UVIS Team Meeting June 4-6 2013 RTWT and Science Planning Report 1

advertisement
UVIS Team Meeting
June 4-6 2013
RTWT and Science Planning Report
UVIS Team Meeting June 4-6, 2013, St. George Utah
Tuesday, June 4, 13
1
Solstice Mission Inclination Profile
Now
UVIS Team Meeting June 4-6, 2013, St. George Utah
Tuesday, June 4, 13
2
Ring Science SM Status Update
• 17 IN1 occs completed to date:
–
–
–
–
–
–
–
–
–
–
–
–
–
–
Alpha Canis Majoris (168, 169 - joint w/ VIMS)
Kappa Canis Majoris (168, PIE, Particle Tracking)
Zeta Canis Majoris (169, PIE, Particle Tracking)
Zeta Pupis (171, PIE)
Gamma Pegasi (172)
Alpha Virginis (173, PIE)
Epsilon Canis Majoris (173, 174)
Gamma Columba (173, PIE)
Alpha Lyrae (175, PIE - joint w/ VIMS)
Kappa Velorum (183)
Delta Centauri (183, 185)
Beta Libra (187, B=16 deg.)
Lamba Tauri (188, PIE, B=18 deg., close to Daphnis)
Theta Carinae (190, bright, B=67 deg.)
• 2 occs integrated between now and next team meeting.
UVIS Team Meeting June 4-6, 2013, St. George Utah
Tuesday, June 4, 13
3
SM PIE Occs
• Tracking occs:
– Eps Sgr (1.1 km/s) in 2016
– Kap CMa in 2012 (June 29, completed)
– Zet CMa (0.1 km/s) in 2012 (July 23; completed)
– Zet Pup (1 km/s) in 2012 (September 3, completed)
• Azimuthal structure:
– Bet Cru (496 km from Bleriot) in 2017
– Zet Cen (147 km from Daphnis) in 2016
– Lam Tau (79 km from Daphnis) in 2013
• Occs with VIMS (Alpha Lyrae, 1 completed, 3
more integrated)
• Orionis occs (low elevation angle to rings)
• Kap Ori 10 hour occ (2015-049)
UVIS Team Meeting June 4-6, 2013, St. George Utah
Tuesday, June 4, 13
4
Lambda Tauri Daphnis Grazing Occ
UVIS Team Meeting June 4-6, 2013, St. George Utah
Tuesday, June 4, 13
5
UVIS Team Meeting June 4-6, 2013, St. George Utah
Tuesday, June 4, 13
6
UVIS Team Meeting June 4-6, 2013, St. George Utah
Tuesday, June 4, 13
7
UVIS Tracking
Occultations for F Ring/Proximal
Orbits
Miodrag Sremčević, LASP/CU, Boulder
Joshua Colwell, UCF, Orlando
Larry Esposito, LASP/CU, Boulder
Tuesday, June 4, 13
UVIS Tracking Occultations
No coverage :(
3 tracking
occs
Apart from 3 tracking occultations (A ring and A ring ramp), and
excluding dim stars, other occultations are limited to 10m true
resolution!
Tuesday, June 4, 13
Future possibilities
Tuesday, June 4, 13
Future possibilities
Tuesday, June 4, 13
Future possibilities
Apart form A ring and A ring ramp we have limited
high resolution coverage of the rest of the rings.
Any occultation with with dl<10m is a gain!
Proposed targets for dl<10m occultations and
examination of ring microstructure:
1. C ring
2. inner B ring (as it is not as opaque)
3. Cassini division
There are only about dozen possibilities in total!
Tuesday, June 4, 13
Download