RCCD DEFERRED MAINTENANCE SMALL CAPITAL PROJECT PRIORITIZATION LIST FPC Approved - November 2009 S - Safety PHASE 1: FISCAL YEAR 2010 - 2015 C - Compliance $ - Savings Site Bldg Priority Project Name Phase Project Description One time/Yr Total Project S C $ Status Est Cost Est. Cost EUREKA CAMPUS EKA EKA PE All 1 2 EKA AT 3 EKA AD 4 EKA EKA EKA PE All AT, PE, AJ 12/16/2009 5 6 7 Lighting Replacement Phase 1 - Replace overhead light fixtures in Gym, Pool, $100,000 2010/15 and Fieldhouse with energy efficient fixtures. Existing fixtures are 35 to 42 year old.(Addt'l $100,000 state paid) Energy credt project. Sewer System Phase 1 - Repair and replace broken and deteriorating $70,000 Repair 2010/15 sewer pipes and manholes. ($70,000 state paid) Heating and Phase 1 - Replace deteriorating and inefficient HVAC $100,000 Ventilation Repair 2010/15 units on roof, 40 years old. Energy credit project. New PBX Phase 1 - Replace failing components in the phone $141,000 Telephone System 2010/15 system. To service Eureka, Del Norte, Mendocino, and Eureka Downtown. Current system is obsolete/no longer supported. New Electrical Phase 1 - Replace Football Stadium distribution panel. $25,000 Panel 2010/15 Existing panel is 34 years old and has shorted out in the past presenting a serious safety hazard. Energy credit project. Emergency Phase 1 - Replace outdated and nonoperational $12,000 Lighting 2010/15 emergency light systems; some systems are 42 years old. Add new systems where needed. 1st year of 5 year project. Fire Alarm Phase 1 - Replace fire alarm systems to include ADA $225,000 Replacement 2010/15 compliant devices, 42 years old. $100,000 S $ $70,000 C $100,000 In Progress In Progress In $ Progress $141,000 S $25,000 S $60,000 S C $225,000 C Page 1 RCCD DEFERRED MAINTENANCE SMALL CAPITAL PROJECT PRIORITIZATION LIST FPC Approved - November 2009 PHASE 1: FISCAL YEAR 2010 - 2015 S - Safety C - Compliance $ - Savings Site Bldg Priority EKA All 8 EKA All 9 EKA AT 10 EKA EKA EKA EKA CA PE AJ Waste Water Plant 12/16/2009 11 12 13 14 Project Name Phase ADA Access Phase 1 2010/15 Lighting Motion Phase 1 Sensors 2010/15 Heating and Phase 1 Ventilation Repair 2010/15 Heating and Phase 1 Ventilation Repair 2010/15 Heating and Phase 1 Ventilation Repair 2010/15 Heating and Phase 1 Ventilation Repair 2010/15 Sewer Lift Station Phase 1 2010/15 Project Description Improve ADA accessibility at various buildings. Install motion sensors in classrooms and offices. Energy credit project. Replace deteriorating and inefficient HVAC units on roof, 40 years old. 1st year of 5 yr project. Energy credit project. Replace deteriorating and inefficient HVAC units on roof, 35 years old. 1st year of 5 year project. Energy credit project. Possible new building cost. Replace deteriorating and inefficient HVAC units on roof, 38 years old. 1st year of 5 year project. Energy credit project. Replace deteriorating and inefficient HVAC units on roof, 32 years old. Energy credit project. Rebuild Lift Station structure with secondary containment to prevent overflow to creek, 35 years old. If Infrastructure capital project approved, this is unecessary. One time/Yr Total Project S C $ Status Est Cost Est. Cost $125,000 $125,000 $80,000 $80,000 $150,000 $750,000 $150,000 $200,000 $525,000 C $ S $ S $ S $ $750,000 $1,000,000 $525,000 $ $10,000 $10,000 S C Page 2 RCCD DEFERRED MAINTENANCE SMALL CAPITAL PROJECT PRIORITIZATION LIST FPC Approved - November 2009 PHASE 1: FISCAL YEAR 2010 - 2015 S - Safety C - Compliance $ - Savings Site EKA EKA Bldg Water Tanks AJ Priority 15 16 EKA CA 17 EKA AT 18 EKA AT 19 EKA Football Stadium 20 PE 21 EKA Project Name Phase Project Description Water Tank Valves Phase 1 - Replace level control valve and shut off $45,000 2010/15 valve. Valves are 44 years old and no longer control water level in tanks. If infrastructure capital project approved, this is unecessary. $45,000 Seating Replacement Phase 1 - Replace seating in rooms 100A and 101 to $45,000 2010/15 include ADA compliant seating, 32 years old. $45,000 Seating Replacement Spray Booth Water Bath Dust Collector Replacement Stadium Light Replacement Phase 1 2010/15 Phase 1 2010/15 Phase 1 2010/15 Phase 1 2010/15 Swimming Pools Replace seating in room 113 to include ADA compliant seating, 35 years old. Replace water bath in Woodshop, unit is 40 years old and nonoperational. Replace dust collector system in Woodshop as current inefficient. Replace deteriorating light fixtures and electrical panels, 34 years old. Possible major capital project. Phase 1 - Repair pool leaks and address code 2010/15 compliance issues, 41 years old. TOTAL EUREKA CAMPUS TOTAL Less Major Capital Project components 12/16/2009 One time/Yr Total Project S C $ Status Est Cost Est. Cost $ S $ S C 17,500 $ 17,500 $150,000 $150,000 $295,292 $295,292 $250,000 $250,000 S C S C C S $400,000 $400,000 $3,115,792 $2,660,792 $5,163,792 $4,108,792 $ C $ Page 3 RCCD DEFERRED MAINTENANCE SMALL CAPITAL PROJECT PRIORITIZATION LIST FPC Approved - November 2009 PHASE 1: FISCAL YEAR 2010 - 2015 S - Safety C - Compliance $ - Savings Site Bldg Priority DN Nursing 1 DN All 2 Project Name Ramp & Railing Phase 1 2010/15 Asphalt Slurry Coat Phase 1 2010/15 DN All 3 Exterior Lighting DN Main, DM, Art Bldg, DAI 4 Replace Exterior Doors Boiler 5 DN Phase 1 2010/15 Phase 1 2010/15 Project Description DEL NORTE INSTRUCTIONAL CENTER Replace wooden ramp and railing as not structurally sound. Parking lot has extensive tree root damage. Pathways installed in 1983. Seal coat applied 15 years ago. Upgrade exterior lighting fixtures that are 26 years old. Energy credit project. Weather & wear of 25 year old doors. One time/Yr Total Project S C $ Status Est Cost Est. Cost $10,000 $10,000 $70,000 $70,000 S C S $15,000 $15,000 $7,500 $7,500 C $ S Replace existing boiler DN Exterior painting 6 Exterior Painting DN Lighting 7 Lighting Motion Sensors 12/16/2009 Phase Phase 1 - Boiler is 19 years old and $36K annual LP 2010/15 costs could be reduced by 20% with more efficient unit. Energy credit project. Phase 1 - Art building last painted 25 years ago. DS 2010/15 building last painted 14 years ago. DN building last painted 6 years ago. DC building last painted 12 years ago. Phase 1 - Additional classrooms and remote offices 2010/15 need T5 ballasts and lighting motion sensors for utility savings. Energy credit project. $40,000 $40,000 $ $40,000 $40,000 $20,000 $20,000 $ Page 4 RCCD DEFERRED MAINTENANCE SMALL CAPITAL PROJECT PRIORITIZATION LIST FPC Approved - November 2009 PHASE 1: FISCAL YEAR 2010 - 2015 S - Safety C - Compliance $ - Savings Site DN DN Bldg Priority Roofing 8 Heat Pumps 9 Project Name Phase Project Description DC, DRC, DS, & Nursing Phase 1 - Old roofs. Art building is 25 years old. 1st 2010/15 year of 5 year project. Energy credit project. Nursing, DS, DRC, Phase 1 - Reaching end of industry lifespan. 1st year of Bldgs. 2010/15 5 year project. Energy credit project. TOTAL DEL NORTE CENTER 12/16/2009 One time/Yr Total Project S C $ Status Est Cost Est. Cost $150,000 $64,000 $416,500 $750,000 $320,000 S $ S $ $1,272,500 Page 5 RCCD DEFERRED MAINTENANCE SMALL CAPITAL PROJECT PRIORITIZATION LIST FPC Approved - November 2009 PHASE 1: FISCAL YEAR 2010 - 2015 S - Safety C - Compliance $ - Savings Site MC MC MC Bldg Parking Lots 300 Buildin gs 300 Buildin gs & FWW Bldg 12/16/2009 Priority 1 2 3 Project Name Replace Asphalt Replace Heaters Paint Exterior Walls Phase Phase 1 2010/15 Phase 1 2010/15 Phase 1 2010/15 Project Description MENDOCINO INSTRUCTIONAL CENTER Main parking lot has not been slurry-coated in 23 years, and the lower lot has not been coated in 9 years. Some areas of the walking paths were broken when the Art building renovation/expansion took place. Dips in the walking paths by the ceramics area are trip hazards. The five heaters which service these buildings are 13 years old and are located on the outside of the buildings, exposing them to the salt air of the ocean. They are experiencing severe rust problems and have been painted several times within the last 13 years. Energy credit project. The 300 Buildings need to be painted. Some parts of the exterior are metal, and - due to our close proximity to the ocean - rust is a huge problem. It has been 7 years since they have been painted. The FWW buildings (classrooms, garage, and shed) have not been painted in 15 years. TOTAL MENDOCINO INSTRUCTIONAL CENTER One time/Yr Total Project S C $ Status Est Cost Est. Cost $50,000 $50,000 S $20,000 $20,000 S C $40,000 $40,000 S $110,000 $110,000 Page 6