Approved Projects 2006-07 2007-08 2008-09

advertisement
Approved Projects
MTSU Sustainable Campus Fee (SCF) Program
2006-07
2007-08
2008-09
2009-10
$ 220,000 $ 230,000 $ 230,000 $ 230,000
Green Power Purchase
Alternative Fuel (Biodiesel) Production Project
AMX Resource Mgmt Suite System Upgrade- ITD
Atrium lighting project for Walker Library
Bioremediation of barbiturates for ecofriendly composting
Blast hand dryers for Campus Rec
Bring green chemistry to campus
Bus conversion to run on used cooking oil
Campus Rec indoor pool LED lights
Change hot water valve tops in Murphy Center
Chilling plant: pressure gauges installation
Clean/replace coils multiple buildings (AMG, Mass Comm, Forest Hall, Voorhies,
JUB, Fairview, KUC, Telecomm, BDA, Wiser Patten, TN Livestock Cntr, McFarland,
Murphy Center first floor)
'Clickable' Polymers
Closed loop sediment filtering system multiple buildings (KUC, Walker Library,
Murphy Cntr, Todd, Stark Ag, VET, LRC, Mass Comm, Jones. Cope, Cason Kennedy;
EHS, and other buildings)
Conduct light level studies in Todd, Mass Comm, BAS, Peck
$
15,000
$
31,450
$
20,157 $
15,100
$
600
$6,502
$
1,000
$ 10,288
$
12,000 $
$
7,490
28,900 $
30,900
$
5,500
$
8,500
$
3,000
Convert vehicle to operate on natural gas/installation of compressed gas station
Creating MTSU as a bicycle friendly university
Creation of a rain garden to assist with storm water run off
Data Loggers for Energy Efficiency Analysis
Dehumidifier project
Dehumidify Voorhies Room 108
Development of a biosensor to detect hydrogen production
Development of flex-fueled engine 1 and 2 (sun and hydrogen)
Dorm room recycling bins pilot program
DRIPS Project (Development and Research into Pervious Surfaces)
Energy Books purchase
Environmentally Friendly Bio-Composting of Toxic Horse Carcasses
FLIR i7 compact infrared camera for energy audits
Golf cart conversion 1 and 2 (electric to solar)
Hot/chilled water valve assessment
HVAC controls replacement Wright Music
HVAC pocket filter project (BAS Phase 1 & 2, JUB Phase 1 & 2, Walker Library
Phase 1 & 2, Honors, DSB, Todd, McFarland, Stark Ag, LRC, Holmes, COE, Murphy
Center first floor, Photography, Peck; BDA)
Hybrid/Alternative fuel vehicle purchase (subsidy)
Hybrid car project
Increasing Production Capacity of Biodiesel
Infrared thermometer guns
Install 10kW solar system
Install FilterPave Porous Pavement in parking lot on Champion Way
Install frequency drive in BDA
Install milk cooling system
Installation of a geothermal cooler system on the MTSU farm
Installation of programmable thermostats in F/S maintenance shops
Installation of variable speed compressor in the Central Utilities Plant
Insulate pipes- DSB, WPS, SFA, Wright Music, Ellington, Murphy Center, Stark Ag,
McFarland, AMG; Todd, TLC, CKN, Midgett; Mass Comm, Peck
Kenaf Agriculture for Sustainable Community (alternative energy crop)
Lamp crusher
Laser alignment devices
LED lamps in Mass Comm and Peck
Library book purchase
Light switch plate labels
Multi-fuel bus emission testing project
Occupancy sensors Honors Building
Permeable Pavers for Sustainable Learning Environment (Forest Hall)
Pleated filter project
Poster campaign and Earthwise reusable bag project
Progression towards becoming a bicycle friendly Univ./ advancing the project
Promotion of SCF Program
Protreat (kills mold in air handling unit pans)
Purchase & installation of surge protectors
Purchase of organic dyes to be used in organic dye sensitized solar cells
Rain Gardens/Bioremediation Ponds on MTSU Campus for MS4
Compliance/Maintenance
Re-caulk exterior windows (Davis Science Building)
Recycling - community drop-off relocation/expansion
Recycling containers/supplies for MTSU Recycling Program
Recycling- increase behavior thru behavior science principles
Recycling at special events pilot program
Re-lamp Cason Kennedy Nursing Building (existing portion) and Fairview
2010-11
2011-12
2012-13
2013-2014
$ 230,000 $ 230,000 $ 230,000 $ 150,000
$
2,500
$
7,500
$19,366
$16,846
$ 11,270
$
13,066
$
6,204
$ 30,900
$4,100
$15,450 $
46,650 $
15,750
$
4,000
$
3,000
40,235 $
4,801
$
15,000
$
17,000
$
4,427
30,668 $
1,000
19,295
$38,169
$2,100
$
11,500
$4,250
$
13,000 $
41,000
$
13,500
$
$
$
$
1,823
8,894
$
2,000
3,450
10,500
5,000
29,950
$
$
$
$
6,250
$ 41,507
$ 19,250
$25,806
$
17,250
$
9,965
$37,337 $
5,000
$500
$ 81,224
$
18,665
$ 12,777
$ 17,500
$
$
$
$
27,150
$
24,000
1,200
5,935
4,000
$ 5,681
$ 39,562
$
$
4,500
$
$
3,372
13,050
2,500
$
$
10,944
18,160
$
$
$1,400
$
$
1,904
1,100
$4,000
$
$
$
3,000
1,500 $
$
30,600 $
$
3,000
14,000
5,000 $
30,600
5,500 $
6,000
$ 13,500
$5,500 $
6,500 $
$
$
17,500
1,300
3,500
MTSU Sustainable Campus Fee (SCF) Program
Approved Projects
2006-07
2007-08
Replace filters in AHU & clean coils in CKN & KOM
Replace old V-Belts system
Replace older motor with energy efficient motor in Holmes; Wright Music;
Murphy Center Phase 1 & 2
Replace older motors with energy efficient motors-Stark Ag.
Replace use of Helium in DSB with Hydrogen generated via electrolysis
$ 35,000
Replacement of exterior windows McFarland and Holmes
Replacement of incandescent lamps in Murphy Center
ReRev Cardio System elliptical machines in Rec Center
Self sustainability Initiative through Alternative Horticulture
Server consolidation/Virtualization/Blade servers-ITD
Server consolidation/Visualization- Health Services
Solar attic fans in Ellington Human Science
Solar boat project
Solar exhaust fans
Steam trap ultrasonic test equipment
Student Suitabilities Education Initiative
Studio lighting installed in Mass Comm and LRC
$
8,000
Sub-metering for Chilling Plant and Murphy Cntr
Test & balance hot water system- KUC
Tree planting project
Turning manure into gold
Ultrasonic transmitters Midgett
Variable Frequency Drive- Jones Hall
Water bottle filling stations- Rec Center
WMTS-FM 88.3 Solar Power Supply Project
Annual Total: $ 339,000 $ 425,704
2008-09
2009-10
2010-11
$ 11,312
$ 2,900
2011-12
2012-13
$2,279
$
$
2013-2014
$
26,180
$
14,160
10,000
47,000 $
$
32,500
20,000
$
6,165
$
$
12,716
3,000
$
3,400
$
440,810
5,300
25,000
$5,729
$
$
30,000
20,000 $
21,000
$
$
$ 21,708
$16,720
$12,212
$
2,600
$
$
$
$
2,500
22,960
1,000
18,130
$ 333,895
$ 406,162
$ 483,984
$
5,225
$12,000 $
$ 419,334 $
19,900
510,417