MARY GRAYDON SITE Mary Graydon Center

advertisement
MARY GRAYDON SITE
Mary Graydon Center
ASBURY
BUILDING
ARENA
BENDER AREN
AND
JACOBS FITNESS CENTER
C
Office of the
University Architect
4620 Wisconsin Avenue, N.W., 3rd Floor
Washington, D.C. 20016
Tel: (202)885-1369
Fax: (202)885-1056
American University
Site Area
73 ftft xx 82
92
94 ftft
6,000
8,650
sf sf
4400 Massachusetts Avenue, NW
Washington DC 20016-8200
Zoning
R-5-B
Currently included in 2001 campus plan
AMERICAN
AMERICAN
UNIVERSITY
UNIVERSITY
CAMPUS PLAN
Project
SPORTS CENTER
PARKING GARAGE
Bird’s Eye Aerial
CAMPUS PLAN
2011
2011
Existing Structures
Mary Graydon Center
Area
131,596 sf
Height
40 ft
PROJECT TITLE
Mary Graydon
Center
Addition
Boundaries / Adjacencies
North - Mary Graydon Center
South - McKinley Building / greenspace
East - Eric Friedheim Quadrangle
West - Vehicular drive through Sports Center Parking Garage
American University
Main Campus
4400 Massachusetts Ave., N.W.
Washington, DC 20016
DRAWING TITLE
Site Attributes
- Central campus location
- Mary Graydon Center Connection
- Adjacent to major student life functions
- Location between the McKinley Building and Mary
Graydon Center
- Minimal visual impact on the campus
MARY GRAYDON CENTER
McKINLEY BUILDING
Project
McKissack McKissack
Description
1401 New York Avenue, NW
Suite 900
Washington DC 20006
Bird’s Eye Aerial
DESIGNED BY:
DRAWN BY:
GMG/GB
GMG
CHECKED:
REVIEWED:
APPROVED:
ACCT NO:
PROJECT NO:
Date
DWG SET:
Zoning
December 22,2010
DATE:
BENDER LIBRARY
ERIC FRIEDHEIM Q
QUADRANGLE
QUA
A
January 14, 2011
REVISIONS:
Scale
N.T.S.
Drawing Name
DRAWING NO:
MARY GRAYDON SITE
EXISTING CONDITIONS
EXHIBIT 20
20.1a
5.5
Drawing No.
Campus Plan
PROPOSED BUILDING SITE
Graphics on this page were prepared by McKissack and McKissack
copyright,©2008 McKissack&Mckissack
SHEET NO 1 OF 8 SHEETS
ASBURY
BUILDING
BENDER ARENA
AND
JACOBS FITNESS CENTER
Office of the
University Architect
4620 Wisconsin Avenue, N.W., 3rd Floor
Washington, D.C. 20016
Tel: (202)885-1369
Fax: (202)885-1056
American University
4400 Massachusetts Avenue, NW
Washington DC 20016-8200
AMERICAN
UNIVERSITY
AMERICAN
CAMPUS
PLAN
UNIVERSITY
Project
1
2
SPORTS CENTER
PARKING GARAGE
4
2011
CAMPUS PLAN
*
2011
2
*
*1
PROJECT TITLE
Mary Graydon
Center
Addition
American University
Main Campus
4400 Massachusetts Ave., N.W.
Washington, DC 20016
3
3
*
DRAWING TITLE
4
MARY GRAYDON CENTER
McKINLEY BUILDING
BENDER LIBRARY
MARY GRAYDON
CENTER
McKINLEY BUILDING
Site
Plan
McKissack McKissack
1401 New York Avenue, NW
Suite 900
Washington DC 20006
DESIGNED BY:
DRAWN BY:
GMG/GB
GMG
CHECKED:
REVIEWED:
APPROVED:
ACCT NO:
PROJECT NO:
Date
DWG SET:
DATE:
ERIC FRIEDHEIM QUADRANGLE
BENDER LIBRARY
Zoning
December 22,2010
January 14, 2011
REVISIONS:
Scale
McKINLEY BUILDING
ASBURY BUILDING
N.T.S.
Drawing Name
DRAWING NO:
MARY GRAYDON SITE
EXHIBIT 20
20.1b
EXISTING CONDITIONS
Drawing No.
PROPOSED BUILDING SITE
EXISTING PRIMARY CAMPUS VEHICULAR CIRCULATION
Graphics on this page were prepared by McKissack and McKissack
5.6
SHEET NO 2 OF 8 SHEETS
copyright,©2008 McKissack&Mckissack
DE
UN
.
7.
RD
36
RG
UL
30
VA
9.
63
36
74
7.
36
6
1.0
66
81
0.
37
37
37
S
6
1.3
P=
37
TO
EE
TR
10
0.
CK
37
RA
9.
36
46
KE
0.
BI
37
4"
3.
20
32
15
3.
3.
36
36
36
53
Y
8
LL
55
7.
7.
36
36
HO
1.6
4"
LL
HO
Y
36
3.
36
01 05
6.
36
91
2.
36
74
2. IS
36
P= DEBR
OF
6.
TO
27
3.
36
10
2
1.5
37
5
0
1.3 1.1
37 375
2
1.3
1.4
37
37
9
1.9
37 44
2.
37
18
21
2.2. 2
37
37 1.8
37
01
9
1.8
4
37
13
1.9
3.
37
Y
2.
LL
37
HO
LL
FU
57
9.
36
96
0.
P= 2.64
37
18 99
TO 35
0. 0. 0.52
V=
37 3737
IN
4"
16
2.
81
2.
37
24
37
P= U
2.
37
TO
71
2.
37
RISER
18 FL.
6.
T.
1S
36
36
4.
98
5.
36
37
41
04
50'-0"
CO
76
4
4.
34
92
5.
07
4.
36
1
4.
36
1
8
4.
8
CR
5.
K
36
IC
36
BR
0
7.
8
9.
3
8.
36
36
36
366
365
7
368
36
369
370
9
4.
BRICK PAVERS
0
2
5.
36
2
3
5.
36
2
5
6.
36
6.
36
37
7
6.
6.
37
2
1,462sf
1,567sf
7.
37
0
4
4
5
7.
7.
37
7.
37
37
2
1
Conference Room VI
1
ST
Foldin
g
1.5
1025sf
5
Foldin
g
AIN
DR 7.
37
1.7
38
5
3.
5
Offic
136
e
96s
f
Cust.
138
59
sf
A/V Storage/Telco
142
58sf
Storage
112A
369sf
359sf
DN
Offic
137
e
87s
f
Rest Rm (M)
139
243sf
37
LEVEL
LOWER
OVER
CONC DECK
2
P
DRAIN
38
5
8
8
9.
9.
7
5
9.
9.
2
9
38
C
MA
5
6
9.
CO
0
8.
382
8.
6.
38
38
8
Sto.
153
186sf
Rest Rm (F)
145 197sf
5
4
7
9.
9.
9.
6
AK
AK
"O
28
"O
12
3
3
9.
9.
38
38
8
AK
"O
15
5
9.
9.
2
2
9.
3
AS
2
9
X
AL
9.
PH
38
8.
BO
Servery
150
1,273
sf
38
38
38
9.
38
X
BO
EC
X
EL
BO
EC
0
9.
38
EL
38
ND
OU
GR HT
LIG
8
7
University Club
T
6
7
8.
LK
WA
5
5
9.
9.
38
38
8.
38
X
38
BO
7
L
8.
L
8.
RO
38
NT
8.
38
RO
NT
CO
38
CO
ND
OU
GR HT
LIG
AK
0
0
9.
9.
T
CONCRETE WALK
Foldin
g
26'-0"
Kitchen
152
1,429
sf
Telco
111
68sf
38
8
9.
38
2
9.
0
ASPHALT WALK
7
8
8.
0
38
9.
4
CONCRETE WALK
9.
38
38
9.
38
5
9.
38
CL
5
1
4
6
9.
9.
38
38
9.
9.
38
1
38
9.
K
38
OC
Hall
125
202sf
UP
Conference Room I
Market Place
Dining
121
3,284sf
Sto
148
77sf
Storage
116B
39sf
304A
90sf
34
7sf
341sf
303
183sf
302
301
176sf
183sf
Office
Office
301A
DN
130sf
MECH.
B01B
62sf
UP
B07
B16
125sf
UP
Stairs
553
189s
f
HALL
B06A
11sf
UP
DN
HALLWAY
TO LOADING
DOCK ABOVE
HALL
B14A
23sf
REST RM(M)
B06B
109sf
#3
902sf
LOCKER RM (F)
B05
B05B
REST RM(F)
196sf
453sf
MECH
B18
95sf
HALL
B19
42sf
B08
STG
B07A
71sf
STG
200sf
Office
322
321
190sf
248sf
2011
50
401
49sf
402
64sf
403
Mech
33sf
401
88sf
100 Feet
DN
400
DN
400
312s
f
Storage
434
(beneath 400)
454
443sf
614sf
56sf
Stairs
453
179s
f
Roof Riser
Riser
UP
Stairs
453A
179s
f
American University
Main Campus
4400 Massachusetts Ave., N.W.
Washington, DC 20016
Mech
456
574sf
B09
1,925sf
FENCE
57sf
(430sf)
481
47sf
Site
and
Floor Plans
UP
Riser
FREEZE STG
B09A1
324sf
(620sf)
OPEN TO BELOW
STORAGE
STAIRS
B28
74sf
50
OPEN TO BELOW
McKissack McKissack
1401 New York Avenue, NW
Suite 900
Washington DC 20006
Basement
1
0
DRAWING TITLE
Roof Access
(THIS LEVEL
IS
2'-6" BELOW
ROOF LINE)
ROOF
COLD STG
B09A
183sf
STORAGE AREAS
FENCE
189sf
BO3A
Opening
in
Wall
132sf
Office
Stairs
Storage
458
(Beneath 558)
611sf
2011
STORAGE
ELEV. MECH
B26
207sf
323
350sf
Riser
(515sf)
1142sf
LOCKER RM(M)
B06
136sf
324
638sf
DN
Riser
Roof
AMERICAN
UNIVERSITY
CAMPUS PLAN
FENCE
UP
CompLab
Classroom
554
446sf
Project
BAKERY
B04
325
197sf
DN
UP
B07
326A
101sf
Comp
Lab
Stairs
American University
4400 Massachusetts Avenue, NW
Washington DC 20016-8200
ELEV
B20
52sf
UP
Electr
Panel
ELEV
B25
46sf
HALL
B05A
16sf
UP
326
163sf
Office
AMERICAN
UNIVERSITY
CAMPUS PLAN
Office
320
Stairs
MECH
B17
257sf
UP
TELCO
B15
Elect
62sf
607sf
Office
94sf
Office
300B
166sf
Mechanical
558
637sf
Stairs
453
171s
f
BOILER ROOM
366sf
Stairs
352
Addition
First
Riser
UP
B01A
300
190sf
480
B13
217sf
Storage
116A1
17sf
Office
116A
113sf
D.S.
UP
SWITCHGEAR ROOM BELOW
839sf
Stairs
Office
300A
Office
302A
182sf
318
213sf
Stairs
316A
36sf
Hallway
338
504sf
Seats
Storage
Office
319
125sf
Office
320A
Hallway
58sf
338A
342sf
316
905sf
314
152sf
4620 Wisconsin Avenue, N.W., 3rd Floor
Washington, D.C. 20016
Tel: (202)885-1369
Fax: (202)885-1056
Mary Graydon
Center
UP
STAIRS
B14
32sf
1,255sf
315
Office
Lobby
340
704sf
Projection
Rm.
Weilcher Theater
Vestibule
108A
160sf
STAIRS
B27
39sf
B01
116sf
Office
314
87sf
Elev
364
127sf
330H
170sf
Third
STAIR #4
B24
445sf
MECH. RM
Office
317
Office
Office
Office
COVERED
WALKWAY
Lounge
102
499sf
UP
Info Desk
116
172sf
Vestibule
100A
245sf
UP
304
116sf
313
Office
330I
149sf
PROJECT TITLE
776sf
STAIRS
B23
392sf
Office
312
Office
330J
149sf
Office
330E
71sf
Office
330F
88sf
101
3,758sf
101
3,758sf
D.S.
Office
545sf
Office
Philips
Lab
Digital Video
Lab
Hallway 339
706sf
303A
350
150sf
Office
330D 104sf
Stairs
351
194sf
Lounge
Lounge
123
339sf
148sf
Office
330K
176sf
Office
330C 87sf
Elev
361
52sf
1
0
ATM
159
14sf
Platform
356
138sf
Elect
358
20sf
330B
173sf
201sf
Office
330G
170sf
OPEN TO BELOW
Stairs
167
117sf
Lobby
100
939sf
311
277sf
146sf
Pura-Vida
106
484sf
UP
Stairs
166
113sf
Foldin
g
Rest Rm (F)
357
66sf
Stairs
307
Electr
180
7sf
149
223sf
Stairs
109
324sf
Foldin
g
Vestibule
125A
69sf
Food
Storage
D
N
Elev
160
119sf
7
6
9.
2
8.
9.
38
38
9.
38
38
2
3
9.
14
9.
38
5.
P .5 38 5.03 38
TO X1
1.5 V= 38
IN V=
IN
6
9.
38
126
GRASS
Office
306
Chick Fil-a
119
836sf
Rest Rm (ADA)
175 56sf
Hall
161
540sf
Custodial
Classroom
Rest Rm (M)
173 163sf
Ref Sto
154
64sf
Classroom
Rest
Rm (M)
Office
330A
Office
328A
116sf
Office
327A
95sf
310
262sf
360
46sf
Office
Rest Rm (F)
174
239sf
Reading Rm
Telco
359
35sf
305B
725sf
GRASS
308A
Office
618sf
Photo
Lab
Class Lab
308
Elev
182
50sf
Elev.
162
55sf
402sf
328
ELEV.
261sf
Dining Area
112f
5,509
sf
Office
327
Class Lab
Electr
181
23sf
329
336sf
221sf
Refrigeration
144
153sf
M
gr.
151
112sf
9.
8.
E
"O
12
V
IN
4
8. M
38 EA
P ST
8
5.
38
78
ON
IR 385.
8
25
8.
"
P
6.
12
38
V " RC 38 P
IN
TO
15 IRON
V
IN
5"
V
IN
6
38
TO
8.
38
38
GRASS
Custodial
140
26s
f
128
964sf
38
38
38
3
38
2
9
9.
9.
38
.
38
NC
8.
1
3
6
8.
8.
38
38
38
8.
38
1
38
6
0
8.
9.
38
38
PAVING
147
163sf
University Club
9
38
LP
8.
ON
9.
38
IR
15" RCP
38
"
E
P
6" TCP
T
TC
OU
6"
V
IN
IN 6.90V 5
38 IN 7.
38
38
38
9.
AK
38
"O
10
8
38
38
MP
MP
1
9.
12
38
9
RA
9.
5 RA
38
38
MP
ON
IR
6" ATE
GR V.
IN 7.31
38
V
IN
38
3
9.
1
9.
1
9.
38
38
38
2
9.1
38
LANDSCAPED
AREA
1.8
0.
RA
1
9.
38
HC
0
0
9.
38
1
9.
9.
AK
7
0
8.
9.
38
38
38
"O
15
GN
SI
38
5
K
8.
7
5
7.
OA
38
24"
38
7.
9
7.
ON
IR 1
4" 1X E
AT
GR
3
8.
38
ON
1 IR E
1X
5
4" GRAT 7.
38
V
1
9.
38
6
5
IN
38
38
5
1
8.
8
8
8.
8.
38
38
0
9
9.
8.
38
38
PAVING
38
39
39
MP
2
NN
8.
8.
2
4
8.
38
38
AK
"O
209.0
38
AK
1
9.
"O
18
AK
0
9.
38
38
"O
24
1
9.
38
ASPHALT
Foldin
g
CONCRETE WALK
CONC
PAD
CONCRETE CURB
156sf
987sf
6
RAMP
CONC
60'-0"
8.
5"
P
MA
9
9.
CO
38
38
8.
8.
0
4
9.
V
IN 8
7.
38
38
38
38
9.
5
3
1
9.
9.
9.
38
38
38
38
9
LANDSCAPED AREA
1 RA
9.
E
8.
38
4
LE
9.
BENCH
CONCRETE WALK
38
38
PLANTING
5"
P
MA
5"
P
MA
IL
RA 9.0
38
38
EVERGREEN
38
WALL
RAIL
RAIL
PL
HT
LIG
38
E
NK
EL
BENCH
CONCRETE WALK
CONCRETE
8.
CONCRETE
RI
SP
7
8
5
7
3"
P
MA 8.7
38
8.
38
3" P
MA
6
3" P
MA
8.
3" P
MA
1.0
38
38
8.
5
8.
E
38
PL
MA
1"
PLANTING
MA
3"
LL
WA
P
TO HT
LIG
IL
RA
4
38
A
E
9.
9.
4
H
NC
D
BE
AB
1
2
0.
9.
38
LO
39
NO
AG
RAIL
LL 5
WA 0.
39 9
8.
38
4
3.
39
8
8.
38 0.5
39
A
0
DI
0.
8"
A
DI
8"
4
"M
8.
38
3
9.
38
37
8.
EP
ST IL
RA
38
8
1.4
38
1.5
4
HEAT 38
7.
IA
37
5D PUMP
0.
6
3.
39 LL
LL
WA
WA 7
P
4
3.
P
9.
TO 39
37
TO
TO
1.0
38
LL 0
WA 382. 7
2.
38
4
8.
10
38
38
9.
E3
9.
38
38
EVERGREEN
El
141
ec.
75s
f
143
129
309A
200sf
The Tavern
Kitchen
115
1,358
sf
Stora
146ge
271sf
7.
P
TO
8.
1
8.
38
4
8.
38
38
8 8.2
MN
LU
37
CO
0
7.
3.
37
38
38
7
0
9.
0.
38
39
37
Conference Room IV
Office
Custodial
348
Hall 330A
135sf
22sf
Photo Lab
147sf
Stair
163
373sf
26'-0"
Hall
130
940sf
Elev
361
64sf
ELEV.
Hallwa
y
1,124sf
336
Office of the
University Architect
Office
330L
Hallway
330
835sf
367
Lockers
TO BUTLER
PAVILION
Office
330M
136sf
330N
838sf
Lounge
Lockers
297sf
DN
1
0
4
2.
6
7.
37 5
3.
39
38
2.
9
8.
38
38
1
5.
2.
38
38
4 .67
7.
37 X0
67
0.
5
E
39
7.
MH
9.
PL
38
MA
37
M
IN
EA
TW
38
5
7. 5
37 0.
5X
0.
1.9
131
7.
37
1
38
"
25
3
Storage
Room
135
330sf
134
597sf
Hall
130
7
7.
37
3.
3 389.
7.
37
7.
38
9.
6
38
9.
CONCRETE LANDING
9
4
7. 8
37380.
4
38
5
9.
CONC
Stair
s
164
466sf
Conference Room V
44'-0"
6
37
0.
38
377.6
BASEMENT FLOOR
FIRST FLOOR
393.7
Library
185sf
Mechanical
Custodial
366
51sf
40sf
Computer Lab
331A
Hallway
335
Office
245sf
333
309
OPEN TO BELOW
3
Sto.
133
317sf
DN
C
7.
38
4
9.
1.4
38
OVERHEAD CONCRETE
37
6
0.
3 38
E 65 0.
EL 3. 38
37
7
8
5.
38
2
5.
9.
383
9.
38
1.5
38
9.
6
38
9.
38 9.6
38
V=
IN 0.
38
38
CONCRETE WALKWAY BELOW
0
6
LK
WA
5
1 0.
0. 5X LL
38 0. WA
P
1
TO
0.
38
7.
6 38
37
7.
NT
37
VE
6
7.
2
0.
RE
TE
8
RE
9.
MO
37
CA
NC
38
5
7.
37 LL
WA
5
38
5
7.
0.
P
37
TO
SY
CO
Stair
s
165
362sf
C
7.
37
D
PA
9
P
TO 373.
3
4.
37
6
6
3.
3.
8
5
IN
38
TW
5
DIRT
844sf
101sf
Office
37
3.
37
37
6
5
4.
5.
37
37
NT
6
7.
VE
37
7.
"
24
4
31
9.
37
38
2.
38
9.
38
377.7
BASEMENT FLOOR
8
8
44'-0"
8.
37
8 LL
2.
37 P WA
TO
D
PA4
P
TO 373.
CONC.
0
9
6.
3.
37
L
3
3.
37
0
7.
8 LL
3.
37 WA
P
TO
8
4.
37 WALL
P
TO
6
3
6.
7.
37
37
6
2
6.
37
32
6.
38
0 45
7. 66.0.36
37 37
6.38
37 0.4
38
30
6. 7.
37 37
E
45
P=
6.
33
TO
6.
37
NN 8
CO 6.
37
P=
37
25
V=
IN
CONCRETE
2
37
37
0
7.
0
7.
9
6.
37
37
37
LL
WA 9
6.
37
0
6.
37
38
6.
37 48
9.
P=
35
TO
V=
IN
TO
7.
T6
9.
CONCRETE
PICNIC/PATIO
AREA
690sf
8.
P
LE
NK
9
6.
RI
37
SP
WA
P
TO 3.5
37
TO
0
7.
37
GV
37
47
8.9.02
37
38
38
E
ON PAD
HEAT PUMP
343
37
1
5
9.
08
38
9.
4
1.5
1.5
38
38
5
9.
38
6
7 4
9.
38 389.
2.
39
9
7.
342
Reception/Help Desk
341 135sf
Office
331B
264sf
4 STORY PRECAST
9.
7.
92'-0"
50'-0"
08
38
56
7.
37 54
7.
37
7.
38
9.
DOCK
MARY GRAYDON CENTER
BENCH
Site
Office
331C
92sf
60'-0"
E
AT 1
GR 8.
37
LL
6.
37
83
7.
37 6.24
38
32
23
84
8.
38
6.
6.
38
38
38
7
7
9.
9.
38
38
CONCRETE
2
2
3
7.
L
3
WA
9.
36
P
1.3
WA
5
6. TOP
37
53
0 7.
6. 37 4
6.
37
GN
SI
37
0
3
9.
E
5
Mechanical
332
Mech
365
Hallway
341
714sf
37
1
5.
37
37
90
69
66
6.
6.69
37
376.
6
BRICK PAVERS
4.
37
37
17
5.
5.
9.
38
38
TRANSFORMER
VAULTS
CONCRETE WALK
38
5.
36
6
S
5.
36
5.
36
5.
36
6.
36
36
TO
BRICK PAVERS
G
7.
388
Office
331D
96sf
36
S
WA
8
2
3
2.
5
9.
36
9.
36
37
37
37
1
LOADING
G
WOODEN
PRIVACY
FENCE
Classroom
331
S
OS
6
7.
36
8.
3
0.
1.6
36
37
37
1
3.
92
8.
15
GN
6.
37
SI
7
37
1.6
37
14
16
6.
6.
37
37
40
6.
37
38
9.
2
1.
38
UP
4.
36
36
2
60 364.
4.
36
81
4.
04
4.
36
61
4.
36
5.
36
79
4.
36
36
8.
06
92
5.
4.
36
80
36
4.
99
4.
36
36
EN
OP
P=
89
.
FL
5.
36
03
6.
84
5.
366.59
90
5.
5
36
6.
36
36
P= 5
1.4
TO
36
V=
IN
2
36
9
7.
36
9.
36
R
33
0.
TE
93
28
9.
1.0
37
4
4. 4.45
37 37
371
36
8
'T
TO
4.
DN
36
05
7.
88
97
7.
79
36
6.
7.
36
00
6.
361ST.
36
36
38
9.9.35
36
36
44
9.
36
9.
WA
36
OF
1
1.1
37
37
P=
TO 5
0.
37
LL
81
FU
0.
81
37
0.
37
41
5.
15
37
5.
3.
82
37
37
2.
3
1.8
37
5
1.9
37
13
2.
371 2
2.
37 1.8
37
WA
1.8
S
37
OS
CR
K
IC
32
2.
BR
37
17
00 373.
9
39
2.
2.
3
37 8.07 37
3.
37
P=
TO V=36
IN
37
83
3
3.
7.
37
37
5155
4.4.
3838
6
38
83
8
8.
84
8.
8.
38
38
38
GATE
37
LANDSCAPED AREA\SHRUBS
36
26
5.
UL
37
BRICK PAVERS
UP
DN
Office
330O
Classroom
Office
331E
98sf
GM
S
E
T
Office
331F
89sf
38
0.
28
11
5.
37
1.9
42
5.
38
38
93
4.
BRICK PAVERS
UP
19
5.
36
5.
00
37
3.
37
51
4.
37
31
9.9.36
37
37
S
Stairs
353
386sf
334
396sf
354
507sf
UP
Storage
DN
Stairs
358
392sf
365sf
36
0.
2
5
58
0.
1.5
37
37
03
2.
1.3
37
37
32
2.
370.00
58
2.
37
37
3140
85
5.5.
7.
37
37
37
38
McKINLEY BULDING
2 STORY GRANITE
S
Storage
Stairs
355
DN
4.
37
UP
Hallway 339
EE
Y
LL
TR
HO
37
IN
4"
11
TW
2.
4"
3"
92'-0"
DESIGNED BY:
100 Feet
DRAWN BY:
GMG
GMG
Date
December 22,2010
Scale
N.T.S.
Drawing Name
CHECKED:
REVIEWED:
APPROVED:
ACCT NO:
MARY GRAYDON SITE
View from
McKinley Building
STORAGE
T54
92'-0"
Drawing No.
379
sf
UP
360
sf
T65
T64A
20sf
264
sf
Stairs
T63
317sf
UP
UP
50'-0"
1
Stairs
295
361sf
x
234
236
238
97sf
97sf
125sf
Stairs
Rm 259
294
432sf
DN
373sf
372sf
DN
x
DN
x
44'-0"
26sf
T35
Custodian
T39
118sf
142sf
Hall T34
366sf
Offic
e
T25C
198sf
Offic
e
T25B
88sf
Vest
T37A
20sf
Offic
T25A
e
76sf
Pots
Stg
T45
154sf
T26
T46
ELEV.
T47
165sf
Kitchen
301 sf
Break Room
217sf
T28
80sf
589sf
DN.
T29
T30
T61
50'-0"
Dining Area
T7
3,70
8sf
115sf
Rm 233
110sf
121sf
Mec
hT11
36sf
Rm 239
135sf
154sf
241A
241B
123sf
108sf
Rm 224
115sf
Genr'l Stor
288A
26'-0"
Vestibule
T7A
55sf
Semi-private
Dining
T19
592sf
Stairs
T14A
35sf
Stairs
T50
UP
Vestibule
T4A
28sf
133sf
Dining
T14B
579sf
T9
Elev.
261
75sf
Vestibule
T3A
27sf
UP
Dining
T5B
708sf
139sf
Stora
Stg
T8A
76sf
Elev
224
162sf
Rm 209
Rm 218
171sf
91sf
Conference
Rm 205
207
37sf
Office
201B
64sf
Conference
Rm 203
358sf
Rm 216
107sf
Stair
s
33sf
T52
352sf
207A
Terrace
T6
55sf
56sf
10
50
100 Feet
383sf
136sf
284
Media Library
254A
21sf
LOUNGE
284B
150sf
Hallway
285
1,066sf
Office
201A
131sf
DN
LOUNGE
284B
150sf
Rm 262
443sf
Rm 266
138sf
Rm 273A
Stairs
248
182sf
Rm 271B
132sf
549sf
Rm 271A
27sf
141sf
Reception
271
105sf
510sf
83sf
CONFERENCE
UP
Stor
Stor
Rm 206B
77sf
Rm 206A
Rm 206
198sf
Rm 204
85sf
Rm 202
274A
167sf
89sf
274
287sf
218sf
Rm 204C
130sf
285A
192sf
Hallway
280
437sf
204A
206C 43sf
STAIRS
296
122sf
Rm 268
Rm 271D
Rm 273
Stor 273B
204B
83sf
Rm 202A
161sf
Conference Rm
Rm 200
915sf
Rm 274D
523sf
274B
85sf
274C
123sf
Rm 270A
76sf
Rm 272
348sf
Office
Cir
270
109sf
Stairs
297
122sf
Rm 270B
330sf
Storage
270C1 Office
16sf
270C
139sf
Rm 208
143sf
1
0
Second
50
DRAWING NO:
Rm 271C
86sf
152sf
STAIR #1
Storage
ge
T56
Rm 260
170sf
Lobby
280
1,316sf
Office
201
391sf
87sf
124sf
143sf
DN
110sf
Hallway
Hallway
281
480sf
CLOSET
Rm 210
UP
Hallway
284
627sf
Elev
WC
Rm 211
59sf
118sf
Rm 212
January 14, 2011
Rm 264
Rm 220
666sf
DATE:
Zoning
Rm 256
263
64sf
277sf
T8
Stairs
T5A
35sf
DWG SET:
254
Conference
Rm 247
611sf
213A
75sf
50 Feet
328sf
254C
27sf
51sf
Hallway
282 638sf
Services Reception
Rm 214
Private
Dining Room
T3
195sf
Mechanical
1,768sf
Tel 287
28sf
Rest Rm
(F)
Rest Rm
(M)
T4
185sf
284
Elec
Rm 245
107sf
Servery
T5
2,178sf
43sf
75sf
Conference
213B
Mech.
251
252A
288B
56sf
110sf
50sf
Hallway
256A
96sf
40sf
Stor.
250C
25
Hallway
58sf
Counseling Center
Terrace Dining Room
100sf
254B
40sf
10
256B
256E
250A
5
REVISIONS:
337sf
661sf
398sf
Vending
284A
29sf
156sf
Rm 258
250B
Rm 250
188sf
Telco
289
74sf
GEN
STOR
246
Rm 217
STO.
215
Lobby
489sf
Servery
T14
3,159sf
290
U
P
Rm 256C
100sf
135sf
55sf
105sf
WOMEN
191sf
Hall
259A
64sf
256D
Rm 252B
252
Maint.
Rm 292
Conference
Rm 244
Reception
243
247sf
114sf
121sf
T1
Academic
Support Ctr.
Rm 231
113sf
Rm 222
Storage
T31C
72sf
UP
Rm 235
Rm 237
BREAK RM.
RM 219
Rm 226
Ref.
Storage
Storage
T31B
144sf
Vest
T5C
54sf
410sf
291
175sf
120sf
174sf
60'-0"
Elev
T60A
119sf
Stairs
T51
118sf
Rm 248
MEN
Rm 228
T5A
98sf
64sf
Dish Washing
Service
T13
572sf
49sf
Rm 242
238sf
78sf
1061sf
Ref.
Storage
Ref.
Sante Fe Room
Semi-private
Dining
T20
457sf
240A
102sf
Rm 229
187sf
78sf
221
Vestibule
T55
91sf
Kitchen and
Storage
2,480 sf
Cust.
28
Rm 240
Rm 227
192sf
114sf
MECH
T49A
61sf
T31
55sf
Rm 225
79sf
Rm 230
T48
200sf
Mech.
T62
Service
Admin. Office
741 sf
Ref.
Offi
ce
T32
85sf
223B
115sf
223A
Ra
mp DN UP
DN
Pots
Stg
Hallway
T31A
121 sf
Offi
ce
T33
90sf
T25
T23
156sf
Up
Vest
T38A
20sf
Admin. Offices
162sf
25'-0"
T43
259
sf
T34
175sf
62'-0"
86sf
h
T44
Hallway
283 1,262sf
Rm 232
1516sf
Mec
Mec
hT44A
45sf
55sf
5,9
19
sf
MECH
T49
47sf
30sf
T35A
Vestibule
T34A
T41
T66
LOADING DOCK TUNNEL
Ves
tibul
T43A
e 24sf
Hallway
282A
Bath(M) Bath(F)
T38
T37
119sf
97sf
Line
n
Clo
T42
set
17sf
44'-0"
T36
Telc
o
T40
10sf
Fourth
copyright,©2008 McKissack&Mckissack
UP
D
N
UP
PROJECT NO:
5.8
92'-0"
Storage
T53
456sf
T64
100 Feet
EXHIBIT 20
20.1c
SHEET NO 3 OF 8 SHEETS
Office of the
University Architect
92'-0"
UP
4620 Wisconsin Avenue, N.W., 3rd Floor
Washington, D.C. 20016
Tel: (202)885-1369
Fax: (202)885-1056
UP
D
N
UP
50'-0"
AMERICAN
UNIVERSITY
CAMPUS PLAN
2011
Ra
mp DN UP
DN
62'-0"
PROJECT TITLE
Mary Graydon
Center
Up
44'-0"
Addition
American University
Main Campus
4400 Massachusetts Ave., N.W.
Washington, DC 20016
DN.
DRAWING TITLE
25'-0"
Office and Support Space
Terrace Level
Floor Plan
UP
DESIGNED BY:
DRAWN BY:
GMG
GMG
CHECKED:
REVIEWED:
APPROVED:
ACCT NO:
PROJECT NO:
DWG SET:
UP
DATE:
Zoning
January 14, 2011
REVISIONS:
UP
DN
DRAWING NO:
10
50
100 Feet
EXHIBIT 20
20.1d
SHEET NO 4 OF 8 SHEETS
Office of the
University Architect
92'-0"
4620 Wisconsin Avenue, N.W., 3rd Floor
Washington, D.C. 20016
Tel: (202)885-1369
Fax: (202)885-1056
DN
DN
DN
C
AMERICAN
UNIVERSITY
CAMPUS PLAN
OPEN TO BELOW
2011
Mary Graydon
Center
44'-0"
60'-0"
PROJECT TITLE
Addition
American University
Main Campus
4400 Massachusetts Ave., N.W.
Washington, DC 20016
DRAWING TITLE
OPEN TO BELOW
26'-0"
Dining and Meeting Space
First
Floor Plan
451-019 D/ADOOR JAMB
D
N
UP
COVEREDDESIGNED
WALKWAY
BY:
DRAWN BY:
GMG
190
DOOR
STILE
GMG
CHECKED:
REVIEWED:
APPROVED:
ACCT NO:
939sf
PROJECT NO:
UP
UP
DWG SET:
DATE:
D.S.
D.S.
Zoning
January 14, 2011
REVISIONS:
UP
UP
UP
DRAWING NO:
EXHIBIT 20
20.1e
SHEET NO 5 OF 8 SHEETS
Office of the
University Architect
92'-0"
4620 Wisconsin Avenue, N.W., 3rd Floor
Washington, D.C. 20016
Tel: (202)885-1369
Fax: (202)885-1056
DN
DN
AMERICAN
UNIVERSITY
CAMPUS PLAN
50'-0"
DN
2011
PROJECT TITLE
Mary Graydon
Center
60'-0"
44'-0"
Addition
American University
Main Campus
4400 Massachusetts Ave., N.W.
Washington, DC 20016
DRAWING TITLE
26'-0"
DN
Second
Floor Plan
Office and Meeting Space
DESIGNED BY:
UP
DRAWN BY:
GMG
GMG
CHECKED:
REVIEWED:
APPROVED:
ACCT NO:
PROJECT NO:
DWG SET:
DATE:
Zoning
January 14, 2011
REVISIONS:
1
0
50
100 Feet
DRAWING NO:
EXHIBIT 20
20.1f
SHEET NO 6 OF 8 SHEETS
Office of the
University Architect
92'-0"
RISER
UP
DN
UP
DN
UP
50'-0"
UP
TO BUTLER
PAVILION
4620 Wisconsin Avenue, N.W., 3rd Floor
Washington, D.C. 20016
Tel: (202)885-1369
Fax: (202)885-1056
DN
AMERICAN
UNIVERSITY
CAMPUS PLAN
UP
2011
PROJECT TITLE
Mary Graydon
Center
44'-0"
60'-0"
Addition
American University
Main Campus
4400 Massachusetts Ave., N.W.
Washington, DC 20016
26'-0"
DRAWING TITLE
Third
Floor Plan
Meeting/Event Space
DESIGNED BY:
DRAWN BY:
GMG
GMG
CHECKED:
REVIEWED:
APPROVED:
ACCT NO:
PROJECT NO:
DWG SET:
DATE:
Zoning
January 14, 2011
REVISIONS:
DRAWING NO:
EXHIBIT 20
20.1g
SHEET NO 7 OF 8 SHEETS
Office of the
University Architect
4620 Wisconsin Avenue, N.W., 3rd Floor
Washington, D.C. 20016
Tel: (202)885-1369
Fax: (202)885-1056
AMERICAN
UNIVERSITY
CAMPUS PLAN
American University
4400 Massachusetts Avenue, NW
Washington DC 20016-8200
Project
2011
AMERICAN
UNIVERSITY
PROJECT TITLE
CAMPUS PLAN
Mary2011
Graydon
Center
Addition
American University
Main Campus
4400 Massachusetts Ave., N.W.
Washington, DC 20016
DRAWING TITLE
DESIGNED BY:
DRAWN BY:
GB
McKissack McKissack GB
1401 New York Avenue,
NW
CHECKED:
REVIEWED:
Suite 900
ACCT NO:
Washington DC 20006
APPROVED:
PROJECT NO:
DWG SET:
DATE:
Zoning
January 14, 2011
REVISIONS:
Date
December 22,2010
Scale
N.T.S.
DRAWING NO:
EXHIBIT 20
MARY GRAYDON SITE
20.1h
View from
Drawing Name
Graphics on this page were prepared by McKissack and McKissack
McKinley Building
SHEET NO 8 OF 8 SHEETS
Drawing No.
Download