UVIS TEAM MEETING OPERATIONS UPDATE 01/05/12 UVIS TEAM MEETING OPERATIONS UPDATE 1 Instrument Status • On/Off Cycle: 28. – None since last meeting. • Hours On: ~98,000 hours. – Longest continuous operations: 9/11/2007 – 11/1/2010. • HDAC Filament Modulation: – – – – Filament 1: 156.28 hours (H cell), 132.28 (D cell). Filament 2: 12.22 hours both H cell and D cell Last: In S71 during T80 (H cell and D cell). Next: In S72 during T81 (H cell). 01/05/12 UVIS TEAM MEETING OPERATIONS UPDATE 2 Significant Data Issues S70 UVIS_153SA_MOS153APO002_PRIME UVIS_153SA_MOS153APO004_PRIME UVIS_154SA_MOS153APO006_PRIME Part of some integrations taken while the S/C is moving – Problem with cyclics onboard the S/C (ISA: 50365) S71 UVIS_159SA_MOS158APO003_PRIME Data return: 6% - S/C USO problem (ISA: 50901) 01/05/12 UVIS TEAM MEETING OPERATIONS UPDATE 3 First Time Events • No First Time Event 01/05/12 UVIS TEAM MEETING OPERATIONS UPDATE 4 Rbot: Workload Impact • The impact of Rbot on the ops team workload has been light: – S70: – S71: – S72: – S73: 01/05/12 0 out of 1 out of 1 out of 1 out of 19 designs 14 designs 14 designs 11 designs (so far) UVIS TEAM MEETING OPERATIONS UPDATE 5 Major Local Issues • Uplink side: None • Downlink side: – Analysis of the E15 data indicates an issue with the processing of FUV and EUV data • (see next presentation) 01/05/12 UVIS TEAM MEETING OPERATIONS UPDATE 6 XM Data Utilization Summary S66 01/05/12 UVIS TEAM MEETING OPERATIONS UPDATE 7 XM Data Utilization Summary S67 01/05/12 UVIS TEAM MEETING OPERATIONS UPDATE 8 XM Data Utilization Summary S68 01/05/12 UVIS TEAM MEETING OPERATIONS UPDATE 9 XM Data Utilization Summary S69 01/05/12 UVIS TEAM MEETING OPERATIONS UPDATE 10 Action Items from Last Meeting • Spica “slow scan” calibration • New design for N/S aurora scan 01/05/12 UVIS TEAM MEETING OPERATIONS UPDATE 11 Action Item #1: Calibration Sequence Date Approximate Range S71 2011-329 -35.0 -> -17.0 S72 2012-071 -19.0 -> -2.0 S73 2012-124 -3.0 -> +14.0 S73 2012-141 (during a CAPS request) +1.0 -> +35.0 (range greater thanks to a larger SSR allocation) 01/05/12 UVIS TEAM MEETING OPERATIONS UPDATE 12 Action Item #2: Aurora Started in S72 – Slightly more complicated design 01/05/12 UVIS TEAM MEETING OPERATIONS UPDATE 13 Notes and Reminders • The list of ring occultations that contain an atmospheric occultation is on the team web site at http://lasp.colorado.edu/cassini/team-site/archive/docs/pdf/Atmospheric_Occ.pdf • The list of all the tour calibrations is on the team web site at http://lasp.colorado.edu/cassini/team-site/archive/docs/pdf/UVIS_Tour_Calibration.pdf • The UVIS PEFs are on the team web site at http://lasp.colorado.edu/cassini/team-site/operations_planning/planning_info/ 01/05/12 UVIS TEAM MEETING OPERATIONS UPDATE 14