DISTRICT DEFERRED MAINTENANCE SMALL CAPITAL PROJECT PRIORITY LIST, PHASE I FISCAL YEAR 2010 - 2014 - MASTER PRIORITIZATION PHASE 1- Draft Priority S - Safety Factors I - Instruction Other Student OS State Funds SF Approved by FPC: 3/8/10 Campus Bldg Priority Project Name Administration and Theater Buildings Replacement Science and Humanities (Academic) Buildings Replacement EKA AD 1 EKA PS 2 EKA ALL 3 Utility Infrastructure Replacement DN ALL 4 Del Norte - Utility Infrastructure Phase Project Description C - Compliance $ Savings Chancellor Capital Plan If Phased In - Total Project S Cost per Year Est. Cost I O S C $ Status S F Fusion State Funds Local Listed Committed Funds Committed Phase 1 2010/14 This project addresses safety concerns by replacing a seismically at-risk building. There is a committed state funding and it is in preliminary stage of design. Phase 1 2010/14 This project addresses safety concerns by replacing seismically at-risk instructional buildings. There is committed state funding and it is in the advanced stage of design. Phase 1 - This project will replace portions and whole systems of utility infrastructure, to 2010/14 include electrical, mechanical, water, sewer, fire suppression, communication, and information technology. It is necessary to relocate or reconstruct utility systems to eliminate/reduce the seismic and environmental hazards from an earthquake. Phase 1 2010/14 This project will provide utility infrastructure extensions, new access roadways, new storm drains and culverts to support adding new buildings to replace portable buildings to be located to the north and across the creek of the center. Phase 1 2010/14 This project addresses safety concerns by demolishing the current west seismically unsound west wing and realigning the west wing toward the east of a seismically atrisk instructional building. Other Seismic Strengthening Options will be considered. Phase 1 - Repair and replace broken and deteriorating sewer pipes and manholes. ($70,000 2010/14 state paid with deferred maintenance block grant) $ - See State Funds S Committed I O SF S $ Approved Yes $ - See State Funds S Committed I SF $ Approved Yes $ - See State Funds S Requested I O SF S $ IPP Yes $ 35,684,000 $ - $ - $ SF $ Fusion Listed/Not IPP Yes $ - $ - See State Funds S Requested SF $ IPP Yes $ 5,865,000 $ 1,320,000 $ - See State Funds Committed SF C $ - See State Funds S Committed $ - See State Funds Committed $ 16,348,450 State Request Local Request $ 2,259,245 $ 16,348,450 $ 2,259,245 $ 3,488,295 $ 29,470,812 $ 3,488,295 $ 29,470,812 2,930,000 S EKA CA 5 EKA All 6 Creative Arts Building Seismic Realignment of West Wing Sewer System Repair EKA PE 7 Lighting Replacement EKA AT 8 Heating and Ventilation Repair Phase 1 - Replace overhead light fixtures in Gym, Pool, and Field house with energy efficient 2010/14 fixtures. Existing fixtures are 35 to 42 year old.(Addt'l $100,000 state paid with deferred maintenance block grant) Phase 1 - Replace deteriorating and inefficient HVAC units on roof, 40 years old paid with 2010/14 state deferred maintenance block grant EKA AT 9 295,292 S ALL 10 Phase 1 - Replace dust collector system in Woodshop. $ 2010/14 Phase 1 - Replace failing components in the phone system. To service Eureka, Del Norte, $ 2010/14 Mendocino, and Eureka Downtown. Current system is obsolete/no longer supported. - $ EKA Dust Collector Replacement New PBX Telephone System - $ 141,000 S EKA PE 11 New Electrical Panel DN Nursing 12 Ramp & Railing EKA ALL 13 Emergency Lighting EKA CA & AJ 14 ADA Access Phase 1 2010/14 Phase 1 2010/14 Phase 1 2010/14 Phase 1 2010/14 MC Parking Lots 15 Replace Asphalt EKA AT, PE, AJ 16 Fire Alarm Replacement I Completed No $ 70,000 SF $ In Progress No $ SF $ In Progress No 70,000 $ - $ - 100,000 $ 100,000 $ - $ - $ 100,000 $ 100,000 $ - $ - $ Bond Identified No $ - $ 295,292 $ - $ - No $ - $ - No $ - $ - C No $ - $ - C No $ - $ - C No $ - $ - No $ - $ - No $ - $ - I Replace Football Stadium distribution panel. Existing panel is 34 years old and has shorted out in the past presenting a serious safety hazard. Replace wooden ramp and railing as not structurally sound. $ - $ 25,000 S I $ - $ 10,000 S I Replace outdated and no operational emergency light systems; some systems are 42 years old. Add new systems where needed. (1st year of 4 year project). $ 15,000 $ 60,000 S $ Replace seating in rooms 100A and 101 to include ADA compliant seating, 32 years old. Replace seating in room 113 to include ADA compliant seating, 35 years old. Phase 1 - Main parking lot has not been slurry-coated in 23 years, and the lower lot has not $ 2010/14 been coated in 9 years. Some areas of the walking paths were broken when the Art building renovation/expansion took place. Dips in the walking paths by the ceramics area are trip hazards. Phase 1 - Replace fire alarm systems to include ADA compliant devices, 42 years old. $ 2010/14 - $ 62,500 - $ 50,000 S - $ 225,000 S I C $ - $ DISTRICT DEFERRED MAINTENANCE SMALL CAPITAL PROJECT PRIORITY LIST, PHASE I FISCAL YEAR 2010 - 2014 - MASTER PRIORITIZATION PHASE 1- Draft Priority S - Safety Factors I - Instruction Other Student OS State Funds SF Approved by FPC: 3/8/10 Campus Bldg Priority Project Name Phase Project Description Phase 1 2010/14 Phase 1 2010/14 Phase 1 2010/14 Phase 1 2010/14 Phase 1 2010/14 Replace deteriorating and inefficient HVAC units on roof, 40 years old.(1st year of 4 yr project). Replace deteriorating and inefficient HVAC units on roof, 35 years old. (1st year of 4 year project . Possible new building cost.) Replace deteriorating and inefficient HVAC units on roof, 38 years old. (1st year of 4 year project.) Replace deteriorating and inefficient HVAC units on roof, 32 years old. Savings Chancellor Capital Plan Fusion State Funds Local Listed Committed Funds Committed $ 200,000 $ 800,000 I $ No $ - $ - $ 187,500 $ 750,000 I $ No $ - $ - $ 250,000 $ 1,000,000 I $ No $ - $ - $ - $ 525,000 I $ No $ - $ - Rebuild Lift Station structure with secondary containment to prevent overflow to $ creek, 35 years old. If Infrastructure capital project approved, this is unnecessary. - $ 10,000 S No $ - $ - Phase 1 - Replace level control valve and shut off valve. Valves are 44 years old and no longer $ 2010/14 control water level in tanks. Replaced as Jan. 2010 Earthquake repair. - $ 15,394 S No $ - $ - No $ - $ - No $ - $ - C No $ - $ - C $ No $ - $ - $ No $ - $ - No $ - $ - No $ - $ - No $ - $ - No $ - $ - No $ - $ - 17 EKA CA 18 EKA PE 19 EKA AJ 20 EKA CDC 21 Heating and Ventilation Repair Heating and Ventilation Repair Heating and Ventilation Repair Heating and Ventilation Repair Sewer Lift Station EKA Water Tanks AT 22 Water Tank Valves 23 Football Stadium 300 Buildings 24 Spray Booth Water Bath Phase 1 - Replace water bath in Woodshop, unit is 40 years old and no operational. 2010/14 Stadium Light Phase 1 - Replace deteriorating light fixtures and electrical panels, 34 years old. Replacement 2010/14 25 Replace Heaters EKA PE 26 Swimming Pools DN 27 Nursing, DS, DRC, Bldgs. DN Heat Pumps All 28 Asphalt Slurry Coat DN All 29 Exterior Lighting DN Main, DM, Art Bldg, Doors 30 Replace Exterior Doors DN Roofing 31 DC, DRC, DS, & Nursing Phase 1 - Old roofs. Art building is 25 years old. (1st year of 4 year project). 2010/14 MC 300 Buildings & FWW Bldg 32 Paint Exterior Walls EKA All 33 Lighting Motion Sensors Phase 1 - Install motion sensors in classrooms and offices 2010/14 DN Boiler 34 Replace existing boiler MC $ I O S C $ Status S F AT EKA - Compliance If Phased In - Total Project S Cost per Year Est. Cost EKA EKA C C $ Completed $ - $ 150,000 I $ - $ 250,000 S I Phase 1 - The five heaters which service these buildings are 13 years old and are located on the $ 2010/14 outside of the buildings, exposing them to the salt air of the ocean. They are experiencing severe rust problems and have been painted several times within the last 13 years. Phase 1 - Repair pool leaks and address code compliance issues, 41 years old. $ 2010/14 Phase 1 - Reaching end of industry lifespan. (1st year of 4 year project ) $ 2010/14 - $ 20,000 S Phase 1 2010/14 Phase 1 2010/14 Phase 1 2010/14 - $ 400,000 I 80,000 $ 320,000 S I C O S O S $ State Request Local Request Parking lot has extensive tree root damage. Pathways installed in 1983. Seal coat applied 15 years ago. Upgrade exterior lighting fixtures that are 26 years old. $ - $ 70,000 S $ - $ 15,000 Weather & wear of 25 year old doors. $ - $ 7,500 S $ 150,000 $ 600,000 S Phase 1 - The 300 Buildings need to be painted. Some parts of the exterior are metal, and - due $ 2010/14 to our close proximity to the ocean - rust is a huge problem. It has been 7 years since they have been painted. The FWW buildings (classrooms, garage, and shed) have not been painted in 15 years. - $ 40,000 S $ - $ 80,000 $ No $ - $ - Phase 1 - Boiler is 19 years old and $36K annual LP costs could be reduced by 20% with more $ 2010/14 efficient unit. - $ 20,000 $ No $ - $ - C $ $ DISTRICT DEFERRED MAINTENANCE SMALL CAPITAL PROJECT PRIORITY LIST, PHASE I FISCAL YEAR 2010 - 2014 - MASTER PRIORITIZATION PHASE 1- Draft Priority S - Safety Factors I - Instruction OS SF Approved by FPC: 3/8/10 Campus Bldg Priority DN Lighting 35 DN Exterior painting 36 Project Name Phase Lighting Motion Sensors Phase 1 2010/14 Exterior Painting Phase 1 2010/14 Project Description Additional classrooms and remote offices need T5 ballasts and lighting motion sensors for utility savings. Art building last painted 25 years ago. DS building last painted 14 years ago. DN building last painted 6 years ago. DC building last painted 12 years ago. Total Phase 1 - $ 20,000 $ - $ 40,000 $ 8,931,686 State Funds C - Compliance $ Savings If Phased In - Total Project S Cost per Year Est. Cost $ Other Student Chancellor Capital Plan I O S C $ Status S F $ TOTAL Fusion State Funds Local Listed Committed Funds Committed State Request Local Request No $ - $ - No $ - $ - $ 46,089,262 $ 6,312,832 $ 87,368,262 $ 7,067,540