Page 1 Cameron University Banner Project Meeting Agenda and Notes Committee/Meeting Name October 26, 2009 Date Location Admin 201 Members Present Members Absent Banner Technical Team Time Convened 10:00 am Recorder May 29, 2016 Time Terminated Julie Duncan Visitors Topics Minutes from Oct 19 Next meeting Update from Sherry Discussion, Information Action Taken, Decisions, Recommendations, Time Line Approved November 2 1. ODS: Dawne and Kurt are administrators a. Update 1. 2. Nolij: Kelly is the administrator (Julie is helping with general person) a. Progress on transferring general person from legacy to Banner b. Update on transferring admission history 3. e-Print: Greg, Chase and Kurt are the administrators a. We need the list of what reports will be in e-Print to determine participants 4. E-Vision: Rick and Cheryl are the administrators a. Status on intellecheck and FormFusion 2. 5. AppWorx: Greg and Chase are the Administrators; Angela 5. 3. 4. ODS/Cognos Update: On hold pending a conference call with Paul from TCC. There are apparently some problems associated with Sungard package upgrades. Paul stated: “Also… I’ve discovered something (this week) that may have a huge impact on our package redesign (and not in a good way). Stated short and sweet – renaming data items in the SunGard delivered model creates huge overhead on an upgrade.” Kurt and Dawne are very concerned about this. Hopefully Paul will shed some light on the situation for us this week. Nolij is scheduled to start the online Banner application interface 11/30/09. End user training with online applications are planned for Dec. ’09. ACT & EOS tape load for recruiters are planned for Jan. ‘10 Sherry is working on the reports doc. This may be matched against the Cognos licensing to ensure all users will continue to have access to required reports. Waiting on response from Ninette for the p.o. form. HigherOne process needs to be activated. Transcripts will need to be completed in Mar – Apr ’10 timeframe for late August go live. Info for training emailed to tech team. Trainer will setup Page 2 Topics Cameron University Banner Project Meeting Agenda and Notes Discussion, Information May 29, 2016 Action Taken, Decisions, Recommendations, Time Line will be the technical lead a. Update – Angie: Appworx Training agenda and notification to participants for Oct. 27-29th Go through checklist prior to training 6. Workflow: Greg and Rick are the administrators a. Update – Rick: SQL for Workflow notification and materials to participants for Oct. 20-22nd Go through checklist prior to training 7. Luminis: Julis is the administrator a. Update 8. Update on interfaces/extracts a. Early Alert: 9/10/10 b. Blackboard Connect-Ed: 8/15/10 c. ID Card: 8/1/10 d. Library interface: 11/30/09 e. Clean Address for HR, FI, AD & FA: 2/1/10 f. Clean Address for ST: 8/10/10 g. Diplomas: 7/31/10 h. Directory Labels: 11/23/09 9. Installations: a. Nolij Week of August 25 b. Workflow week of September 13, 2009 c. AppWorx week of September 1 10. Patches/Upgrades a. Week of September 7: Integration components 8.0.1 (Carlos recommended) upgrade i. Luminis and FA 11. Production Transition document discussion – anyone detect any issues? 6. 12. Integrating Banner access into existing user management system. What are the plans and the go live date to have user management updated? 13. A list of expertise needs to be defined for the help desk when the question is beyond their knowledge. 12. users for training in S Shep 407. It was suggested we need to take down JInitiator and use Java plug-ins. Oracle no longer supports JInitiator. ILT needs to tell users to contact HD for assistance when they have unsuccessful attempts with JIniator and should install Java plug-ins. Sherry will test steps. Completed SQL training last week (10/20-10/23). Sherry will find out the number of hours Judson proposes for WF tasks. ILT must establish procedural steps for creating workflows. 7. Nothing to report at this time. 8. Kurt is working on the library interface and the pay tape for OSF submission. Cheryl plans to complete directory labels by 10/30/09. 9. Appworx installed on PROD 10/20. ODS and Cognos still need to be installed on PROD. 10. System is to be down for upgrades on Oct. 30 and Nov. 6 11. The document is in excellent shape with good dates. Sherry is checking with Mike for the system to be accessible to tech team and functional leads by 8 a.m. on 1/22/10. A/R loads are set for 7/1 and go live set for 7/6/10. Chase is working on this now. 13. FAQs should be prepared by all teams for AA. ILT should define their help desk person and add to the following list: Page 3 Cameron University Banner Project Meeting Agenda and Notes Topics a. May 29, 2016 Discussion, Information Action Taken, Decisions, Recommendations, Time Line Discuss assistance form for end users Margot: Bb Online Learning; Turnitin; Student Accounts; Student Issues Dawne: ST; ODS/Cognos Kurt: HR/Payroll; ODS/Cognos; ePrint; Library Patron Extracts Rick: Finance; Workflow; Higher One; Bb Card Access; EVision Chase: Database errors; User Access; Browser Issues; System Errors; Clean Address Kelly: ST; Online App; Nolij; Diplomas; Directory Labels Greg: System Errors; Database Errors; Early Alert; Bb Connect-Ed; e-Print; Workflow Cheryl: HR/Payroll; User Access; Directory Labels; E-Vision Angela: FA, AD, Appworx Julie: Luminis; Browser Issues; SSB Help Desk: Browser issues; login issues The functional leads also need to define their help desk person More discussion is required for this. 14. Cameron’s code tree for Banner ($CAMERON_HOME) on dev-db01: Keeping the directory structure similar to that of Banner’s Code tree ($BANNER_HOME) will make the Banner Upgrade process easier. That way if mods are made to existing files in $BANNER_HOME we can identify the mod easily in Cameron's Banner Code tree ($CAMERON_HOME). What about naming of new files? How about keeping this similar to the standard of what we have for IFAS except change the module name so that they match Banners? Ex. rim = student alumni arsys finaid finance general payroll posnctl 14. WF SQL Training Report Page 4 Topics Cameron University Banner Project Meeting Agenda and Notes Discussion, Information May 29, 2016 Action Taken, Decisions, Recommendations, Time Line Naming Conventions – samples from Judson??? Has this been decided - Store all workflow objects in WFOBJECTS. Yes, DBA approves Ask that IT staff be able to Create and Drop from WFOBJECTS Yes, DBA approves and can allow functionality DBA to create a process to move code from TEST to PROD. Auditors will ask how this is done. Roles – associate users and roles. Determine CU roles. DEVL – more access given - IT developers need to test TEST – fix roles for users, remove IT role(s), users test. PROD – move from TEST to PROD, roles should not have to change. 15. # of forms opened in GUAINST set to 4 in TEST and PPRD discussion 16. Replacing 3Com CoreBuilder with Cisco enterprise network switch planned for Nov. 13, pending E.C. approval 17. Any other topics? Task Lists Tech Team & ITL Tech Team & Continue to update: W:\workgrps\its_share\Banner\BANNER Data handling.docx – OSRHE info needs to be added and which DBs it will be reported from Data cleanup - ongoing process This will be suggested to ILT and implemented 10/21/09 after ILT meeting. This will shut down everything except for the dorm and village residents and video conferencing. Card swipe system might be affected as well. The data is stored in the reader in the event of network issues, but we should have a contingency plan for housing and OPS to be ‘on call’ in case the readers do not hold the data. Cash register data is supposed to be stored until the network is available and it is uploaded after connectivity is restored. As a contingency plan, a list will need to be prepared for Sodexo. Wireless will also be down. Best case scenario for downtime is 30 minutes to an hour and worst case, several hours. Page 5 Cameron University Banner Project Meeting Agenda and Notes May 29, 2016 Functional Areas Tech Team Debbie Decision re: no mods to Baseline Banner: possibly w/ the exception of fed & state mandates?? Research best practices for keeping 3rd party software in sync with Banner upgrades and patches Update Milestone Certification & keep up-to-date Scott & Debbie Physical Facilities needs a key control system Tech Team Julie started a Go-Live Checklist document at w:\workgrps\its\banner Please add to it so that we remember to do everything after each conversion. This should be our checklist of things that must be done after the conversion scripts but before we let the users in for testing. Patch management procedures documented and request form. Tech Team Greg, Chase & Debbie ILT Debbie Reviewing critical programs for go live and all programs required @ go live Identify what needs to be setup through FormFusion and Intellecheck Actionline support procedure ILT & Tech Evaluate load testing timeline for luminis and production ssb/inb. Will December 8 – ST’s CRP be a possibility? Debbie Seek input on client-side software for visually-impaired. Actionline never responded. Posted to BGENERAL and received two responses that I will be following up on. Debbie Work on FAQ Debbie Follow-up on PCs in S Shep 407 not allowing users to connect Debbie Browser issues: a. Turnitin requires IE7 or above b. Bb works well w/ IE7 or above c. Bb does not work well with IE6 d. Bb does not work well with Firefox e. Banner requires IE7 f. Firefox 3.5.2 will not work with IE8 g. INB will not work with IE8 Gather Blumen info and contact vendor to populate Blumen DB from Banner. ILT & Tech Debbie One of the respondents to my visually-impaired question said Banner and IE7 had problems working together w/ their software. I will follow-up on this. Info received from Blumen and forwarded to Linda Phillips, Jennifer Holland, Sherry Hendrix and Dawne Massey