PLANNING DATA

advertisement
PLANNING DATA
The Strategic Plan and Educational Master Plan for College of the Redwoods (CR or the District) serve as the foundation for the development of this Facilities Master Plan. Overall, the planning
data provides evidence that CR controls excess facility capacity. Utilities, maintenance, repair, custodial and other costs required to service this excess space increases operating expenditures
and effectively siphons away funds that might otherwise be used for activities aimed at improving student learning outcomes. As a result, the planning data points to a critical need for the District
to reduce leased/rented space costs and to maintain excess capacity in large contiguous vacant spaces to facilitiate leasing out this space to partners to offset these unaviodable operating costs.
Full-Time Equivalent Students (FTES) and Headcounts Forecasts
The FTES and headcounts charts below shows the District's recent student enrollment history. The forecast is primarily based on the assumption that no additional state enrollment growth
funding will be available, or only limited funds will be available on a sustained basis. The District's conservative forecast is to maintain a sustainable level of student enrollments and to consider
accepting state enrollment growth funding only in small annual increments. The CO's 2013-14 Five-Year Capital Outlay Plan five-year enrollment growth forecast projects a 16% through 201718, which is higher than the District's more conservative forecast.
Enrollment History and Forecast: This chart shows the Total FTES from the District's Apportionment Attendance Reports.
YEAR
FTES
Change
Percent Change
2007-08
4,755
2008-09
5,273
517
10.9%
2009-10
5,542
269
5.1%
2010-11
5,221
(321)
-5.8%
2011-12
4,744
(477)
-9.1%
2012-13
4,465
(279)
-5.9% (Assumes November 2012 tax initiatives fail)
2016-17
4,600
135
3.0%
Student Headcounts by Location
YEAR
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2016-17
8/22/2012 3:26 PM
Eureka & 101
Cooridor
7,646
8,289
9,022
8,321
6,993
6,581
6,800
Del Norte &
Klamath
1,177
1,401
1,521
1,364
1,199
1,128
1,200
Mendocino &
Southern
Humboldt
918
1,085
977
875
788
742
800
Online
Total
1,425
2,186
2,164
1,936
2,296
2,161
2,200
11,166
12,961
13,684
12,496
11,276
10,612
11,000
1
Change
1,795
723
-1,188
-1,220
-664
388
Percent
Change
16.1%
5.6%
-8.7%
-9.8%
-5.9%
3.7%
Facilities Master Plan Evaluation2.xlsx Planning Data
Space inventory
The Controlled Space Inventory chart reports our inventory of facilities space by category. Most of the categories appear to be self-explanatory, except that AV/TV is basically distance learning,
and Other space is comprised of both instructional (physical education, performing arts, and child development) and non- instructional support space that is essential to fulfilling the educational
mission at each campus. The report includes only that space which is 100% controlled by the District, such as owned and leased facilities. As a result, certain facilities where students may
engage in learning activities, such as a local hospital, are not included in these figures. The District's 381,000 assignable square footage represents about 0.77% of the entire California
Community College system's 49,448,000 total square footage. Systemwide, there is a forecasted shortage of 18,945,000 square feet of assignable space, so the District's excess capacity is not
reflective of the system's shortage.
Space Inventory (Assignable Square Footage):
Location
Lecture
Lab
Eureka
36,908
83,397
Del Norte
4,939
6,341
Mendocino
3,067
15,434
Total
44,914
105,172
Office
36,639
3,400
2,672
42,711
Library
28,692
3,185
2,785
34,662
AV/TV
2,506
0
307
2,813
Other
144,284
4,347
1,761
150,392
Total
332,426
22,212
26,026
380,664
Facility Load Ratios
Title 5 of the California Administrative Code prescribes a set of benchmark standards for the utilization and planning of most educational facilities in public community colleges using Weekly
Student Contact Hour (WSCH) projections. The CO's 2013-14 Five-Year Capital Outlay Plan notes, As defined in title 5, California Code of Regulations, WSCH means “the product of the
number of students and the scheduled class periods in which they are enrolled, in graded and ungraded community college classes convened prior to 10 o’clock pm during a census week. A
class period is not less than 50 minutes and not more than 60 minutes.” (tit. 5, CCR, §57001(e).) WSCH increase and decrease in roughly the same proportions as FTES. The facility capacity-toload ratios (the percentages) are noted in the chart below. The ratios are compared across the State to determine eligibility for state funded building space. Basically, a lower capacity-to-load
ratio equates to a greater need for additional space, according to this calculation. A 100% ratio would be considered in-balance, while a lower percentage indicates a need for additional space
and a higher percentage indicates excess space. The chart below indicates that the District has more facilities than are needed for its level of student enrollments.
Facility Load Ratios
Item
Projected Student Load
Projected Facility Capacity
Capacity-to-Load Ratio
Lecture
55,283
105,814
191%
Lab
17,285
39,780
Office
118
279
Library
32,642
35,350
AV/TV
17,161
2,599
230%
236%
108%
15%
Total
122,489
183,822
150% (Higher percentage equates to excess capacity)
Chancellor's Office Capital Outlay Projects
The CO's 2013-14 Five-Year Capital Outlay Plan identifies projects across the state. The CO prioritizes projects into three major categories as shown in the chart below. Due to the level of nonstate funding required, the District will not be able to move forward with most of the projects on the CO's list.
8/22/2012 3:26 PM
2
Facilities Master Plan Evaluation2.xlsx Planning Data
Chancellor's Office Capital Outlay Project Priorities - Includes state funded & non-state funded dollars
A Critical Infrastructure Deficiencies
2013-14
All other years
CO Total
A-1 To provide safe facilities and activate existing space: life/safety projects
CR
-
All other Districts
-
147,322,000
-
147,322,000
-
A-1 Subtotal
-
147,322,000
147,322,000
A-3 To provide safe facilities and activate existing space: seismic deficiency projects
CR Art building (renovate/replace. requires $1.3 million non-state funding)
7,185,000
7,185,000
CR Utility infrastructure replacement/seismic strengthening (all state funding)
3,498,000
-
35,434,000
38,932,000
All other Districts
2,111,000
117,229,000
119,340,000
A-3 Subtotal
5,609,000
159,848,000
165,457,000
A-4 To provide safe facilities and activate existing space: immediate infrastrucure failure projects
CR
-
-
-
All other Districts
9,802,000
90,759,000
100,561,000
A-4 Subtotal
9,802,000
90,759,000
100,561,000
15,411,000
397,929,000
413,340,000
A TOTAL
B/D/E Enrollment/Caseload/Population
B To provide adequate and usable instructional space: projects to increase instructional capacity
CR Health Services/Student Services - Del Norte (requires $2.9 million non-state funding)
-
8,244,000
8,244,000
CR Construction Fine Woodworking building - Mendocino (requires $361 thousand non-state funding)
-
5,492,000
5,492,000
All other Districts
890,352,000
10,698,143,000
11,588,495,000
B Subtotal
890,352,000
10,711,879,000
11,602,231,000
D-1 To promote a complete campus concept: projects to provide PE, arts, child care
CR
8/22/2012 3:26 PM
-
-
-
All other Districts
58,754,000
1,249,620,000
1,308,374,000
D-1 Subtotal
58,754,000
1,249,620,000
1,308,374,000
3
Facilities Master Plan Evaluation2.xlsx Planning Data
Chancellor's Office Capital Outlay Project Priorities - Includes state funded & non-state funded dollars
D-2 To promote a complete campus concept: projects to provide cafeterias, shops/warehouses
CR
2013-14
All other years
-
-
CO Total
-
All other Districts
79,400,000
255,017,000
334,417,000
D-2 Subtotal
79,400,000
255,017,000
334,417,000
E To provide instructional support services facilities: projects to increase instructional support services capacity
CR
-
-
-
All other Districts
131,052,000
434,236,000
565,288,000
E Subtotal
131,052,000
434,236,000
565,288,000
1,159,558,000
12,650,752,000
13,810,310,000
B/D/E TOTAL
C/F Facility/Infrastructure Modernizattion
C To provide adequate and usable instructional space: projects to modernize instructional space
CR Renovation/modernization Health Occupations/Applied Technology building (requires all non-state funding)
CR modernization & additions to the Del Norte Center (requires all non-state funding)
CR modernization & additions to the Mendocino Coast Center (requires all non-state funding)
6,538,000
435,000
2,979,000
4,834,000
-
6,538,000
5,269,000
2,979,000
All other Districts
528,090,000
9,977,652,000
10,505,742,000
C Subtotal
538,042,000
9,982,486,000
10,520,528,000
F To provide instructional support services facilities: projects to modernize instructional support services capacity
CR
-
-
All other Districts
71,665,000
246,106,000
317,771,000
FSubtotal
71,665,000
246,106,000
317,771,000
609,707,000
10,228,592,000
10,838,299,000
1,784,676,000
23,277,273,000
25,061,949,000
C/F TOTAL
GRAND TOTAL CALIFORNIA COMMUNITY COLLEGE CAPITAL OUTLAY
8/22/2012 3:26 PM
-
4
Facilities Master Plan Evaluation2.xlsx Planning Data
CR Facilities Planning Committee Proposed Five Year Capital Outlay Plan Rankings
Due to the level of non-state funding required, the District will not be able to move forward with most of the projects on the list. Facilities Planning Committee (FPC) provided rankings as listed
below. The two projects prioritized by the CO as Critical Infrastructure Deficiencies were both placed as FPC ranking 1 due to health and safety concerns. Should state funding be delayed for
the Critical Infrastructure projects, then the backup plan would be to delay the projects. If immediate health and safety concerns arose during the interim, then a smaller project of scope
necesary to mitiagte the immediate health adn safety concern would be implemented.
CO Priority
Project
A-3 CR Art building (renovate/replace)
A-3 CR Utility infrastructure replacement/seismic strengthening
B CR Health Services/Student Services - Del Norte
B CR Construction Fine Woodworking building - Mendocino
C CR Renovation/modernization Health Occupations/Applied Technology building
C CR modernization & additions to the Del Norte Center
C CR modernization & additions to the Mendocino Coast Center
Subtotal projects already on the CO's priority list
FPC Rank
1
1
Non-state
1,300,000
2,900,000
361,000
6,538,000
5,269,000
2,979,000
19,347,000
State
5,885,000
38,932,000
5,344,000
5,131,000
55,292,000
Total
7,185,000
38,932,000
8,244,000
5,492,000
6,538,000
5,269,000
2,979,000
74,639,000
CO Priority
Project
Additional Projects for CR Five Year Capital Outlay Plan:
CR Sewer main to replace on-site waste treatment plant
$1,200,000 will need to be identified with help from partners.
$500,000 might possibly come from utility infrastructure project above.
Modernize auxiliaries (Housing, Bookstore, Dining, Parking) funded by the
respective auxiliary
Districtwide deferred maintenance plan
Tim to provide project cost estimate?
Projects listed on CR's most recent 5-year construction plan, but not on the CO's list:
Student Union conversion to Culinary Arts - Remove
Computer Center - Del Norte
Tim to provide project cost estimate?
FPC Rank
Non-state
State
Total
1,200,000
1,000,000
Measure Q projects previously ranked for funding, but not yet funded:
Stadium scoreboard, roof, stands, walkways, field
Roof replacement (see "modernize auxiliaries" above)
HVAC, boiler equipment
Energy conservation
Carpet replacement
Maint & Dining equipment, mini-bookstore, portable bldgs
8/22/2012 3:26 PM
500,000
1,000,000
???
???
-
???
???
-
800,000
3,300,000
360,000
140,000
80,000
5
1,700,000
800,000
3,300,000
360,000
140,000
80,000
Facilities Master Plan Evaluation2.xlsx Planning Data
Subtotal Changes
6,880,000
Project management on changes @ 3%
Contingency on changes @ 10%
Total Changes less $500,000 already included in utility infrastructure above
6,880,000
8/22/2012 3:26 PM
6
500,000
-
7,380,000
221,400
738,000
7,839,400
Facilities Master Plan Evaluation2.xlsx Planning Data