Shoreline Management Plan 6 Action Plan Update 2014 Cancelled Actions (All Policy Units) Policy Unit 6.13 Policy Unit Name Eccles to Winterton Beach Road Action Reference EA/02 Action Description 6.09 6.12 Mundesley to Eccles NNDC/12 6.08 6.11 Mundesley - Ostend NNDC/13 6.21 Hopton to Corton WDC/08 Removal of groynes and revetment as they become a health and safety problem. Maintain defences in the absence of an adaptation strategy. Implement agreed solution for the management/remo val of the RAF Hopton bunker. Monitor Eccles to Winterton beach recharge materials for shell fragments to ensure low levels of calcium are present to prevent negative impacts on dune habitats. Lead Organisation EA Implementation Date Most likely Sept-14 Status Update 2014 Cancelled NNDC Not determined Cancelled This is completed through the EA monitoring programme see EA/ 01 and through the implementation of the beach recharge scheme EA/04. CANCELLED Combined with NNDC/ 09. NNDC Ongoing Cancelled CANCELLED Combined with NNDC/ 10. WDC TBC Cancelled CANCELLED don’t know what action will be required from the Gorleston to Lowestoft Study. 1 6.21 Hopton to Corton WDC/09 6.20 6.22 Hopton to Corton WDC/01 6.20 6.22 Hopton to Corton WDC/03 6.20 6.22 Hopton to Corton WDC/01 6.20 6.22 Hopton to Corton WDC/03 Manage defences to improve public safety and amenity through appropriate removal of redundant defences. Community engagement regarding coastal change and adaptation A project appraisal report for Corton and Hopton will need to be developed in order to progress the management of defences. Community engagement regarding coastal change and adaptation A project appraisal report for Corton and Hopton will need to be developed in order to progress the management of WDC TBC Cancelled CANCELLED don’t know what action will be required from the Gorleston to Lowestoft Study. WDC TBC Cancelled CANCELLED Amalgamated into G/ 15. WDC TBC Cancelled CANCELLED don’t know what action will be required from the Gorleston to Lowestoft Study. WDC TBC Cancelled CANCELLED Amalgamated into G/ 15. WDC TBC Cancelled CANCELLED don’t know what action will be required from the Gorleston to Lowestoft Study. 2 defences. 6.23 Corton to Lowestoft WDC/06 6.20 6.24 Hopton to Lowestoft North (to Ness point) Hopton to Lowestoft North (to Ness point) Lowestoft North (to Ness Point) WDC/14 6.20 6.24 6.24 Implement agreed WDC solution for the management of the Eleni V oil burial sites. Review and update WDC coastal asset monitoring plan. TBC Cancelled CANCEL Dependent on WDC/ 05. TBC Cancelled WDC/14 Review and update WDC coastal asset monitoring plan. TBC Cancelled WDC/04 A project appraisal report will need to be developed in order to progress repair/removal of defences. TBC Cancelled CANCELLED as part of routine action of coastal management team. CANCELLED as part of routine action of coastal management team. CANCELLED don’t know what action will be required from the Gorleston to Lowestoft Study. WDC 3 6.06, 6.08, 6.10 6.16, 6.19, 6.20, 6.22 Overstrand G/12 , Mundesley , Bacton Gas Terminal, Caister-onSea, Gorleston to Hopton, Corton Develop consistent medium to longterm plans for relocation of services and facilities that will be lost to erosion, e.g. outfalls, highways in line with Defra Coastal Change Policy and resulting pathfinder studies. Local Authorities/E A with service and utilities providers 4 Ongoing Cancelled CANCELLED Amalgamated with G/ 03 & G/ 10