MARY GRAYDON SITE Mary Graydon Center ASBURY BUILDING ARENA BENDER AREN AND JACOBS FITNESS CENTER C Office of the University Architect 4620 Wisconsin Avenue, N.W., 3rd Floor Washington, D.C. 20016 Tel: (202)885-1369 Fax: (202)885-1056 American University Site Area 73 ftft xx 82 92 94 ftft 6,000 8,650 sf sf 4400 Massachusetts Avenue, NW Washington DC 20016-8200 Zoning R-5-B Currently included in 2001 campus plan AMERICAN AMERICAN UNIVERSITY UNIVERSITY CAMPUS PLAN Project SPORTS CENTER PARKING GARAGE Bird’s Eye Aerial CAMPUS PLAN 2011 2011 Existing Structures Mary Graydon Center Area 131,596 sf Height 40 ft PROJECT TITLE Mary Graydon Center Addition Boundaries / Adjacencies North - Mary Graydon Center South - McKinley Building / greenspace East - Eric Friedheim Quadrangle West - Vehicular drive through Sports Center Parking Garage American University Main Campus 4400 Massachusetts Ave., N.W. Washington, DC 20016 DRAWING TITLE Site Attributes - Central campus location - Mary Graydon Center Connection - Adjacent to major student life functions - Location between the McKinley Building and Mary Graydon Center - Minimal visual impact on the campus MARY GRAYDON CENTER McKINLEY BUILDING Project McKissack McKissack Description 1401 New York Avenue, NW Suite 900 Washington DC 20006 Bird’s Eye Aerial DESIGNED BY: DRAWN BY: GMG/GB GMG CHECKED: REVIEWED: APPROVED: ACCT NO: PROJECT NO: Date DWG SET: Zoning December 22,2010 DATE: BENDER LIBRARY ERIC FRIEDHEIM Q QUADRANGLE QUA A January 14, 2011 REVISIONS: Scale N.T.S. Drawing Name DRAWING NO: MARY GRAYDON SITE EXISTING CONDITIONS EXHIBIT 20 20.1a 5.5 Drawing No. Campus Plan PROPOSED BUILDING SITE Graphics on this page were prepared by McKissack and McKissack copyright,©2008 McKissack&Mckissack SHEET NO 1 OF 8 SHEETS ASBURY BUILDING BENDER ARENA AND JACOBS FITNESS CENTER Office of the University Architect 4620 Wisconsin Avenue, N.W., 3rd Floor Washington, D.C. 20016 Tel: (202)885-1369 Fax: (202)885-1056 American University 4400 Massachusetts Avenue, NW Washington DC 20016-8200 AMERICAN UNIVERSITY AMERICAN CAMPUS PLAN UNIVERSITY Project 1 2 SPORTS CENTER PARKING GARAGE 4 2011 CAMPUS PLAN * 2011 2 * *1 PROJECT TITLE Mary Graydon Center Addition American University Main Campus 4400 Massachusetts Ave., N.W. Washington, DC 20016 3 3 * DRAWING TITLE 4 MARY GRAYDON CENTER McKINLEY BUILDING BENDER LIBRARY MARY GRAYDON CENTER McKINLEY BUILDING Site Plan McKissack McKissack 1401 New York Avenue, NW Suite 900 Washington DC 20006 DESIGNED BY: DRAWN BY: GMG/GB GMG CHECKED: REVIEWED: APPROVED: ACCT NO: PROJECT NO: Date DWG SET: DATE: ERIC FRIEDHEIM QUADRANGLE BENDER LIBRARY Zoning December 22,2010 January 14, 2011 REVISIONS: Scale McKINLEY BUILDING ASBURY BUILDING N.T.S. Drawing Name DRAWING NO: MARY GRAYDON SITE EXHIBIT 20 20.1b EXISTING CONDITIONS Drawing No. PROPOSED BUILDING SITE EXISTING PRIMARY CAMPUS VEHICULAR CIRCULATION Graphics on this page were prepared by McKissack and McKissack 5.6 SHEET NO 2 OF 8 SHEETS copyright,©2008 McKissack&Mckissack DE UN . 7. RD 36 RG UL 30 VA 9. 63 36 74 7. 36 6 1.0 66 81 0. 37 37 37 S 6 1.3 P= 37 TO EE TR 10 0. CK 37 RA 9. 36 46 KE 0. BI 37 4" 3. 20 32 15 3. 3. 36 36 36 53 Y 8 LL 55 7. 7. 36 36 HO 1.6 4" LL HO Y 36 3. 36 01 05 6. 36 91 2. 36 74 2. IS 36 P= DEBR OF 6. TO 27 3. 36 10 2 1.5 37 5 0 1.3 1.1 37 375 2 1.3 1.4 37 37 9 1.9 37 44 2. 37 18 21 2.2. 2 37 37 1.8 37 01 9 1.8 4 37 13 1.9 3. 37 Y 2. LL 37 HO LL FU 57 9. 36 96 0. P= 2.64 37 18 99 TO 35 0. 0. 0.52 V= 37 3737 IN 4" 16 2. 81 2. 37 24 37 P= U 2. 37 TO 71 2. 37 RISER 18 FL. 6. T. 1S 36 36 4. 98 5. 36 37 41 04 50'-0" CO 76 4 4. 34 92 5. 07 4. 36 1 4. 36 1 8 4. 8 CR 5. K 36 IC 36 BR 0 7. 8 9. 3 8. 36 36 36 366 365 7 368 36 369 370 9 4. BRICK PAVERS 0 2 5. 36 2 3 5. 36 2 5 6. 36 6. 36 37 7 6. 6. 37 2 1,462sf 1,567sf 7. 37 0 4 4 5 7. 7. 37 7. 37 37 2 1 Conference Room VI 1 ST Foldin g 1.5 1025sf 5 Foldin g AIN DR 7. 37 1.7 38 5 3. 5 Offic 136 e 96s f Cust. 138 59 sf A/V Storage/Telco 142 58sf Storage 112A 369sf 359sf DN Offic 137 e 87s f Rest Rm (M) 139 243sf 37 LEVEL LOWER OVER CONC DECK 2 P DRAIN 38 5 8 8 9. 9. 7 5 9. 9. 2 9 38 C MA 5 6 9. CO 0 8. 382 8. 6. 38 38 8 Sto. 153 186sf Rest Rm (F) 145 197sf 5 4 7 9. 9. 9. 6 AK AK "O 28 "O 12 3 3 9. 9. 38 38 8 AK "O 15 5 9. 9. 2 2 9. 3 AS 2 9 X AL 9. PH 38 8. BO Servery 150 1,273 sf 38 38 38 9. 38 X BO EC X EL BO EC 0 9. 38 EL 38 ND OU GR HT LIG 8 7 University Club T 6 7 8. LK WA 5 5 9. 9. 38 38 8. 38 X 38 BO 7 L 8. L 8. RO 38 NT 8. 38 RO NT CO 38 CO ND OU GR HT LIG AK 0 0 9. 9. T CONCRETE WALK Foldin g 26'-0" Kitchen 152 1,429 sf Telco 111 68sf 38 8 9. 38 2 9. 0 ASPHALT WALK 7 8 8. 0 38 9. 4 CONCRETE WALK 9. 38 38 9. 38 5 9. 38 CL 5 1 4 6 9. 9. 38 38 9. 9. 38 1 38 9. K 38 OC Hall 125 202sf UP Conference Room I Market Place Dining 121 3,284sf Sto 148 77sf Storage 116B 39sf 304A 90sf 34 7sf 341sf 303 183sf 302 301 176sf 183sf Office Office 301A DN 130sf MECH. B01B 62sf UP B07 B16 125sf UP Stairs 553 189s f HALL B06A 11sf UP DN HALLWAY TO LOADING DOCK ABOVE HALL B14A 23sf REST RM(M) B06B 109sf #3 902sf LOCKER RM (F) B05 B05B REST RM(F) 196sf 453sf MECH B18 95sf HALL B19 42sf B08 STG B07A 71sf STG 200sf Office 322 321 190sf 248sf 2011 50 401 49sf 402 64sf 403 Mech 33sf 401 88sf 100 Feet DN 400 DN 400 312s f Storage 434 (beneath 400) 454 443sf 614sf 56sf Stairs 453 179s f Roof Riser Riser UP Stairs 453A 179s f American University Main Campus 4400 Massachusetts Ave., N.W. Washington, DC 20016 Mech 456 574sf B09 1,925sf FENCE 57sf (430sf) 481 47sf Site and Floor Plans UP Riser FREEZE STG B09A1 324sf (620sf) OPEN TO BELOW STORAGE STAIRS B28 74sf 50 OPEN TO BELOW McKissack McKissack 1401 New York Avenue, NW Suite 900 Washington DC 20006 Basement 1 0 DRAWING TITLE Roof Access (THIS LEVEL IS 2'-6" BELOW ROOF LINE) ROOF COLD STG B09A 183sf STORAGE AREAS FENCE 189sf BO3A Opening in Wall 132sf Office Stairs Storage 458 (Beneath 558) 611sf 2011 STORAGE ELEV. MECH B26 207sf 323 350sf Riser (515sf) 1142sf LOCKER RM(M) B06 136sf 324 638sf DN Riser Roof AMERICAN UNIVERSITY CAMPUS PLAN FENCE UP CompLab Classroom 554 446sf Project BAKERY B04 325 197sf DN UP B07 326A 101sf Comp Lab Stairs American University 4400 Massachusetts Avenue, NW Washington DC 20016-8200 ELEV B20 52sf UP Electr Panel ELEV B25 46sf HALL B05A 16sf UP 326 163sf Office AMERICAN UNIVERSITY CAMPUS PLAN Office 320 Stairs MECH B17 257sf UP TELCO B15 Elect 62sf 607sf Office 94sf Office 300B 166sf Mechanical 558 637sf Stairs 453 171s f BOILER ROOM 366sf Stairs 352 Addition First Riser UP B01A 300 190sf 480 B13 217sf Storage 116A1 17sf Office 116A 113sf D.S. UP SWITCHGEAR ROOM BELOW 839sf Stairs Office 300A Office 302A 182sf 318 213sf Stairs 316A 36sf Hallway 338 504sf Seats Storage Office 319 125sf Office 320A Hallway 58sf 338A 342sf 316 905sf 314 152sf 4620 Wisconsin Avenue, N.W., 3rd Floor Washington, D.C. 20016 Tel: (202)885-1369 Fax: (202)885-1056 Mary Graydon Center UP STAIRS B14 32sf 1,255sf 315 Office Lobby 340 704sf Projection Rm. Weilcher Theater Vestibule 108A 160sf STAIRS B27 39sf B01 116sf Office 314 87sf Elev 364 127sf 330H 170sf Third STAIR #4 B24 445sf MECH. RM Office 317 Office Office Office COVERED WALKWAY Lounge 102 499sf UP Info Desk 116 172sf Vestibule 100A 245sf UP 304 116sf 313 Office 330I 149sf PROJECT TITLE 776sf STAIRS B23 392sf Office 312 Office 330J 149sf Office 330E 71sf Office 330F 88sf 101 3,758sf 101 3,758sf D.S. Office 545sf Office Philips Lab Digital Video Lab Hallway 339 706sf 303A 350 150sf Office 330D 104sf Stairs 351 194sf Lounge Lounge 123 339sf 148sf Office 330K 176sf Office 330C 87sf Elev 361 52sf 1 0 ATM 159 14sf Platform 356 138sf Elect 358 20sf 330B 173sf 201sf Office 330G 170sf OPEN TO BELOW Stairs 167 117sf Lobby 100 939sf 311 277sf 146sf Pura-Vida 106 484sf UP Stairs 166 113sf Foldin g Rest Rm (F) 357 66sf Stairs 307 Electr 180 7sf 149 223sf Stairs 109 324sf Foldin g Vestibule 125A 69sf Food Storage D N Elev 160 119sf 7 6 9. 2 8. 9. 38 38 9. 38 38 2 3 9. 14 9. 38 5. P .5 38 5.03 38 TO X1 1.5 V= 38 IN V= IN 6 9. 38 126 GRASS Office 306 Chick Fil-a 119 836sf Rest Rm (ADA) 175 56sf Hall 161 540sf Custodial Classroom Rest Rm (M) 173 163sf Ref Sto 154 64sf Classroom Rest Rm (M) Office 330A Office 328A 116sf Office 327A 95sf 310 262sf 360 46sf Office Rest Rm (F) 174 239sf Reading Rm Telco 359 35sf 305B 725sf GRASS 308A Office 618sf Photo Lab Class Lab 308 Elev 182 50sf Elev. 162 55sf 402sf 328 ELEV. 261sf Dining Area 112f 5,509 sf Office 327 Class Lab Electr 181 23sf 329 336sf 221sf Refrigeration 144 153sf M gr. 151 112sf 9. 8. E "O 12 V IN 4 8. M 38 EA P ST 8 5. 38 78 ON IR 385. 8 25 8. " P 6. 12 38 V " RC 38 P IN TO 15 IRON V IN 5" V IN 6 38 TO 8. 38 38 GRASS Custodial 140 26s f 128 964sf 38 38 38 3 38 2 9 9. 9. 38 . 38 NC 8. 1 3 6 8. 8. 38 38 38 8. 38 1 38 6 0 8. 9. 38 38 PAVING 147 163sf University Club 9 38 LP 8. ON 9. 38 IR 15" RCP 38 " E P 6" TCP T TC OU 6" V IN IN 6.90V 5 38 IN 7. 38 38 38 9. AK 38 "O 10 8 38 38 MP MP 1 9. 12 38 9 RA 9. 5 RA 38 38 MP ON IR 6" ATE GR V. IN 7.31 38 V IN 38 3 9. 1 9. 1 9. 38 38 38 2 9.1 38 LANDSCAPED AREA 1.8 0. RA 1 9. 38 HC 0 0 9. 38 1 9. 9. AK 7 0 8. 9. 38 38 38 "O 15 GN SI 38 5 K 8. 7 5 7. OA 38 24" 38 7. 9 7. ON IR 1 4" 1X E AT GR 3 8. 38 ON 1 IR E 1X 5 4" GRAT 7. 38 V 1 9. 38 6 5 IN 38 38 5 1 8. 8 8 8. 8. 38 38 0 9 9. 8. 38 38 PAVING 38 39 39 MP 2 NN 8. 8. 2 4 8. 38 38 AK "O 209.0 38 AK 1 9. "O 18 AK 0 9. 38 38 "O 24 1 9. 38 ASPHALT Foldin g CONCRETE WALK CONC PAD CONCRETE CURB 156sf 987sf 6 RAMP CONC 60'-0" 8. 5" P MA 9 9. CO 38 38 8. 8. 0 4 9. V IN 8 7. 38 38 38 38 9. 5 3 1 9. 9. 9. 38 38 38 38 9 LANDSCAPED AREA 1 RA 9. E 8. 38 4 LE 9. BENCH CONCRETE WALK 38 38 PLANTING 5" P MA 5" P MA IL RA 9.0 38 38 EVERGREEN 38 WALL RAIL RAIL PL HT LIG 38 E NK EL BENCH CONCRETE WALK CONCRETE 8. CONCRETE RI SP 7 8 5 7 3" P MA 8.7 38 8. 38 3" P MA 6 3" P MA 8. 3" P MA 1.0 38 38 8. 5 8. E 38 PL MA 1" PLANTING MA 3" LL WA P TO HT LIG IL RA 4 38 A E 9. 9. 4 H NC D BE AB 1 2 0. 9. 38 LO 39 NO AG RAIL LL 5 WA 0. 39 9 8. 38 4 3. 39 8 8. 38 0.5 39 A 0 DI 0. 8" A DI 8" 4 "M 8. 38 3 9. 38 37 8. EP ST IL RA 38 8 1.4 38 1.5 4 HEAT 38 7. IA 37 5D PUMP 0. 6 3. 39 LL LL WA WA 7 P 4 3. P 9. TO 39 37 TO TO 1.0 38 LL 0 WA 382. 7 2. 38 4 8. 10 38 38 9. E3 9. 38 38 EVERGREEN El 141 ec. 75s f 143 129 309A 200sf The Tavern Kitchen 115 1,358 sf Stora 146ge 271sf 7. P TO 8. 1 8. 38 4 8. 38 38 8 8.2 MN LU 37 CO 0 7. 3. 37 38 38 7 0 9. 0. 38 39 37 Conference Room IV Office Custodial 348 Hall 330A 135sf 22sf Photo Lab 147sf Stair 163 373sf 26'-0" Hall 130 940sf Elev 361 64sf ELEV. Hallwa y 1,124sf 336 Office of the University Architect Office 330L Hallway 330 835sf 367 Lockers TO BUTLER PAVILION Office 330M 136sf 330N 838sf Lounge Lockers 297sf DN 1 0 4 2. 6 7. 37 5 3. 39 38 2. 9 8. 38 38 1 5. 2. 38 38 4 .67 7. 37 X0 67 0. 5 E 39 7. MH 9. PL 38 MA 37 M IN EA TW 38 5 7. 5 37 0. 5X 0. 1.9 131 7. 37 1 38 " 25 3 Storage Room 135 330sf 134 597sf Hall 130 7 7. 37 3. 3 389. 7. 37 7. 38 9. 6 38 9. CONCRETE LANDING 9 4 7. 8 37380. 4 38 5 9. CONC Stair s 164 466sf Conference Room V 44'-0" 6 37 0. 38 377.6 BASEMENT FLOOR FIRST FLOOR 393.7 Library 185sf Mechanical Custodial 366 51sf 40sf Computer Lab 331A Hallway 335 Office 245sf 333 309 OPEN TO BELOW 3 Sto. 133 317sf DN C 7. 38 4 9. 1.4 38 OVERHEAD CONCRETE 37 6 0. 3 38 E 65 0. EL 3. 38 37 7 8 5. 38 2 5. 9. 383 9. 38 1.5 38 9. 6 38 9. 38 9.6 38 V= IN 0. 38 38 CONCRETE WALKWAY BELOW 0 6 LK WA 5 1 0. 0. 5X LL 38 0. WA P 1 TO 0. 38 7. 6 38 37 7. NT 37 VE 6 7. 2 0. RE TE 8 RE 9. MO 37 CA NC 38 5 7. 37 LL WA 5 38 5 7. 0. P 37 TO SY CO Stair s 165 362sf C 7. 37 D PA 9 P TO 373. 3 4. 37 6 6 3. 3. 8 5 IN 38 TW 5 DIRT 844sf 101sf Office 37 3. 37 37 6 5 4. 5. 37 37 NT 6 7. VE 37 7. " 24 4 31 9. 37 38 2. 38 9. 38 377.7 BASEMENT FLOOR 8 8 44'-0" 8. 37 8 LL 2. 37 P WA TO D PA4 P TO 373. CONC. 0 9 6. 3. 37 L 3 3. 37 0 7. 8 LL 3. 37 WA P TO 8 4. 37 WALL P TO 6 3 6. 7. 37 37 6 2 6. 37 32 6. 38 0 45 7. 66.0.36 37 37 6.38 37 0.4 38 30 6. 7. 37 37 E 45 P= 6. 33 TO 6. 37 NN 8 CO 6. 37 P= 37 25 V= IN CONCRETE 2 37 37 0 7. 0 7. 9 6. 37 37 37 LL WA 9 6. 37 0 6. 37 38 6. 37 48 9. P= 35 TO V= IN TO 7. T6 9. CONCRETE PICNIC/PATIO AREA 690sf 8. P LE NK 9 6. RI 37 SP WA P TO 3.5 37 TO 0 7. 37 GV 37 47 8.9.02 37 38 38 E ON PAD HEAT PUMP 343 37 1 5 9. 08 38 9. 4 1.5 1.5 38 38 5 9. 38 6 7 4 9. 38 389. 2. 39 9 7. 342 Reception/Help Desk 341 135sf Office 331B 264sf 4 STORY PRECAST 9. 7. 92'-0" 50'-0" 08 38 56 7. 37 54 7. 37 7. 38 9. DOCK MARY GRAYDON CENTER BENCH Site Office 331C 92sf 60'-0" E AT 1 GR 8. 37 LL 6. 37 83 7. 37 6.24 38 32 23 84 8. 38 6. 6. 38 38 38 7 7 9. 9. 38 38 CONCRETE 2 2 3 7. L 3 WA 9. 36 P 1.3 WA 5 6. TOP 37 53 0 7. 6. 37 4 6. 37 GN SI 37 0 3 9. E 5 Mechanical 332 Mech 365 Hallway 341 714sf 37 1 5. 37 37 90 69 66 6. 6.69 37 376. 6 BRICK PAVERS 4. 37 37 17 5. 5. 9. 38 38 TRANSFORMER VAULTS CONCRETE WALK 38 5. 36 6 S 5. 36 5. 36 5. 36 6. 36 36 TO BRICK PAVERS G 7. 388 Office 331D 96sf 36 S WA 8 2 3 2. 5 9. 36 9. 36 37 37 37 1 LOADING G WOODEN PRIVACY FENCE Classroom 331 S OS 6 7. 36 8. 3 0. 1.6 36 37 37 1 3. 92 8. 15 GN 6. 37 SI 7 37 1.6 37 14 16 6. 6. 37 37 40 6. 37 38 9. 2 1. 38 UP 4. 36 36 2 60 364. 4. 36 81 4. 04 4. 36 61 4. 36 5. 36 79 4. 36 36 8. 06 92 5. 4. 36 80 36 4. 99 4. 36 36 EN OP P= 89 . FL 5. 36 03 6. 84 5. 366.59 90 5. 5 36 6. 36 36 P= 5 1.4 TO 36 V= IN 2 36 9 7. 36 9. 36 R 33 0. TE 93 28 9. 1.0 37 4 4. 4.45 37 37 371 36 8 'T TO 4. DN 36 05 7. 88 97 7. 79 36 6. 7. 36 00 6. 361ST. 36 36 38 9.9.35 36 36 44 9. 36 9. WA 36 OF 1 1.1 37 37 P= TO 5 0. 37 LL 81 FU 0. 81 37 0. 37 41 5. 15 37 5. 3. 82 37 37 2. 3 1.8 37 5 1.9 37 13 2. 371 2 2. 37 1.8 37 WA 1.8 S 37 OS CR K IC 32 2. BR 37 17 00 373. 9 39 2. 2. 3 37 8.07 37 3. 37 P= TO V=36 IN 37 83 3 3. 7. 37 37 5155 4.4. 3838 6 38 83 8 8. 84 8. 8. 38 38 38 GATE 37 LANDSCAPED AREA\SHRUBS 36 26 5. UL 37 BRICK PAVERS UP DN Office 330O Classroom Office 331E 98sf GM S E T Office 331F 89sf 38 0. 28 11 5. 37 1.9 42 5. 38 38 93 4. BRICK PAVERS UP 19 5. 36 5. 00 37 3. 37 51 4. 37 31 9.9.36 37 37 S Stairs 353 386sf 334 396sf 354 507sf UP Storage DN Stairs 358 392sf 365sf 36 0. 2 5 58 0. 1.5 37 37 03 2. 1.3 37 37 32 2. 370.00 58 2. 37 37 3140 85 5.5. 7. 37 37 37 38 McKINLEY BULDING 2 STORY GRANITE S Storage Stairs 355 DN 4. 37 UP Hallway 339 EE Y LL TR HO 37 IN 4" 11 TW 2. 4" 3" 92'-0" DESIGNED BY: 100 Feet DRAWN BY: GMG GMG Date December 22,2010 Scale N.T.S. Drawing Name CHECKED: REVIEWED: APPROVED: ACCT NO: MARY GRAYDON SITE View from McKinley Building STORAGE T54 92'-0" Drawing No. 379 sf UP 360 sf T65 T64A 20sf 264 sf Stairs T63 317sf UP UP 50'-0" 1 Stairs 295 361sf x 234 236 238 97sf 97sf 125sf Stairs Rm 259 294 432sf DN 373sf 372sf DN x DN x 44'-0" 26sf T35 Custodian T39 118sf 142sf Hall T34 366sf Offic e T25C 198sf Offic e T25B 88sf Vest T37A 20sf Offic T25A e 76sf Pots Stg T45 154sf T26 T46 ELEV. T47 165sf Kitchen 301 sf Break Room 217sf T28 80sf 589sf DN. T29 T30 T61 50'-0" Dining Area T7 3,70 8sf 115sf Rm 233 110sf 121sf Mec hT11 36sf Rm 239 135sf 154sf 241A 241B 123sf 108sf Rm 224 115sf Genr'l Stor 288A 26'-0" Vestibule T7A 55sf Semi-private Dining T19 592sf Stairs T14A 35sf Stairs T50 UP Vestibule T4A 28sf 133sf Dining T14B 579sf T9 Elev. 261 75sf Vestibule T3A 27sf UP Dining T5B 708sf 139sf Stora Stg T8A 76sf Elev 224 162sf Rm 209 Rm 218 171sf 91sf Conference Rm 205 207 37sf Office 201B 64sf Conference Rm 203 358sf Rm 216 107sf Stair s 33sf T52 352sf 207A Terrace T6 55sf 56sf 10 50 100 Feet 383sf 136sf 284 Media Library 254A 21sf LOUNGE 284B 150sf Hallway 285 1,066sf Office 201A 131sf DN LOUNGE 284B 150sf Rm 262 443sf Rm 266 138sf Rm 273A Stairs 248 182sf Rm 271B 132sf 549sf Rm 271A 27sf 141sf Reception 271 105sf 510sf 83sf CONFERENCE UP Stor Stor Rm 206B 77sf Rm 206A Rm 206 198sf Rm 204 85sf Rm 202 274A 167sf 89sf 274 287sf 218sf Rm 204C 130sf 285A 192sf Hallway 280 437sf 204A 206C 43sf STAIRS 296 122sf Rm 268 Rm 271D Rm 273 Stor 273B 204B 83sf Rm 202A 161sf Conference Rm Rm 200 915sf Rm 274D 523sf 274B 85sf 274C 123sf Rm 270A 76sf Rm 272 348sf Office Cir 270 109sf Stairs 297 122sf Rm 270B 330sf Storage 270C1 Office 16sf 270C 139sf Rm 208 143sf 1 0 Second 50 DRAWING NO: Rm 271C 86sf 152sf STAIR #1 Storage ge T56 Rm 260 170sf Lobby 280 1,316sf Office 201 391sf 87sf 124sf 143sf DN 110sf Hallway Hallway 281 480sf CLOSET Rm 210 UP Hallway 284 627sf Elev WC Rm 211 59sf 118sf Rm 212 January 14, 2011 Rm 264 Rm 220 666sf DATE: Zoning Rm 256 263 64sf 277sf T8 Stairs T5A 35sf DWG SET: 254 Conference Rm 247 611sf 213A 75sf 50 Feet 328sf 254C 27sf 51sf Hallway 282 638sf Services Reception Rm 214 Private Dining Room T3 195sf Mechanical 1,768sf Tel 287 28sf Rest Rm (F) Rest Rm (M) T4 185sf 284 Elec Rm 245 107sf Servery T5 2,178sf 43sf 75sf Conference 213B Mech. 251 252A 288B 56sf 110sf 50sf Hallway 256A 96sf 40sf Stor. 250C 25 Hallway 58sf Counseling Center Terrace Dining Room 100sf 254B 40sf 10 256B 256E 250A 5 REVISIONS: 337sf 661sf 398sf Vending 284A 29sf 156sf Rm 258 250B Rm 250 188sf Telco 289 74sf GEN STOR 246 Rm 217 STO. 215 Lobby 489sf Servery T14 3,159sf 290 U P Rm 256C 100sf 135sf 55sf 105sf WOMEN 191sf Hall 259A 64sf 256D Rm 252B 252 Maint. Rm 292 Conference Rm 244 Reception 243 247sf 114sf 121sf T1 Academic Support Ctr. Rm 231 113sf Rm 222 Storage T31C 72sf UP Rm 235 Rm 237 BREAK RM. RM 219 Rm 226 Ref. Storage Storage T31B 144sf Vest T5C 54sf 410sf 291 175sf 120sf 174sf 60'-0" Elev T60A 119sf Stairs T51 118sf Rm 248 MEN Rm 228 T5A 98sf 64sf Dish Washing Service T13 572sf 49sf Rm 242 238sf 78sf 1061sf Ref. Storage Ref. Sante Fe Room Semi-private Dining T20 457sf 240A 102sf Rm 229 187sf 78sf 221 Vestibule T55 91sf Kitchen and Storage 2,480 sf Cust. 28 Rm 240 Rm 227 192sf 114sf MECH T49A 61sf T31 55sf Rm 225 79sf Rm 230 T48 200sf Mech. T62 Service Admin. Office 741 sf Ref. Offi ce T32 85sf 223B 115sf 223A Ra mp DN UP DN Pots Stg Hallway T31A 121 sf Offi ce T33 90sf T25 T23 156sf Up Vest T38A 20sf Admin. Offices 162sf 25'-0" T43 259 sf T34 175sf 62'-0" 86sf h T44 Hallway 283 1,262sf Rm 232 1516sf Mec Mec hT44A 45sf 55sf 5,9 19 sf MECH T49 47sf 30sf T35A Vestibule T34A T41 T66 LOADING DOCK TUNNEL Ves tibul T43A e 24sf Hallway 282A Bath(M) Bath(F) T38 T37 119sf 97sf Line n Clo T42 set 17sf 44'-0" T36 Telc o T40 10sf Fourth copyright,©2008 McKissack&Mckissack UP D N UP PROJECT NO: 5.8 92'-0" Storage T53 456sf T64 100 Feet EXHIBIT 20 20.1c SHEET NO 3 OF 8 SHEETS Office of the University Architect 92'-0" UP 4620 Wisconsin Avenue, N.W., 3rd Floor Washington, D.C. 20016 Tel: (202)885-1369 Fax: (202)885-1056 UP D N UP 50'-0" AMERICAN UNIVERSITY CAMPUS PLAN 2011 Ra mp DN UP DN 62'-0" PROJECT TITLE Mary Graydon Center Up 44'-0" Addition American University Main Campus 4400 Massachusetts Ave., N.W. Washington, DC 20016 DN. DRAWING TITLE 25'-0" Office and Support Space Terrace Level Floor Plan UP DESIGNED BY: DRAWN BY: GMG GMG CHECKED: REVIEWED: APPROVED: ACCT NO: PROJECT NO: DWG SET: UP DATE: Zoning January 14, 2011 REVISIONS: UP DN DRAWING NO: 10 50 100 Feet EXHIBIT 20 20.1d SHEET NO 4 OF 8 SHEETS Office of the University Architect 92'-0" 4620 Wisconsin Avenue, N.W., 3rd Floor Washington, D.C. 20016 Tel: (202)885-1369 Fax: (202)885-1056 DN DN DN C AMERICAN UNIVERSITY CAMPUS PLAN OPEN TO BELOW 2011 Mary Graydon Center 44'-0" 60'-0" PROJECT TITLE Addition American University Main Campus 4400 Massachusetts Ave., N.W. Washington, DC 20016 DRAWING TITLE OPEN TO BELOW 26'-0" Dining and Meeting Space First Floor Plan 451-019 D/ADOOR JAMB D N UP COVEREDDESIGNED WALKWAY BY: DRAWN BY: GMG 190 DOOR STILE GMG CHECKED: REVIEWED: APPROVED: ACCT NO: 939sf PROJECT NO: UP UP DWG SET: DATE: D.S. D.S. Zoning January 14, 2011 REVISIONS: UP UP UP DRAWING NO: EXHIBIT 20 20.1e SHEET NO 5 OF 8 SHEETS Office of the University Architect 92'-0" 4620 Wisconsin Avenue, N.W., 3rd Floor Washington, D.C. 20016 Tel: (202)885-1369 Fax: (202)885-1056 DN DN AMERICAN UNIVERSITY CAMPUS PLAN 50'-0" DN 2011 PROJECT TITLE Mary Graydon Center 60'-0" 44'-0" Addition American University Main Campus 4400 Massachusetts Ave., N.W. Washington, DC 20016 DRAWING TITLE 26'-0" DN Second Floor Plan Office and Meeting Space DESIGNED BY: UP DRAWN BY: GMG GMG CHECKED: REVIEWED: APPROVED: ACCT NO: PROJECT NO: DWG SET: DATE: Zoning January 14, 2011 REVISIONS: 1 0 50 100 Feet DRAWING NO: EXHIBIT 20 20.1f SHEET NO 6 OF 8 SHEETS Office of the University Architect 92'-0" RISER UP DN UP DN UP 50'-0" UP TO BUTLER PAVILION 4620 Wisconsin Avenue, N.W., 3rd Floor Washington, D.C. 20016 Tel: (202)885-1369 Fax: (202)885-1056 DN AMERICAN UNIVERSITY CAMPUS PLAN UP 2011 PROJECT TITLE Mary Graydon Center 44'-0" 60'-0" Addition American University Main Campus 4400 Massachusetts Ave., N.W. Washington, DC 20016 26'-0" DRAWING TITLE Third Floor Plan Meeting/Event Space DESIGNED BY: DRAWN BY: GMG GMG CHECKED: REVIEWED: APPROVED: ACCT NO: PROJECT NO: DWG SET: DATE: Zoning January 14, 2011 REVISIONS: DRAWING NO: EXHIBIT 20 20.1g SHEET NO 7 OF 8 SHEETS Office of the University Architect 4620 Wisconsin Avenue, N.W., 3rd Floor Washington, D.C. 20016 Tel: (202)885-1369 Fax: (202)885-1056 AMERICAN UNIVERSITY CAMPUS PLAN American University 4400 Massachusetts Avenue, NW Washington DC 20016-8200 Project 2011 AMERICAN UNIVERSITY PROJECT TITLE CAMPUS PLAN Mary2011 Graydon Center Addition American University Main Campus 4400 Massachusetts Ave., N.W. Washington, DC 20016 DRAWING TITLE DESIGNED BY: DRAWN BY: GB McKissack McKissack GB 1401 New York Avenue, NW CHECKED: REVIEWED: Suite 900 ACCT NO: Washington DC 20006 APPROVED: PROJECT NO: DWG SET: DATE: Zoning January 14, 2011 REVISIONS: Date December 22,2010 Scale N.T.S. DRAWING NO: EXHIBIT 20 MARY GRAYDON SITE 20.1h View from Drawing Name Graphics on this page were prepared by McKissack and McKissack McKinley Building SHEET NO 8 OF 8 SHEETS Drawing No.