DISTRICT DEFERRED MAINTENANCE SMALL CAPITAL PROJECT PRIORITY LIST, PHASE I Program Review - Technology Items Summary and Prioritization - DRAFT - (5/27/10) Campus Department Smart Classroom Requests Eka AJ Art Art HE/PE/Dance Biology Earth/Astro Art Art Earth/Astro HRC Math HE/PE/Dance Math English English Library English English English Psych Psych Speech HE/PE/Dance Athletics Athletics Building -Room Priority AJ 101A CA 136 CA 138 PE 200 LS 102 PS 133 CA 126 CA 135 PS 111 AIS 150 PS 201 PE 201 PS 110 AD 107 FM 206 FM 210 FM 208 AD 107 AD 103 AIS 212 CA 113 ARC 212 PE 200/201 PE 201 PE 200 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Computer Requests Tech Services is completing a site survey to identify oldest PCs Political Science FM 100 1 AJ AJ 101A 2 AJ AJ 108 3 Anth/Soc FM 203 4 Art CA 139 5 Athletics PE 6 HRC AIS 150 7 Cal-SOAP Cal-SOAP 8 Library Library 9 Counsel AD 205 10 Counsel AD 205C 11 HRC AIS 150 12 Athletics PE 13 A&R library 14 Math PS 116 15 EOPS EOPS 16 Assess Library 17 Math Library 18 Art CA 136 19 Art CA 138 20 Earth/Astro PS 111 21 Earth/Astro PS 133 22 Projector Bulbs - stock inventory English FM 206 Eka English AD 103 Eka History FM 209 Eka Speech FM 205 Eka Art CA 126 Eka Art CA 135 Eka 8/9/2010 Project Name Project Description - Notes If Phased In - Cost per Year Priority S Safety Factors I Instruction OS Other Student SF State Funds C Compliance $ Savings Total Project Est. Cost Desktop & white board monitor (wbm) WBM and standard Mac WBM and standard Mac WBM, computer and internet WBM ELMO and computer WBM WBM Computer and screen WBM, speakers, and computer WBM WBM ELMO ELMO ELMO Computer, internet, WBM 96 by 96 screen PPT clicker PPT clicker Computer and internet access Internet access Internet access ELMO installation and securing WBM WBM, computer and internet $3,000 $3,500 $3,500 $3,500 $2,000 $2,000 $2,000 $2,000 $1,000 $3,000 $2,000 $2,000 $1,000 $1,000 $1,000 $3,000 $500 $100 $100 $1,000 $500 P P P P P P P P P P P P P P P P P P P P P $500 $1,000 $1,000 $3,000 P P P P and re-allocation targets. The following requests are brought forward from Program Review. PC's are $1,000 each Computer with Power Point 2007 6 computers (AJ lab) Desktop Computer Standard Mac 1 AOA computer Staff computer and printer - Old Arcata site Old ARC site 1 computer 25 computers AOA computer Assistant Director computer 2 computer stations with printers (lab) Old ARC site 13 computers (coaches) Lab for registration 12 computers, printer and math software 3 computers 10 computers more info. Library/ASC computers combined Mac mini combined Mac mini combined Computer combined Computer combined $ $ $ $ White board monitor would not require bulbs White board monitor would not require bulbs S I O S C $ Status S F 300 300 300 300 Unallocated Measure Q Funds P P P P P P P P P P P P P P P P P P P P P P P P P Page 1 COP DISTRICT DEFERRED MAINTENANCE SMALL CAPITAL PROJECT PRIORITY LIST, PHASE I Program Review - Technology Items Summary and Prioritization - DRAFT - (5/27/10) Campus Eka Eka Department Art Art General Technology Res Life Eka Library Eka Biology Eka HRC Eka English Eka English Eka Campus DN Campus DN Speech Eka Advise Eka EOPS Eka Advise Eka DSPS Eka DSPS Eka DSPS Eka A&R Eka HRC Eka A&R Eka Cal-SOAP Eka Counsel Eka Advise Eka DSPS / Biology Eka Building -Room Priority CA 136 CA 138 dorms Library LS 108 AIS 150 AD 107 department all all Arc 212 ASC EOPS ASC LIGHT center LIGHT center LIGHT center A&R AIS 150 Library Cal-SOAP District ASC LS 108/DSPS District-wide Technolgy Items A&R, Counseling, Eka Financial Aid All Eka Advising, Counseling, Financial Aid Virtual PCs for LRC Eka Eka Project Description - Notes 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Emergency communication system Server and Voyager upgrade Video microscope and Motix image capture software Video recorder Rolling cart for the digital presenter Conference phone T3 network Del Norte direct broadcast capability Presentation remote Fax/copy machine Fax/copy machine Multi-line phone Digital voice recorder TI84 calculators Microphone headsets 2 external hard drives DVD player Attendance database Access database training CBORD Odyssey Judicial System Contribute license Magnifying microscope 75 servers total, all are at least two years of age, some substantially more. Use Virtual Servers to replace Replace edge and local network devices with switches, provide at least 100mbs to all locations. Not inclusive of Backbone at 1gb. Details below. HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch Blackbox 100Mb-10/100Mb Fiber Transceiver HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch Eka Network infrastructure upgrade/update various buildings AD103 AD105 AD106E AD108 AD202E AD203 AD203 AD204 AD204C AJ100B AJ101A AJ110 AT100 AT109EE Other Student SF State Funds C Compliance $ Savings Total Project Est. Cost S I O S C $ Status S F P $3,000 Must be ADA compliant Unallocated Measure Q Funds $200 $500 $500 $1,000 $200 $1,000 $300 $300 $200 Needed? Work request Equipment Equipment Equipment Need more info. combined in progress ADA? in-house training New system may supercede New system to supercede Biology request Utilize existing system components, expand with Ruckus proprietary signal-shaping technology Investigate potential use of HP rx3600 extra capacity These devices would replace the existing network structure, but not accommodate VOIP, those costs higher by ~ 35% P P P P P P P $300 $1,000 use check out PolyComm phones? look into cloud technologies Mentioned in numerous Program Reviews, needed to obtain 95% on-line registration 50+ UniData / Datatel licenses Approximately 150 PC's, all need update/replacement. Server purchased; moving PCs from Labs as replaced Many can be updated based on "Thin Client' or virtual by new units PC technology, extending life of PCs Update network Domain Controllers Provide wireless network capacity for entire campus all Instruction OS P P P P P P P P P P P $120 ~$3000 $100,000 P $2040 per $102,000 + license, plus $12,000 annual renewal $ 30,000 P Document Imaging system various various Replace servers more than 2 years of age Safety I P P P P 2 District wide LRC If Phased In - Cost per Year S Factors White board monitor would not require bulbs White board monitor would not require bulbs 1 All 8/9/2010 Project Name Priority $ $ 5,000 7,000 $ 30,000 $ 20,200 P P P $240.00 $480.00 $480.00 $240.00 $480.00 $480.00 $240.00 $240.00 $240.00 $240.00 $240.00 $180.00 $240.00 $240.00 Page 2 COP DISTRICT DEFERRED MAINTENANCE SMALL CAPITAL PROJECT PRIORITY LIST, PHASE I Program Review - Technology Items Summary and Prioritization - DRAFT - (5/27/10) Campus Department Building -Room Priority AT129 AT130 AT133F CA113CC CA113CC CA124 CA126 FM200 FM212 L106 L106 LS101A LS101A LS111B MH100 MT101 PE103EE PS110 PS116 PS118 PS200A PS200A SU103C T20-100 T80-103S T80-103S T90-100 WH102 Various 8/9/2010 Project Name HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch Cisco 2811 10/100Mb Router Blackbox 100Mb-10/100Mb Fiber Transceiver HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch Cisco Catalyst 2960 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch Blackbox 100Mb-10/100Mb Fiber Transceiver HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch Blackbox 100Mb-10/100Mb Fiber Transceiver HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch Blackbox 100Mb-10/100Mb Fiber Transceiver HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch Blackbox 100Mb-10/100Mb Fiber Transceiver HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch HP Procurve 2124 24-Port 10/100Mb Switch Cabling/Connectors/Miscellaneous Hardware Project Description - Notes If Phased In - Cost per Year Priority S Safety Factors I Instruction OS Other Student SF State Funds C Compliance $ Savings Total Project Est. Cost S I O S C $ Status S F Unallocated Measure Q Funds $240.00 $240.00 $2,800.00 $180.00 $240.00 $240.00 $240.00 $240.00 $240.00 $1,000.00 $4,800.00 $240.00 $180.00 $240.00 $240.00 $240.00 $180.00 $480.00 $240.00 $240.00 $360.00 $720.00 $240.00 $480.00 $180.00 $240.00 $240.00 $240.00 $500.00 Page 3 COP