TD 392 (GEN/19) - PUBLIC STUDY GROUP 19 English only Original: English

advertisement
INTERNATIONAL TELECOMMUNICATION UNION
TELECOMMUNICATION
STANDARDIZATION SECTOR
STUDY GROUP 19
TD 392 (GEN/19) - PUBLIC
English only
STUDY PERIOD 2005-2008
Original: English
Question(s):
4/19
Geneva, 19-27 July 2006
TEMPORARY DOCUMENT
Source:
Acting Rapporteur, Q.4/19
Title:
Q.4/19 Meeting Report
Table of Contents
1
Organization of Meeting ............................................................................................... 2
1.1
Meeting Identification, Chairmanship and Participation................................ 2
1.2
Meeting agenda .............................................................................................. 2
2
Key Results ................................................................................................................... 2
2.1
Work Items Progressed................................................................................... 2
3
Meeting Documentation ............................................................................................... 2
4
Liaison Statements ........................................................................................................ 2
5
Recommendation status and Work Plan ....................................................................... 2
5.1
Future work .................................................................................................... 2
6
Detailed report of discussions ....................................................................................... 3
7
Review of Meeting Report............................................................................................ 3
Annex 1 – Meeting agenda ...................................................................................................... 4
Annex 2 – Work Plan ............................................................................................................... 5
Annex 3 – List of documents ................................................................................................... 6
Attention: This is a document submitted to the work of ITU-T and as such is intended for use by the Member States of ITU, by ITUT Sector Members and Associates, and their respective staff and collaborators in their ITU-related work. It is made publicly available
for information purposes but shall not be redistributed without the prior written consent of ITU. Copyright on this document is owned
by the author, unless otherwise mentioned. This document is not an ITU-T Recommendation, an ITU publication, or part thereof.
-2TD 392 (GEN/19) - PUBLIC
1
1.1
Organization of Meeting
Meeting Identification, Chairmanship and Participation
This is the report of a meeting of Q.4/19 Title: Preparation of a handbook on IMT-2000.
Q.4/19 met in Geneva on 24-25 July 2006. The Q.4/19 Rapporteur Mr Maurice Ghazal, Ministry of
Telecommunications, Lebanon, was not unfortunately be able to participate the meeting, so meeting
was chaired by Acting Rapporteur Mr Konstantin Trofimov, Radio R&D Institute (NIIR), Russian
Federation, and was attended by 7 delegates from 6 countries.
1.2
Meeting agenda
The Meeting Agenda was published in Temporary Document 371. It was reviewed and agreed by
the meeting as TD 371 R1 and is reproduced in Annex 1 of this Report. It was approved.
2
2.1
Key Results
Work Items Progressed
Baseline text towards the Second edition of the Handbook on Deployment of IMT-2000 Systems
was reviewed and adopted by the meeting participants. The new chapter on billing was received
from ITU-T WP1/3 and adopted by the meeting participants.
3
Meeting Documentation
Documents considered at this meeting are listed in Annex 3. All documents are available at
http://www.itu.int/ITU-T/studygroups/com19/index.asp.
4
Liaison Statements
The meeting resulted in the preparation of Liaison Statements as summarized in Table 1.
Table 1 – Outgoing Liaison Statements
Addressee
ITU-R WP8F
5
Document
number
Question
TD 391R1 Q.4/19
For
Action
Title/ Subject
Development of the Handbook on
deployment of IMT-2000 systems
Recommendation status and Work Plan
Status and Work Plan for Recommendations and other deliverables under the responsibility of this
Question are summarized in Annex 2.
5.1
Future work
The next activity of Question 4/19 will be in the form of electronic Rapporteur meeting in October,
2006. The Terms of Reference for this meeting are editing the Baseline text towards the draft
Second edition of the Handbook. The results of the electronic meeting will be reviewed at the next
SG 19 meeting in April, 2007.
-3TD 392 (GEN/19) - PUBLIC
6
Detailed report of discussions

The Contribution C.4 from Siemens SpA “Preface to the ITU "Handbook on Deployment of
IMT-2000 Systems" was presented to the meeting and adopted by the meeting participants.
The text of the Contribution was included into the Handbook without any changes.

TD 356 is a Liaison Statement from ITU-T WP 1/3. It contains draft new chapter for the
Handbook on billing aspects.
<Discussion notes are in the version of this document behind TIES.>

TD 360 contains the Baseline text towards the Second edition of the Handbook on
Deployment of IMT-2000 Systems.
<Discussion notes are in the version of this document behind TIES.>

TD 353 is a TSB informational document on the ITU Workshops. It was noted.

TD 355 is a Liaison Statement from ITU-R WP8F concerning the radio aspects of the
Handbook.
<Discussion notes are in the version of this document behind TIES.>
7

TD 322 is a SG19 Work Programme. The Q.4/19 portion of it was reviewed and minor
editorial changes were made: the words “Core networks aspects” were deleted.

TD 391 is a liaison statement to the ITU-R WP8F. It was prepared during the meeting,
reviewed and adopted by the meeting participants as TD 391 R1.
Review of Meeting Report
The draft meeting report in TD 392 was reviewed and approved.
-4TD 392 (GEN/19) - PUBLIC
Annex 1 – Meeting agenda
1.
Opening
2.
Approval of agenda
3.
Review of input contributions/documents:
4.
-
C.4, TDs 356, 360 – for action
-
TD 353, 355 – for information
-
Workplan for Q.4/19 TD 322
Review of baseline document for the Edition 2 of Handbook
-
5.
Baseline text towards the Second edition of the Handbook on Deployment of IMT2000 Systems TD 360
Future activities
-
possible Q.4/19 Rapporteurs meetings
6.
Approval of the Liaisons and Meeting Report
7.
Any other business
8.
Close of meeting
-5TD 392 (GEN/19) - PUBLIC
Annex 2 – Work Plan
Rec.
Handbook
on IMT2000 (2nd
Edition)
ST
N
Question
4/19
SG
19
Timing Priority
2Q 2007
H
Pages Liaison Area
299
All ITU-T 15,37
SGs,
SDOs
Domain
00
References* Subject
The Handbook of evolving IMT-2000 Systems
-6TD 392 (GEN/19) - PUBLIC
Annex 3 – List of documents
Doc. No.
Source
Title
C.4
Siemens SpA
Preface to the ITU "Handbook on Deployment of IMT-2000
Systems"
TD322
SG19 ViceChairman
SG19 Work programme
TD353
TSB
ITU Workshops
TD355
ITU-R WP8F
LS - Preparation of the Handbook on IMT-2000
TD356
ITU-T WP1/3
LS - IMT 2000 Handbook
TD360R1 Editor
Baseline text towards the Second edition of the Handbook on
Deployment of IMT-2000 Systems
TD371R1 Rapporteur, Q4/19 Agenda for Q.4/19 meeting
TD391R1 ITU-T SG19
OUTGOING LS - Development of the Handbook on
deployment of IMT-2000 Systems
-7TD 392 (GEN/19) - PUBLIC
Download