B 4, 92 0 D 3 C 9,892 0 Lobby Demolition 0 Meeting Room Meeting/Teaching Space Entrance/Waiting 1 A: 23 m2 5,000 A: 38 m2 A: 25 m2 Projector screen A A: 8 m2 Open Plan Office Existing column locations are indicative and exact locations can not be confirmed until demolition works have started on site Office 2 A: 16 m2 4, 83 9 Keycard access ew w 2 do 4 person Office in A: 22 m2 Fridge w A: 10 m2 4 124 Meeting/Teaching Space Water boiler N Office 1 w A: 33 m2 ith in 4,680 Projector screen lw al l A: 12 m2 na Staff tea point r te ex 3 g 5 Water cooler 2,431 Keycard access Keycard access Keycard access Circulation A: 49 m2 New Vinyl floor finish 1800 Keycard access 6 Glazed screen Student Hub A: 34 m2 Keycard access 3,777 72 tin is ex 3, Existing WCs to be fully refurbished Student Hub Glazed folding / demountable screen A: 66 m2 Glazed screen Glazed doors & screen 7 Lobby A: 7 m2 2,041 Acoustic folding / demountable screen Description C2 Project Date B Issued for client comment 22.05.13 C Issued for client comment 30.05.13 D Issued for client comment 17.06.13 E Issued to design team 20.08.13 F Issued to design team 23.09.13 G Revised and issued to design team 25.10.13 8 4,441 C1 Revision 2,815 3 0 ,3 New wall construction 350 14 E 9,269 Law School Extension 72 - 82 Rosebery Avenue London EC1R 4RW Tel: 020 7833 9974 Fax: 020 7833 8255 E mail: london@bmjarchitects.co.uk Title AM Dwg No Ground floor plan, as proposed Job No Checked Drawn by SG 2960 Revision Scale AL(00)04 1:100@A3 G Date May 2013