UVIS TEAM MEETING OPERATIONS UPDATE 06/16/14 UVIS TEAM MEETING OPERATIONS UPDATE 1 Instrument Status • On/Off Cycle: 29. – No change – Last time off: In S75 (2012/293 to 2012/303) • Hours On: ~120,000 hours. – Longest continuous operations: 9/11/2007 – 11/1/2010 • HDAC Filament Modulation: – – – – Filament 1: 354 hours (H cell), 148 hours (D cell). Filament 2: 12 hours both H cell and D cell. Last: In S83 during T101. Next: In S84 during T102 and T103 06/16/14 UVIS TEAM MEETING OPERATIONS UPDATE 2 Significant Data Issues S82 UVIS_200SW_IPHSURVEY017_RIDER DSN problem. No data after 2014-011T02:00 S82 UVIS_202SW_IPHSURVEY009_RIDER ????. Data shredded starting 2014-063T17:02 S83 UVIS_203SA_NAURSLEW001_PRIME Rain. Data shredded starting 2014-087T18:03 S83 UVIS_204SW_IPHSURVEY006_RIDER DSN problem. No Data 06/16/14 UVIS TEAM MEETING OPERATIONS UPDATE 3 First Time Events • No first time event 06/16/14 UVIS TEAM MEETING OPERATIONS UPDATE 4 Rbot: Workload Impact • The impact of Rbot on the ops team workload has been very light: – S84: 0 out of 25 design – S85: 1 out of 23 design 06/16/14 UVIS TEAM MEETING OPERATIONS UPDATE 5 Major Local Issues • Uplink side: None • Downlink side: None 06/16/14 UVIS TEAM MEETING OPERATIONS UPDATE 6 Data Utilization • Estimated unused allocation (SP has not published number for S81 and after) – S84: 5% (338 Mbit out of 8155 Mbit) – S85: 6% (372 Mbit out of 6331 Mbit) • Sponge Bit – None for UVIS • Release of SSR allocation due to DSN contention – S85: 260 Mbit out of 1020 Mbit from 2014-251T09:19 259T23:33. Only UVIS_208OT_OUTERSAT001_ISS is affected. 06/16/14 UVIS TEAM MEETING OPERATIONS UPDATE 7 OPS Team Status • Darren is full time – QuikScat, Ops group interface with IT and OpsSw group, MMS and UVIS • Crystal is full time – UVIS and Kepler – Expecting for end of October. Will take 3 months of maternity leave. • Alain is part time (75%) – Will probably go 50% next year – UVIS, QuikScat and OASIS software 06/16/14 UVIS TEAM MEETING OPERATIONS UPDATE 8 Notes and Reminders • The list of ring occultations that contain an atmospheric occultation is on the team web site at http://lasp.colorado.edu/cassini/team-site/archive/docs/pdf/Atmospheric_Occ.pdf • The list of all the tour calibrations is on the team web site at http://lasp.colorado.edu/cassini/team-site/archive/docs/pdf/UVIS_Tour_Calibration.pdf • The UVIS PEFs are on the team web site at http://lasp.colorado.edu/cassini/team-site/operations_planning/planning_info/ 06/16/14 UVIS TEAM MEETING OPERATIONS UPDATE 9