Worksheet 4 – Record and report water pre-treatment processes Complete the following details: Name Name of Instructor Instructions To record your answers for the activities and tasks, you will need to: 1) click in the text boxes 2) type your response When you close the document you will be prompted to save your changes. Save the document to your computer hard drive or a removable storage device such as a USB drive. When finished, print it and keep it with the other forms and records. You may be required to submit this document as part of your evidence of learning for this task. Please check with your instructor or team leader. How do you record routine and relevant day to day information in your job? Review your workplace policies and procedures to find out what information is reported, when and to whom. Attach a copy to this worksheet. When would you report a situation that was outside usual operational parameters? What are some different ways that this situation could come to your attention (eg customer complaint or own observation)? Worksheet 4 – Record and report water pre-treatment processes Page 1 of 2 Use your organisational policies and procedures to complete the following table. Who would you report the following issues to and in what timeframe? Issue Who to make the report to In what time frame Contamination of source water with a chemical spill. Major changes in raw or treated water quality, such as turbidity, pH. Different level warnings on the SCADA (or other control system). Sudden changes in environmental conditions such as ambient temperature, wind speed and direction, heavy rainfall. Sudden changes in influent water temperature. Equipment failure. Power failures. Worksheet 4 – Record and report water pre-treatment processes Page 2 of 2