Appendix A GLOBAL HAWK FLIGHT TEST DATA Table A.1 contains information on the Global Hawk flight test program. Data include sortie numbers, sortie dates, flight hours, objectives, results of the mission, and additional comments regarding significant events during the test. These data were used to create the charts used in Chapters Two and Four. The data in the table were derived from the flash reports and quicklook reports that documented the results of each sortie. 59 5/10/98 5/30/98 2 3 Utopia 2/28/98 Date 1 Sortie Number AV01 AV01 AV01 Air Vehicle AW-03 AW-02 AW-01 5.35 2.4 0.95 8.7 3.4 0.95 II II II Official Flight Cumulative Sortie Time Flight Designation (hours) Hours Phase Functional checkout: expand flight envelope and demonstrate systems/functions Comments Objectives met Brake problem resulted in stopping slightly off the runway; TO 0701 LD 1222. LRE-MCE handoff demonstration; 150 knots current air speed (KCAS), 41,000-ft mean sea level (MSL). Most primary Landing gear would not objectives lock up; ECS low met temperature resulted in shortening of mission by 11 minutes. Results Functional Objectives checkout: met demonstrate basic flight controls and systems; instrument calibration Functional checkout: airworthiness first flight Objective Global Hawk Flight Test Dataa Table A.1 60 Innovative Development: Global Hawk and DarkStar 9/17/98 10/29/98 11/20/98 5 6 7 Utopia 8/29/98 Date 4 Sortie Number AV02 AV01 AV01 AV01 Air Vehicle AV02-01 AW-06 AW-05 AW-04 3.1 9.7 6.1 5.7 33.3 30.2 20.5 14.4 II II II II Official Flight Cumulative Sortie Time Flight Designation (hours) Hours Phase Functional checkout: first flight; evaluate core airworthiness Medium endurance Functional checkout: expand flight envelope; demonstrate FL600 full fuel load Functional checkout: expand flight envelope; demonstrate FL600 Objective Table A.1—continued Comments Objectives partially met Shortened by 0.5 hour owing to sticking outboard spoiler; link with MCE could not be established. Executed missed approach. Most primary Flown at night, no objectives chase aircraft; IMMC A met failed; UHF SATCOM failed again; first interaction with FAA ATC. Most primary Minor discrepancies in objectives some systems; FL593 met reached (61,000 inertial); TO 0835 LD 1417. Results Global Hawk Flight Test Data 61 12/19/98 9 Utopia 12/4/98 Date 8 Sortie Number AV02 AV02 Air Vehicle AV02-03 AV02-02 7.4 3.3 44.0 36.6 II II Official Flight Cumulative Sortie Time Flight Designation (hours) Hours Phase Functional checkout: general and payload objectives Functional checkout: refly of first flight Objective Table A.1—continued Objectives partially met Objectives mostly met Results General objectives mostly met; no ISS payloads met; reached FL583; ISS shut down; unsuccessful reboot attempts—temperature fell below lower limit. Wideband communications demonstrated; aircraft taxied off runway autonomously after landing; CDL failure detected prior to takeoff. Comments 62 Innovative Development: Global Hawk and DarkStar 1/28/99 2/2/99 11 12 Utopia 1/22/99 Date 10 Sortie Number AV01 AV01 AV02 Air Vehicle AV01-08 AV01-07 AV02-04 10.1 1.7 6.4 62.2 52.1 50.4 II II II Official Flight Cumulative Sortie Time Flight Designation (hours) Hours Phase Objectives not met Objectives partially met Results Functional Objectives checkout: refly mostly met AV1-07 mission/endurance Functional checkout: lightweight; expand sortie duration envelope Payload test Objective Table A.1—continued Reached 64,700 ft MSL; hydraulic system failure cut flight short; emergency backup systems worked. Engine anomalies due to software problem indicated early RTB: was to evaluate fix to wing fuel transfer discovered in August. General objectives mostly met; some ISS objectives met; imagery taken for the first time (poor quality). Comments Global Hawk Flight Test Data 63 2/28/99 3/11/99 3/13/99 14 15 16 Utopia 2/20/99 Date 13 Sortie Number AV02 AV02 AV01 AV02 Air Vehicle AV02-07 AV02-06 AV01-09 AV02-05 15.2 0.7 18.1 12.5 108.7 93.5 92.8 74.7 II II II II Official Flight Cumulative Sortie Time Flight Designation (hours) Hours Phase Payload functionality test for incentive scoring; continued ISS checkout ISS basic functionality and characteristics Demonstrate endurance, towed decoy, fuel balance below 5000 lb fuel; basically refly of 2/2/99 mission ISS basic functionality and characteristics Objective Table A.1—continued Objectives met Objectives not met Objectives met Objectives met Results Simultaneous SAR and EO spot imaging. Aborted: landing gear fault during autonomous retraction. Except decoy objective; reached 66,400 ft MSL. Reached 61,000 ft; 144 of 156 planned sensor events; continued improvement in Kuband communications. Comments 64 Innovative Development: Global Hawk and DarkStar 3/29/99 5/18/99 6/3/99 18 19 20 Utopia 3/26/99 Date 17 Sortie Number AV01 AV01 AV02 AV02 Air Vehicle AV01-11 AV01-10 AV02-09 AV02-08 27.2 7.8 0.7 5.8 150.2 123.0 115.2 114.5 II II II II Official Flight Cumulative Sortie Time Flight Designation (hours) Hours Phase Objectives not met Objectives not met Results SAR sensor checkout/long endurance Prepare for payload Objectives integration/ met wideband link evaluation Payload functionality test Payload functionality checkout Objective Table A.1—continued First flight after crash. Air vehicle crash owing to initiation of auto destruct by transmission from Nellis Air Force Base. Mission terminated early owing to poor SAR performance. Comments Global Hawk Flight Test Data 65 6/19/99 6/26/99 6/27/99 22 23 24 Utopia 6/11/99 Date 21 Sortie Number AV01 AV01 AV01 AV01 Air Vehicle AV01-15 AV01-14 AV01-13 AV01-12 17.2 2.0 12.8 7.8 190.0 172.8 170.8 158.0 III III III II Official Flight Cumulative Sortie Time Flight Designation (hours) Hours Phase D&E— Roving Sands 2B D&E— Roving Sands 2 D&E— Roving Sands 1 Exercise SAR Objective Table A.1—continued Objectives met Objectives not met Objectives met Objectives met Results Operated in NAS under FAA control for majority of mission; use of encrypted links for C2 and imagery; demonstrated quick turnaround time. Curtailed: SAR would not boot up. Operated in NAS under FAA control for majority of mission; use of encrypted links for C2 and imagery; demonstrated quick turnaround time; first in crawl series. Second time AV01 carried SAR. Comments 66 Innovative Development: Global Hawk and DarkStar 7/27/99 8/12/99 26 27 Utopia 7/15/99 Date 25 Sortie Number AV03 AV01 AV01 Air Vehicle AV03-01 AV01-17 AV01-16 4.0 23.9 12.9 230.8 226.8 202.9 III III III Official Flight Cumulative Sortie Time Flight Designation (hours) Hours Phase Functional checkout: first flight, evaluate core airworthiness D&E—Extended Range 1-2 D&E—Extended Range 1-1 Objective Table A.1—continued Objectives met Objectives met Objectives met Results Continued expansion and demonstration of Global Hawk capabilities: different imagery, tasking, links, etc. Third D&E Phase III flight; 91 of 119 planned sensor events accomplished; imagery disseminated. Comments Global Hawk Flight Test Data 67 9/9/99 9/16/99 10/4/99 29 30 31 Utopia 8/30/99 Date 28 Sortie Number AV01 AV03 AV01 AV01 Air Vehicle AV01-20 AV03-02 AV01-19 AV01-18 25.3 12.0 18.8 25 311.9 286.6 274.6 255.8 III III III III Official Flight Cumulative Sortie Time Flight Designation (hours) Hours Phase D&E—Extended Range U.S. Navy Seals Functional checkout: continue airworthiness D&E—CAX 99-10 U.S. Marine Corps Exercise D&E— Extended Range 2/JEFX/CAX Objective Table A.1—continued Objectives met Objectives met Objectives met Objectives met Results Except GMTI; Extended Range 3-01 exercise; first in walk series. LRE CCO provided by 31st TES. Sixth D&E participation flight. 66,000 MSL; 5 ISS restarts during D&E phase; 3 during engineering phase of flight. Comments 68 Innovative Development: Global Hawk and DarkStar 10/19/99 10/25/99 10/30/99 11/4/99 33 34 35 36 Utopia 10/8/99 Date 32 Sortie Number AV03 AV03 AV01 AV01 AV01 Air Vehicle AV03-04 AV03-03 AV01-23 AV01-22 AV01-21 24.6 3.0 25.5 24.8 24.8 R 414.6 390.0 387.0 361.5 336.7 III III III III III Official Flight Cumulative Sortie Time Flight Designation (hours) Hours Phase Functional checkout: ISS Functional checkout: ISS D&E—Extended Range 4-02 Alaska D&E—Extended Range 4-01 Alaska D&E—Extended Range 3-02 U.S. Navy Seals and CAS Objective Table A.1—continued Objectives met Objectives not met Objectives met Objectives met Objectives met Results ✺❁❐❆ AV03 cleared for participation in D&E. Early RTB due to AC generator anomaly. Extended Range 4, second flight; operation outside CONUS; 23.8 hours ISS continuous operations. Except Delta V; Extended Range 4; tenth dedicated D&E exercise. Comments Global Hawk Flight Test Data 69 11/13/99 11/17/99 12/3/99 12/6/99 38 39 40 41 Utopia 11/9/99 Date 37 Sortie Number AV03 AV03 AV03 AV03 AV03 Air Vehicle AV03-09 AV03-08 AV03-07 AV03-06 AV03-05 9.8 22.0 19.8 9.2 17.4 492.8 483.0 461.0 441.2 432.0 III III III III III Official Flight Cumulative Sortie Time Flight Designation (hours) Hours Phase D&E—JTF-6 Sortie 2 D&E—JTF-6 Sortie 1 D&E—Desert Lightning II D&E—Desert Lightning II D&E—Desert Lightning II Objective Table A.1—continued Objectives not met Objectives met Objectives met Objectives not met Objectives met Results Early RTB; postflight taxi “event.” 14 D&E sorties flown since June 1999. Curtailed following IMMC A failure due to low temperature in avionics compartment. Notes 434 total test hours in Global Hawk program to date; 230.5 hours flown since June 1999. Comments 70 Innovative Development: Global Hawk and DarkStar 3/24/00 AV04 3/30/00 AV04 4/4/00 4/11/00 AV04 44 45 46 47 Utopia 3/17/00 AV01 43 AV04 3/11/00 AV01 Date Air Vehicle 42 Sortie Number AV04-04 AV04-03 AV04-02 AV04-01 AV01-25 AV01-24 24.2 5.4 4.5 4.1 5.8 6.6 543.4 519.2 513.8 509.3 505.2 499.4 III III III III III III Official Flight Cumulative Sortie Time Flight Designation (hours) Hours Phase Functional checkout Functional checkout Functional checkout Functional checkout: first flight AV04 Engineering test: wing pressure validation (2) Engineering test; demonstrate LRE 2, MRE 2; wing pressure validation Objective Table A.1—continued Objectives met Objectives not met Objectives not met Objectives met Objectives met Objectives met Results Functional validation of LRE 3 and MCE 2 during flight. Early RTB due to low fuel temperature; plan was 24 hours. Early RTB due to INS anomaly; plan was 11.2 hours. 62.3 kft; no sensor suite; first sortie with AFFTC as RTO. Comments Global Hawk Flight Test Data 71 4/20/00 5/8/00 5/11/00 49 50 51 Utopia 4/14/00 Date 48 Sortie Number AV04 AV04 AV04 AV04 Air Vehicle AV04-08 AV04-07 AV04-06 AV04-05 14.1 28.0 10.5 31.5 627.5 613.4 585.4 574.9 III III III III Official Flight Cumulative Sortie Time Flight Designation (hours) Hours Phase D&E— Linked Seas - 2 D&E—Linked Seas - 1 D&E deployment to Eglin Air Force Base Functional checkout Objective Table A.1—continued Objectives partially met Objectives met Objectives met Objectives met Results UHF satellite link problems. First trans-ocean flight; first East Coast launch and recovery; first NATO demonstration; first Global Hawk operation in international airspace. Resumption of D&E: LREs and MRE located on East Coast; FAA coordination. Maximum altitude 65,100 ft; testing Kuband satellite links for East Coast deployment. Comments 72 Innovative Development: Global Hawk and DarkStar 5/19/00 6/19/00 6/30/00 7/7/00 7/12/00 53 54 55 56 57 Utopia 5/18/00 Date 52 Sortie Number AV05 AV05 AV05 AV04 AV04 AV04 Air Vehicle AV05-03 AV05-02 AV05-01 AV04-11 AV04-10 AV04-09 11.4 3.0 0.8 8.3 14.7 22.5 688.2 676.8 673.8 673.0 664.7 650.0 III III III III III III Official Flight Cumulative Sortie Time Flight Designation (hours) Hours Phase Functional checkout Functional checkout Functional checkout Redeployment to EAFB D&E—JTFEX00-2 D&E—JTFEX00-1 Objective Table A.1—continued Objectives met Objectives mostly met Objectives partially met Objectives partially met Objectives partially met Objectives met Results SAR checkout. Refly of previous mission; flight curtailed by 1 hour due to failure of ruddervator actuator. Early RTB—failure in EO/IR LN-100 navigator. ISS-IMMC interface problems. Early RTB—IMMC failure. Comments Global Hawk Flight Test Data 73 8/4/00 8/11/00 8/31/00 59 60 61 Utopia 7/19/00 Date 58 Sortie Number AV05 AV05 AV05 AV05 Air Vehicle AV05-07 AV05-06 AV05-05 AV05-04 5.8 3.8 8.5 23.8 730.1 724.3 720.5 712.0 III+ III+ III+ III Official Flight Cumulative Sortie Time Flight Designation (hours) Hours Phase Refly 5-05 VPH GMTI SAR maritime mode evaluation Payload configuration functional checkout Functional checkout Objective Table A.1—continued Objectives mostly met Objectives met Objectives partially met Objectives met Results Test for video phase history (VPH), ISS reconfigure from VPH to legacy mode. Preparation for Australian deployment. First test flight in support of Australian deployment; ISS would not boot in new mode. Final Phase III flight. Comments 74 Global Hawk Flight Test Data 9/14/00 63 AV05 AV05 Air Vehicle AV05-09 AV05-08 0 7.0 737.1 737.1 III+ III+ Official Flight Cumulative Sortie Time Flight Designation (hours) Hours Phase Support JEFX time-critical targeting Support JEFX time-critical targeting Objective Objectives not met Objectives met Results Mission abort prior to takeoff—exceed crosstrack error criteria on rollout. JEFX first sortie. Comments Utopia SOURCE: HAE UAV JPO flash reports, quick-look reports, and flight test summary data charts. a FL = flight level; ECS = environmental control system; TO = takeoff; LD = landing; ATC = air traffic control; CDL = command data link; ISS = integrated sensor suite; RTB = return to base; NAS = national air space; GMTI = ground moving target indicator; INS = inertial navigation system. 9/12/00 Date 62 Sortie Number Table A.1—continued Global Hawk Flight Test Data 75