ADDENDUM #2 PROJECT 34-16-02 MEMORIAL UNION BUILDING KEWEENAW COMMONS UPGRADE GENERAL WORK May 10, 2016 Contractor shall list all addenda by number on the bid form to ensure conformity in the bid. Drawings, Specifications and/or Proposals are herein amended, expanded and/or modified, as hereinafter described, and become a part of the Contract Documents with the same force and effect as if incorporated, herein, originally. Any contrary provisions contained, or referred to, in Drawings and/or Specifications, shall remain applicable unless overridden by this Addendum. Revised or contrary provisions herein shall not affect any other part of the Contract Documents and any deletions, additions, substitutions and/or revisions mentioned, shall include all labor, materials, methods, modifications, etc. required for complete performance of the work. CONTRACT DOCUMENT MODIFICATIONS AND CLARIFICATIONS Clarification: 1. Specification 06 80 00 indicates ‘Basis of Design’ to be 16”. There are two columns that will receive new FRP covers; one is over a steel column (approximate size 12”), and one is over a poured concrete column (approximate size 16”). Provide FRP column of size necessary, but field verify size of column prior to ordering. 2. Drawing A102 indicates the incorrect detail for the round columns in the Main Walkway. All notes should refer to Detail C1/A501 for an elevation of all the column covers. 3. Drawing A102 indicates three round columns in the Main Walkway; one is an existing cover to remain (with existing tackable surface to be removed), and two are to have new FRP column covers. All three columns are to receive new tackable surface over ¼” cork, with paint surface above height indicated on the detail. 4. Drawing A102 points to end wall and references the incorrect detail. Detail at all end walls shall be D3/A501. 5. Attached sketch SK-1 indicates location for ½” GWB adhered to existing CMU. 1. . End of Addendum