Annual Report FINAL DRAFT 2013/14 Version 1.5 Any queries please contact Policy and Performance Management Officer, Helen Thomas Tel. 01263 516214 Annual Report 2013-14 v1 5 for Cabinet Page 1 of 40 Contents Contents .................................................................................... 2 Introduction............................................................................... 3 Content ...................................................................................... 3 Overview ................................................................................... 4 Our Vision and Values.............................................................. 5 Our Priorities............................................................................. 6 Jobs and the Local Economy .............................................................. 6 Housing and Infrastructure .................................................................. 7 Coast, Countryside and Built Heritage................................................. 9 Localism ............................................................................................ 10 Delivering the Vision .......................................................................... 12 Financial Summary ................................................................. 13 Appendix 1 – Annual Action Plan Delivery Report ............... 14 Appendix 2 – Performance Indicator Results ....................... 28 Appendix 3 – Responding to the Tidal Surge ....................... 36 Appendix 4 – Workforce Profile Statistics ............................ 40 Version Control....................................................................... 40 Annual Report 2013-14 v1 5 for Cabinet Page 2 of 40 Introduction [To be provided by the Leader and Chief Executive after completion of the report and appendices and to include an element on key events including the storm surge] Content The annual report shows progress against the Corporate Plan 2012-2015 Themes, together with any other relevant performance achievements and issues. Each Theme has an assessment of progress achieved during the year in delivering the Annual Action Plan 2013/14 and achieving targets. It presents key achievements, issues and challenges faced during 2013/14. Performance against targets set for performance indicators and whether or not performance is improving are shown in the performance indicators at a glance section. The appendices contain the detailed evidence to support the overview and assessments. Appendix 1 gives progress reports for each activity in the 2013/14 action plan and Appendix 2 shows performance and further information against each performance indicator. The purpose of the report and the process for producing it is to highlight any performance issues to help the Council identify areas for discussion and take action to secure improvement in the future where it is needed. Signifies an action or target achieved that has an outcome that meets our equalities objectives. Annual Report 2013-14 v1 5 for Cabinet Page 3 of 40 Overview 1. The majority of the 49 activities in the Annual Action Plan 2013/14 are progressing to plan (35). Performance is being closely monitored, particularly for the small number of activities where issues or problems have been identified (five) or the activity is on hold (one). Some activities have already been completed successfully (eight). See Chart 1 below. 2. Of the 14 performance indicators where a target has been set eight are on or above target, one close to target and five below target. 3. Where assessment of performance in 2013/14 is possible against performance in 2012/13 17 indicators have improved, three are unchanged and none worse compared to last year. See Chart 2 below. 4. See Appendices 1 and 2 for data and progress reports for individual activities and performance indicators. Activities Completed Successfully 5, 10% 1, 2% 8, 16% Progressing to Plan Postponed, Delayed or On Hold Some Problems 35, 72% Chart 1 : Progress in delivering the activities in the Annual Action Plan 2013/14 Performance Indicators 0, 0% Improving compared to the same period last year 3, 15% 17, 85% Close to the same period last year’s result Chart 2 : Performance indicators direction of travel in 2013/14 Annual Report 2013-14 v1 5 for Cabinet Page 4 of 40 Our Vision and Values North Norfolk is a unique and beautiful place. It is somewhere we cherish and we are proud to be entrusted with the role of leading our district and contributing to the future wellbeing and prosperity of the many communities we represent. Our vision Our priorities for North Norfolk are: To boost employment and create more jobs To enable the provision of new homes and the infrastructure that goes with them To protect our coastline and the character of our countryside and built heritage To empower individuals and local communities to have a greater say in their own futures To reform the organisation to deliver high quality services that achieve our priorities in an efficient manner that represents good value for local taxpayers Our values We will: Empower people and communities to make their own decisions Support people in taking control of their own lives Be innovative and flexible in the delivery of our services Be open and transparent in our decision-making Work with partners in the private, public and voluntary sectors where appropriate for the benefit of the District Value and respect the roles of councillors and staff and act with integrity at all times Annual Report 2013-14 v1 5 for Cabinet Page 5 of 40 Our Priorities Jobs and the Local Economy What we want to achieve: A district with a thriving economy offering better jobs and prospects for local people. What we have done in 2013/14 towards meeting the priority: 1. Progressed the proposal to develop a Local Development Order for Egmere to accommodate investment by businesses associated with the development and operation of offshore wind schemes off the North Norfolk coast. 2. Received planning applications for the allocated development sites at North Walsham and Holt with a combined housing number of up to 391. 3. Advised Kinnerton Confectionery in the expansion of its factory in Fakenham by 2,710 sqm, safeguarding the jobs of 600+ employees and supporting a further 90 new jobs. 4. Seen an increase in the rateable value of business stock within North Norfolk of almost £1m. 5. Promoted business growth through a North Norfolk enterprise and start up grant scheme. 6. Encouraged 45 new business through the Enterprise North Norfolk programme. 7. Engaged with over 60 local businesses at the March 2014 skills event. Helped existing businesses resulting directly in 16 new apprenticeships being created. From August 2013 to January 2014 there were 350 new apprentices starting in North Norfolk, 260 under 25. 8. Supported Visit North Norfolk, Coast and Countryside, the newly established Destination Management Organisation in North Norfolk. 9. Actively supporting Norfolk County Council in the development of proposals for the re-use of the former RAF Coltishall site. 10. Employed directly 3 apprentices during 2013/14 who are undertaking qualifications at level 2 in business administration. 11. Supported the first longer distance triathlon to be hosted in North Norfolk and also the Pedal Norfolk event hosted at Holkham. Both events are due to run again in 2014/15. 12. Reduced costs to market traders to try to ensure that North Norfolk‘s traditional markets continue to play an important part in the economies of market towns. 13. Offered half price beach huts in Spring and Autumn 2013. Issues and challenges The Council plans to: 1. Develop a Growth Plan and Business Engagement Strategy for the district which will set out where the Council can support and enable business growth and will provide a framework for economic development in the district and how we hope to better engage with businesses. Annual Report 2013-14 v1 5 for Cabinet Page 6 of 40 Housing and Infrastructure What we want to achieve: Everyone in North Norfolk should have the opportunity to buy or rent a decent home at a price they can afford, in a community where they want to live and work. What we have done in 2013/14 towards meeting the priority: 1. Implemented the Housing Delivery Incentive Scheme to encourage development in North Norfolk whilst ensuring that the quality of developments remain acceptable. This scheme has been adopted on 30 sites which will provide a total of 494 dwellings. 2. Continued to bring more empty homes back into use, particularly those that have been empty in some cases for decades, with direct intervention over 50 cases that have so far been dealt with having seen a positive outcome. 3. Maximised the New Homes Bonus awarded to the Council with an increase of £547,785 from 2013/14 to 2014/15. 4. Seen continued signs of improved conditions and delivery rates of new homes during 2013/14 with the delivery of 383 dwellings compared to that of last year (242) of which 153 (38%) were affordable dwellings. 5. Seen the highest number of affordable homes (153) completed in the district since the end of the council housing programme. This represents a significant increase in delivery both through 100% affordable housing schemes and as part of market developments. 6. Working in partnership with Housing Associations, provided 112 new build one and two bedroom affordable properties to rent across the district. Four bungalows built to the full wheelchair standard were also provided of which one had three bedrooms and the remaining three had two bedrooms. 7. Delivered its Housing Strategy approved in 2012 and is engaging with a number of parish councils to address local housing need. 8. Seen a continued improvement in the number of homes granted planning permission, increased from 536 in 2012/13 to 582 in 2013/14. 9. Made progress to bring forward the allocation in Fakenham (site F01) with agreement to bring forward the development brief for this major application within the first half of 2014, allowing for the submission of planning applications during 2014 with the aim of commencing on site during 2015. 10. Continued to deliver the car park improvement programme with surfacing improvements made to the car parks in Holt (Albert Street), Mundesley (Beach Rd) and Fakenham Connect. 11. Achieved Gold Awards for the public conveniences in both Happisburgh and Sheringham (East Promenade) for the second year in a row in the 2013 Loo of the Year Awards 12. Completed 110 disabled facilities grants for adaptations so that people with disabilities can remain in their homes. Issues and challenges The Council plans to: Annual Report 2013-14 v1 5 for Cabinet Page 7 of 40 1. Implement the Local Investment Strategy: Loans to Registered Providers Scheme which is designed to ensure higher levels of housing delivery through the use of Council resources. This is an innovative and ambitious project, but is hoped to deliver much needed homes in our towns and villages. 2. Continue to ensure that its assets are fit for purpose. Where assets are not performing as they should improvements will need to be made or alternative uses sought. 3. Maximise new homes bonus through bringing empty properties back into use and maximising housing delivery. Annual Report 2013-14 v1 5 for Cabinet Page 8 of 40 Coast, Countryside and Built Heritage What we want to achieve: A district where the beautiful natural environment and built heritage is valued and protected for future generations and where the coastline is defended against erosion wherever practicable. What we have done in 2013/14 towards meeting the priority: 1. Through the work of the Enforcement Board enabled long term empty properties to be tackled throughout the district. 2. Improved significantly the performance of the Planning Service for determining planning applications during the second half of 2013/14, resulting in improvements in performance across all three categories of planning application last year. The percentage of major applications determined within time has improved from 58% to 77%. 3. Entered into its first Planning Performance Agreement, for the cable work for the Dudgeon Offshore Wind Farm, which will act as a pilot project to assess the benefit of introducing PPA‘s as an integral part of the service. 4. Completed the £1.2m Cromer Pier repair scheme. 5. Commenced the £8m Cromer Sea Defence scheme. 6. Successfully had most of the frontages open for business within two weeks of the storm surge on 5 December 2013 and most of the repair work is now either complete or nearing completion. The storm surge caused very significant levels of damage costing £3m along the coast which required rapid response in terms of immediate emergency repairs and arranging long term repair work. (See page 7 for further detail) 7. Delivered 67 countryside and beach events. Events were held at Holt Country Park, Bacton Woods, Sadler‘s Wood, Pretty Corner Woods and some beaches. Total participation at events was 5,800 in 2013/14 compared with 2,714 in 2012/13. 8. Achieved a new Green Flag award for Pretty Corner Woods in Sheringham while Blue Flags were retained at Sheringham, Cromer and Sea Palling. Quality Coast Awards were awarded at East Runton and Mundesley. 9. Improved the household waste recycling rate from 42.02% in 2012/13 to 43.47% in 2013/14. Issues and challenges The Council plans to: 1. Keep up the debate about the funding for coastal management, working with communities to seek locally acceptable solutions to the longer term issues. The impacts of the storm surge have been significant, not only in terms of the level of funding to address the repairs, but also in raising awareness of the continual challenge that coastal erosion places on our communities. 2. Continue to drive forward the required repairs to Council property still outstanding following the storm surge to ensure that income streams are protected along with the Council‘s reputation. 3. Improve planning performance further and continue to maintain pressure on property and land owners who hold empty property or properties falling into disrepair. Annual Report 2013-14 v1 5 for Cabinet Page 9 of 40 Localism What we want to achieve: To embrace the Government’s localism agenda to empower individuals and communities to take more responsibility for their own futures and to build a stronger civil society. What we have done in 2013/14 towards meeting the priority: 1. Established a Localism Board to provide a steer with respect to Localism initiatives and community projects, particularly in relation to expressions of interest for local public services (under the Community Right to Challenge) and nominations for assets of Community Value (under the Community Right to Bid) 2. Designated the Parishes of Corpusty and Saxthorpe and Holt as Neighbourhood Areas and work is progressing on the preparation of Neighbourhood Plans. 3. Signed up to the ‗Hate Free Norfolk‘ Pledge demonstrating commitment to treating all customers and staff fairly and with dignity and respect. Promoted North Norfolk as a safe place to live, visit and work where hate crime should not be tolerated. 4. Successfully managed the Big Society Fund, delivering projects with some £225,000 being awarded for enabling projects and a further £219,000 for smaller community based projects including multi-use games areas and skate parks across the district. 5. Joined the Your Voice membership scheme allowing everyone interested in sharing their views and experiences to help develop and improve a wide range of services. 6. Been successful in a £211,512 funding application to Sport England‘s ‗Community Sports Activation Fund‘ to increase access to sport for women, girls and older people by setting up six community hubs in community settings and 10 sports clubs based at high school sites across the district over the next three years. 7. Offered free ‗rock school‘ workshops to 13 – 18 year olds in Walcott and North Walsham to help young people develop their ‗band‘ and performance skills. 8. Held the Greenbuild green lifestyle event hosting a range of exhibitors, from renewable technologies and sustainable construction techniques to information and advice on green building & renovation, gardening and saving energy. A record 8,500 people attended the event in 2013. 9. Launched a community dog warden scheme to crack down on dog fouling across the district. 10. Council Deputy Leader Rhodri Oliver named ‗Young Councillor of the Year‘. 11. Approved funding of £100,000 for four playground improvement schemes. 12. Successfully concluded negotiations with Cromer Town Council in relation to the future ownership and management of North Lodge Park. This will provide the opportunity for the local community to achieve long-term benefits for the park and its users and will put decisions about how the park is maintained in the hands of local people Issues and challenges The Council plans to: 1. Continue to explore opportunities provided by the Localism agenda to transfer assets to other bodies which can in turn often access funding streams not available to the Council. This can result in significant improvements and local benefits such as with the Wells Maltings project. Annual Report 2013-14 v1 5 for Cabinet Page 10 of 40 2. Ensure funding remains available through the return of the Second Homes Council Tax to support local initiatives through the Big Society Fund. Annual Report 2013-14 v1 5 for Cabinet Page 11 of 40 Delivering the Vision What we want to achieve: We will make the Council more efficient so that we can deliver our priorities and offer value for money for local taxpayers. What we have done in 2013/14 towards meeting the priority: 1. Approved a £1.4m Business Transformation Programme including an IT Strategy and Customer Management Strategy. 2. Identified savings and additional income in 2014/15 of £581k. 3. Completed an agreement with Norfolk County Council‘s Children‘s Services Northern Area Team to occupy part of the Cromer building, maximising the use of the building and achieving a future income stream of £70,000 per annum. 4. Continued to pursue large scale debt assertively and recover costs and expenses from those people we prosecute and enforce against so that Council Tax payers do not bear the costs. 5. Achieved the highest level of assurance for the management of the Freedom of Information and the Data Protection Act compliance during audit this year. 6. Been shortlisted for the Municipal Journal ―Legal Excellence‖ Award 2014. 7. Introduced self-service for employees linked to the Human Resources system which enables staff to view their personal employment information on line. Further changes will take place during 2014 to streamline processes which will create further efficiencies across the organisation. 8. Of the eleven decisions made as a result of complaints to the Local Government Ombudsman ten found no fault with the Council. 9. Successfully delivered the front reception project which has resulted in a far better working environment and has helped achieve cashable savings of £54,000 per annum. 10. Achieved slightly lower staff sickness levels of 6.77 days per full time equivalent member of staff than the previous year (6.80). 11. Retained Investor in People (IIP) accreditation at bronze level showing the Councils commitment to developing its staff. 12. Exceeded the target in the collection of business rates, achieving 99.14% against a target of 99.00%. 13. Successfully launched the Coastshare cost sharing group in October 2014 and promoted it as an example of good practice. Issues and challenges The Council plans to: 1. Continue to derive maximum benefit from its asset portfolio, minimising operating costs wherever possible and maximising income streams which will help to address the forecast budget deficit. 2. Deliver the Business Transformation Programme. Annual Report 2013-14 v1 5 for Cabinet Page 12 of 40 Financial Summary [To be provided by the Head of Financial Services] Annual Report 2013-14 v1 5 for Cabinet Page 13 of 40 Appendix 1 – Annual Action Plan Delivery Report Key Activity Status Symbol Description Completed Successfully Progressing to Plan This is for major projects, programmes or service plans and gives an indication that the plan will be achieved on time, to budget and will deliver the expected outputs and outcomes/ impacts. On Track Activity has started on schedule, and is on track to be completed by the predicted end date, to budget and will deliver the expected outputs and outcomes/ impact. On Hold Activities that have started but have had to pause. Some Problems Lead officers should have described the problems and the action being taken to deal with them. Signifies an action or target achieved that has an outcome that meets our equalities objectives. Jobs and the Local Economy A - Increase the number of new businesses and support the growth and expansion of existing businesses Activity Status AAP 13/14 - J A 01 - We will support businesses investing in the district through the provision of comprehensive advice about District Council support and signpost to other agencies as appropriate On Track AAP 13/14 - J A 02 - We will work with partners to develop and deliver the business support scheme Enterprise North Norfolk On Track AAP 13/14 - J A 03 - Working in partnership we will maximise the opportunities for investment in the district through the development of On Track Progress/ Action Note We have continued to support businesses through direct enquires and through a programme of visits to the key business sectors. Annual Report 2013-14 v1 5 for Cabinet The Enterprise North Norfolk programme has continued to deliver high quality business startup training and 45 new businesses have been established through the programme in 2013/14. The Leadership of Place project was reviewed in 2013. The North Walsham Town team has been supported with funding from the Portas Review to enable 14 businesses to pilot retail space through a ―pop-up shop‖ on the high Page 14 of 40 Activity Status retail sites Progress/ Action Note street. Four of these businesses are now trading in Cromer and North Walsham. AAP 13/14 - J A 04 - We will seek to maximise the opportunities for the district to benefit from investment in renewable energy developments off the North Norfolk coast Progressing to Plan Local Development Order (LDO) proposal now finalised and being presented to Cabinet May 2014. Details of LDO proposal included within New Anglia Local Enterprise Partnership (LEP) Growth Prospectus as shared with Government to include funding bid for access improvements from the B1105. Application also to be made for infrastructure funding to Coastal Communities Fund 30 April 2014. Good relationships being maintained with Statkraft, operators of the Sheringham Shoal development. Planning Performance Agreement agreed with the Dudgeon Offshore Wind Company in respect of the discharge of conditions in connection with the laying of the onshore cable across the district from late 2014. Initial visit to the Port of Wells / Egmere Business Zone by representatives of DONG Energy, developers of the Race Bank Offshore Wind development. Council member and officer involvement in Norfolk and Suffolk Energy Alliance on-going. AAP 13/14 - J A 05 - We will support the North Norfolk Fisheries Local Action Group (FLAG) and review the delivery of projects from the £2.4 million funding secured for the fishing sector On Track FLAG has continued to submit applications to the MMO for funding for fishery sector projects. Approximately £350,000 of project costs have been drawn down through 15 projects including support for the Wells Maltings Fishing Heritage Visitor Centre and the Princes Trust Apprenticeship scheme. AAP 13/14 - J A 06 - We will actively pursue all options in order to ensure the future development and operation of an Enterprise Hub for North Norfolk as a platform for improving levels of business start up and enterprise On Track AAP 13/14 - J A 07 - We will develop our corporate position in respect of emerging renewable energy technologies through preparation of an Energy Strategy Some Problems This project has involved consideration of an enterprise hub in the district and there are proposals for a feasibility study for a hub at Melton Constable. Annual Report 2013-14 v1 5 for Cabinet Work has begun on preparing a draft Energy Strategy, which is planned to be presented to Cabinet and the Overview and Scrutiny Committee in June 2014. There is at the present time significant debate nationally about some elements of energy policy in relation to onshore wind developments, solar photo-voltaic developments and fracking and it is important that our draft strategy document accurately reflects the national policy position in respect of these issues. Page 15 of 40 B - Improve the job prospects of our residents by developing a skilled and adaptable workforce that is matched to business growth and development Activity Status Progress/ Action Note AAP 13/14 - J B 01 - Through the Council's Learning for Everyone (L4E) Team we will provide information, advice and guidance to local people wishing to enter employment or improve their levels of skills and raise aspiration On Track This team provides advice and training for those seeking work. The team continues to operate under the National Careers Service contract and has successfully fulfilled the contract obligations for 2013/14 helping in excess of 60 people into work. AAP 13/14 - J B 02 - The L4E team will offer bespoke programmes of advice and support to people faced with redundancy from local companies as and when such events occur. The L4E team will also engage with existing and new employers in the district to understand their future workforce requirements and co-ordinate provision of relevant training courses to secure employment within the district On Track AAP 13/14 - J B 03 - We will explore opportunities to work with local businesses and identify funding to support the provision of apprenticeships and work experience schemes with the aim of increasing the employment opportunities of young people in the district On Track This reactive service continues on track. Redundancy enquiries continue to come through in very small numbers of individual people affected. We are increasingly engaging with businesses to assist them with their workforce planning. In particular, assisting in setting up work experience opportunities and creating apprenticeships. From August 2013 to January 2014 there were 350 new apprentices starting in North Norfolk, 260 under 25. On 25 March 2014 60 businesses attended an event called Business Magic to promote work experience and apprenticeships and to identify better links between businesses, education establishments and young people. As a result several are building closer links with schools and thus far there are 16 new apprenticeships being created. Guest speakers included the new chair of the New Anglia Local Enterprise Partnership. We have had very positive feedback from the event, and this forms a solid basis to progress this action plan item in the new financial year. The team have also continued to work with schools, carrying out careers promotion activity with Fakenham and Stalham in the last quarter. C - Improve access to funding for businesses Activity Status AAP 13/14 - J C 01 - Working with the North Norfolk Business Forum, other representative local groups, regional partners and financial services companies we will seek to ensure that small and medium sized On Track Annual Report 2013-14 v1 5 for Cabinet Progress/ Action Note A new memorandum of understanding has been proposed and the Council has engaged the services of an economic advisor to inform how the Forum can develop Page 16 of 40 Activity Status enterprises have improved access to investment finance to support business growth and development across the district Progress/ Action Note in the future. D - Reduce burdens to business by removing unnecessary red tape and bureaucracy at the local level Activity Status AAP 13/14 - J D 01 - We will work together to ensure we support and provide information to simplify the process for businesses looking to invest in North Norfolk On Track AAP 13/14 - J D 02 - We will work with partners to roll out BDUK's £60m Norfolk Broadband Initiative across North Norfolk On Track AAP 13/14 - J D 03 - We will review our approach to enforcement On Track Progress/ Action Note Advice to new businesses is provided through the web and with a face to face service. A new enterprise and start up grant scheme has been developed to address the credit needs of small and expanding local companies which compliments other grants available through the New Anglia Local Enterprise Partnership (LEP). The Council continues to support the County Council‘s roll out of Broadband in the County. The Enforcement Board continues to make significant progress towards its objectives of dealing with difficult and longstanding enforcement cases and bringing long term empty properties back into use, with both social and economic benefits, and financial benefits to the council. Almost 100 cases have or are being dealt with, with over half having seen a positive outcome. Environmental Health Restructure is on-going and due for completion by the end of May 2014 E - Promote a positive image of North Norfolk as a premier visitor destination Activity Status AAP 13/14 - J E 01 - We will support and facilitate the newly established private sector led Destination Management Organisation (DMO) for the North Norfolk coast and countryside to maintain the profile of the district as a leading tourist destination within the UK, boosting levels of employment and On Track Annual Report 2013-14 v1 5 for Cabinet Progress/ Action Note The Council continues to support the development of the Visit North Norfolk Destination Management Organisation (DMO) and has commissioned a new website as well as jointly preparing a Destination Management Plan. The website is planned to be launched in June 2014. Page 17 of 40 Activity Status Progress/ Action Note income for the district Housing and Infrastructure A - Increase the number of new homes built within the district and reduce the number of empty properties Activity Status Progress/ Action Note AAP 13/14 - H A 01 - We will bring forward detailed proposals on allocated sites by better engagement with developers On track Good progress has been made with work commencing on the majority of the allocated sites within the District, Development has commenced on the larger site allocations at Hoveton (nearing completion), Stalham, both allocations at Cromer, and Wells. Planning permissions have been granted for further allocated sites at Holt and North Walsham where development is expected to commence during 2014. Applications are pending or expected in relation to the remaining large allocations at North Walsham, Fakenham and Holt during 2014. Many of the smaller allocations in villages are the subject of pre application discussions and are also likely to be subject to planning applications during 2014. The introduction of the Housing Incentive Scheme in September has resulted in renewed developer interest in both large and small scale development. The scheme has been adopted on 30 sites which will provide a total of 494 dwellings. AAP 13/14 - H A 02 - We will produce development briefs on 3 of the allocated sites Some problems Annual Report 2013-14 v1 5 for Cabinet Planning applications have now been submitted for two of the sites, (Holt, North Walsham). A timetable has been agreed with the majority land owner of the Fakenham allocation (F01) which should allow for the completion of work on the brief during the first half of 2014. This would allow for the submission of planning applications during 2014 and commencing some development during 2015. Page 18 of 40 Activity Status Progress/ Action Note AAP 13/14 - H A 03 - We will seek to increase the number of new homes built of all tenures On track The number of houses delivered this year (383) is a significant increase over last year (242). There has been significant developer interest in the Housing Incentive Scheme although the impact of this is not likely to be evident until late 2014. AAP 13/14 - H A 04 - We will encourage the development of neighbourhood plans by supporting towns and parishes when they indicate a desire to go down that route On track Applications from Holt and Corpusty to be designated as Neighbourhood Areas have both been approved and work has commenced on the preparation of their Neighbourhood Plans. AAP 13/14 - H A 05 - We will support owners to bring empty homes back into use and provide opportunities to do so through advertising of private rented properties and the Empty Homes Matching Service. Where owners are reluctant to bring properties back into use we will take enforcement action as required. This will be enacted by the implementation of the recently approved Empty Homes Policy and Enforcement Policy On Track The Enforcement Board continues to make significant progress towards its objectives of dealing with difficult and longstanding enforcement cases and bringing long term empty properties back into use, with both social and economic benefits, and financial benefits to the council. Almost 100 cases have or are being dealt with, with over half having seen a positive outcome. Environmental Health Restructure is ongoing and due for completion by the end of May 2014. B - Increase the number of affordable homes with a range of tenure types Activity Status Progress/ Action Note AAP 13/14 - H B 01 - We will evaluate our approach to viability assessments, which assess the proportion of affordable housing that are viable to include in housing developments, to maximise development opportunities On Track We evaluate viability assessments received with applications to assess the appropriate provision of affordable housing. A review of this approach will be undertaken in 2014/15. C - Secure investment in new infrastructure Activity Status Progress/ Action Note AAP 13/14 - H C 01 - We will consult and then obtain agreement on a process for securing contributions towards infrastructure from development proposals in the district Completed Successfully The Council has resolved not to introduce a Community Infrastructure Levy at this time. Annual Report 2013-14 v1 5 for Cabinet Page 19 of 40 Coast Countryside and Built Heritage A - Maintain the integrity of special landscape designations and balance the development of housing and economic activity with the need to preserve the character and quality of the district's countryside and built heritage Activity Status AAP 13/14 - C A 01 - We will assess and implement requirements for new Green Flag awards and work to retain the existing awards Completed Successfully AAP 13/14 - C A 02 - We will work with other agencies to retain three of the district's Blue Flags for the quality of the beaches and to achieve Quality Coast awards Completed Successfully AAP 13/14 - C A 03 - We will achieve zero defaults in our waste and related services contract for cleanliness Some Problems Progress/ Action Note Green flags have been awarded to both Holt Country Park and Sadlers Wood North Walsham. A new Green Flag for Pretty Corner Woods in Sheringham has been awarded which now brings the total for the District to three. Blue Flags retained at Sheringham, Cromer and Sea Palling. Quality Coast Awards were awarded at East Runton and Mundesley. Kier have generally responded positively and promptly where problems have been identified. However, the approach is not yet proactive enough to prevent these problems recurring elsewhere in the district. However, the cleanliness of North Norfolk in comparison to other areas is generally very good. The agreed contract cost savings are likely to have an impact on response times and service levels for cleansing services in the future. However, officers will continue to closely monitor performance and will seek to mitigate the impact of the reduction in contract resources. Kier provided significant assistance with the clear up work associated with December's storm surge. This work was vital in helping North Norfolk return to normality quickly. AAP 13/14 - C A 04 - We will ensure all reported fly-tips are responded to within 2 working days On track Kier continue to maintain their performance in response to flytipping achieving 77% of the service requests within 2 days throughout the year. B - Recognise the District's built environment as a heritage asset when promoting North Norfolk Activity Annual Report 2013-14 v1 5 for Cabinet Status Progress/ Action Note Page 20 of 40 Activity Status Progress/ Action Note AAP 13/14 - C B 01 - We will adopt conservation area appraisals and management plans for Sheringham, Walsingham and Wells On track Walsingham Conservation area appraisal has been adopted. C - Design a more cohesive framework for coastline management Activity Status Progress/ Action Note AAP 13/14 - C C 01 - We will identify specific Integrated Coastal Zone Management (ICZM) projects and identify the means of funding Progressing to Plan The Council has continued to develop its integrated coastal management approach guided by the Council‘s Coastal Management Board. The maintenance programme and reactive works have continued and the Coastal Forum has met to discuss topical issues and held a successful field trip in June 2013 at Bacton, Walcott and Sea Palling. The North Sea surge of 5/6 December 2013 created very significant damage across the North Norfolk frontage. The Coastal Management Team has been working to assess and repair damage to coast protection assets as a matter of urgency, leaving less time for other streams of work. Surge repairs are complete at Weybourne and The Runtons. Significant progress has been made at Sheringham, Cromer, Overstrand, Mundesley, Bacton, Walcott and Cart Gap. The Council has received confirmation of £765,000 of emergency coast protection works funding from the Environment Agency for the year 2013/14. D - Continue to defend coastal settlements against erosion wherever practicable Activity Status Progress/ Action Note AAP 13/14 - C D 01 - We will commission design works and oversee the implementation of the Cromer Defence Scheme Progressing to Plan The Council were successful in drawing down £8m Government funding for a major refurbishment of the sea defences at Cromer. Work is programmed to take place outside the holiday periods to ensure Cromer remains open for business during the works. The first winter season of works has now been completed with the successful installation of all steel sheet piles. Additional works to stabilize the cliff between the Pier and Melbourne following surge damage as also been achieved. AAP 13/14 - C D 02 - We will develop and adopt a prioritised programme for future 'selected' coastal On Hold Some of the previously planned works were temporarily suspended after the storm surge to enable a review of funding arrangements. It is anticipated that works will recommence in the new financial year Annual Report 2013-14 v1 5 for Cabinet Page 21 of 40 Activity Status Progress/ Action Note defence work schemes following the completion of the main surge repair works. Localism A - Recognise the important role that Town and Parish Councils have as the democratic embodiment of their communities Activity Status Progress/ Action Note AAP 13/14 - L A 01 - We will respond positively to a Community Right to Challenge to take over the running of services within their area/communities if they can be run more efficiently (to our Service Level Agreement) and we will establish a regular dialogue and work with town and parish councils. We will hold workshops for training and development, in particular to encourage wide community participation in the democratic process On Track Delivery of the Tourist Information Centre at Wells was delivered through the Community Right to Challenge and the district continues to respond positively to any requests for information and advice. AAP 13/14 - L A 02 - We will work with Town and Parish Councils, local organisations and community and voluntary groups to improve health and wellbeing consistent with the aims of the Health and Wellbeing Board On Track The Council is leading on two projects funded by the Health and Wellbeing Board funding to offer health and physical activity programmes in primary schools and additional non sports focussed sessions at sports centres aimed at people who don't traditionally engage in activity. The Big Society Fund and projects such as Grow Your Community have increased proactive engagement with Town and Parish Councils. In addition, the offer for Cabinet and Corporate Leadership Team (CLT) to attend Town and Parish Council meetings was well received and has improved engagement. The Council made a successful bid to the Sport England ‗Community Sports Activation Fund‘ for £211,000 which will fund the Community Gym and Activity Team for a further 3 years. Discussions are currently underway with the Director of Public Health at Norfolk County Council regarding future funding of health improvement and prevention Annual Report 2013-14 v1 5 for Cabinet Page 22 of 40 Activity Status Progress/ Action Note based activities which will help in the County Councils aim for maximise healthy life expectancy and minimising acute and residential care. B - Encourage communities to develop their own vision for their future and help them to deliver it Activity Status Progress/ Action Note AAP 13/14 - L B 01 - We will commission work to support community planning and for community and voluntary sector capacity building On Track The Council has grant agreements with Norfolk Citizens Advice Bureau, Mid Norfolk Citizens Advice Bureau and Voluntary Norfolk. Each grant agreement is regularly monitored to ensure that it meets identified outputs and outcomes. Grants are also given to several community transport providers. In the last year the Growth and Communities Team has continue to offer support and in depth advice to a wide range of community organisations some of which have resulted in applications to the Enabling Fund, Big Society Fund or to external funding bodies. AAP 13/14 - L B 02 - We will utilise our resources, statutory powers and influence to encourage communities to realise opportunities for their own future On Track The Council provides an advice service to community groups to develop community empowerment projects and to support grant funding applications. It has been agreed to transfer North Lodge Park to Cromer Council. C - Encourage the growth of The Big Society within communities Activity Status Progress/ Action Note AAP 13/14 - L C 01 - We will continue to monitor the community investment fund, known as The Big Society Fund, to invest in local communities, strengthen civil society, and establish the process for determining priorities for expenditure On Track The Big Society Fund has been managed internally since 1.4.2013. The Fund which totals £450,000 is divided equally between an enabling fund and a grant fund. Funding is awarded to projects that strengthen and improve social and economic wellbeing in communities across North Norfolk. In the last year the enabling fund has awarded £185,000 to three projects. A further £40,000 has been provisionally allocated to two further projects. The grant fund which awards grants up to £15,000 has awarded thirty three grants totalling £219,441. An annual report into the Funds activity during the past year will be presented to Cabinet in May. Annual Report 2013-14 v1 5 for Cabinet Page 23 of 40 Delivering the Vision A - Deliver strong governance arrangements Activity Status Progress/ Action Note AAP 13/14 - V A 01 - The Audit Committee will oversee a review programme to ensure that audit coverage reflects the risks facing the Council and produce a revised annual audit plan for 2013/14 onwards On Track Audit plan set and delivered for 2013/14 (subject to final completion and sign off of outstanding 2013/14 reviews) – overall position will be reported to the Audit Committee in June 2014. AAP 13/14 - V A 02 - We will set and achieve 100% compliance with deadlines agreed with Internal Audit for recommendations rated as Medium and High Some Problems There has been some delay in the implementation of the recommendations compared to the deadlines agreed within the audit reports sometimes due to ability to resource the implementation and reprioritisation within the service. Once the outcome of the Internal Audit Follow up review has been confirmed the status of this can be updated. AAP 13/14 - V A 03 - We will review and improve the revised performance management framework Completed Successfully The framework has been reviewed and changes implemented which have been favourably received. This included; - A Management Scorecard and Scorecard Report for managing performance in 2013/14. - A search function added to the performance and risk system to provide an additional route for users to find relevant performance and risk information. - A revised format quarterly performance report to Cabinet. - Delivering training in managing performance. B - Ensure that effective communications exist Activity Status Progress/ Action Note AAP 13/14 - V B 01 - We will optimise media coverage and devise other means of disseminating information to residents regarding Council activities and initiatives and we will place the Council's website and intranet at the heart of all we do On Track Over the last year we have seen a number of key developments with the website. The web survey has been implemented throughout the site and is generating a steady flow of customer feedback. This information is being collated and reviewed on a regular basis providing valuable insight into satisfaction levels, reasons for visit and likelihood of avoidable contact. All of which will aid prioritisation of future developments. Work undertaken to address website errors relating to function, code quality and accessibility has resulted in the North Norfolk District Council Annual Report 2013-14 v1 5 for Cabinet Page 24 of 40 Activity Status Progress/ Action Note website being ranked 9th by Sitemorse out of all 429 local government websites. This is our highest ever ranking and shows continuous improvement in this area. Other developments include the Bin Collection application that allows customers to check when their bins are collected via the website. This was a prominent issue highlighted via web survey feedback and since its launch (at the end of March) has received positive feedback from customers. With regard to Social Media this year has seen the launch of corporate accounts on Twitter (May), Streetlife (February) and Facebook (March). The number of Twitter followers has steadily grown to the current total of 879, 43 likes have been received on Facebook to date and 1564 people are currently following us on streetlife. AAP 13/14 - V B 02 - We will develop a Customer Access Strategy to ensure that the most economic, efficient and accessible forms of contact are in place for all our customers On Track The Head of Business Transformation and IT commences employment at the Council in April 2014. In addition, the first workstream of the Business Transformation programme, Telephony, will be considered in a report to Cabinet in April 2014 with an anticipated procurement of 9 to 12 months following this date. This will improve telephony contact for all customer groups with the Council and will provide a foundation for improved working in the future as other workstreams are developed. C - Deliver strong and proportionate organisational management in the Council Activity Status AAP 13/14 - V C 01 - We will review the Council's management arrangements to ensure they remain fit for purpose On Track Progress/ Action Note The Head of Business Transformation and IT has been appointed and is now in post. The Customer Service Manager post is being interviewed for shortly. No other changes are currently proposed and the financial implications of these changes are reflected in the 2014/15 budget. D - Prioritise Services and Functions in line with the wishes of our communities and to deliver our corporate objectives Activity Status Annual Report 2013-14 v1 5 for Cabinet Progress/ Action Note Page 25 of 40 Activity Status AAP 13/14 - V D 01 - We will prioritise services and redirect resources in line with those priorities by completing fundamental reviews of services that residents have identified as the least important and that the Council does not consider to be a priority On Track AAP 13/14 - V D 02 - We will review the CCTV service to identify savings and consider options for the future provision of the service Completed Successfully Progress/ Action Note The CCTV service provided by the Council has ceased as of 1 April 2014 and is currently being de-commissioned. Fakenham, Sheringham and North Walsham Town Councils have been provided with one off funding (which would otherwise have been used for decommissioning) in order that they may provide a reduced CCTV service to those towns at no other cost to the District Council. The CCTV review was successfully completed. Members took the difficult decision to decommission the service which will achieve on-going savings of just under £200k per annum. E - Deliver year-on-year improvements in efficiency Activity Status Progress/ Action Note AAP 13/14 - V E 01 - We will support the implementation of the cost saving Revenues and Benefits shared services project Some Problems The Civica OPENRevenues system is now operating well with a stable environment established and increased levels of staff confidence in the system now delivering improved outcomes in terms of processing times and other efficiencies in the delivery of the service. This has allowed further consideration to be given to the future delivery of a sustainable Revenues and Benefits service in terms of performance outcomes, financial sustainability and resilience with further discussions with the Borough Council of Kings Lynn and West Norfolk being proposed and an action plan developed to deliver on-going savings and efficiencies through our current service structure involving implementation of outstanding system modules and a further Business Process Review being undertaken building upon the increased levels of confidence in the OPENRevenues system. AAP 13/14 - V E 02 - We will devise and implement budgets to deliver a zero increase in the District Council's part of the Council Tax charge and ensure spend is contained within budgeted allocations Completed Successfully Delivered as part of the 2014/15 budget setting report. Annual Report 2013-14 v1 5 for Cabinet Page 26 of 40 Activity Status Progress/ Action Note AAP 13/14 - V E 03 - We will review the reward structures to encourage and reward staff, for finding innovative new ways to deliver higher quality services more efficiently On Track Work has commenced on this activity and will be completed during 2014/15. AAP 13/14 - V E 04 - We will review service delivery models and re-tender the leisure contract to ensure increased value for money and health and well-being Completed Successfully The contract was reviewed during the year and the option to extend the contract for 5 years was agreed. This has resulted in a reduction in the annual management fee of £100,000 per annum over the next 5 years. AAP 13/14 - V E 05 - We will work towards securing continued accreditation in Investors in People status through reassessment in August 2013 Completed successfully The Investors in People (IIP) assessment took place in July 2013 and the Council successfully retained its accreditation at Bronze level through meeting 69 evidence requirements out of a possible 73 selected. An action plan has been produced to ensure that the Council continuously develops as an employer. AAP 13/14 - V E 06 - We will respond to the Peer Review of the Development Management Service by implementing an action plan addressing capacity, resources and performance issues On track Initiatives to date have been focussed on improving our planning performance in relation to the minor and other application, whilst retaining our good performance in dealing with major application. Our 4th quarter figures and year end performance shows that these are now beginning to have an impact, along with the additional Planning Assistants appointed in August 2013. The first planning workshop has been held to identify areas for improvement, which will form the basis of the Service Improvement. Annual Report 2013-14 v1 5 for Cabinet Page 27 of 40 Appendix 2 – Performance Indicator Results Key Achievement against Target NA = Not applicable Direction of Travel Target achieved or exceeded Improving compared to the same period last year Close to target Close to the same period last year‘s result Significantly below target Significantly worse compared to the same period last year Indicators can be labelled as not applicable as this is important information for the Council where the influence and actions of the Council may make improvements but there is not sufficient control over the outcome to set a target Signifies an action or target achieved that has an outcome that meets our equalities objectives. Jobs and the Local Economy Indicators and Measures J 001 - Percentage of Loan Fund that can be lent out (Quarterly) J 002 - Number of businesses receiving grant from the Pathfinder Grant Scheme (Quarterly Cumulative) Result 2013/14 Target 2013/14 46.0% 3 NA Target suspended NA Target suspended Result 2012/13 20% 20.0% 25 9 Pathfinder Grant Scheme closed April 2013 pending wider business support project. The loans scheme is still open but no loans were approved in the last two quarters. J 004 - Number of businesses assisted to retain jobs and/or increase employment each year (Quarterly Cumulative) 90 Annual Report 2013-14 v1 5 for Cabinet 25 Page 28 of 40 45 Indicators and Measures Result 2013/14 J 014 - Number of economically active people assisted into work each year (Quarterly Cumulative) 63 (provisional figure likely to rise) J 015 - Number of member businesses of the Destination Management Organisation (DMO) for the North Norfolk coast and countryside (quarterly) Q4=141 Target 2013/14 NA tbc Result 2012/13 NA 67 165 Q4=115 Housing and Infrastructure Indicators and Measures H 001 Number of new homes built of all tenures (Annual) H 002 - Number of long term empty homes (6 months or more as at October each year) (Annual) H 003 - Number of development briefs produced on allocated sites (Quarterly Cumulative) Result 2013/14 Target 2013/14 Result 2012/13 Health of North Norfolk measure 383 NA 242 Carry out trend analysis 561 NA 886 3 (Land North of Rudham Stile Lane, Fakenham (F01), Land at Heath Farm /Hempstead Road, Holt (H01), Land at Norwich Road / Nursery Drive, North Walsham (NW01)) 1 2 The Holt development brief was approved in July 2013, and outline planning permission on part of the allocation was granted by Development Committee 17 April 2014 subject to conditions and S106 agreement. A timetable has been agreed with the majority of the land owner of the Fakenham allocation (F01) which should allow for completion of work on the brief during the first half of 2014. This would allow for the submission of applications during 2014, with the aim of commencing some development on site during 2015. The HL Food site application was approved subject to conditions by Development Committee at its 2013 meeting. H 007 - Number of affordable homes built 153 NA Annual Report 2013-14 v1 5 for Cabinet Carry out trend analysis Page 29 of 40 18 Indicators and Measures Result 2013/14 Target 2013/14 Result 2012/13 (Quarterly Cumulative) Coast Countryside and Built Heritage Indicators and Measures Result 2013/14 Target 2013/14 C 002 - Percentage of planning appeals allowed (quarterly) 25.9% NA C 003 - Percentage of MAJOR planning applications processed within thirteen weeks (monthly cumulative) 76.92% NA C 004 - Percentage of MINOR planning applications processed within eight weeks (monthly cumulative) C 005 - Percentage of OTHER planning applications processed within eight weeks (monthly cumulative) Review and report Result 2012/13 50.0% 80% 58.33% 45.21% 72% 38.35% 62.00% 80% 53.38% DM 009 - Number of MAJOR planning application decisions made (monthly cumulative) 39 NA NA NA 24 DM 010 - Number of MINOR planning application decisions made (monthly cumulative) 480 NA NA NA 425 Annual Report 2013-14 v1 5 for Cabinet Page 30 of 40 Indicators and Measures DM 011 – Number of OTHER planning application decisions made (monthly cumulative) Result 2013/14 780 Target 2013/14 NA NA NA 710 NA NA DM 005 - Percentage of MAJOR planning applications processed within thirteen weeks over the last 24 months (monthly cumulative) 69.84% NA NA Target not yet set. Government threshold likely to start at 30%. DM 006 - Percentage of MAJOR planning applications refused and then overturned on appeal over the last 24 months (monthly cumulative) 0% NA NA Target not yet set. Low is good. C 006 - Conservation Area plans that have been completed or reviewed (quarterly cumulative) Walsingham Conservation Area Plan has been adopted. C 007 - Target response time to fly tipping and all other pollution complaints (within 2 working days) (quarterly) C 008 - Number of pollution enforcement interventions (quarterly cumulative) NA Result 2012/13 NA 3 (Sheringham, Walsingham and Wells) Q1=86.0% Cromer Conservation Area Plan was adopted. Q1=89.74% Q2=90.0% Q2=89.22% 95% Q3=90.0% Q3=88.00% Q4=88.00% Q4=78.90% 30 Annual Report 2013-14 v1 5 for Cabinet NA NA Review and report 51 Page 31 of 40 Indicators and Measures Result 2013/14 Target 2013/14 Result 2012/13 During the year the service has undertaken formal investigations into 30 incidents this is a reduction from last year and it is believed that the majority of this difference is due to the reduction in intelligence being passed to the team by Kier staff. This will be addressed with the Environmental Services team and training provided as required to try and improve this information flow. The team also agreed a change in the criteria when assessing evidence to take forward a case for investigation, this may have also led to a reduction in the number of cases overall. The team completed 40 cases during this year with 13 of these receiving warning letters, 5 FPNs being issued, 3 simple cautions being accepted, 1 successful prosecution leading to community service and a fine. 18 cases were closed with no evidence to proceed. The team continues to progress cases where there is sufficient evidence to do so. Cases are assessed and appropriate interventions are used to achieve the desired outcome of changing people‘s behaviour. C 009 - Number of fixed penalty notices issued (quarterly cumulative) 5 NA NA Carry out trend analysis 6 C 010 – Number of defaults issued to the waste and related services contractor for cleanliness (monthly cumulative) 41 NA NA 0 39 NA No target. Report to Head of Service and Management Team 55 3 4 ES 015 - Number of rectifications issued to the waste and related services contractor for cleanliness (monthly cumulative) C 012 - Blue flag accreditation: Resort Beaches (annual) 197 Blue Flags retained at Sheringham, Cromer and Sea Palling. Quality Coast Awards were awarded at East Runton and Mundesley. Annual Report 2013-14 v1 5 for Cabinet NA Page 32 of 40 Indicators and Measures C 013 - Number of Green Flag accreditations for parks and countryside (annual) Result 2013/14 Target 2013/14 Result 2012/13 Green flags have been awarded to both Holt Country Park and Sadlers Wood North Walsham. A new Green Flag for Pretty Corner Woods in Sheringham has been awarded which now brings the total for the District to three. 2 (Holt Country Park and Sadlers Wood, North Walsham) 2 Localism Indicators and Measures L 005 - Number of grants awarded to local communities from the Big Society Fund (quarterly cumulative) L 006 - Amount of funding investment in community projects (from the Big Society Fund) (£) (quarterly cumulative) Result 2013/14 Target 2013/14 Result 2012/13 33 NA NA Review and report 47 £219,441 NA NA Review and report £397,537 The Big Society Fund has been managed internally since 1.4.2013. The Fund which totals £450,000 is divided equally between an enabling fund and a grant fund. Funding is awarded to projects that strengthen and improve social and economic wellbeing in communities across North Norfolk. In the last year the enabling fund has awarded £185,000 to three projects. A further £40,000 has been provisionally allocated to two further projects. The grant fund which awards grants up to £15,000 has awarded thirty three grants totalling £219,441. An annual report into the Funds activity during the past year will be presented to Cabinet in May. Annual Report 2013-14 v1 5 for Cabinet Page 33 of 40 Delivering the Vision Indicators and Measures Result 2013/14 Target 2013/14 Result 2012/13 V 001 - Percentage of (Medium Priority) audit recommendations completed on time (quarterly cumulative) Tbc 80% 66.1% V 002 - Percentage of (High Priority) audit recommendations completed on time (quarterly cumulative) Tbc 100% 100% NA Derived from the Annual Governance Statement in June 2013 3 of 3 100% 100% 6 days per full time equivalent (FTE) employee 6.80 V 003 - Number of actions identified in the Annual Governance Statement action plan completed on time (annual) V 004 - Percentage of audit days delivered (quarterly cumulative) V 007 - Working Days Lost Due to Sickness Absence (Whole Authority days per Full Time Equivalent members of staff) (quarterly cumulative) NA NA 100% 6.77 NA The annual FTE (full time equivalent) figure is slightly lower than at the same point last year (6.80). All staff were offered the opportunity to have a flu injection in November 2013 and 95 staff had the injection. Absence data relating to colds and flu shows that the number of days off during 2013/14 decreased by 18% (63 FTE days) when compared to 2012/13. V 008 - Level of overspend/ (underspend) (£) total (quarterly cumulative) See 2013/14 Outturn Report NA NA Review and report (£185,662) RB 009 – Percentage of Council Tax Collected (monthly cumulative) 98.08% 98.3% 97.90% RB 010 – Percentage of Non-domestic Rates collected (monthly cumulative) 99.14% 99.0% 98.40% 24.0 days 18 days 30.0 days RB 027 - Average time for processing new claims (Housing and Council Tax Benefit) (monthly cumulative) Annual Report 2013-14 v1 5 for Cabinet Page 34 of 40 Indicators and Measures RB 028 - Speed of processing: change in circumstances for Housing and Council Tax Benefit claims (average calendar days) (monthly cumulative) Result 2013/14 17.0 days Target 2013/14 9 days Result 2012/13 18.0 days 72% of changes in circumstance were processed within 14 days of receiving all information required from the customer. Annual Report 2013-14 v1 5 for Cabinet Page 35 of 40 Appendix 3 – Responding to the Tidal Surge The local need During the course of the extreme storm-driven tidal surge that hit the east coast over 5/6 December 2013 the small, sometimes vulnerable communities dotted along the 45 mile-long coastline of North Norfolk, much of it exposed salt-marsh, sand dune or soft low cliff, were badly hit: 364 properties were evacuated, 152 homes and businesses flooded and coastal assets such as ramps, promenades, toilets and cafes severely damaged. The vision ―Our aim was to ensure that everyone who needed help, physical, emotional or financial, received it, from the most appropriate quarter. This demanded close co-operation between the public services, utilities and many volunteers involved, and a shared determination to continue to work until all the work had been done. And, with a tourism dependent economy, we had to be able to tell the world that North Norfolk was ‗open for business‘ despite the gloomy news reports.‖ Tom FitzPatrick, Leader, North Norfolk District Council The challenge Despite sea defences having held well in the main, homes and businesses had been flooded or damaged along 45 miles of vulnerable coastline; roads were impassable or had been washed away; the sea had encroached up to two miles inland at some points. There was not only alternative accommodation to be found for some, there were whole communities to be supported and reassured, and the self-confidence of a whole district to be restored, quickly. North Norfolk is a small district council with limited resources, all of which would be required to focus on the immediate response to the impact of the tidal surge and then on the long-term recovery of communities and building increased resilience for the future. The results All those in need of accommodation were found it—the council‘s housing, coastal, environmental and resilience teams were on hand during the event and in the most affected areas for up to two weeks afterwards, 24 hours a day. Cromer‘s iconic end of pier show was re-opened within a week of the event despite much of the pier‘s wooden decking having been stripped away— hugely symbolic in showing that North Norfolk was ‗open for business‘. Together with the regional newspaper, the Eastern Daily Press, and other affected coastal councils, NNDC launched the Norfolk and Lowestoft Flood Appeal; over £200,000 has been raised and distributed to those in need. The reputation of the District Council has been significantly heightened as a direct result of its immediate and positive response to the event. Where next? To ensure this small District Council and the vulnerable coastal communities it serves are not inundated by a future, even more extreme event, efforts are now underway to formulate a mutually supportive ‗buddy‘ system through the Norfolk Resilience Forum and to build local community resilience and associated capabilities still further, promoting self-reliance and reducing dependence on statutory bodies. And we continue to talk with central government about the availability of future financial support. Annual Report 2013-14 v1 5 for Cabinet Page 36 of 40 Annual Report 2013-14 v1 5 for Cabinet Page 37 of 40 Annual Report 2013-14 v1 5 for Cabinet Page 38 of 40 Annual Report 2013-14 v1 5 for Cabinet Page 39 of 40 Appendix 4 – Workforce Profile Statistics Published separately. Version Control Version 1.0 Originator Helen Thomas 1.1 Helen Thomas 1.2 Helen Thomas/ CLT Helen Thomas/ CLT Helen Thomas/ CLT Cabinet 1.3 1.4 1.5 Description including reason for changes First draft for review and amendment by Corporate Leadership Team (CLT) Edited bullet points provided by Heads of Service and added points from sources such as press releases. Document reviewed and edited by CLT, one or two other additions and draft of storm surge page added Amended bullet points Date 25/4/2014 Review, amendments and additions from CLT and Karen Sly Minor amendments 19/05/2014 Annual Report 2013-14 v1 5 for Cabinet 1/5/2014 16/05/2014 16/05/2014 27/05/2014 Page 40 of 40