwide 2024-25 Paint Tech 53,546,171 15 of 15