Réponse R12.1 RÉPONSES DU TRANSPORTEUR À LA DEMANDE DE

advertisement
Demande R-3549-2004
RÉPONSES DU TRANSPORTEUR À LA DEMANDE DE
RENSEIGNEMENTS NUMÉRO 1 DE LA FCEI
Réponse R12.1
Original : 2004-12-07
HQT-10, Document 4.1
(En liasse)
Programme 2004 - Zone de réglage Québec
1. Le programme de conformité du NPCC (RCEP)
(document A-08)
No
Measurement
1
CPS 1
2
CPS 2
3
NPCC RCEP Description
Échéance
Responsabilité
Control Performance Standard 1 (monthly through December 2004)
mensuel
CMÉ
Control Performance Standard 2 (monthly through December 2004)
mensuel
CMÉ
DCS
Disturbance Control Standard (all quarters 2004)
trimestriel
CMÉ
4
A2-1
Area Transmission Review (report period ending December 31, 2003)
04-08-01
PAAR
5
A3-1
Underfrequency Load Shedding (report period ending December 31, 2003)
04-07-01
ESTT/PAAR
6
A3-2
System Restoration Plan (2003)
04-09-01
CMÉ
7
A4-1
Bulk Power System Protection Minimum Maintenance (report period ending December 31, 2003)
04-06-22
ESTT/VPEI
8
A6-1
Ten-Minute Operating Reserve (monthly through December 2004)
mensuel
CMÉ
Échéance
Responsabilité
Testing Requirements for critical components associated with key facilities
(Areas to develop their key facilities list and provide as part of the submittal report)
05-04-01
CMÉ/TC/TEL/
ESTT/VPEI/P
Compensating load shedding requirement of Emergency Operation Criteria (Document A-3 §4-9)
04-06-01
CMÉ/PAAR
2. NPCC NRAP Surveys pour 2004
No
Report
1
A3-4.10.1
2
A3-4.9
3
C-04
Monitoring and reporting requirement for Inter-Area Voltage Control
04-07-01
CMÉ
4
C-05
Monitoring and reporting requirement for Emergency Operation Criteria
04-07-01
CMÉ
5
C-21
Conformance with normal and emergency transfer limits
04-07-01
CMÉ/PAAR
2004-05-11
NPCC NRAP Surveys 2004 / Description
Annexe «B»
Page 1/3
Programme 2004 - Zone de réglage Québec
3. Le programme de conformité du NERC pour 2004
No
Measurement
1
2
3
4
5
6
7
8
9
10
I.A.S1.M1
I.A.S2.M2
I.A.S3.M3
I.A.S3.M4
II.C.M1
III.A.M4
III.A.M5
III.D.S1.M2
III.D.S1.M3
III.D.S1.M4
Programme du NERC pour 2004 / Description
Simulated system performance under normal conditions (no contingency)
Simulated system performance following loss of a single bulk system component
System performance following loss of two or more bulk system elements
System performance following extreme events resulting in the loss of 2 or more bulk system elements
Document methodology(ies) for determining electrical facility ratings
Documentation + implementation of transmission protection system maintenance + testing program
Documentation of protection system misoperations, analyses, and corrective actions
Ensure consistency of UFLS program with NPCC UFLS requirements
Documentation and implementation of UFLS equipment maintenance and testing program
Analysis of UFLS program performance for underfrequency events below the UFLS set points.
11
III.E.M3
Technical assessment of the design and effectiveness of UVLS programs (TDST)
12
13
14
15
16
17
18
19
20
21
22
23
24
III.E.M4
III.E.M5
III.F.S4.M5
III.F.M6
IV.A.M4
P1T1
P1T2
P2T1
P2T2
P3T3
P3T4
P4T2
P4T4
25
P5T1
26
27
28
29
30
31
P6T1
P6T2
P6T3
P8T1
P8T2
P8T3
Implementation and documentation of UVLS equipment maintenance program
Analysis and documentation of UVLS program performance
Documentation of SPS misoperations and corrective plans
Documentation and implementation of SPS maintenance and testing
Documentation of blackstart units test results
Control Performance Standard CPS-1 and CPS-2 (Policy 1, Section A)
Disturbance Control Standard DCS (Policy 1, Section B)
Transmission Operations/Operating Security Procedures (Policy 2, Sec A, Req. 1 and Sec B, Req. 1)
Transmission Operations/Operating Security Procedures (Policy 2, Sec A, Std 2, 2.1, 2.2 + Sec B, Req 3.2.2)
Interchange Transaction Implementation and Electronic Tagging
Interchange Transaction Implementation – Required E-tag revisions for Dynamic Interchange Schedule
System Coordination/Operational Security Information – Policy 4, Section B, Requirements 3 and 3.1
Coordination of Outages – Policy 4, Section B Requirements 3 and 3.1
Emergency Operations/Plan Implementation of Capacity and Energy Emergency plans and
Coordination with other systems – Policy 5, Sec A Req 1 and Policy 6, Sec B Req 2
Emergency Operations/Preparation of Capacity and Energy Emergency Plans – Policy 6, Sec B Req 2
Emergency Operation/Preparation of Restoration Plan – Policy 6, Section D
Emergency Operation/Loss of primary Controlling Facility
Operating Personnel and Training/Responsibility and Authority – Policy 8, Section A
Operating Personnel and Training/NERC Certified System Operators – Policy 8 Section C
Operating Personnel and Training/Training Program – Policy 8 Section B, Req. 1, 1.1-1.7, Appendix B1
2004-05-11
Annexe «B»
Page 2/3
Échéance
Responsabilité
04-08-01
04-08-01
04-08-01
04-08-01
04-12-01
04-06-22
04-06-01
04-07-01
04-06-22
04-06-01
PAAR
04-12-01
PAAR
PAAR
PAAR
PAAR
ESTT/VPEI
ESTT/PAAR
ESTT/PAAR/P
ESTT/VPEI
ESTT/PAAR
ESTT/PAAR/
VPEI/P/D
04-12-01
04-12-01
04-08-01
04-06-22
05-04-01
mensuel
trimestriel
événement
événement
04-10-01
04-10-01
04-07-01
04-09-01
ESTT/VPEI/P/D
événement
CMÉ
04-08-01
04-09-01
04-08-01
04-08-01
événement
04-09-01
CMÉ
ESTT/VPEI/P/D
ESTT/PAAR
ESTT/VPEI
P
CMÉ
CMÉ
CMÉ
CMÉ
CMÉ
CMÉ
CMÉ
CMÉ
CMÉ
CMÉ
CMÉ
CMÉ
CMÉ
Programme 2004 - Zone de réglage Québec
32
33
34
35
36
37
P9T1
P9T2
P9T3
P9T4
VM1
VM2
2004-05-11
Security Coordinator Procedures/ Next day Operations Planning – Policy 9, Section A Req 1, 1.1 and 1.2
Security Coordinator Procedures/ Implementing Transmission system relief
Reliability Coordinator has the authority to direct operating authorities
Security Coordinator Procedures/ Energy Emergency Alerts – Policy 9, Appendix B Requirement 1.1
Vegetation Management – self certification
Vegetation Management – periodic reporting (starting June 1, 2004
Annexe «B»
Page 3/3
04-09-01
événement
04-09-01
événement
04-12-01
événement
CMÉ
CMÉ
CMÉ
CMÉ
ESTT/VPEI
ESTT/VPEI