Approved Projects MTSU Sustainable Campus Fee (SCF) Program 2006-07 2007-08 2008-09 2009-10 $ 220,000 $ 230,000 $ 230,000 $ 230,000 Green Power Purchase Alternative Fuel (Biodiesel) Production Project AMX Resource Mgmt Suite System Upgrade- ITD Atrium lighting project for Walker Library Bioremediation of barbiturates for ecofriendly composting Blast hand dryers for Campus Rec Bring green chemistry to campus Bus conversion to run on used cooking oil Campus Rec indoor pool LED lights Change hot water valve tops in Murphy Center Chilling plant: pressure gauges installation Clean/replace coils multiple buildings (AMG, Mass Comm, Forest Hall, Voorhies, JUB, Fairview, KUC, Telecomm, BDA, Wiser Patten, TN Livestock Cntr, McFarland, Murphy Center first floor) 'Clickable' Polymers Closed loop sediment filtering system multiple buildings (KUC, Walker Library, Murphy Cntr, Todd, Stark Ag, VET, LRC, Mass Comm, Jones. Cope, Cason Kennedy; EHS, and other buildings) Conduct light level studies in Todd, Mass Comm, BAS, Peck $ 15,000 $ 31,450 $ 20,157 $ 15,100 $ 600 $6,502 $ 1,000 $ 10,288 $ 12,000 $ $ 7,490 28,900 $ 30,900 $ 5,500 $ 8,500 $ 3,000 Convert vehicle to operate on natural gas/installation of compressed gas station Creating MTSU as a bicycle friendly university Creation of a rain garden to assist with storm water run off Data Loggers for Energy Efficiency Analysis Dehumidifier project Dehumidify Voorhies Room 108 Development of a biosensor to detect hydrogen production Development of flex-fueled engine 1 and 2 (sun and hydrogen) Dorm room recycling bins pilot program DRIPS Project (Development and Research into Pervious Surfaces) Energy Books purchase Environmentally Friendly Bio-Composting of Toxic Horse Carcasses FLIR i7 compact infrared camera for energy audits Golf cart conversion 1 and 2 (electric to solar) Hot/chilled water valve assessment HVAC controls replacement Wright Music HVAC pocket filter project (BAS Phase 1 & 2, JUB Phase 1 & 2, Walker Library Phase 1 & 2, Honors, DSB, Todd, McFarland, Stark Ag, LRC, Holmes, COE, Murphy Center first floor, Photography, Peck; BDA) Hybrid/Alternative fuel vehicle purchase (subsidy) Hybrid car project Increasing Production Capacity of Biodiesel Infrared thermometer guns Install 10kW solar system Install FilterPave Porous Pavement in parking lot on Champion Way Install frequency drive in BDA Install milk cooling system Installation of a geothermal cooler system on the MTSU farm Installation of programmable thermostats in F/S maintenance shops Installation of variable speed compressor in the Central Utilities Plant Insulate pipes- DSB, WPS, SFA, Wright Music, Ellington, Murphy Center, Stark Ag, McFarland, AMG; Todd, TLC, CKN, Midgett; Mass Comm, Peck Kenaf Agriculture for Sustainable Community (alternative energy crop) Lamp crusher Laser alignment devices LED lamps in Mass Comm and Peck Library book purchase Light switch plate labels Multi-fuel bus emission testing project Occupancy sensors Honors Building Permeable Pavers for Sustainable Learning Environment (Forest Hall) Pleated filter project Poster campaign and Earthwise reusable bag project Progression towards becoming a bicycle friendly Univ./ advancing the project Promotion of SCF Program Protreat (kills mold in air handling unit pans) Purchase & installation of surge protectors Purchase of organic dyes to be used in organic dye sensitized solar cells Rain Gardens/Bioremediation Ponds on MTSU Campus for MS4 Compliance/Maintenance Re-caulk exterior windows (Davis Science Building) Recycling - community drop-off relocation/expansion Recycling containers/supplies for MTSU Recycling Program Recycling- increase behavior thru behavior science principles Recycling at special events pilot program Re-lamp Cason Kennedy Nursing Building (existing portion) and Fairview 2010-11 2011-12 2012-13 2013-2014 $ 230,000 $ 230,000 $ 230,000 $ 150,000 $ 2,500 $ 7,500 $19,366 $16,846 $ 11,270 $ 13,066 $ 6,204 $ 30,900 $4,100 $15,450 $ 46,650 $ 15,750 $ 4,000 $ 3,000 40,235 $ 4,801 $ 15,000 $ 17,000 $ 4,427 30,668 $ 1,000 19,295 $38,169 $2,100 $ 11,500 $4,250 $ 13,000 $ 41,000 $ 13,500 $ $ $ $ 1,823 8,894 $ 2,000 3,450 10,500 5,000 29,950 $ $ $ $ 6,250 $ 41,507 $ 19,250 $25,806 $ 17,250 $ 9,965 $37,337 $ 5,000 $500 $ 81,224 $ 18,665 $ 12,777 $ 17,500 $ $ $ $ 27,150 $ 24,000 1,200 5,935 4,000 $ 5,681 $ 39,562 $ $ 4,500 $ $ 3,372 13,050 2,500 $ $ 10,944 18,160 $ $ $1,400 $ $ 1,904 1,100 $4,000 $ $ $ 3,000 1,500 $ $ 30,600 $ $ 3,000 14,000 5,000 $ 30,600 5,500 $ 6,000 $ 13,500 $5,500 $ 6,500 $ $ $ 17,500 1,300 3,500 MTSU Sustainable Campus Fee (SCF) Program Approved Projects 2006-07 2007-08 Replace filters in AHU & clean coils in CKN & KOM Replace old V-Belts system Replace older motor with energy efficient motor in Holmes; Wright Music; Murphy Center Phase 1 & 2 Replace older motors with energy efficient motors-Stark Ag. Replace use of Helium in DSB with Hydrogen generated via electrolysis $ 35,000 Replacement of exterior windows McFarland and Holmes Replacement of incandescent lamps in Murphy Center ReRev Cardio System elliptical machines in Rec Center Self sustainability Initiative through Alternative Horticulture Server consolidation/Virtualization/Blade servers-ITD Server consolidation/Visualization- Health Services Solar attic fans in Ellington Human Science Solar boat project Solar exhaust fans Steam trap ultrasonic test equipment Student Suitabilities Education Initiative Studio lighting installed in Mass Comm and LRC $ 8,000 Sub-metering for Chilling Plant and Murphy Cntr Test & balance hot water system- KUC Tree planting project Turning manure into gold Ultrasonic transmitters Midgett Variable Frequency Drive- Jones Hall Water bottle filling stations- Rec Center WMTS-FM 88.3 Solar Power Supply Project Annual Total: $ 339,000 $ 425,704 2008-09 2009-10 2010-11 $ 11,312 $ 2,900 2011-12 2012-13 $2,279 $ $ 2013-2014 $ 26,180 $ 14,160 10,000 47,000 $ $ 32,500 20,000 $ 6,165 $ $ 12,716 3,000 $ 3,400 $ 440,810 5,300 25,000 $5,729 $ $ 30,000 20,000 $ 21,000 $ $ $ 21,708 $16,720 $12,212 $ 2,600 $ $ $ $ 2,500 22,960 1,000 18,130 $ 333,895 $ 406,162 $ 483,984 $ 5,225 $12,000 $ $ 419,334 $ 19,900 510,417