Pending Audit Para’s in respect of Directorate SC,OBC’s & Minority Affairs Sr.No Period Para.No Particulars Status 1. 11/77to3/79 Para 1(B) Shortage worth store articles Rs.20167/- Reply sent to the A.G. H.P. vide this directorate letter No. 13-2/2010-WEL-A.O. dated 3.8.2013 , even No. dated 21.8.2014 and 2 No.s I.R. and 4 Para’s settled in adhoc committee meeting held on 2.7.2014 . 2. 4/86to3/87 Para 3(a) Misutilisation of LTC AdvanceRs.23400/-by Sh.M.S.Negi. 3. 8/2003 to 7/2004 4. 8/2004to7/2005 Para 1 5 12/2007 to11/2008 Para 11(a) 6. 12/2008 to 11/2010 Para 3(a) Loss of Interest to Govt. Excheque Rs.1892.48 Lakh. 7. 12/2008 to 11/2010 Para 4(a)i Non commencement of Construction of hostels Rs.83.39 Crores. ----------do---------- Para 4(a)ii Loss of Interest Rs 252.43 lakh. -------do---------- Para 4(b) Unfruitful Expdt.Hostel Building Rs.13.88Crore -------do--------- Para 4© Unfruitful Expdt. Hostel building2379.72 Lakh Advance Drfawl of funds for construction of observation cum special Home for Children at sundernagar.Blockade of Govt.MoneyRs.15.40 Lakh. Drawl of funds in Advance of requirement Blockade of Govt.Money19.06 lakh Excess Consumption of POL. Loss of Govt. Rs.1.88Lakh 8. 5/2010to11/2011 Para 1(a) Irregula r retention of Govt.funds in Banks Blockade of Money Rs. 1032.01 Lakh. 9. -----do---------- Para 8 Irregular release of Rs.38Lakh consruction of OBC Hostels Bhoranj /Tarkwadi. 10. ---------do------------ Para-9 Non Deduction of Rs 0.10akh. 11. ---------do------------ Para-10 Non recovery of Fees & Stipends Paid to droped out candidates. 12. ------------do---------- Para-11 Irregular Unauthorised payments of Typing allowance Rs.0.08Lakh. 13. ------------do-------- Para-12 Over Payment on account of incorrect fixation of pay Rs.0.04lakh allowances. 14. -----------do--------- Para14(a) Non disposal of UInserviceable store articles Valuing Rs.15.00lakh. -----------do-------- 14(b) Non dispiosal of unserviceable dismental spare parts of the vehicles. 15. 12/2011to11/2012 Para-1 Blocade of Govt.Funds amounting Rs82.69 Lakh. 16. ----------do------- Para-2 17. ----------do--------- Para-3 Blocade of Govt.Funds Rs.2.71 crore due to Non start of work(Hpstel) Unauthorized retention of central assistance Rs.1.25 Crore. 18. ------------do--------- Para-4 Irregular retention of Govt.funds in Banks blockade of funds Rs 594.44lakh. 19. 20. ------------do-------- Para5(a) Non start of construction work.blockade of Govt.Funds Rs.775.71 lakh. -----------do--------- Para 5(b) Blockade of govt. funds due to incomplete work Rs.918.02Lakh. ------------------do---- Para-6 Non Deduction of TDS Rs.0.72 Lakh. DISTT. WELFARE OFFICE SHIMLA Sr. No. 1. Period Para No. 5/2004 to 2/2007 3/2007 to 4/2013 Para 1 3. -do- Para 3 1. 10/78 to 8/86 Para 6 2. 3. -do-do- 2. Para 2 Particulars Non start of works Rs. 1.94 lac & blockades of funds Rs. 3.87 lac . Latest STatus Reply sent to the A.G.H.P. vide letter No. 8-8/74-Wel A.O. report dated 10.09.2013 Blockades of funds under housing subsidy scheme SC, ST & OBC Rs. 14.82 lac . 4. -doPara 4 Drawal of funds without requirement 89.06 lac . 5. -doPara 5 Blocking of funds due to non release of Ist instalment of Minor works Rs. 1.20 lac . DISTT. WELFARE OFFICE Lahaul Spiti 4. Para 7 Para 11 (B) 9/95 to 8/98 Para 3 5. 8/2007 to 6/2013 Para 1 6. -do- Para 2 7. 8. -do-do- Para 3 Para 4 Double payments to benficieries . Wanting APRS Misutilization of LTC amount of interest of Rs. 1103 . Non recovery of interest fre loan Rs. 0.37 lac . Blockade of funds due to non release of IInd instalment of housing subsidy Rs. 1.16 lac suspected utilization of Ist instalment Rs. 1.12 lac . Blockades of funds due to non organizing of awareness camps Rs. 1.02 lac . Non deduction of TDS Rs.1022 . Awaited utilization certificates under improvement of Harijan Basti& drinking water scheme Rs. 5.00 lac and NFBS Rs. 1.80 lac . Reply sent to the A.G.H.P. vide letter No. 8-8/74-Wel A.O. report dated 10.09.2013 DISTT. WELFARE OFFICE Kullu Sr. No. 1. Period Para No. 11/82 to 6/83 Para 1 2. 3. 4. 3/94 to 5/95 Para 6 8/2007 to Para 1 12/2012 -doPara 2 5. -do- Para3(A) DISTT. WELFARE OFFICE SOLAN 1. 12/98 to Para 6 1/2002 2. 3/2007 to 5/2012 Para 1 3. -do- Para2 4. -do- Para 3 -do- Para 4 6. -do- Para 5 7. -do- Para6 8. -do- Para 7 9. -do- Para 8 Particulars Regarding misappropriation of Rs. 0.48 lac . Latest Status Reply sent to the A.G.H.P. vide letter No. 8-13/66 -Wel A.O. report dated 19.06.2013 Balance interest free loan Rs. 0.62 lac Blocking of Govt. funds on a/c of housing subsidy Rs. 5.12 lac . Incomplete minor works blocking of govt. funds Rs. 5.48 lac . Irregular reimbursement of medical claim Rs. 7450 . Non Transfer /auction of surplus material and equipments Rs. 0.34 lac . Non disbursement of pension to pensioner Rs. 11.09 lac and blockades of funds Rs. 128.26 lac . Delaye in remittance of pension Rs. 87.56 lac . Non maintenance of inventory of household completed , incomplete and abandoned Rs. 558.72 lac 5. Non collection of data of pensioners from the panchayats resulted unavoidable expenditure of Rs. 1.17 lac and deprived other eligible person from pension Rs. 23.39 lac . Non maintenance of manual ledgers and systematic record of money order receipt resulted in non verification of pension disbursement receipts Rs. 1931.60 lac Lack of monitoring resulted in non completion of 16 household of RS.75 lac unfruitful expenditure Rs. 3.38 lac. Blockades of funds Rs. 3.37 lac Non start of works of Rs. 9.25 lac resulted in blockades of funds Rs 4.62 lac.with E.A. Double payment /preparation of money Reply sent to the A.G.H.P. vide letter No. 8-13/66 -Wel A.O. –III report dated 28.12.2012 order of pension Rs. 0.36 lac and avoidable expenditure of Rs. 0.02 lac 10 -doPara 9 Irregular payment of house rent allowance Rs. 24068 . DISTT. WELFARE OFFICE SIRMOUR 1. 7/01 TO 6/2004 Para 1 Irregular expenditure of Rs. 1.17 lac. Of Hari Dass Sangam MSW Reply sent to the A.G.H.P. vide letter No. 8-11/75-Wel A.O.report dated 7. 2.2014 2. 1/2008 to Para 2 Non release of sanctioned funds under 10/2013 housing subsidy scheme Rs. 5.58 lac DISTT. WELFARE OFFICE BILASPUR 1. 3/2007 to 11/2010 Para 6 Reply sent to the A.G.H.P. vide letter No. 8-11/75-Wel A.O.report dated 3.1.2014 2. 12/2010 to Para 3 Non utilization of funds under the 8/2013 prevention of atrocity scheme Rs. 0.65 lac DISTT. WELFARE OFFICE MANDI 1. 4/99 to 5/2014 Para 4 Outstanding recoveries of interest free loan Rs. 1.41 lac 2. 10/2007 to 1/2014 -do- Para 3(A) -do- Para 4 Unfruitful expenditure on housing subsidy amounting Rs. 4.88 lac Blockade of funds under housing subsidy scheme to backward classes Rs. 2.30 lac Non deduction of license fee of govt. Residential accommodation Rs. 0.5 lac 3. Para 3(B) Reply sent to the A.G.H.P. vide letter No. 8-8/74-Wel A.O.report dated 15.3.2013 DISTT. WELFARE OFFICE UNA 1. 3/07 to 11/2012 Para 1 Non release of sanctioned funds under housing subsidy scheme and minor works scheme Rs. 14.81 lac 2. -do- Para 2 3. -do- Para 3 Blockade of Govt. funds due to non issue of sewing machines amounting to Rs. 0.44 lac. Non receipt of material Rs. 0.05 lac. Non maintenance of manual ledgers and systematic record of money order receipt resulted in non verification of pension disbursement receipt Rs. 31.5 crore. Reply sent to the A.G.H.P. vide letter No. 8-15/74-Wel A.O.-IV report dated 19.6.2013 DISTT. WELFARE OFFICE Hamirpur Sr. No. 1. Period Para No. 10/82 to 12/83 Para 10 2. 8/91 to 1/93 Para 2 3. 7/2009 to 2/2013 Para 2(A) -do- Para 2(B) Particulars Recovery showed in LPC Rs. 0.57 lac Latest Status Reply sent to the A.G.H.P. vide letter No. 8-8/74-Wel A.O. report dated 12.8.2013 Unauthorised occupation of Govt. building Non accountal of receipt into cash book and reconciliation with treasury Rs. 2.47 lac . Non accountal of salary in cash book Rs. 6.38 lac 4. -doPara 4 DISTT. WELFARE OFFICE KANGRA 1. 7/95 to 6/97 Para 5 Non recovery of interest free loan Rs. 2.39 lac 2. 7/97 to 10/2k 1/2007 to 4/2012 -do- Blockades of Govt. funds in commercial bank Rs. 31.74 lac Un fruitful expenditure on housing subsidy amounting to Rs. 103.88 lac Blockade of funds due to uncompletion of minor works amounting to Rs. 9.59 lac 3. 4. Para 4 Para 1 Para 4 Reply sent to the A.G.H.P. vide letter No. 8-13/66-Wel A.O.-IIIreport dated 18.9.2012 DISTT. WELFARE OFFICE CHAMBA 1. 1/2005 to 4/2007 Para 10 Non recovery of interest free loan amounting Rs. 63622/- 2. 5/2007 to 8/2012 Para 1 3. -do- Para 3 4. -do- Para 4 Incomplete work construction laper patients rehabilitation center at Sarol amounting Rs. 69.65 Lac Blockades of funds due to non purchase of tools/equipments under followup programme Rs. 4.78 lac . Blockade of funds Rs. 2.14 lac suspected misutilization of funds Rs. 2.15 lac . Reply sent to the A.G.H.P. vide letter No. 8-13/66-Wel A.O.-IIIreport dated 19.6.2013 DISTT. WELFARE OFFICE Kinnaur Sr. No. 1. Period Para No. 7/2007 to 01/2013 Para 1 2. -do- Para 2 Particulars Blockade of funds on a/c of housing subsidy Rs. 15.89 lac Blockade of Govt. funds due to incomplete works Rs. 6.25 lac 3. -doPara3 Non utilization of sewing machine grant Rs. 1.03 lac 4. -doPara 5 Irregular retention of Govt. funds Rs. 286.43 lac . TEHSIL WELFARE OFFICER BHARMOUR 1. 8/89 to 5/93 Para 1 Suspected misappropriation of widow pension Rs. 4360/- 2. -do-do- Para 2(A) Para 2(B) -do- Para 2(C) 3. -do- Para 7 4. 5. Para 11 Para 1 6. -do8/2007 to 9/2013 -do- 7. -do- Para 3 8 -do- Para4 9 -do- Para 5 Para 2 Doubtful payment of pension Unauthorised pension payments Rs. 2.27 lac Unauthorised pension payments Rs. 0.09 lac Irregular disbursement of sewing machine of Rs. 0.75 lac . Blocking of funds Rs. 13.50 lac Non deposit of interest receipt into Govt. treasury Rs. 1.61 lac Incomplete works Rs. 3 lac and blockade of funds Rs. 1.25 lac Blocking of funds due to non disbursement of social security pension Rs. 0.82 lac Blockade of funds Rs. 0.14 lac due to non achievement of physical targets . Latest Status Reply sent to the A.G.H.P. vide letter No. 8-8/74-Wel A.O. report dated 5.6.2013 Asked T.W.O. Bharmour vide letter No. 8-31/91Wel A.O. report dated 12.12.2013 to send this directorate annotated reply of audit report 8/2007 to 9/2013 . TEHSIL WELFARE OFFICER PANGI Sr. No. 1. Period Para No. 8/89 to 7/92 Para 2 Non accountal of material worth Rs. 27626/- 2. Para 1 3. 4. 8/2002 to 8/2007 -do-do- 5. -do- Para 4 6. -do- Para 5 7. Para 1 8. 9/2007 to 5/2013 . –do- 9. -do- Para 3 10. -do- Para 4 11. -do- Para 5 12. -do- Para 6 Drawal of funds in advance of requirements Rs. 14.28 lac Time barred subsidy Rs. 0.56 lac Injudicious purchase of sewing machines Rs. 0.69 lac. Non deposite of interest into Govt. account Rs. 0.23 lac . Non disposal of unserviceable articles Rs. 2.27 lac . Drawal of funds in advance of the requirement Rs. 41.05 lac . Unfruitful expenditure under housing subsidy schemes Rs. 1.80 lac, blockade of funds Rs. 2.57 lac Non providing of sewing machine under follw up programme, blockade of funds Rs. 2.20 lac . Awaited utilization certificates under improvement of Harijan Basti & Drinking water scheme Rs. 14.60 lac . Non deposition of unclaimed subsidy and pension funds into Govt. account Rs. 17.82 lac . Non Deposition refund of interest to Govt. account Rs. 1.96 lac. Para 2 Para 3 Para 2 Particulars Latest Status Asked T.W.O. Pangi vide letter No. 8-17/2007Wel-A.O. report dated 11.11.2013 to send the annotated replies of the para to this directorate, but stiil no action has been initiated by the office. TEHSIL WELFARE OFFICER KAZA Sr. No. 1. Period Para No. Particulars 8/89 to 7/91 Para 1(A) Regarding misappropriation of public money Rs.o.63 lac -do- Para 1(B) 2. 3. -do-do- Para 2 Para 4 4. 9/97 to 6/2002 Para 1 5. -do- Para 3 6. 8/2007 to 8/2013 Para 1 7. -do- Para 2 8. -do- Para 3 9. -do- Para 4 Regarding misappropriation of public money Rs.3.11 lac Blockade of Govt. funds 57396/- . Non Obtaining of live certificate and non conducting of periodical verification of pensioners . Suspected misutilization of housing subsidy Rs. 85500/- and blockade of funds Rs. 85500/- . Non recovery of interest free loans Rs. 30450/- . Double payment under housing subsidy scheme Rs. 0.79 lac due to lac of internal control . Drawal of funds at the fage end of the financial year Rs. 70.37 lac . Non deposit of undisbursed welfare pension in Govt. account Rs. 1.13 lac . Non confirmation of recovery of pay advance Rs. 0.90 lac . Latest Status Asked T.W.O. Kaza vide letter No. 8-31/91 WelA.O. report dated 11.11.2013 to send the annotated replies of the para to this directorate, but stiil no action has been initiated by the office