DISTRICT DEFERRED MAINTENANCE CAPITAL PROJECT PRIORITY LIST, PHASE II FISCAL YEAR 2015 - 2019 - MASTER PRIORITIZATION PHASE II - DRAFT Priority S - Safety Factors I - Instruction Other Student OS State Funds SF Approved by FPC: 4/21/10 Campus Bldg Priority Project Name EKA AD 37 Dorms - Seismic Strengthening and Rennovation EKA PS 38 Student Union EKA PE 39 Athletic Fields and Stadium If Phased In - Total Project S Cost per Year Est. Cost I O S C $ Status S F $ - $ 3,010,000 S O S C $ - $ 1,550,000 S O S C $ - $ 1,770,000 S I Chancellor Capital Plan Fusion State Funds Local Listed Committed Funds Committed State Request O S Local Request $ - $ - $ - $ - $ - C I $ - $ 10,000 S I Phase II - Ventaliation/air circulation of classrooms. Make facilities ADA compliant, including ADA and 2015/19 access to sinks, counter tops, work stations Rennovation of Culinary Facilities $ Health Science Bldg Phase II - The proposed new health services building is a 3400 SF structure that will provide $ 500,000 $ 3,761,830 I - $ 200,000 I $ $ - $ - Phase II - Replace deteriorating plumbing fixtures, including bathrooms and upper Gym shower $ 2015/19 rooms Phase II - Install cooling coils in existing fan units for classrooms. $ 2015/19 - $ 200,000 I $ $ - $ - - $ 250,000 I $ $ - $ - Phase II - The 300 Buildings and the Fine Woodworking Building (built in 1981) need to be 2015/19 upgraded with new lighting and motion sensors to increase efficiency. The FWW Building still has incandescent lighting outside. $ - I $ $ - $ - Phase II 2015/19 Phase II 2015/19 $ 20,000 $ 100,000 $ $ - $ - $ 20,000 $ 100,000 S $ - $ - Remove and Regrade Concrete MC 300 Bldgs, Art Bldgs, & Garage Ericson Ct 41 Replace Wooden Doors 43 Savings 300,000 S 40 DN Phase II - This project addresses safety concerns by structurally retrofitting a building occupied 2015/19 by students. In addition rennovation is required for ADA compliance, asbestos abatement, to replace roofs, improve lighting, refurbish bathrooms, replace the hearing system, correct plumbing problems, upgrade electrical, and install fire control sprinklers. The strengthening may be separate from rennovation Phase II - This project addresses safety concerns by structurally retrofitting a building occupied 2015/19 by students. Additional Rennovations would increase the estimated cost of this project. Phase II - Install field drainage on Baseball and Softball fields. Rennovate Football Field and 2015/19 Track. Replace visitors bleachers with ADA compliant bleachers. Replace roof and back wall at Stadium, 40 years old. Wall and roof have failed due to dry rot. Replace football scoreboard, existing board is 35 years old. Project could be done in portions: athletic fields, stadium, track, scoreboard. Phase II - The 300 Buildings were originally built 13 years ago and there had been a planned 2015/19 canopy between the two buildings and in front of the exterior classroom doors, that was not built. The sidewalks that abut the exterior walls of the buildings were not designed to slope away from the buildings to allow for water to drain. When it rains, water collects in pools along the exterior walls causing the walls to rot. Flooring has had to be replaced three times due to dry rot. A fourth area is showing signs of flooring and cracked floor tiles. Phase II - spongy Replacement of doors that have been damaged by water and weather. Doors have $ - $ 300 Bulidings 42 Project Description - Compliance $ MC ARC Phase C EKA All 44 Double Pane Windows Plumbing Fixtures EKA All 45 EKA LRC 46 MC 47 EKA 300 Bldgs & FWW Bldg All Air Conditioning Installation Upgrade Lighting 48 Exterior Painting EKA All 49 Carpet Replacement C 2015/19 rotted and currently allow water into the instructional space. This presents a safety hazard 2015/19 functional, efficient and modern facilities for the health services program and includes offices, lecture/meeting areas, classrooms, and simulation labs for the health services program and replaces the existing portable structure where the program is currentlysingle housed. Phase II - Replace pane windows with energy efficient double pane windows. Energy $ 2015/19 credit project. Paint exterior of buildings, some have not been painted in over 10 years. 1st year of 5 year project. Replace carpet throughout existing old bldgs. Much of the carpeting is 42 years old. 1st year of 5 years. - $ 40,000 S I IPP DISTRICT DEFERRED MAINTENANCE CAPITAL PROJECT PRIORITY LIST, PHASE II FISCAL YEAR 2015 - 2019 - MASTER PRIORITIZATION PHASE II - DRAFT Priority S - Safety Factors I - Instruction Other Student OS State Funds SF Approved by FPC: 4/21/10 Campus Bldg Priority Project Name DN Painting 50 EKA CA 51 Classrooms in all buildings Boiler Replacement EKA AJ 52 Boiler Replacement EKA All 53 DN Irrigation System 54 EKA 55 EKA Parking Lot AT Lighting Energy Efficiency Under an agriculture/water only. No sewer New Marquee EKA AT 57 EKA All 58 EKA All 59 56 DN 60 MC 61 Construction Tech Lab Remodel Auto Lab Remodel Phase Phase II 2015/19 Phase II 2015/19 Phase II 2015/19 - Compliance $ Savings If Phased In - Total Project S Cost per Year Est. Cost Phase II - Original paint; needs to be redone. 2015/19 Chancellor Capital Plan I O S C $ Status S F $ 40,000 I Fusion State Funds Local Listed Committed Funds Committed State Request Local Request $ - $ - Replace inefficient heating boiler, 35 years old. Possible major capital project . Energy credit project. Replace heating boiler, 37 years old. Energy credit project. $ - $ 225,000 I $ $ - $ - $ - 150,000 I $ $ - $ - Replace outdated lighting with energy efficient lamps and fixtures. Energy credit project. $ - $ 45,000 S $ $ - $ - $ $ - $ - $ - $ - $ Phase II - Irrigation for lawn and flower beds. 2015/19 $ 20,000 Phase II - Install double sided electronic LED sign system - south entrance, old Marquee is 42 2015/19 years old. $ 50,000 Phase II - Remodel Woodshop . 2015/19 $ 340,000 I $ - $ - Remodel Automotive Lab $ 450,000 I $ - $ - Replace locks with a card locks system. 1st year of 5 year project. $ 160,000 $ - $ - Install addt'l irrigation piping & sprinklers to irrigate lawn areas not currently irrigated. $ 150,000 $ - $ - $ 987,000 O S $ 2,400,000 O S $ 16,808,830 $ - $ - Phase II 2015/19 Phase II Door locks 2015/19 Additional Irrigation Phase II 2015/19 Phase II Student Center 2015/19 Building Student Housing (Growth) Project Description C Phase II 2015/19 Total Phase II $ TOTAL $ - $ -