DISTRICT DEFERRED MAINTENANCE CAPITAL PROJECT PRIORITY LIST, PHASE III FISCAL YEAR 2020 - 2024 - MASTER PRIORITIZATION PHASE III - DRAFT Priority S - Safety Factors I - Instruction Other Student OS State Funds SF Approved by FPC: 4/21/10 Campus Bldg Priority Project Name Phase Project Description MC 300 Buildings 62 Replace Carpet Phase III - The 13-year old carpets in the 300 Buildings were not replaced when 2020/24 the rest of the campus was renovated in 2007. The carpet is worn and MC Sphygnu m Bog 63 Replace Fence Phase III - Fencing needs to be replaced with metal chain link to protect 2020/24 environmentally sensitive area for the sphygnum bog. The existing EKA Parking Lots and Pathways Water Tanks 64 Seal Coat 65 Water Tanks Replacement EKA CalSOAP 66 Roof Replacement EKA Parking Lots at Creative Arts, Main West Side, AJ and AT 67 Install Light poles Phase III and Security Cameras in Parking lots and Pathways 68 Heating and Ventilation Repair **EKA Football Stadium EKA AJ 69 **EKA Dorms 71 EKA AT 72 EKA CA 73 EKA Maint. 74 Resurace Running Track Replace Exterior Electrical Distribution Panel Replace Exterior Electrical Distribution Panel Replace Electrical Distribution Panels Replace Exterior and Interior Electrical Distribution Panels Replace Electrical Distribution Panel C - Compliance $ Savings If Phased In - Total Project S Cost per Year Est. Cost I O S C $ Status S F $ 40,000 I $ 70,000 S I Phase III Seal coat parking lots and pathways to prolong asphalt. 1st of 10 year $60,000 project $ 600,000 S Phase III Replace 2-360,000 gallon domestic water tanks. 1st of 2 year project. $465,000 Tanks are 44 years old. If Infrastructure capital project approved, this is unecessary. Phase III Replace roof, 52 years old. $12,000 $ 930,000 C $ $ 12,000 $ stained. fence has fallen due to vandalism and rust corrosion. EKA EKA 70 Replace parking lot poles and fixtures in the west side of main lot and $400,000 Creative Arts, and add additonal light poles and security cameras. Install parking lot poles and security cameras in AJ and Dorm parking lot. $ 400,000 S Phase III Replace deteriorating and inefficient HVAC units and ducting on roof $200,000 and attics, 50 years old. 1st of 4 year project. This is in addition to the project listed in Phase I Phase III Resurface and restrip running track. If athletic field renovation takes $150,000 place (project from Phase II) this is unnecessary. Phase III Replace exterior electrical distibution panel. Panel is beyond useful life $80,000 and poses a safety hazard. $ 800,000 $ 150,000 S $ 80,000 S Phase III Replace exterior electrical distibution panel. Panela are 43 years old. They are beyond useful life and poses a safety hazard. $ 80,000 S Phase III Replace exterior and interior electrical distibution panels. Panels are 44 $240,000 years old. They are beyond useful life and pose a safety hazard. Phase III Replace electrical distibution panels. Panels are 38 years old. They are $160,000 beyond useful life and pose a safety hazard. $ 240,000 S $ 160,000 S Phase III Replace electrical distibution panel. Panel is 44 years old. It is beyond $80,000 useful life and poses a safety hazard. $ 80,000 S $80,000 $ $ Chancellor Capital Plan Fusion State Funds Local Listed Committed Funds Committed State Request Local Request DISTRICT DEFERRED MAINTENANCE CAPITAL PROJECT PRIORITY LIST, PHASE III FISCAL YEAR 2020 - 2024 - MASTER PRIORITIZATION PHASE III - DRAFT Priority S - Safety Factors I - Instruction Other Student OS State Funds SF Approved by FPC: 4/21/10 Campus Bldg Priority EKA PE 75 EKA All 76 EKA Tennis Courts 77 EKA PE, SU, AD 78 EKA LRC 79 EKA CDC 80 EKA All EKA Project Name Replace Electrical Distribution Panels Exterior Painting Phase Project Description - Compliance $ Savings If Phased In - Total Project S Cost per Year Est. Cost Phase III Replace electrical distibution panels. Panels are 39 years old. They are $160,000 beyond useful life and pose a safety hazard. Phase III Paint exterior of buildngs. 10 years since last paint job. 1st of 4 year $25,000 project. Phase III Resurface six tennis courts. Four of the six have not been repaired in $150,000 35 years. Repplace lighting on first two courts. Resurface Tennis Courts and replace Lighting Replace Generator at Phase III PE and add Generators at SU and AD Replace Boiler Phase III C $ 160,000 S $ 100,000 $ 150,000 S I O S C $ Status S F $250,000 $ 250,000 S Replace heating boiler. Boiler is 28 years old. $150,000 $ 150,000 S $ Replace Heating and Phase III Replace heating and hot water boilers. Boilers are 28 years old. Hot Water Boiler $225,000 $ 225,000 S $ 81 Replace Carpet $25,000 $ 100,000 S AT 82 Replace Boiler Phase III Replace carpet throughout existing buildings. Some carpet is over 20 years old and beyond useful life. 1st year of 4 year project. Phase III Replae heating boiler. Boiler is 30 years old and beyond useful life. $150,000 $ 150,000 S $ EKA PE 83 Replace Boiler Phase III Replace heating boiler. Boiler is 30 years old and beyond useful life. $225,000 $ 225,000 S $ EKA All 84 Emergency Lighting Phase III Replace emergency lighting systems throughout campus. Systems are 15 years old and beyond useful life. 1st year of 4 year project. Phase III - Enclose firing range to allow adjacent forest to be used for forestry and natural Enclose Firing 2020/24 resources courses. Lead abatement would also be required. Cost estimates vary Range $20,000 $ 80,000 S 85 EKA 86 Fusion State Funds Local Listed Committed Funds Committed State Request Local Request $ Replace generator at PE, and add generators at Student Union and original Administration. Generators will provide emergency lighting and operate critical equipment. EKA Chancellor Capital Plan C C $ - $ 300,000 S I Strengthen old CDC Phase III - Strengthen the old child development center (located behind the dorms on the Eureka $ - $ 300,000 S I - $ 5,492,000 I $ 40,000 I $ 400,000 I O S $ - - $ - depending on type of enclosure and degree of soil remediation required. $ 2020/24 campus). The facility is currently being used by the Academy of the Redwoods. Project cost and viability is dependent on proximity of this facility to faults. MC ARC MC Ericson Ct Science Labs 87 Woodworking and Gallery 88 Culinary Facilities Expansion Expansion of Labs 89 Phase III - This project proposes to construct a new Fine Woodworking Building on the Main 2020/24 Campus at the Mendocino Coast Education Center in Ft. Bragg. This project would allow a 50% increase in the lab space over what is currently used. This project will also modernize the program by the replacement of out-dated equipment and the addition of new safer equipment. Phase III - Refrigerators, Freezer, Storage space expansion. Cost is approximate. Details not 2020/24 provided in program review document Phase III - Expansion of Science Lab Space. Dependent on growth in programs 2020/24 $ O S DISTRICT DEFERRED MAINTENANCE CAPITAL PROJECT PRIORITY LIST, PHASE III FISCAL YEAR 2020 - 2024 - MASTER PRIORITIZATION PHASE III - DRAFT Priority S - Safety Factors I - Instruction Other Student OS State Funds SF Approved by FPC: 4/21/10 Campus Bldg Priority Project Name EKA 90 Strengthening Admin and Forum EKA 91 EKA 92 EKA 93 Seismic Strengthening Physical and Life Strengthening, modification or demolition of Old Library Additional Dorm Buildings (Two) Phase Project Description C - Compliance $ Savings If Phased In - Total Project S Cost per Year Est. Cost Chancellor Capital Plan I O S C $ Status S F Fusion State Funds Local Listed Committed Funds Committed State Request Local Request Phase III - Seismic strengthening of old administration and forum building. Costs are uncertain $ 2020/24 given the additional rennovation required once stregthening is performed as well as the future status of seismic restrictions and related modifications of surrounding buildings. Phase III - Seismic strengthening of old sciences buildings (physical and life). Costs are $ 2020/24 uncertain given the additional rennovation required once stregthening is performed as well as the future status of seismic restrictions and proposed new purpose of the buildings. Phase III - Seismic strengthening and other modifications performed to modify the old library $ 2020/24 to serve as a functioning building. Project is dependent on future needs of the college, seismic restrictions, and additional rennovations required. The cost may vary considerably. - $ 1,900,000 S $ - $ - - $ 1,800,000 S $ - $ - - $ 325,000 S $ - $ - Phase III - Expansion of dormatory facilities. Project dependent on future growth trends and 2020/24 modes of instructional delivery - $ 3,200,000 $ - $ - $ - $ - Total Phase III $ $ 18,989,000 O S TOTAL $ - $ -