UVIS Team Meeting Berlin 2009 Saturn and Titan Planning Bob West Working with Don Shemansky Cassini Equinox Mission (XM) Titan • Solar and stellar occultations • EUVFUV Images of Titan • HDAC Riders with CIRS and ISS in T66 and T67 – Pascal Hedelt will do the analysis • UVIS PRIME Requests T55-T61.ppt Titan Stellar Occs – Prime + XM Number refers to table of occultations 1-12 in Prime mission, 13-20 in XM Also indicated are Latitudes (dashed) Altitude contours XXM (Solstice Mission) Plan Saturn TWT activity for UVIS • • • • Identify solar and stellar occ opportunities (now evaluating 7A) Conflict exercise to indicate over-subscription and conflicts (done) Identify PIE (Pre-Integrated Events) opportunities PIE assignments identification – done for the ‘Bridge’ segment, to come for the rest of the XXM • Segmentation with no liens • Templates for apoapse and fill in the rest of periapse TOST activity for UVIS • Identify solar and stellar occ opportunities (done) • ‘Jumpstart’ meeting to decide who controls +- 2 hours from closest approach (took place at APL in mid-April) • Additional meetings to decide on template activity outside of +- 2 hours, plus input to PIE process plus disposition of T119 C/A (INMS vs. RSS) Bridge Sequence – Prelude to XXM • • • • Observations for July – September 2010 Each working group requested a set of PIEs Three meetings were held to adjudicate Saturn WG requested one solar occ out of three opportunities - two were obtained during the negotiations (Ingress and egress on rev 138; only one was a PIE) • Process worked well in terms or rapid decision making XXM Saturn Stellar Occ Opportunities in SM-7 Key BP = Bright star in periapse BA = Bright star in aoapse FP = Faint star in periapse FA = Faint star in apoapse Slower/brighter events have larger symbol sizes Goal: Obtain good latitude coverage XXM (Solstice Mission) Plans • UVIS Goals for CSM.ppt Tour 7a Titan Solar Occs What We Must Do Next • Check Titan solar and stellar occ opportunities for tour SM-7A • Plan and request EUVFUVs and riders for Titan • Identify solar and stellar occ opportunities for CSM (XXM) for Saturn – Communicate these to and interact with Saturn TWT • Identify and quantify template activities like system scans, EUVFUV, auroral scans – any others? System Scans Need a Home • Which group (Mag or Saturn) should take charge of system scans? – Neither wants to do it – system scans are viewed as a large resource request in competition with other requests favored by each group – My recommendation: provide an incentive by offering extra revs to the group that takes it • Leads need to know the details of the request (time, data volume, turns) and how it can be ‘templatized’ General Issues for the XXM • Dwindling resources – Diminished workforce in the XXM • Templates in apoapse periods • Less dense planning in both periapse and apoapse • Segments are mostly for one discipline with few intruding PIEs from other disciplines – RBOT issues • Diminished turning and limited options for secondary axis • How to plan? – Diminished power due to RTG half life • More instruments going to sleep